Loading...
HomeMy WebLinkAbout101011_ca06 Department of Public Works o Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request From: Board of Commissioners Philip Morley, County Administrator Frank Gifford, Public Works Director :Jj1 October 3, 2011 To: Agenda Date: Subject: Execution of Contract Change Order #2 with Anderson Environmental Contracting, LLC, Dismal Creek Culvert Replacement, Upper Hoh Road, M.P. 9.19, Co. Rd. No. 914207, Federal Aid Project No. ER-0701 (051), County Project No. X01736, Statement of Issue: Execution of a contract change order with Anderson Environmental Contracting, LLC for the Dismal Creek Culvert Replacement project, County Project No. X01736. Analysis/Strategic Goals/Pro's & Con's: Emergency repairs were completed at Upper Hoh Road M.P. 4.0 in March, 2007, with construction of 400 lineal feet of armored bank protection. Remaining work consists of mitigation as required by the Washington State Dept. of Fish & Wildlife (WDFW). The mitigation will be satisfied by replacing the fish-passage barrier culvert at Dismal Creek, Upper Hoh Road M.P. 9.19, with a three-sided concrete box culvert. This contract change order will provide for two changes: Part A: the work required for a change in grade for two culvert wingwall footings, Part B: Six additional contract working days to complete the three-sided concrete box culvert. FiscallmpactlCost Benefit Analysis: The cost of the contract change order is Part A: $1,077.33 and no contract days, Part B: $0.00 and six contract days. This will be funded at 86.5% by the Federal Highway Administration and 13.5% by the Jefferson County roads fund. The original contract amount was $258,327.31 Recommendation: The attached contract change order is recommended for your execution. Tl:tis action is recommended, as it will allow for the completion of this project. The Board is asked to sign the contract change order where indicated, and return two signed originals to Public Works (attn. John Wayand). Department Contact: Monte Reinders, P.E., County Engineer 385-9242 tor ~6K~t' Date , Sheet 1 of JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS CHANGE ORDER Change 2 OllIe: 91212011 Order No. Ordered by Couoly Engineer under !elmS of [ElSection 1 - 04. 4 of the Standerd Specifications DChange proposed by Contractor Endorsed by: Anderson Environmental Contracting, LLC .J. ~II ContraeJorFImINt111UJ ~ / L.JJJ...l-)~_~~, II S/gnahUU ~ P , - TUle Consent given by Surely: (when required) Contract No. XOl736 To: Anderson Environmental Contraeting,LLC 70S Colorado Kelso, W A 98626 Project Title Dismal Creek Culvert Replacement Upper Hoh Road M.P. 9.19 By: Attomey-tn-faeJ Date This contract is revised as follows: PART A: This change order adds the new pay item "Item 30, Grade Change for NE and NW Wlngwall Footings, Lump Sum". This additional item is necessary as it will correct an unforeseen gap at the vertical joint between the precast Reinf. Cone. Three Sided Structure leg and the corresponding wingwall, for the NE and NW wingwalls. No addtional contract time is granted for this part of the change order. PART B: In accordance with Section 1-08.8, this change order adds 6 Contract Days due to the necessity of replacing the third section of Item 15, Precast Reinf. Cone. Three Sided Structure, which was damaged beyond repair during transport by the supplier. The Engineer has determined that the Contractor had no control over the cause of this delay. No additional payment Is granted for this part of the change order. Approved as ~ form. only: All__,''''''_..bo.._...1bo....-~~ ~ll) S1leCial nrovisions for the :voe of construction involved. ORIGINAL CURRENT CONTRACT CONTRACT AMOUNT ..... AMOUNf ESTIMATED NET CHANGE TIns ORDER:" ESTIMATED CONTRACT TOTAL AFfERCHANt!r. $258,327.31 $267,009.31 $1,077.33 $268,086.64 ORIGINAL CONTRACTTIME CURRENT CONTRACT TIME CONTRACT TIME CHANGE (AddlDeI) NEW CONTRACT TIME APPROVAL RECOMMENDED ~ 'v; U- uj-. , Proj'.6Manoger ~ APPROVALRECOMMENDIl6' W -~~2 EngIneering ServWeiJ 'geT' q-1~Zol/ Date 6 days 48 days ~ALRECOMMENDED l" ~/ -/) 40 days 42 days 'fA. ;; Date CotJ11Jy Engineer APPROVED o 9_D./t Dare Chair. Jefferson CotJ11Jy Co_ooers Date