Loading...
HomeMy WebLinkAbout111411_ca05 '-" - "t Department of Public Works o Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request From: Board of Commissioners Philip Morley, County Administrator Frank Gifford, Public Works Director ~ To: Agenda Date: November 14, 2011 Subject: Hoh Shop Roof Retrofit Project Execution of Change Order County Project No.: 1805431858 Statement of Issue: Execution of the Change Order #1, to the contract for construction for the Hoh Shop Roof Retrofit Project, with PHC Construction LLC of Bainbridge Island. This change order provides additional construction services for the above referenced project. Analysis/Strategic Goals/Pro's B: Con's: The contract for construction with PHC Construction LLC, was executed on September 19, 2001. The additional work included in the Change Order #1 was necessary to complete the project in a practical and responsible manner Fiscal Impact/Cost Benefit Analysis: The original contract amount with PHC Construction LLC, is $56,337.74 including WSST. This Change Order will authorize an additionaL$1, 035.96 including WSST in payment. This project is funded through local funds. Recommendation: We recommend that this Change order to the Contract for Construction be signed by the BoCC. Please sign and return the (3) originals to Public Works. Department Contact: Monte Reinders, County Engineer, 385-9160 f~ Date ~, JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS CHANGE ORDER Cbange 1 Sheet 1 of 1 Date: Ocotber 27, 2011 Ordered by c"unty Engineer under temIll of ~Conlra<:t !lootnnmm DCbange proposed by ContnlCIOr Order No. Ernlorsed by: PHC Construction lLC .L A"A#.. C_F/rmName ~~:J' ~?/N r'1-t H~o" Ti1k~ Co..... given by Surety: (when wp1ind) Contract No. T- ATTN: 11m Mattson PHC Construction LLC 710 John Nelson NE I BaInbridge Island, WA 98110 By: PrQject Tille Hoh Road Shop Roof Retrofit Project Project Number: 180 543 1858 AI1nm8y-in-{oct Date You are ordered to perfonn the following described work upon receipt of an approved copy ofthiB change order: Summary of the three attached Change Order Propoals: COP #1: Electrical Relocation COP #2: Photo Cell Relocation COP #3: Replacement of Guy Wires on existing antenna $262.52 $545.00 $228.44 TOTAL $1,035.96 Approved as te form only f). \\lz-)Z?) 1 Jefforaon Co, Prosecutor's All work materials and measurement to be In accordance with the provisions of the contract documents and ial rovlsions for the of construction Involved. ORIGINAL CURRENT CONTRACT CONTRACT AMOUNT AMOUNT ESTIMATED NET CHANGE THIS ORDER $56,337.74 $1,035.96 ESTIMATED CONTRACT TOTAL AFTER CHANGE $56,337.74 $57,373.70 NO CHANGE CONTRACT TIME CHANGE (AddIDel) NO CHANGE NEW CONTRACT TIME ORIGINAL CONTRACT TIME 25 working days CURRENT CONTRACT TIME jZROVALRE7/:ENDFD tel Manager I()~l-I' Date County En APPROVFD o ~v L.&b_h'lJ Senices Manager .......... It) 31) 11 Dare Chair, Jefferson County Commissionen1 Date CONSTRUCTION Change Order Proposal Date: Job Name: Contract #: PHC Job #: October 12, 2011 Hoh Road Shop Roof Retrofit Project 1805431858 1117 Change Order Request #: One Change Order Description: Electrical Relocation PHC Cons1ruction LLC proposes the following changes to the above referenced project in accordance with the contract and specifications as requested. 1. To relocate the main electric feed to the building 30 inches above new roofwith metal conduit and to supply the extra wire to the extended metal pipe. This change is based as a result of the precons1ruction meeting where it was decided that the conduit would terminate in the horizontal position, 12 inches out from the building. The price for the above-described changes is: $ 262.52 and includes WSST Please call Tim Mattson at (206) 510-1677 if you have any question regarding this request. If you would like for us to precede with this item, please sign your acceptance below and we will incorporate this item into the contract Thank you, PHC Construction LLC 4~~ Tim Mattson Project Manager ~ thorization to Precede: 'f'0 Date: OCT. ! g I 9-.0 / , PHC Construction LLC 710 Jolin Nelson Lane NE I BaInbndgeleiend WA 98110 I Pii 206.780.Ml8C I ". 206.780.4061 1 www.phC.constructlon.coml : CONSTRUCTION Change Order Proposal Date: Job Name: PHC Job #: October 18, 2011 Hoh Building Shop Roof Retrofit 1117 Change Order Request #: Two Change Order Description: Photo Cell Pipe Relocation PHC Construction LLC proposes the following changes to the above referenced project in accordance with the contract and specifications as requested. 1. To relocate the existing photo cell that currently goes through the roof and install it through the side of the building. PHC will have it installed out past the gutters and then turned up to extend past the top of the gutters. This will include the extra wire and all noct"Ssary fittings and pipe to complete relocating. The price for the above-described changes is: $545.00 this includes WSST Please call Tim Mattson at (206) 780-7457 if you have any question regarding this request. If you would like for us to precede with this item, please sign your acceptance below and we will incorporate this item into the contract. Thank you, PHC Construction LLC -4'}~~/- Tim Mattson Project Mai:mger - Date: Oc;r, ~ /; ,:;:2-.0/ / , PHC Construction LLC I 710 John Nelson Lens NE I Bainbridge Island WA 96110 i , .: 206.760.4060 F.'" 206.760.4061 ~. www.phc-conatructlon.com. iCONSTRUCTlON Change Order Proposal Date: Job Name: PHC Job #: October 21,2011 Hob Road Shop Roof Retrofit 1117 Change Order Request #: Three Change Order Description: Replacement of Guide Wires on existing antenna PHC Construction LLC proposes the following changes to the above referenced project in accordance with the contract and specifications as requested. To replace three guide wires on existing antenna with three new wires of 3/16 diameter braided cable and install three turn buckles to the S-S-E clamps for tightening of cables. The price below includes 8 percent PHC markup and WSST at 9 percent. · 6S-feet ofJ/16 galvanized cable 49 cents per foot . 6- Galvanized cable clamps 79 cents per clamp . 3- Galvanized turn buckles 2.49 per buckle . Kiwi Steels Price of$150.00 to install items above The price for the above-described changes is: $228.44 Please call Tim Mattson at (206) 510-1677 if you have any question regarding this request If you would like for ns to precede with this item. please sign your acceptance below and we will incorporate this item into the contract. Thank you, PHC Construction LLC ~ 4/"~-' Tim Mattson Project Manager - Date: oc:Tt '9--S {).OIl , PHC Construct<<,. UC I 710 John NelSon Lane NE , BSlnbrt~gs l8lan~ WA 98110 i 'C". 208.780.4080 i r-, y 208.780.4061 I www.phc-..conatruotlon.com1 .,