Department of Public Works
o Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
From:
Board of Commissioners
Philip Morley, County Administrator
Frank Gifford, Public Works Director
~
To:
Agenda Date:
November 14, 2011
Subject:
Hoh Shop Roof Retrofit Project
Execution of Change Order
County Project No.: 1805431858
Statement of Issue:
Execution of the Change Order #1, to the contract for construction for the Hoh Shop
Roof Retrofit Project, with PHC Construction LLC of Bainbridge Island.
This change order provides additional construction services for the above referenced
project.
Analysis/Strategic Goals/Pro's B: Con's:
The contract for construction with PHC Construction LLC, was executed on September
19, 2001. The additional work included in the Change Order #1 was necessary to
complete the project in a practical and responsible manner
Fiscal Impact/Cost Benefit Analysis:
The original contract amount with PHC Construction LLC, is $56,337.74 including
WSST. This Change Order will authorize an additionaL$1, 035.96 including WSST in
payment. This project is funded through local funds.
Recommendation:
We recommend that this Change order to the Contract for Construction be signed by
the BoCC. Please sign and return the (3) originals to Public Works.
Department Contact: Monte Reinders, County Engineer, 385-9160
f~
Date
~,
JEFFERSON COUNTY
DEPARTMENT OF PUBLIC WORKS
CHANGE ORDER
Cbange
1
Sheet 1 of 1
Date: Ocotber 27, 2011
Ordered by c"unty Engineer under temIll of
~Conlra<:t !lootnnmm
DCbange proposed by ContnlCIOr
Order No.
Ernlorsed by: PHC Construction lLC
.L A"A#.. C_F/rmName
~~:J' ~?/N
r'1-t H~o"
Ti1k~
Co..... given by Surety: (when wp1ind)
Contract No.
T-
ATTN: 11m Mattson
PHC Construction LLC
710 John Nelson NE
I BaInbridge Island, WA
98110
By:
PrQject Tille
Hoh Road Shop Roof Retrofit Project
Project Number: 180 543 1858
AI1nm8y-in-{oct Date
You are ordered to perfonn the following described work upon receipt of an approved copy ofthiB change order:
Summary of the three attached Change Order Propoals:
COP #1: Electrical Relocation
COP #2: Photo Cell Relocation
COP #3: Replacement of Guy Wires on existing antenna
$262.52
$545.00
$228.44
TOTAL
$1,035.96
Approved as te form only
f). \\lz-)Z?) 1
Jefforaon Co, Prosecutor's
All work materials and measurement to be In accordance with the provisions of the contract documents and
ial rovlsions for the of construction Involved.
ORIGINAL CURRENT
CONTRACT CONTRACT
AMOUNT AMOUNT
ESTIMATED
NET CHANGE
THIS ORDER
$56,337.74
$1,035.96
ESTIMATED
CONTRACT TOTAL
AFTER CHANGE
$56,337.74
$57,373.70
NO CHANGE
CONTRACT TIME
CHANGE (AddIDel)
NO CHANGE
NEW CONTRACT
TIME
ORIGINAL
CONTRACT TIME
25 working days
CURRENT
CONTRACT TIME
jZROVALRE7/:ENDFD
tel Manager
I()~l-I'
Date
County En
APPROVFD
o
~v
L.&b_h'lJ Senices Manager
.......... It) 31) 11
Dare
Chair, Jefferson County Commissionen1
Date
CONSTRUCTION
Change Order Proposal
Date:
Job Name:
Contract #:
PHC Job #:
October 12, 2011
Hoh Road Shop Roof Retrofit Project
1805431858
1117
Change Order Request #: One
Change Order Description: Electrical Relocation
PHC Cons1ruction LLC proposes the following changes to the above referenced project in
accordance with the contract and specifications as requested.
1. To relocate the main electric feed to the building 30 inches above new roofwith metal
conduit and to supply the extra wire to the extended metal pipe. This change is based as
a result of the precons1ruction meeting where it was decided that the conduit would
terminate in the horizontal position, 12 inches out from the building.
The price for the above-described changes is: $ 262.52 and includes WSST
Please call Tim Mattson at (206) 510-1677 if you have any question regarding this request. If
you would like for us to precede with this item, please sign your acceptance below and we will
incorporate this item into the contract
Thank you,
PHC Construction LLC
4~~
Tim Mattson
Project Manager
~
thorization to Precede:
'f'0 Date: OCT. ! g I 9-.0 / ,
PHC Construction LLC 710 Jolin Nelson Lane NE I BaInbndgeleiend WA 98110 I Pii 206.780.Ml8C I ". 206.780.4061
1 www.phC.constructlon.coml
: CONSTRUCTION
Change Order Proposal
Date:
Job Name:
PHC Job #:
October 18, 2011
Hoh Building Shop Roof Retrofit
1117
Change Order Request #: Two
Change Order Description: Photo Cell Pipe Relocation
PHC Construction LLC proposes the following changes to the above referenced project in
accordance with the contract and specifications as requested.
1. To relocate the existing photo cell that currently goes through the roof and install it
through the side of the building. PHC will have it installed out past the gutters and then
turned up to extend past the top of the gutters. This will include the extra wire and all
noct"Ssary fittings and pipe to complete relocating.
The price for the above-described changes is: $545.00 this includes WSST
Please call Tim Mattson at (206) 780-7457 if you have any question regarding this request. If
you would like for us to precede with this item, please sign your acceptance below and we will
incorporate this item into the contract.
Thank you,
PHC Construction LLC
-4'}~~/-
Tim Mattson
Project Mai:mger
-
Date: Oc;r, ~ /; ,:;:2-.0/ /
,
PHC Construction LLC I 710 John Nelson Lens NE I Bainbridge Island WA 96110 i , .: 206.760.4060 F.'" 206.760.4061
~. www.phc-conatructlon.com.
iCONSTRUCTlON
Change Order Proposal
Date:
Job Name:
PHC Job #:
October 21,2011
Hob Road Shop Roof Retrofit
1117
Change Order Request #: Three
Change Order Description: Replacement of Guide Wires on existing antenna
PHC Construction LLC proposes the following changes to the above referenced project in
accordance with the contract and specifications as requested.
To replace three guide wires on existing antenna with three new wires of 3/16 diameter braided
cable and install three turn buckles to the S-S-E clamps for tightening of cables. The price below
includes 8 percent PHC markup and WSST at 9 percent.
· 6S-feet ofJ/16 galvanized cable 49 cents per foot
. 6- Galvanized cable clamps 79 cents per clamp
. 3- Galvanized turn buckles 2.49 per buckle
. Kiwi Steels Price of$150.00 to install items above
The price for the above-described changes is: $228.44
Please call Tim Mattson at (206) 510-1677 if you have any question regarding this request If
you would like for ns to precede with this item. please sign your acceptance below and we will
incorporate this item into the contract.
Thank you,
PHC Construction LLC
~ 4/"~-'
Tim Mattson
Project Manager
-
Date: oc:Tt '9--S {).OIl
,