HomeMy WebLinkAbout110711_ca11
Department of Public Works
o Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
From:
Board of Commissioners
Philip Morley, County Administrator
Frank Gifford, Public Works Director ..;jJJ
To:
Agenda Date:
November 7, 2011
Subject:
Local Agency Agreement Supplement with the Washington State
Dept. of Transportation (WSDOT), Upper Hoh Road Emergency
Repair, MP 7.7-8.0, X01781, Federal Aid Project No. ER-0801 (025)
Statement of Issue: The attached Local Agency Agreement Supplement with WSDOT
is necessary in order to proceed with completion of the Upper Hoh Road, MP 7.7 to MP
8.0 emergency repair project.
Analysis/Strategic Goals/Pro's 8: Con's: Between December, 2004 and January, 2008
Public Works performed emergency repairs at Upper Hoh Rd. MP 7.7 to MP 8.0 under
Federal Aid Project No.'s ER-0501 (015) and ER-0801 (025), constructing a total of
1,400 lineal feet of armored bank protection. Remaining work consists of mitigation
required by the Washington State Dept. of Fish 8: Wildlife (WDFW). Mitigation will be
satisfied by replacing the culvert at Alder Creek Tributary, Upper Hoh Road MP 2.15,
with a WDFW-approved, fish passable structure. A Local Agency Agreement
Supplement is necessary in order to fund the construction contract and construction
engineering.
Fiscal Impact/Cost Benefit Analysis: This supplement will add $nO,OOO to the
construction funding, for the construction contract and construction engineering.
This will be funded at 86.5% by the Federal Highway Administration and 13.5% by a
combination of Rural Arterial Program (RAP) funds, and County road funds.
Recommendation: The Board is requested to sign the Local Agency Agreement
Supplement, and return to Public Works.
Department Contact: Monte Reinders, County Engineer, 385-9242.
pM
Date
.......
w
Washington State
Department of Transportation
Local Agency Agreement Supplement
Agency Supplement Number
Jefferson Coun 4
Federal Aid Project Number Agreement Number CFDA No. 20.205
ER-0801 025 LA-6569 ofFedemlDomas1IcAssls1Bnce
The local Agency requests to supplement the agreement entered into and executed on January 3 I, 2008
All provlslons in the basic agreement remain in effect except as modified by this supplement.
The changes to the agreement are as follows:
Project Description
Name Upper Hoh Road MP 7.7 to MP 8.0 Emergency Repair length 0.3
Termini Milepost 7.7 to Milepost 8.0
Description of Work ~ No Change
Emergency Repairs at Upper Hoh Rd. MP 7.7 to 8.0 were completed in 2008. Remaining work consists ofenvironmentaI
mitigation for placement of rip rap in the Hoh River, as required by the Washington State Dep!. ofFish and Wildlife.
Reason for Supplement
As mitigation for the emergency repairs, the culvert at Alder Creek Tributary, Upper Hoh Road MP 2.15, will be replaced with a
WDFW-approved fish passable structure. This supplement is for the construction contract and construction engineering, to be
performed by agency staff and consultants.
Does this change require additlonal Right of Way or Easements?
Dyes ~No
Estimate of Funding
Type of Work (1) (2) (3) (4) (5)
Previous Supplement Estimated Total Estimated Agency Estimated
AareementlSuool. Prolect Funds Funds Federal Funds
PE e. ADeney 247 000.00 247000.00 33,345.00 213655.00
86.5 % b. Other
c.Other
Federal Aid d.Stste 10 000.00 10,000.00 1,350.00 8650.00
Participation
Ratio for PE e. Total PE Cost EstImate (a+b+c+d) 257 000.00 257,000.00 34,695.00 222,305.00
Right of Way f. ADeney
% a.Other ftpproVt: ..taSW uwy:
Federal Aid h. Other " ,. \,
Participation I. Slsle , . J'] J 1=)/
Ratio for RW
j. Total RIW Cost Estimate (f+g+h+Q U iV':I tl~33.oo
Conetructlon k. Contmct ~y.o ll, 489,933.00
J. Othar Contract 86.5% (ER) 160,107.00 667,000.00 827 107.00 111 ,659.50 715447.50
86.5 % m. Other Agency 100% 40,863.00 40 863.00 40,863.00
Federal Aid n. Other Agencv 86.5% (ER) 24 137.00 93 000.00 117 137.00 15.813.50 JOD2350
Particlpstion o. ADeney
Rstio for CN o. State 10,000.00 10 000.00 1 350.00 8 650.00
Q. Tolel CN Cost Estimate {k<l 715 040.00 770 000.00 1 485 040.00 128 823.00 1.356.217,00
r. Total Prolact Cost EstImate (&01+01 ""~ "A" 00 ~" . ,~ u, ~.. 001 .~_n.nn
The local Agency further stipulates that pursuant to said TrtJe 23, regulations and policies and procedures, and as a conditlon
to payment of the Federal funds obligated, It accepts and will comply with the applicable provisions.
Agency OffIcIal Washington State Department of Transportation
By
By
TrtJe
Dlmctor of Highways and Local Programs
Date Executed
DOT Fonn 140-041 EF
Revised 0312011