HomeMy WebLinkAbout061812_ca034 Organization and Address: Supplemental Agreement Number 1 Integrity Structural Engineering, PPLC 4124 Interlake Ave. N. Seattle, WA. 98103 Agreement Number: Oueets 2011 -1 Project Number: Phone: CR1881 206-547-1379 Project Title: New Maximum Amount Payable: Queets Bridge Painting, Bridge No. 8W $196,664.50 Clearwater Road M.P. 0.60 to M.P. 0.76 Description of Work: Provide additional project management, administration & coordination, preliminaryand final structural engineering, construction documentation, and review and confirmation bya structural engineering subconsultant for the repair of bridge girder web buckling on the Queets Bridge. This Supplement also includes the increased cost due to a revision from the provisional overhead rate to an approved negotiated hourly rate for subconsultant GreenmaRPedersen, Inc. The Local Agency of Jefferson County, Washington desires to supplement the agreement entered into with Integrity Structural En ing eering, PPLC and executed on March 19, 2012 and identified as Agreement No. Queets 2011-1 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section II, SCOPE OF WORK, is hereby changed to read: As specified in Exhibit "B" II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: (No Change) III Section V, PAYMENT, shall be amended as follows: Original Agreement Maximum Amount Payable: $172,361.22 Supplemental Agreement #1 additional amount: $ 24,303.28 New Agreement Maximum Amount Payable: $196,664.50 as set forth in the attached Exhibit A-1,A-2, A-3, A-4 and by this reference made a part of this supplement. Page 1 of 3 Revised 10/25/11 If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. Integrity Structural Engineering, PPLC Consultant Consultant's Signature Z 0110111, Date COUNTY OF JEFFERSON BOARD OF COMMISSIONERS John Austin, Chair Phil Johnson, Member David W. Sullivan, Member Approved as to form only this t day of'TV?V? , 2012. "4'x-qtt David Alvarez Deputy Prosecuting Attorney -5 `6 /Z,T/ Frank Gifford Date Public Works Director Page 2 of 3 Revised 10/25/11 Exhibit "A-1" Summary of Payments Basic Agreement Supplement #1 Total Direct Salary Cost $155,152.72 $24,198.28 $179,351.00 (including Overhead and Profit) Direct Non-Salary Costs $17,208.50 $105.00 $17,313.50 Total $172,361.22 $24,303.28 $196,664.50 Page 3 of 3 Revised 10/25/11 EXHIBIT A-2 PM/Br Total Hrs ISE, Task Engr PLLC GPI Exeltech Supplement #1: GPI OH Correction & Girder Web Buckling 1 GPI Budget Increase for Approved Overhead Rate $ 2,381.50 a. Approved Overhead Rate of 143.23% up from 128.31% (Direct 0 0 Sala Costs DSC = $15,958 remains unchanged) Subtotal Task 1 0 0 Subtotal Task 1 $ 2,381.50 $ 2 Added Administration and Coordination a. Management & Administration 2 2 b. Coordination with County 4 4 c. Subconsultant Supplement, Coordination and Work Review 8 8 Subtotal Task 2 14 14 Subtotal Task 2 $ $ - 3 Added Design Report Phase Queets Bridge Web Buckling $ 5,497.02 a. Review AASHTO Data and Added Modeling and Analysis for 10 10 Determination of Critical Buckling Zones Locations that Limited External Load & Stress b. Concept Design, Sketches, and Preparation of Two Web 22 22 Stiffening Alternative Details Allowing Project Loading Required c. Calculation Or anization Summa Creation and Memo Update 8 81 1 Subtotal Task 3 40 40 Subtotal Task 3 $ $ 5,497.02 4 Added Plans, Specification, and Estimate $ 1,529.76 a. Finalize Selected Repair Concept Design and Calculations 24 24 b. Added ACAD Drafting and Web Stiffening Detail Plan Creation (1 24 24 Sheet) c. Special Provision Drafting for Repair Details 8 8 d. Quantity Estimate and Stiffening Cost Estimate 4 4 Subtotal Task 4 60 60 Subtotal Task 4 $ - $ 1,529.76 Supplement #1: GPI OH Correction & Girder Web Buckling 1 GPI Budget Increase for Approved Overhead Rate 0 0 Subtotal Task 1 $ 2,381.50 $ - 2 Added Administration and Coordination 14 14 Subtotal Task 2 $ $ - 3 Added Design Report Phase Queets Bridge Web Buckling 40 40 Subtotal Task 3 $ - $ 5,497.02 4 Added Plans, Specification, and Estimate 60 60 Subtotal Task 4 $ $ 1,529.76 Supplement #1: GPI OH Correction & Girder Web Buckling 114 114 2,381.50 7,026.78 Billing Rate $ 130.00 Fee $ 14,820 $ 14,820 labor cost= $ 14,820 Mileage $ - direct cost= $ 75 Courier, mail $ 10 ISE Subtotal = $ 14,895 Phone $ - Reproduction $ 65 Subconsultants = $ 9,408 ISE, PLLC Direct Expenses Subtotal: F75 Grand Total: 24,303.28 EXHIBIT A-3 Supplemental Consultant Agreement #1 Fee Estimate Exeltech Consulting, Inc. 5/1/2012 - (REV. 5/2/12) Effective Dates May 1 to December 31, 2012 Jefferson County/Integrity Structural Engineering, PLLC Queets River Bridge Web Splice Evaluation TASK 2: DESIGN REPORT SUPPLEMENT MAN-HOUR ESTIMATE Tasks Task Initiation and Project Management Review Existing Information / Investigate Structural Analysis Longitudinal Girder Design Calculations Splice Location Opinion of Probable Cause Two Repair Alternative Ideas Sketches for Two Alternatives Man-Hour Resources (Hours) Director Bridge Bridge Engineer Inspector 4 1 1 8 1 4 1 4 0.5 0.5 2 0.5 0.5 2 0.5 0.5 2 Letter 0.5 0.5 2 Technical Memo Prepare 2 3 Review Letter Labor Total = 41 9 5 27 0 (Hours) TASK 3: PS&E SUPPLEMENT Man-Hour Resources MAN-HOUR ESTIMATE (Hours) Tasks Director Bridge Bridge Engineer Inspector Added QA/QC Plan & Spec Review 12 Labor Total = 12 0 0 12 0 Page 1 of 2 (Hours) TASK COST SUMMARY DIRECT SALARY COSTS: Man-hour Resources Director Bridge Engineer Bridge Inspector Labor Subtotal DIRECT NON-SALARY COSTS ANTICIPATED: Travel Trips Document Processing Direct Non-Salary Costs Subtotal: EXELTECH CONSULTING ESTIMATED COSTS Man-hours Rate Cost 9 hrs @ $158.39 $1,425.51 5 hrs @ $119.91 $599.55 39 hrs @ $127.48 $4,971.72 0 hrs @ $0.00 $0.00 0 hrs @ $0.00 $0.00 53 hrs $6,996.78 0 0 miles @ 0.550 $0.00 $30.00 $30.00 $7,026.78 Page 2 of 2 N ? w z N a r O O V d' V O O O aD O t0 V N N O N O N O M o N U t iJ W x '? L s O ttpp M O W V m = x O O O O O O O O W O OD O O V W O O ?2 F- Pa Z z U c » no ? w y N Q W U o m m = 0 0 0 0 0 0 0 0 0 0 0 00. 0 0 0 0 0 0 0 °o a z . q 0 A 9 O Za - U a Cl o W r a N v N ? ? V ` = a O O O O O V O O O O V N O O 7 O ? O ? O CL v 3 » ? C ? N N ? 0 O m ' V V O O O tl O V O M ? ? O O ? O O N 0 m W ° H z ? n Q O V Y R O O O a0 O N O ` N N O N O W W _ W N C V N L O N w r V z y 0 j? 0 E y? x am O O O O O O O O aD O 00 t0 O O aD O O N ? ? ad z w q ? w u a ro x w in a w 0¢ rj o L m N m O = 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 O 0 _ a z . d e> v, u o f N Lu v L C .1 N m O O O O O O O O O O V [O O O V O O d N 3 w a ?° N Ol ? J C N M ? O N ? CD N m R V V O O (O eD O V f0 t0+1 ^ ?2 O O O O N O z ° N M V LL O w , ° m K 'o m K g m d o m K g r W w W z F M ? x ? cc ? go n y Y K - K C9 W x ° Y O = O F' a z J o w O = m z p z ? (? c d 0 p O LL a F• y 2 a = o r p rc ? F z m m F z p ° W x O 3 ? LU z a ? > ¢ o O v o w o F- z ° ° ? a N F z Z ~ J y (3 3 0 ti (9 z V aA } w u0- z z ? w x m z 3 0 r O F- O a Z b c a Y 0-' z O W W Z z ? w y z . J a . wO f w ¢ < z F- O H O U r W w W z ?i w Q IL a } } r z C? ' w 0 y m g w a 2 z O O z U' z w K a w m z OJ w K O Z C7 N w K W m o W ~~a d O LL Z W K W ° d a Q f a t Z U w` ' a ? z ¢ r Y O _ J o J 0 N ? Z o W w m ° w J r K a K U g C9 K a Q yzj a O 3 m Q a a a K U' w r W L a O z m w r w O U) O z a o F- W j y a . z F Z w w y m U m O U 0 O n z 2 y w z z p U t Z m (? m 22 C 12 U) W W H W W z € J z W w o .- C7 Q y a ' r ¢ w W C7 ¢ a r U a r W O Z ¢ >} r J w d } : W O a O O W p g W J J .7 J w } r „ F C7 (n w LL y W M ro z y U' m z r U r O C7 ¢ ? t L' z u7 Y N K a 1 ¢ ' ? W W V ' V 2 W a LL o LL ? J a z w w W w o p w Y U r ! u7 Z o v x r z ? 6 F S2 S2 m 1-, 1-, ug m m a * o o t a W. (1 z z O ? r 8 W 9 Cl W 0 0 X W2 w U r a r a r qa z w a S U W ] m > z O 0° ? ? z 0 °D w o w C-) x a $ z O U) w w p? p cri ? a Z ¢ a ¢ r Y Z ? ¢ W a. ? U `0 Op O N w a m. J a o ? d a o a Z w O > z J > z J > z a r O FQ w a J ? wa t a z F rQQ Or- ¢¢ m ¢ w L J a r J w ¢ O O O U w K ¢ w r ¢ iii Y Z c w K ¢ K ¢ > I - Or > y a ¢ m d U > U > U > °w J w > ? Z a ? W ? 9 o. a J a r ? m a m m m a o a r m ¢ r CL .Ca w a a 0 r m N ? w Q N D O O rO O O O O O O O O O O O O O O O O O O O O O O w t U E r 5 O O w C:1 '? = p x O O O O O O O O O O O O O O O O O O O O O O Z Z U a C a N w Q U o > a Z a m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O O o o O = '? 9 a N W W N X IL N U o S o O o O o 0 0 o O o 0 o O O o o O O o 0 o q a v e> a `fl 3 ' o N O p m x O O O O O O O O O O O O O O O O O O O O O p a " ° a ? w ¢ y o o Q 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N w = ? a N ? o 0 w r V ? U A? Uj? E y o» x Q`m O O O O O O O O O O O O a O O O O O O O 0 0 0 ui Q 2 z . ? y q ¢ W x ? o w L N O O La w aw Q D. m ,6 = 0 0 0 0 0 0 0 O O o o O o 0 0 o a a 0 O O X >O a z _ es a to W -1 2 ? N W ? C d ?( C V O ? O r ? IL C ?p U N x m O O O O O O O O O O O O O O O O O O O O O O a a y 3 c o 0 V ¢ o x o 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 0 °0 a a " LL N c K LL ? w v w OLL 0 ? W O w d 3 J O LL K O y vl z o w a ? w 3 w 3 < a n ? g W LL > _ w w_ > U w R w > > ¢ X0 W w af w w ¢ w L m r m a ~ o 2 a ro ? y K K ?7 LU ? ? O :r Z ? ¢ O O 3 p N m F- W V o Y O a ? w E w a o z o N a :3 p a H = Of < a a a ' 0 Z V W W a H O w > o O ¢ ° W O r O r O co O p ¢ v ¢ ' O F p U ? ? O z_ ~ ? m N = Z W O O C7 W d a OJ o g r - a ? F a a a v U F F 1O a ? y W z 0 ¢ ? °? at ¢ > m ¢ a o t a F W - a d ? O ? V Z w w 0 ZZ Q ¢ z a v > U O o o ai V V F a 0 z w > a d z + a. U' = 0! (L M a fA ui W O O = N N U r Z ? ? W J ~ Q w w z W 9 (6 0 F O W o W a ¢ ~ V z ° g r F- a ¢ Y W x U ' U' ¢ ? Q W a a ¢ w d d j a z W Z 0 W W z ¢ 7 > m x R w F- ¢ Z ¢ . z L ? Z Q y Z Z z ¢ O N W ] U N O LL U Q U N p a z z F= ¢ ?? W Z w w 2 w ( > m A N LL' w W ? z o ? W ai _ cN F. O a ¢ a Y r w ¢ K O r w w a! w a O w w w ? O (7 QQ > n r w N x c W ?.. y w- z - J w w ? Q U w U ? Ill N ui U U v W ¢ z r N O w x o x W W 2 I J F W ® LL w O v (7 Z - ( ( L m z z W W ri Il! Q 3 O r` VJ ¢ = ° Q z W S N a z ri ¢ F " 3 r` f q J W w Z ?y @ t Z w W U ' w ° o z I z r z ¢ o N ¢ z ¢ z w x o ? z W Z LL O ? v1 ? LL a w 3 w ? ? LL 0 O ni Z x p (7 p O N F 0 z LL O LL O V w LL O LL O W ai W w 3 LL O w N d a LL o LL O O LL o LL o z y LL ¢ 'Y K m w ? ? z ° r g O J q O O ¢ O LL O w O O ¢ O O p ¢ Z O U) ¢ O =11 ? a) w z w w o ii 4 4 z LL r 4 z U P F LL F a F z LL r Q z LL F ? w ¢ r N w a ¢ o. a ¢ a i ¢ a n ¢ o a ¢ a ui U ¢ a F z w s ¢ a 4 a r ¢ a d ¢ a r ¢ a O ? < w w > > o a C, a K a r a w w w a N ? r ? a a N a a U m a N ¢ a m U a a m a O r ar N w r0 O a 1 -0 O tp ry O N a O O O o O N M M N W V V f0 O ao N N N U W 2 n L _ E oo 0 w Z 'v = x o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 °o 2 U x d fwp m w w y v ; a Z p_ m 0 m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O p O Q o a N M z w L O ? ¢ C m r r o M ap ? C U v 7 N V O 7 N O O O O O ro W V V Cp V v O O w O O O o. 3 a » C m N 0 O ?2 ? ? O N ? O O O O O ? N N-- p O O O ? O O W op c 0 v, O M° a ¢ a 9 F m O O N M N N m O O N O N O O O O O N M w V V O M VV Cli U) W x N q?p U V L L N N J O O w ?j y r E a x o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 °0 2 ? W Q x W 0 L N o 0 m w Wa Q d m = O O 0 0 0 O 0 O 0 O O 0 O O 0 O O O O O O O 0 00 - Z W 0 e 2i ? ? IT w m N w C n c o o x W p U 2 V N V O V N O O O 0 O OD aD V R M V R O O M R A m a ° D- 0 Q o x N O O O N N O O O O O N N N w a O O O O O aD t°O a ¢ a o N C 0 W 0 , (D z U) r EWD a w ' w ¢ -' ? n n n w N a w 0 0 O U) LL' O Q a y a? O ? F w F- w x F- w N o X u?i : O LL F _ = H z d m v' ? 3 w a a w F w a e o o a z ?. 2 J Z 0 C7 a C7 Z ? W O O w O N ¢ w cl CL z (D w Z 0 C ? 2 W ? ? w y ai w ? ? w z ¢ ¢ ¢ m q 3 W o a d a ? ? p W u w a m z rn z U) z z O w ~ ? I w Z U) Q Z a m o 1- > z o a a a U C) 0 O a m W U z J z w W ? O 0 F p a w } w ? a a a F y z v}j w z N z o r w w z O z O z 0 > N z N z ?? LL w w ri w m m F Z 0 W D ? z ¢ G 0 O OC z a O r z z U O F F r O O 0 a a a a ? z C3 to _ m p N K Z a O H ~ r O a a v > U > U > z O a F ¢ F ¢ W a N H H rn O O O 0 U F- z z O m r?0 2 y w H w w W a V Z Q (? Z K .1 Z 0 U O J O K !- K F., K F U J J Q U LL U u. N J to W to W U J z Z W O Z }} F w z F Q d1 F ® LL y O Z c7 J K E M N u. V O r tq O Q a U 0 a O (? Z F K z Z O Z m o Z w O Z ¢ LL W U a U W a U W a Z ¢ LL t- m 0 F- V) 0 a Z O U ? O m J j U LL W v w U Z d LL w U m m LL J 0 z O O O U n m m O U e o a O 0 w W 7 w w 0 LL o C y w > w > O Z Q f/3 ¢ a a U 0 a M op W o ° o M op a? N po O e op as m o 00 ? m z LL u7 U W ? a to (? Q z O - Q Z W m - a (/1 W w x LL 4 LL o LL O LL O LL O LL o LL 0 LL o LL O LL O LL O LL O F U LL O Z 0 z z g m > W J Q J m ¢ m ¢ ? a o a r z o z O z O z O z o z O z o z 0 z 0 z 0 z 0 z o O 0 a w Q O. LL LL w m w ow w FQ-Q !- F 1- I- I- F H H ~HQ H Z 0 Q Q U Q F N Y z c? z 0 z c? z c? Z 0 Z Z 9 K ¢ ¢ Q ¢ Q Q Q Q Q K Q ¢ 0 J a } F- LL O w a F fn w 70 w to W co w to w co w co w a w Q: a W K a W K a W K a W w a W w a W w a w K a w K a w a w K ¢ z a W w J ¢ O OS F ? ? ? ? 3 D 1 ? ? a m m a a a a a m a a U. a 0 0 U1 N N ° a = F 0 I V N O v N N 0 O 0 ° O O N m 7 0 °D 0! M ?? (n O = m O ? N N ( M U L O N C N E = '0 = 0 O 0+1 ui V O ° O 06 p O 0 ° 0 O 0 ° O pj Cp W Z U m y) a 06 H N < < CJ (A O f9 CO M z' c ? N a = LU G W W m L 0 , O 2 O O O 0 O 0 p O 0 O O O O O O j C z z ° = m '? m e, y a p 0 0 6 0 0 o 0 O 0 p o v> O e < , O N W r N O 1! M IL I?Q 0 I? O 0 ° 0 O N g p ° O O m Oj o O ? M M °y 0 in a 6 0 ro < m N d o » ed m < CO 0. a c N 0 0 0 m o 0 pp w O N OR N O m a ? d M ° m tmo ° ? m < ? u cm 06 NN a i °w n V N o p 0 o m vi 0 a Go rn co v oO y ? o h A m v o 73 0 _ a m ^ 1 O y N n (S O - M O Cl) v (? w N N M V a a O V 2 > OH 1A to 4 O m tp w t 5 0 m a v 0 w R' F Q: LU '? c b w F U Z .0 V C T U E v d O m t0 °. < 7 0 ° °. 0 ° 0 0 N o> N W o W N Q K W 2 » W W V ? a F = W , W w ? t m `_ 0 0 0 0 0 . 0 . 0 > O > O ? c 5 > W ¢ z o. ? m ? = a ° 0 o 0 ° d o y ° 0 o » ° d o ? ° o ? °ly n N m 2 W m o a ? o r `r c v u e n W C m N L W m O. V w o 'o p t.?- O V t0 d p O o O 0 N o 0 A LO y $ Ld, ° n a" ? ? m ° °a w ? m ` CL 3 5 Ol m 0 N Oap N ° N m O ? n O p O ?k N F E d V a N ? a (p M n M (?j m ? f1 ? O O ? O m O 0 ? OD N a - N ii G $? v 3 ds g ? d M co w w w w of a: Of Of N It b1: ."t. C O 0 = O 0 = , O 0 M , 0 0 = O O , s°o w ? ? ? O = O « € a?n W I Of ° OJ p Z F- m m o m° `?' ,o W W w F a' z O F Z K w F- U) w ? J m g y °° T n Y 4' C9 W ? w O O c0 -n Q. ? z? F O Q 0 a 0. a F , ? o C 3 O Q z a °w ° W z < a c6 F F- . 4 O c x: a F a E Q z = w U) z o 03 Z w J ? W W 2 Q F C7 3 w > 0 F o w a z 0 ? a z v w F U " ~ z tOD o ? a Y ? y Z W z z U) Q ? ? F O z D 2 w " w F m 2 d•oe o d z C ? 0 Z Z w F O n a a w a ° v ^ 13 7 + ?W.. 1 ? %Z Z LU i W t a M Q W U' a ? y Q z c6 Z 3 ?Ngc o4 D C K V LL U' } R' w a a Q rn z ? F a w- v ?. Z O F y Z K Q Z z ? OF a 0 > W v y a? m . owl °' m A ? F W D W ° w a c'i F y M 10 LL N Z W ww a, O y °' L°,°o c V W C.) Z W It LL O ? O a < F w V' O W, U) .C o C Fn a a S 'i .: OZ > x F ?? '0 a' a m W Z O down O rn F a c 6 "3 v ° S O ? O a z @a4A N 0 w U K 7 .? ° o a O F N V U ? W m L r Fw- U z m U = ? ? 2 a Q K z c cl S y W w U w L a O j d Z Z ? c m ° m v m a O e f S2 O N O W d m C m r r J O c ` a m m a ? ? C Q m N r ? O a V a e> a O F co p w O= p L N N 0 O c 2 h K ? z U 0 = v a W w a F- = K o W w U m L m 21 ? = X w O CL Q Z c u a W e O c6 c6 W e m r ? 6 ?( IL C m L V O 0 O _ U ? m a m w a 3 C M O m O a m a w ? a N (7 V O Z w O (if Q K r W W F K O r v n o Y rc n o a W a o ? x W r O V LL W z Q = a = a 2 W H > 0 = J z 0 0 Q) C7 Z X0 p 7 a Y N w W K W Z O Z d 13 'i P z ... (1) 0 O U y 1 C9 w K Z a z O W < M A LL F (A W Z - W w ww m W m a Z ') w I w 0 0 7 d Lu zz ° D a <n a 10 W ? J Z L O N - - O K EXHIBIT B SUPPLEMENTAL AGREEMENT #1 SCOPE OF WORK FOR ENGINEERING SERVICES QUEETS BRIDGE PAINTING Bridge No. 8W Clearwater Road M.P. 0.60 to M.P. 0.76 County Road Project CR1881 County Road Number 107508 OBJECTIVES: The objective of the proposed work is to provide additional project management, administration & coordination, additional preliminary engineering for the design report, additional engineering for final design, provide independent review of the problem and Consultant's solutions by a structural engineering subconsultant, additional construction plans, specifications, and estimates, necessary for the repair of existing bridge girder web buckling on Jefferson County's Queets Bridge. The Consultant, Integrity Structural Engineering (I.S.E.), conducted a field inspection of the paint condition of the bridge on March 20, 2012 with subconsultant Greenman-Pedersen, Inc. (G.P.I.). During the field inspection, the Consultant structural engineer observed that there is steel girder web buckling at several field bolted splice locations. This existing condition of the girders had been noted in several previous WSDOT bridge inspections but was never considered unsafe or addressed as significant. The Consultant engineer stated that the potential loading requirements for paint blasting, containment, and painting equipment and personnel required for the proposed bridge painting work, could become critical for the completion of the painting project. The situation needs to be analyzed and a mitigating design solution developed and implemented to ensure the safe continuation of the project prior to undertaking the painting work. The Consultant will be responsible for any and all work and materials necessary to provide the additional engineering services required, as specified in this supplemental agreement scope of work. The Consultant shall complete the tasks as specified in this scope to the satisfaction of the Jefferson County Public Works (Agency). PHASE I: PRELIMINARY ENGINEERING TASKS TASK 1: PROJECT MANAGEMENT, ADMINISTRATION & COORDINATION (ADDED WORK) This task includes additional management due to the added engineering services required for this supplemental agreement: 1. Management of the prime Consultant's work, scope, budget, and schedule. Preparation and submittal of progress reports and invoices for the added work with the regular monthly invoices. 2. Coordination of added design work and reviews with the Agency. 3. Management, coordination, and reviews of the Subconsultant's added work. TASK 2: PRELIMINARY DESIGN REPORT (ADDED WORK) This task includes additional analysis, engineering, and construction documentation preparation for the repair of the girder web buckling problem. 1. Assemble collected field data, review girder web buckling condition. 2. Perform additional modeling and analysis to determine critical buckling zone locations that limit external load & stress. Two alternate solutions will be prepared by the prime consultant. The structural engineering subconsultant will provide review and confirmation that the two alternate solutions are valid, and verification of the design and calculations. 3. Prepare preliminary design sketches and details of the web bracing repair designs. Include preparation of sufficient details for the two alternative web stiffening solutions that provide the required project loading. The structural engineering subconsultant will provide engineering review and confirmation of the details. Include organization of calculations, preparation of summary, and recommendation for the optimal repair solution. 4. Incorporate additional engineering, summary, and recommendation into preliminary design report. TASK 3: PLANS, SPECIFICATIONS AND ESTIMATE (ADDED WORK) This task includes final design and preparation of the final Plans, Specifications and Estimate for the selected girder web buckling repair solution. The Consultant shall provide a Professional Engineer's stamp and signature on all design calculations, reports, plan sheets, specifications, and estimates. 1. Final design and calculations for the selected girder web buckling repair solution. 2. Prepare final details and plan sheet (1 sheet) for the girder web buckling repair solution. Incorporate into the main project plans. 3. Prepare the final special provisions for the girder web buckling repair solution. Incorporate into the main project special provisions. 4. Prepare the final quantity calculations and cost estimate. Incorporate into the main project special provisions. 5. The structural engineering subconsultant will provide engineering review and confirmation of the final design calculations, plans, special provisions, quantity calculations, and cost estimate for the girder web buckling repair solution. The Agency will review the plans, specifications, and estimate at the same frequency as specified in the scope of work for the main project. The Consultant will provide deliverables as specified in the scope of work for the main project. e N °m (° m 4N f i I _ i ??rv ZI M, LL?m m ?° rv o e ? i ?m n a °a rv z< d rv?y on e f • min e e °c m° a = im U - e - yqR {{ I 'm rv?? 3 n m rv. r e rv'm ? E N LL N i ?? 5? ?? ? rv a = `a a` a s `a ?. a M= S S=? a k a a _ ? ? a? ? a a m ? ? - LL LL LL LL LL ? ? 3 ? LL LL LL LL LL LL LL ? € ? € LL ? ? ? F ? ? ? ? ? ? . F - LL LL LL ? ? ? LL N c c u e ? S c 1i ° i 'c ? c c ? c °' G c i .c S c c .c u LL LL u c LL E 2 2 `L M* ? LL u LL F LL LL l LL u LL u u ? ? u ? w LL I ? ? u F ~ LL i ? . ° in rv r ? ? e C1 ` °1 ° ° ° 1O e $ n e ? 0 o o o $ O q- 0 0 0 ? - 21 J, a EL, I? Y? @ rc v w 'B € - ? W N $ 2 o - $ tl 4 a ?Q i m g e ? ,$ d $ ` e; $ a a y g A 3 z e b ?a ¢ b b S -o a LL '" b `o F Yn o .a 8 $ c E a ; N o EE c n 3 E a a$ R w $ ; e_ $ w 83 g w '. 'w ?o. 8 8 - x o a a ' 3® Q 8 $ o '? -O1 C s 8 s i - g o ? . .E a 'a 21 o a !i - '? V N a U ?` ? u a S S E t °-o $ E ?' ?_ P 8 - L? 9? cg E - s w = g o ? 8 : - v: E v ` N w 3 $ 3 "m q rc ? a -?. z ?» o c . w E 31 9 1 , @ E ? X - E S - 3 11 2 l ig N a ? r m,e - ? i ?Y LL ?m mm ? ?IW e o z < ,? m a ? U 3 £ m r w' _ ,_ _ a a a a a S `a a ` a s - I a a u a a ? ? ?? ? 3 LL LL z ?. a a a a? ?? ? s i ? ? ? F ?? ?? r F a LL ? . LL j a c LL E2 2 2 u u u LL u u " u u z u` F u LL u ? 'E . u LL ? LL °t. LL? a LL i a E ? '% x x gg gg .. ? u 4 !p ?- F- u - a s 3 3 i 3 v 3 §$ 3 w v a• S• E ?' 3 3 i o i $ T a m o ' Q o I n c a € °a ? E - r ? c c _ ? I - yyqq 0 4 ¢ u e C '°°' $ C a e C S e ? C a m c s a°. 8 ? $ ? 2 ? ? a $ ¢ ¢ a a ° °° b a ? Yn c 8- ; E ° P? w° - p ° . a 8 p - c ° R Y a' g ° $ ? z ° co 8 ° ° p? °' c c m W u $? ci o a y- a °` ,Q ; ''" .o ER 81 s w o w 5 v z 'a a £' 5 E c7 q? s, . - e ° S $ > $ m -- c r o C .: ,a s rc ' a rc y $ c a .. t5 . 8 - 8 0 _ $ _ E n ° i -c5 a v? ^ qa °o E :S E ~ 8 ?' '? Q ? .i °° - $ E ? r -a ?C• ? -" g c ?C• EE E ? - ? ? n 5 ? $ 3 - rc ,3` a -°. i m ?W , °- ?R p A i? X3 R S ?< Q 8 w 1 4 e Exhibit D-3 Payment (Negotiated Hourly Rate) [This exhibit applies to Subconsultant Greenman - Pedersen, Inc. only, and replaces Exhibit D-3 (Provisional Hourly Rate) contained in the original Consultant Agreement] The CONSULTANT shall be paid by the AGENCY for completed work and services rendered under this AGREEMENT as provided hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work. The CONSULTANT shall conform to all applicable portions of 48 CFR 31. Hourly Rates: The CONSULTANT shall be paid by the AGENCY for work done, based upon the negotiated hourly rates shown in Exhibits "E" and "F" attached hereto and by this reference made part of this AGREEMENT. The rates listed shall be applicable for the first twelve (12) month period and shall be subject to negotiation for the following twelve (12) month period upon request of the CONSULTANT or the AGENCY. If negotiations are not conducted for the second or subsequent twelve (12) month periods within ninety (90) days after completion of the previous period, the rates listed in this AGREEMENT, or subsequent written authorization(s) from the AGENCY shall be utilized. The rates are inclusive of direct salaries, payroll additives, overhead, and fee. The CONSULTANT shall maintain support data to verify the hours billed on the AGREEMENT. 2. Direct Non-Salary Costs: Direct Non-Salary Costs will be reimbursed at the Actual Cost to the CONSULTANT. These charges may include, but are not limited to the following items: travel, printing, long distance telephone, supplies, computer charges, and sub-consultant costs. a. Air or train travel will be reimbursed only to economy class levels unless otherwise approved by the AGENCY. The CONSULTANT shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with the AGENCY'S Travel Rules and Procedures. However, air, train, and rental car costs shall be reimbursed in accordance with 48CFR Part 31.205-46 "Travel Costs." b. The billing for Direct Non-Salary Costs shall include an itemized listing of the charges directly identifiable with the PROJECT. c. The CONSULTANT shall maintain the original supporting documents in their office. Copies of the original supporting documents shall be supplied to the AGENCY upon request. d. All above charges must be necessary for the services provided under this AGREEMENT. 3. Management Reserve Fund: The AGENCY may desire to establish a Management Reserve Fund to provide the Agreement Administrator with the flexibility to authorize additional funds to the AGREEMENT for allowable unforeseen costs, or reimbursing the CONSULTANT for additional work beyond that already defined in this AGREEMENT. Such authorization(s) shall be in writing and shall not exceed the lesser of $100,000 or 10% of the Total Amount Authorized as shown in the heading of this AGREEMENT. The amount included for the Management Reserve Fund is shown in the heading of this AGREEMENT. This fund may not be replenished. Any changes requiring additional costs in excess of the Management Reserve Fund shall be made in accordance with Section XIV, "Extra Work." 4. Maximum Total Amount Payable: The Maximum Total Amount Payable by the AGENCY to the CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized, and the Management Reserve Fund. The Maximum Total Amount Payable does not include payment for Extra Work as stipulated in Section XIV, "Extra Work." No minimum amount payable is guaranteed under this AGREEMENT. Monthly Progress Payments: Progress payments may be claimed on a monthly basis for all costs authorized in 1 and 2 above. The monthly billings shall be supported by detailed statements for hours expended at the rates established in Exhibit "E", including names and classifications of all employees, and billings for all direct non-salary expenses. To provide a means of verifying the billed salary costs for the CONSULTANT'S employees, the AGENCY may conduct employee interviews. These interviews may consist of recording the names, titles, salary rates, and present duties of those employees performing work on the PROJECT at the time of the interview. 6 Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be made promptly upon its verification by the AGENCY after the completion of the work under this AGREEMENT, contingent upon receipt of all PS&E, plans, maps, notes, reports, electronic data and other related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to the AGENCY by the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may pursue with respect to such claims. The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time of final audit, all required adjustments will be made and reflected in a final payment. In the event that such final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment to the AGENCY within thirty (30) days of notice of the overpayment. Such refund shall not constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY of overpayment. The CONSULTANT has twenty (20) days after receipt of the final POST AUDIT to begin the appeal process to the AGENCY for audit findings. Inspection of Cost Records: The CONSULTANT and their sub-consultants shall keep available for inspection by representatives of the AGENCY, STATE, and the United States, for a period of three (3) years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon these records with the following exception: if any litigation, claim or audit arising out of, in connection with, or related to this contract is initiated before the expiration of the three (3) year period, the cost records and accounts shall be retained until such litigation, claim, or audit involving the records is completed. J Exhibit G-1 Subconsultant Fee Determination - Summary Sheet (Mandatory when Subconsultants are utilized) Project: Queets Bridge Painting, CR1881 Sub Consultant: Greenman - Pedersen, Inc. DIRECT SALARY COST (DSC): Classification Man Hours Rate = Paint Expert/Vice President 88.00 x 58.50 Project Mgr./Paint Expert 258.00 x 40.00 NACE Inspector 0.0 x 32.50 Clerical 20.0 x 24.50 X X x x TOTAL DSC = OVERHEAD (OH cost - including Salary Additives): OH Rate x DSC of 143.23 % x $15,958.00 = FIXED FEE (FF): FF Rate x DSC of 35% x $ 15,958.00 = REIMBURSABLES: Itemized SUBCONSULTANT TOTAL GRAND TOTAL Cost $5,148.00 $10,320.00 $0,000.00 $490.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $15,958.00 $22,857.21 $5,585.30 $4,314.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $48,714.51 PREPARED BY: Alec Angus - GPI Project Mgr. DATE: April 20, 2012 Exhibit G-2 Subconsultant Fee Determination - Summary Sheet (Negotiated Hourly Rate - applies to Subconsultant Greenman - Pedersen, Inc. only) Fee Schedule Subconsultant Greenman - Pedersen, Inc. Discipline or Job Title Hourly Rate Overhead 143.23% Profit 35.00 % Rate Per Hour Paint Expert / Vice President 58.50 83.79 20.48 162.77 Project Manager / Paint Expert / Asst. VP 40.00 57.29 14.00 111.29 NACE Inspector 32.50 46.55 11.38 90.43 Clerical 24.50 35.09 8.58 68.17 W Greenman-Pedersen, Inc. Exhibit G-3 Breakdown of Subconsultants Overhead Cost Account Title Direct Labor Overhead Expenses Fringe Benefits FICA Unemployment Health/Accident Insurance Medical Aid & Industrial Insurance HolidayNacation/Sick Leave Commission/Bonus/Pension Total Fringe Benefits General Overhead State B&O Taxes Insurance Administration & Time not Assignable Printing, Stationery & Supplies Professional Services Travel not Assignable Telephone & Telegraph not Assignable Fees, Dues & Professional Meetings Utilities & Maintenance Professional Development Rent Equipment Support (ind Depr & FCCM) Office, Misc & Postage Total General Expenses Total Overhead (Fringe & General) Overhead Rate (Total OH / Direct Labor) $ Balance % of Direct Labor 50,356,755 100.00% 5,385,638 10.69% 802,081 1.59% 7,918,012 15.72% 0.00% 9,030,352 17.93% 14,857,866 29.51% 37,993,949 75.45% 384,488 0.76% 2,330,977 4.63% 15,085,842 29.96% 1,313,637 2.61% 1,076,867 2.14% 2,240,625 4.45% 589,948 1.17% 432,192 0.86% 998,863 1.98% 287,660 0.57% 4,019,150 7.98% 5,111,990 10.15% 259,954 0.52% 34,132,193 67.78% 72,126,142 143.23% 143.23% 1- 6 Local Agency Standard Consultant Agreement ®Architectural/Engineering Agreement ? Personal Services Agreement Agreement Number Queets 2011-1 Federal Aid Numberv U BHOS-16WA(001) Agreement Type (Choose one) ? Lump Sum Lump Sum Amount $ ? Cost Plus Fixed Fee Overhead Progress Payment Rate Overhead Cost Method ? Actual Cost ? Actual Cost Not to Exceed ? Fixed Rate Fixed Fee $ ® Specific Rates Of Pay ® Negotiated Hourly Rate ? Provisional Hourly Rate ? Cost Per Unit Maximum Amount Payable $172,361.22 Index of Exhibits (Check all that apply): ® Exhibit A-1 Scope of Work ® Exhibit G-2 Fee-Sub Specific Rates ? Exhibit A-2 Task Order Agreement ® Exhibit G-3 Sub Overhead Cost ? Exhibit B-1 DBE Utilization Certification ® Exhibit H Title VI Assurances ® Exhibit C Electronic Exchange of Data ® Exhibit I Payment Upon Termination of Agreement ? Exhibit D-I Payment - Lump Sum ® Exhibit J Alleged Consultant Design Error Procedures ? Exhibit D-2 Payment - Cost Plus ® Exhibit K Consultant Claim Procedures ® Exhibit D-3 Payment - Hourly Rate ? Exhibit L Liability Insurance Increase ® Exhibit D-4 Payment - Provisional ® Exhibit M-la Consultant Certification ? Exhibit E-1 Fee - Lump/Fixed/Unit ® Exhibit M-lb Agency Official Certification ® Exhibit E-2 Fee - Specific Rates ® Exhibit M-2 Certification - Prima ? Exhibit F Overhead Cost ® Exhibit M-3 Lobbying Certification ® Exhibit G Subcontracted Work ® Exhibit M-4 Pricing Data Certification ® Exhibit G-1 Subconsultant Fee ? A . 31.910 Supplemental Signature Page THIS AGREEMENT, made and entered into this 1 94 "` day of M 6, k/ (,1/) , Zu Z, between the Local Agency of Jefferson County, Washington, hereinafter called the "AGENCY", and the above organization hereinafter called the "CONSULTANT" DOT Form 140-089 EF Revised 3/2008 Consultant/Address/Telephone Integrity Structural Engineering, PLLC 4124 Interlake Ave. N. Seattle, WA. 98103 Project Title And Work Description Professional Engineering Services for: Queets Bridge Painting, Bridge No. SW, CR1881 Clearwater Road, M.P. 0.60 to M.P. 0.76 Co. Rd. No. 107508 DBE Participation ? Yes ®No % Federal ID Number or Social Security Number % 59-3807489 Do you require a 1099 for IRS. Completion Date ® Yes ?No December 31, 2013 Total Amount Authorized $172,361.22 Management Reserve Fund $0.00 PW-Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 1 of 42 WITNESSETH THAT: WHEREAS, the AGENCY desires to accomplish the above referenced project, and WHEREAS, the AGENCY does not have sufficient staff to meet the required commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide the necessary services for the PROJECT; and WHEREAS, the CONSULTANT represents that he/she is in compliance with the Washington State Statutes relating to professional registration, if applicable, and has signified a willingness to furnish Consulting services to the AGENCY, NOW THEREFORE, in consideration of the terms, conditions, covenants and performance contained herein, or attached and incorporated and made a part hereof, the parties hereto agree as follows: I General Description of Work The work under this AGREEMENT shall consist of the above described work and services as herein defined and necessary to accomplish the completed work for this PROJECT. The CONSULTANT shall furnish all services, labor, and related equipment necessary to conduct and complete the work as designated elsewhere in this AGREEMENT. II Scope of Work The Scope of Work and projected level of effort required for this PROJECT is detailed in Exhibit "A" attached hereto and by this reference made a part of this AGREEMENT. III General Requirements All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals shall receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and/or individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress and presentation meetings with the AGENCY and/or such Federal, State, Community, City or County officials, groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit "A." The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will outline in written and graphical form the various phases and the order of performance of the work in sufficient detail so that the progress of the work can easily be evaluated. The CONSULTANT, and each SUBCONSULTANT, shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The CONSULTANT, and each SUBCONSULTANT, shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of USDOT-assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this AGREEMENT that may result in the termination of this AGREEMENT. Participation for Disadvantaged Business Enterprises (DBE), if required, per 49 CFR Part 26, or participation of Minority Business Enterprises (MBE), and Women Business Enterprises (WBE), shall be shown on the heading of this AGREEMENT. If D/M/WBE firms are utilized, the amounts authorized to each firm and their certification number will be shown on Exhibit "B" attached hereto and by this reference made a part of this AGREEMENT. If the Prime CONSULTANT is a DBE firm they must comply with the Commercial Useful Function (CUF) regulation outlined in the AGENCY'S "DBE Program Participation Plan". The mandatory DBE participation goals of the AGREEMENT are those established by the WSDOT'S Highway and Local Programs Project Development Engineer in consultation with the AGENCY. PW_Forms/Standard Consultant Agreement with Exhibits Revised i inn i Page 2 of 42 All Reports, PS&E materials, and other data furnished to the CONSULTANT by the AGENCY shall be returned. All electronic files, prepared by the CONSULTANT, must meet the requirements as outlined in Exhibit "C." All designs, drawings, specifications, documents, and other work products, including all electronic files, prepared by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of service for this PROJECT, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or on behalf of the AGENCY of any such instruments of service, not occurring as a part of this PROJECT, shall be without liability or legal exposure to the CONSULTANT. IV Time for Beginning and Completion The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing by the AGENCY. All work under this AGREEMENT shall be completed by the date shown in the heading of this AGREEMENT under completion date. The established completion time shall not be extended because of any delays attributable to the CONSULTANT, but may be extended by the AGENCY in the event of a delay attributable to the AGENCY, or because of unavoidable delays caused by an act of GOD or governmental actions or other conditions beyond the control of the CONSULTANT. A prior supplemental agreement issued by the AGENCY is required to extend the established completion time. V Payment Provisions The CONSULTANT shall be paid by the AGENCY for completed work and services rendered under this AGREEMENT as provided in Exhibit "D" attached hereto, and by reference made part of this AGREEMENT. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work. The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31. A post audit may be performed on this AGREEMENT. The need for a post audit will be determined by the State Auditor, WSDOT External Audit Office and/or at the request of the AGENCY' S PROJECT Manager. VI Sub-Contracting The AGENCY permits sub-contracts for those items of work as shown in Exhibit "G" attached hereto and by this reference made part of this AGREEMENT. Compensation for this sub-consultant work shall be based on the cost factors shown on Exhibit "G." The work of the sub-consultant shall not exceed its maximum amount payable unless a prior written approval has been issued by the AGENCY. All reimbursable direct labor, overhead, direct non-salary costs and fixed fee costs for the sub-consultant shall be substantiated in the same manner as outlined in Section V. All sub-contracts shall contain all applicable provisions of this AGREEMENT. With respect to sub-consultant payment, the CONSULTANT shall comply with all applicable sections of the Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.011. The CONSULTANT shall not sub-contract for the performance of any work under this AGREEMENT without prior written permission of the AGENCY. No permission for sub-contracting shall create, between the AGENCY and sub-contractor, any contract or any other relationship. A DBE certified sub-consultant is required to perform a minimum amount of their sub-contracted agreement that is established by the WSDOT Highways and Local Programs Project Development Engineer in. consultation with the AGENCY. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 3 of 42 VII Employment The CONSULTANT warrants that they have not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT, to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the AGENCY shall have the right to annul this AGREEMENT without liability or, in its discretion, to deduct from the AGREEMENT price or consideration or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen's Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made by a third party as a consequence of any act or omission on the part of the CONSULTANT'S employees or other persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of the CONSULTANT. The CONSULTANT shall not engage, on a full- or part-time basis, or other basis, during the period of the contract, any professional or technical personnel who are, or have been, at any time during the period of the contract, in the employ of the United States Department of Transportation, or the STATE, or the AGENCY, except regularly retired employees, without written consent of the public employer of such person. VIII Nondiscrimination During the performance of this contract, the CONSULTANT, for itself, its assignees, and successors in interest agrees to comply with the following laws and regulations: Title VI of the Civil Rights Act of 1964 (42 USC Chapter 21 Subchapter V Section 2000d through 2000d-4a) Federal-aid Highway Act of 1973 (23 USC Chapter 3 Section 324) Rehabilitation Act of 1973 (29 USC Chapter 16 Subchapter V Section 794) Age Discrimination Act of 1975 (42 USC Chapter 76 Section 6101 et seq.) Civil Rights Restoration Act of 1987 (Public Law 100-259) American with Disabilities Act of 1990 (42 USC Chapter 126 Section 12101 et. seq.) 49 CFR Part 21 23 CFR Part 200 RCW 49.60.180 In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit "H" attached hereto and by this reference made part of this AGREEMENT, and shall include the PW Forms/Standard Consultant Agreement with Exhibits Revised i in/11 Page 4 of 42 • attached Exhibit "H" in every sub-contract, including procurement of materials and leases of equipment, unless- exempt by the Regulations or directives issued pursuant thereto. IX Termination of Agreement The right is reserved by the AGENCY to terminate this AGREEMENT at any time upon ten (10) days written notice to the CONSULTANT. In the event this AGREEMENT is terminated by the AGENCY other than for default on the part of the CONSULTANT, a final payment shall be made to the CONSULTANT as shown in Exhibit "I" for the type of AGREEMENT used. No payment shall be made for any work completed after ten (10) days following receipt by the CONSULTANT of the Notice to Terminate. If the accumulated payment made to the CONSULTANT prior to Notice of Termination exceeds the total amount that would be due when computed as set forth herein above, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any excess paid. If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT, the above formula for payment shall not apply. In such an event, the amount to be paid shall be determined by the AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing the work to the date of termination, the amount of work originally required which was satisfactorily completed to date of termination, whether that work is in a form or a type which is usable to the AGENCY at the time of termination, the cost to the AGENCY of employing another firm to complete the work required and the time which may be required to do so, and other factors which affect the value to the AGENCY of the work performed at the time of termination, Under no circumstances shall payment made under this subsection exceed the amount, which would have been made using the formula set forth above. If it is determined for any reason that the CONSULTANT was not in default or that the CONSULTANT'S failure to perform is without the CONSULTANT'S or its employee's default or negligence, the termination shall be deemed to be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT would be reimbursed for actual costs in accordance with the termination for other than default clauses listed previously. In the event of the death of any member, partner or officer of the CONSULTANT or any of its supervisory personnel assigned to the PROJECT, or dissolution of the partnership, termination of the corporation, or disaffiliation of the principally involved employee, the surviving members of the CONSULTANT hereby agree to complete the work under the terms of this AGREEMENT, if requested to do so by the AGENCY. This subsection shall not be a bar to renegotiation of the AGREEMENT between the surviving members of the CONSULTANT and the AGENCY, if the AGENCY so chooses. In the event of the death of any of the parties listed in the previous paragraph, should the surviving members of the CONSULTANT, with the AGENCY' S concurrence, desire to terminate this AGREEMENT, payment shall be made as set forth in the second paragraph of this section. Payment for any part of the work by the AGENCY shall not constitute a waiver by the AGENCY of any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the CONSULTANT, or for failure of the CONSULTANT to perform work required of it by the AGENCY. Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those rights with respect to any fixture act or omission by the CONSULTANT. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 5 of 42 X Changes of Work The CONSULTANT shall make such changes and revisions in the complete work of this AGREEMENT as necessary to correct errors appearing therein, when required to do so by the AGENCY, without additional compensation thereof. Should the AGENCY find it desirable for its own purposes to have previously satisfactorily completed work or parts thereof changed or revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be considered as Extra Work and will be paid for as herein provided under Section XIV. XI Disputes Any dispute concerning questions of fact in connection with the work not disposed of by AGREEMENT between the CONSULTANT and the AGENCY shall be referred for determination to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and binding on the parties of this AGREEMENT; provided, however, that if an action is brought challenging the Director of Public Works or AGENCY Engineer's decision, that decision shall be subject to de novo judicial review. If the parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under the procedures found in Exhibit "J", and disputes concerning claims will be conducted under the procedures found in Exhibit "K". XII Venue, Applicable Law, and Personal Jurisdiction In the event that either party deems it necessary to institute legal action or proceedings to.enforce any right or obligation under this AGREEMENT, the parties hereto agree that any such action shall be initiated in the Superior court of the State of Washington, situated in the county in which the AGENCY is located. The parties hereto agree that all questions shall be resolved by application of Washington law and that the parties to such action shall have the right of appeal from such decisions of the Superior court in accordance with the laws of the State of Washington. The CONSULTANT hereby consents to the personal jurisdiction of the Superior court of the State of Washington, situated in the county in which the AGENCY is located. XIII Legal Relations The CONSULTANT shall comply with all Federal, State, and local laws and ordinances applicable to the work to be done under this AGREEMENT. This contract shall be interpreted and construed in accordance with the laws of the State of Washington. The CONSULTANT shall indemnify and hold the AGENCY and the STATE and its officers and employees harmless from and shall process and defend at its own expense all claims, demands, or suits at law or equity arising in whole or in part from the CONSULTANT'S negligence or breach of any of its obligations under this AGREEMENT; provided that nothing herein shall require a CONSULTANT to indemnify the AGENCY or the STATE against and hold harmless the AGENCY or the STATE from claims, demands or suits based solely upon the conduct of the AGENCY or the STATE, their agents, officers and employees; and provided further that if the claims or suits are caused by or result from the concurrent negligence of (a) the CONSULTANT' S agents or employees, and (b) the AGENCY or the STATE, their agents, officers and employees, this indemnity provision with respect to (1) claims or suits based upon such negligence (2) the costs to the AGENCY or the STATE of defending such claims and suits shall be valid and enforceable only to the extent of the CONSULTANT'S negligence or the negligence of the CONSULTANT S agents or employees. The CONSULTANT'S relation to the AGENCY shall be at all times as an independent contractor. The CONSULTANT shall comply with all applicable sections of the applicable Ethics laws, including RCW 42.23, which is the Code of Ethics for regulating contract interest by municipal officers. The CONSULTANT specifically assumes potential liability for actions brought by the CONSULTANT'S own employees against the AGENCY and, solely for the purpose of this indemnification and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51 RCW. Unless otherwise specified in the AGREEMENT, the AGENCY shall be responsible for administration of construction contracts, if any, on the PROJECT. Subject to the processing of a new sole source, or an PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 6 of 42 acceptable supplemental agreement, the CONSULTANT shall provide On-Call assistance to the AGENCY during contract administration. By providing such assistance, the CONSULTANT shall assume no responsibility for: proper construction techniques, job site safety, or any construction contractor's failure to perform its work in accordance with the contract documents. The CONSULTANT shall obtain and keep in force during the terms of the AGREEMENT, or as otherwise required, the following insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. Insurance Coverage A. Worker's compensation and employer's liability insurance as required by the STATE. B. Commercial general liability and property damage insurance in an aggregate amount not less than two million dollars ($2,000,000) for bodily injury, including death and property damage. The per occurrence amount shall not exceed one million dollars ($1,000,000). C. Vehicle liability insurance for any automobile used in an amount not less than a one million dollar ($1,000,000) combined single limit. D. Professional liability (Errors and Omissions) policy in an amount of not less than one million dollars ($1,000,000.00) combined single limit if any employee, agent or representative of the CONSULTANT undertaking work in furtherance of or pursuant to this Agreement holds or is required to hold a professional license issued by the State of Washington or any other state. Excepting the Worker's Compensation Insurance and any Professional Liability Insurance secured by the CONSULTANT, the AGENCY will be named on all policies as an additional insured. The CONSULTANT'S insurance required by this Section shall be in all circumstances primary to any insurance available to the AGENCY. The CONSULTANT shall furnish the AGENCY with verification of insurance and endorsements required by the AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all required insurance policies at any time. Excepting the Worker's Compensation Insurance and any Professional Liability Insurance secured by the CONSULTANT, the AGENCY will be named on all policies as an additional insured. The CONSULTANT shall furnish the AGENCY with verification of insurance and endorsements required by the AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all required insurance policies at any time. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. The CONSULTANT shall submit a verification of insurance as outlined above within fourteen (14) days of the execution of this AGREEMENT to the AGENCY. No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY. The CONSULTANT'S professional liability to the AGENCY shall be limited to the amount payable under this AGREEMENT or one million ($1,000,000) dollars, whichever is the greater, unless modified by Exhibit "L". In no case shall the CONSULTANT'S professional liability to third parties be limited in any way. The AGENCY will pay no progress payments under Section V until the CONSULTANT has fully complied with this section. This remedy is not exclusive; and the AGENCY and the STATE may take such other action as is available to it under other provisions of this AGREEMENT, or otherwise in law. XIV Extra Work A. The AGENCY may at any time, by written order, make changes within the general scope of the AGREEMENT in the services to be performed. PW Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 7 of 42 B. If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the work under this AGREEMENT, whether or not changed by the order, or otherwise affects any other terms and conditions of the AGREEMENT, the AGENCY shall make an equitable adjustment in the (1) maximum amount payable; (2) delivery or completion schedule, or both; and (3) other affected terms and shall modify the AGREEMENT accordingly. C. The CONSULTANT must submit any "request for equitable adjustment", hereafter referred to as "CLAIM", under this clause within thirty (30) days from the date of receipt of the written order. However, if the AGENCY decides that the facts justify it, the AGENCY may receive and act upon a CLAIM submitted before final payment of the AGREEMENT. D. Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed. E. Notwithstanding the terms and conditions of paragraphs (A) and (B) above, the maximum amount payable for this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement to this AGREEMENT. XV Endorsement of Plans If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other engineering data furnished by them. XVI Federal and State Review The Federal Highway Administration and the Washington State Department of Transportation shall have the right to participate in the review or examination of the work in progress. XVII Certification of the Consultant and the Agency Attached hereto as Exhibit "M- 1 (a and b)" are the Certifications of the CONSULTANT and the AGENCY, Exhibit "M-2" Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions, Exhibit "M-3" Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying and Exhibit "M-4" Certificate of Current Cost or Pricing Data. Exhibit "M-3" is required only in AGREEMENTS over $100,000 and Exhibit "M-4" is required only in AGREEMENTS over $500,000. XVIII Complete Agreement This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as an amendment to this AGREEMENT. XIX Execution and Acceptance This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements, representations, warranties, covenants, and agreements contained in the proposal, and the supporting material submitted by the CONSULTANT, and does hereby accept the AGREEMENT and agrees to all of the terms and conditions thereof. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 8 of 42 In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the "Execution Date" box on page one (1) of this AGREEMENT. Integrity Structural Engineering, PLLC Consultant (Please print) Consultant's Name (Please print) e 57 Consultant's Signature 31 7-1 )2 Date COUNTY OF JEFFERSON BOARD OF COMMISSIONERS John lal)2, Phil Joflnson,)t"4'ober ? "7 David W. Sullivan. Member 154-? Approved as to form only this d of , 2012 David Alvarez Deputy Proocuti Attorney Frank Giffo Date Public Works Director PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 9 of 42 EXHIBIT A-1 SCOPE OF WORK FOR ENGINEERING SERVICES QUEETS BRIDGE PAINTING Bridge No. 8W Clearwater Road M.P. 0.60 to M.P. 0.76 County Road Project CR1881 County Road Number 107508 OBJECTIVES: The objective of the proposed work is to provide the preliminary engineering, construction documentation, and construction engineering support necessary for the painting of Jefferson County's Queets Bridge. Queets Bridge is located on the Clearwater Road between M.P. 0.60 and M.P. 0.76, approximately 45 miles from Forks, WA. and 65 miles from Aberdeen, WA., in Section 19, Township 24 North, Range 12 West, W.M. The bridge is 844 feet long and 37 feet wide, out-to-out. The superstructure is comprised of steel plate girders, cross-bracing, and a concrete deck. The girders are made from weathering steel which were painted when the bridge was constructed in 1988. The painting is planned for 2013. All work is to be performed per the WSDOT Standard Specifications for Road, Bridge, and Municipal Construction, the AASHTO Standard Specifications for Highway Bridges, and the Steel Structures Painting Council (SSPC) Painting Manuals. The proposed scope of work for this project is divided into two phases. Phase I: Preliminary Engineering includes: Project Management, Preparation of Preliminary Design Report, Environmental Services and Permitting, and Preparation of Plans, Specifications, and Estimates. Phase II: Construction Engineering includes Construction Engineering Support Services. The Consultant may be considered for negotiation of Phase 11 work after successful completion of the Phase I work. The Consultant will be responsible for any and all work and materials necessary to provide the preliminary engineering, construction documentation, and construction engineering support required for this project. The Consultant's work effort shall be to complete the tasks as specified in this scope to the satisfaction of the Jefferson County Public Works (Agency). AGENCY'S RESPONSIBILITIES: a. Right of Entry and access to the project for all required services. b. Payment for permit fees associated with the project. c. Provide review comments and revisions for all Consultant deliverables. d. Provide all readily available project information to the Consultant, (original bridge plans, bridge inspection report) e. Provide typical formats for plan sheets and sample specifications. f. Provide standard Agency special provisions to be included in the project Special Provisions. g. Provide internal coordination within Jefferson County for reviews, permits, and approvals. h. Provide and manage the construction bidding process. i. Provide a part-time construction inspector during the construction phase. DESIGN CRITERIA: a. Steel Structures Painting Council (SSPC) Painting Manuals, latest edition b. WSDOT Local Agency Guidelines Manual, latest edition c. WSDOT Standard Specifications for Road, Bridge, and Municipal Construction, latest edition d. WSDOT Standard Plans for Road, Bridge, and Municipal Construction, latest edition e. WSDOT Bridge Design Manual, latest edition f. AASHTO Standard Specifications for Highway Bridges, latest edition g. WSDOT Design Manual, latest edition h. WSDOT Plans Preparation Manual, latest edition i. WSDOT Environmental Procedures manual, latest edition j. WSDOT Construction Manual, latest edition PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 10 of 42 PHASE I: PRELIMINARY ENGINEERING TASKS TASK 1: PROJECT MANAGEMENT, ADMINISTRATION AND COORDINATION, QUALITY ASSURANCE/QUALITY CONTROL This task includes management of the Consultant's work effort, management of scope and budget, management of schedule and delivery dates, coordination of the Consultant's activities with the Agency and Subconsultants, and submittal of project progress reports and invoices. Subtask 1.1 -Project Management and Administration This work includes monitoring monthly progress and the status of individual work elements, project meetings, and work planned for the following month. The Consultant will document the current project status and provide projections for remaining work and expenditures. This work also includes preparation of project correspondence, submittals, transmittals, and management of Consultant's personnel for this project. The Consultant will be required to coordinate the work effort involved in all tasks under this agreement with the Agency. Prior to beginning any work, the Consultant will establish a project manager dedicated to this project, who will be the Consultant contact for the Agency. This work includes the preparation, attendance, follow-up, and documentation of meetings for the duration of the project. These meetings will be used by the Agency to provide input and guidance for the Consultant team, and will be used to discuss submittals, identify project issues, and develop solutions. The Consultant will prepare meeting agenda and distribute to the Agency a minimum of two working days prior to each meeting. The Consultant will prepare and distribute meeting notes with required actions to all meeting participants within 5 working days of the meeting. The initial project meeting will be held at the Jefferson County Department of Public Works office in Port Townsend. Subsequent meetings may be held at the Agency's Port Townsend office or by phone as directed by the Agency. Provide monthly written progress reports submitted with the monthly project invoice, which shall include the following for the Consultant and any Subconsultants: a. Progress-to-date for that month. Provide detailed description of the work completed by each employee. b. Progress compared to original schedule and anticipated progress next month. c. Anticipated problems and delays for the Consultant's work. d. Quality Assurance/Quality Control review documentation e. Updated schedule of individual work elements. f. Critical path schedule for the Consultant's work. Provide invoices for accomplished work at a frequency not to exceed one per calendar month. The Agency will disallow all or part of any claimed cost, which is not adequately supported by documentation. Invoices shall include the following for the Consultant and any Subconsultants: a. Name of each employee that worked on the project in the billing period b. Each employee's job classification. c. Each employee's hours worked. d. Each employee's regular and overtime hourly wage rates. e. The total wages paid each employee, f. Each invoice will also include all direct non-salary costs and copies of supporting invoices or bills. g. All mileage charges will be supported by departure and arrival odometer readings for all vehicles used for the work. Mileage charges will be paid at the current IRS standard mileage rate. h. Copies of invoices from any Subconsultants used on this project, with copies of associated invoices for non-salary costs. i. Perdiem rates will be paid per the current published State of Washington Perdiem Rates, (www. ofm. wa. gov/resourcesltravel/colormap. pdo. Meetings: One initial project meeting at the Agency's office in Port Townsend. Subsequent progress meetings will be as directed by the Agency. Deliverables: Meeting agendas and meeting notes with required actions, monthly progress reports including updated schedules, critical path schedules, and monthly project invoices. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 11 of 42 Subtask 1.2 - Coordination with Subconsultant Direction of the Subconsultant and review of their work for the project will be provided by the Consultant. This work includes reviewing the status of individual work elements, review of monthly Subconsultant progress reports and invoices, attending meetings, and planning of work items for the following month. The Subconsultant will meet with the Consultant prior to the start of any work. The Subconsultant's work plan, expectations, report and plans format, review process, deliverables, and examples of required documentation will be discussed and agreed to at that time. Meetings: One meeting between the Consultant and the Subconsultant to prepare the subconsultant agreement contract and the invoice and progress report format. Deliverables: Monthly Subconsultant progress reports and Subconsultant project invoices. Subtask 1.3 - Quality Assurance/Quality Control The Consultant will provide Quality Assurance/Quality Control (QA/QC) for the services provided under this scope of work. The Consultant will include quality assurance review on deliverables by a designated staff member highly qualified in bridge painting engineering. The review will cover documents, reports, plans, and other project information for the duration of the project. The cost of the QA/QC services is to be included individually under each Task. Potential changes to the project scope, schedule, and budget identified in the quality control process, will be reported to the Agency immediately. Meetings: QA/QC work to be discussed in the initial Agency project meeting and subsequent Agency meetings. Deliverables: Documentation of quality assurance/quality control review will be included in the monthly progress reports TASK 2: PRELIMINARY DESIGN REPORT The Consultant will review the reference material provided by the Agency and any other relevant information that is available. The Consultant will visit the bridge site, perform tests and measurements, and prepare a Preliminary Design Report for the painting of the Queets Bridge. Subtask 2.1: Field Inspection and Data Collection The key member(s) of the Consultant team will travel to the bridge site and perform field inspection, testing, and measurements to evaluate and establish the existing paint condition. The field inspection will include: 1. A close visual inspection of the existing bridge structure. 2. Photographs with captions of significant features regarding corrosion, paint, etc, 3. Preparation of a bridge paint inspection report. The field testing and measurements may include: 1. Taking existing paint thickness measurements. 2. Performing adhesion tests in accordance with applicable ASTM standards. 3. Taking representative paint samples for analysis of heavy metals. Testing will be done by a materials testing firm with the appropriate accreditations. 4. Take representative soil samples prior to performing any work. Soil samples will be held and an analysis performed only in the event there is an environmental challenge. 5. Paint test patch application and evaluation. Procure the primers that are specified in the WSDOT Standard Specifications and other possible candidate primers. Procure the materials and supplies to perform the paint test application. Prepare the surfaces and apply the various primers to readily accessible locations on the bridge that require no special rigging. Return to the bridge and evaluate the test patches with adhesion tests, visual examination and photographs. The Consultant will provide an Under Bridge Inspection Truck (UBIT) for bridge paint inspection and evaluation. The Consultant will provide traffic control for bridge paint inspection and evaluation. PW-Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 12 of 42 Deliverables: Bridge paint inspection report, testing and measurements will be included in the Preliminary Design Report. Subtask 2.2: Preliminary Design Report The Consultant will review the information collected from the field inspection, testing, and measurements, the reference material provided by the Agency including a completed WSDOT Steel Bridge Paint form, Bridgeworks program data, and existing bridge plans. The Consultant will prepare a preliminary design report which describes the existing condition of the bridge paint, presents the testing and measurement data, discusses any construction issues, proposes containment systems and painting options, provides recommendations for painting materials and methods, and provides painting cost estimates. The preliminary design report will also provide a determination of the need for a construction easement / permit for contractor staging areas. Size and locations for the construction easement/permit will also be provided. The Consultant will provide revisions as requested by the Agency, for preparation of the final Preliminary Design Report. The Consultant shall stamp & sign the final Preliminary Design Report. Deliverables: • 80% Preliminary Design Report: MS Word file, PDF file • 100% Preliminary Design Report (stamped and signed): MS Word file, PDF file and printed original. TASK 3: ENVIRONMENTAL SERVICES AND PERMITTING This task includes preparing and obtaining approval for all required environmental documents for this federally funded project. The Consultant will be responsible for satisfying the requirements for the National Environmental Policy Act (NEPA), Section 7 of the Endangered Species Act, Section 106 of the National Historic Preservation Act, State Environmental Policy Act, and all other required State and Local approvals and permits. Subtask 3.1: Environmental Documentation The Consultant will determine which environmental approvals and permits are required for this project. The Consultant will prepare and obtain approvals for all required environmental documents. The following documents are typically required for construction projects: a. ESA Section 7, Biological Assessment b. Section 106, NHPA c. NEPA checklist: Environmental Classification Summary (ECS). WSDOT and FHWA approvals required. d. SEPA checklist: Jefferson County Department of Community Development (JCDCD) approval required e. JARPA: 1. Wetland Delineation Report: 2. JARPA 3. USACE Section 404 review 4. USACE Section 10 review 5. HPA, WDF&W review 6. WSDOE 401 permit review f. WSDOE Coastal Zone Management Review g. Jefferson County Master Application h. Jefferson County Stormwater Permit Application i. Jefferson County Shoreline Permit Application j. Additional environmental documents and approvals as determined. Prior to initiating environmental work, the Consultant will participate in a conference call(s) with the Agency and WSDOT Local Programs Environmental staff to determine the appropriate level of environmental permitting. A preliminary ECS form will be completed and reviewed by the Agency and Local Programs early in the Preliminary Engineering phase and prior to proceeding with additional work. All required project environmental documentation will be developed following the WSDOT Local Agency Guidelines manual. The Consultant will attend a pre-application meeting at the Jefferson County Department of Community Development (JCDCD). PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 13 of 42 The Consultant will prepare the draft applications and permits and provide copies to the Agency for review. The consultant will revise the draft applications and permits per the Agencies review for final documents. The Consultant will respond to comments from WSDOT, JCDCD, and the resource agencies. The Consultant will apply for and obtain all required approvals and permits from the appropriate regulatory agencies. The Agency will provide all permitting fees. WSDOT will be the official lead agency for NEPA issues and will be responsible for federal agency coordination and concurrence. JCDCD will be the official lead agency for SEPA issues and will be responsible for state agency coordination and concurrence. Deliverables: Draft and Final applications and permits for all required environmental documents. TASK 4: PLANS, SPECIFICATIONS AND ESTIMATE (PS&E) This task includes design of the bridge preparation / painting system and preparation of the Plans, Specifications and Estimate. The PS&E package shall be prepared to meet all applicable standards as listed under Design Criteria. The Consultant shall provide a Professional Engineer's stamp and signature on the following documents: Design documents, Plan sheets, Specifications, Special Provisions, Estimates. The Consultant shall assist in coordinating the Bridge Replacement Off System grant funds for the construction phase with FHWA/WSDOT. Subtask 4.1: Design The Consultant shall provide the design for the following items: a. Abrasive containment system including wind & containment load verification. b. Abrasive blasting to remove existing paint. c. Treatment of pack rust. d. Repainting with a primer and top coat painting system. e. Other painting operations as needed. f. Traffic control for construction activities (One-lane or two-lane closures, and detours. Two lane closures longer than 1 hour will not be allowed.) Subtask 4.2 Plans The Consultant shall prepare plans for bridge preparation and painting in accordance with the WSDOT Plans Preparation Manual and Jefferson County Public Works standard construction plan sheets. The plans shall include the following sheets, but not be limited to: a. Vicinity Map and Drawing Index b. Summary of Quantities c. Bridge Layout/Painting Plan and General Notes d. Traffic Control Plans The Agency will review the plans (30%, 60%, and 90%) and the Consultant shall incorporate the Agency's comments in the plans. Deliverables: • 30% Check Plans: AutoCAD file, PDF file and 11"x17" printed copy • 60% Check Plans: AutoCAD file, PDF file and 11"x17" printed copy • 90% Check Plans: AutoCAD file, PDF file and 11"x17" printed copy • 100% Final Plans (stamped and signed): AutoCAD file, PDF file, 11"x17" printed original, 22"04" printed original. Subtask 4.3 Specifications The Consultant shall assemble the specifications for this project. This work shall consist of obtaining current WSDOT amendments, general special provisions (GSPs), bridge special provisions (BSPs), and writing project special provisions. The Agency will provide standard Agency special provisions to the Consultant, for incorporation into the project special provisions. The Agency will provide standard contract document sheets to the Consultant to incorporate into the project specification package. The Consultant will be responsible for assembling the final contract documents (plans, contract provisions and bid proposal). The Consultant will provide a copy of the final assembled contract documents to the Agency for review. The Consultant shall provide a final contract document package to the Agency after all revisions have been completed by the Consultant. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 14 of 42 Deliverables: • 30% Check Project Special Provisions: MS Word file, PDF file and printed copy • 60% Check Specifications: MS Word file, PDF file and printed copy • 90% Check Specifications: MS Word file, PDF file and printed copy • 100% Final Specifications (stamped and signed): MS Word file, PDF file and printed original. Subtask 4.4 Estimate The Consultant shall prepare an Engineer's Estimate to reflect the expected construction costs for this project. The estimate shall include WSDOT standard bid item names, quantities, unit measures, unit costs, item costs, and total cost. The Engineer's Estimate shall include a list of assumptions used in the preparation of the estimate. The Consultant shall prepare detailed backup quantity calculations for all bid items. The backup quantity calculations for lump sum items will include detailed "breakout" calculations. The Consultant shall provide the Agency with printed copies of the quantity calculations in an organized binder. The consultant shall provide the Agency with updated quantity calculations as stated under Deliverables. Deliverables: • 60% Check Estimate and quantity calculations: MS Excel file, PDF file and printed copy • 90% Check Estimate and quantity calculations: MS Excel file, PDF file and printed copy • 100% Final Estimate and quantity calculations (stamped and signed): MS Excel file, PDF file and printed original, final quantity calculations to be submitted in an organized binder. Subtask 4.5: Clarification of Design Intent This task includes responding to requests from bidders (via the Agency) for clarification of design intent during the bidding process. The Consultant's responses to requests for clarification of design intent will be used by the Agency for issuing addendums or informational bulletins to bidders. The Consultant shall treat the requests for clarification of design intent as high priority tasks and respond to them as soon as possible and within one day maximum. For estimation purposes, it is assumed that the Consultant will review, and provide responses to 5 requests for clarification of design intent. Deliverables: Responses to requests for clarification of design intent (stamped & signed): PDF file PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 15 of 42 = m m; ?` o m ; 1 fA l f cl ' obi t N m' i O i V z?-, C o rvl?wt ? i N }N7 _ -Ay ? E . 8: f r 12 E -?. ? ? ? ? a ?n v> n v-.m ? .- .- « ? N N rv rv °' N m m 1O " m m e e; o i y r a = C/a ? LL ?? ? m 'a ? a 5 5 5 a a a s a a ?? a s ? - a ? a a a m p a s a ? a a s a ? j ?, LL LL d d d d n LL n n LL d n d n n n LL? :€ ? n? ? n 1? n n -:? n_ 3 d n 3 ? '? i . a N a a a s \ rv a `a a a a` F 51 a c .? S S a N `a ,_ a s a a s Z?w a s a a ° f ? E E E E f ? ?? E ? :E f E ? E g '? f ? a g b 8 $? g o' t m a « 0 d«« N 0 0 m 0 ? A o 0 ? 4 B e U g U a 4 ?° S E $ e _ » e ' °° 1d ? ? '? S H ? 6 - : ? a :K Vl a U y ' w w W s c o a - a c o. w O i'n n . - p m a P a - u b w v c w r P P _° d M d S E a P ?' N 8. ; E n l W 8 o f .e $ ° ;w S° ` E a z a Pi N $ ,$ u S w E .a ? 3 °; u y ,8 - a u rd .? "5 > Eq U ? `o ° K tl K y S ° w U «n 1- W 8E c° K :;? u y :? $ N a p qq P O N p P E o 0 d U E l U I _ ° a a U d ?? e? E ? :o o v g C ? Q n o r d a w U ?i ? d : d m? ? tq v w 3 V O k' O C oW ,e E o ? o LL a rc rc ? ? $ N $ E ,? v? ? E n° P w '? X u U ? a H ? q z ?? ? i O ? d d . ? n ? . .n . ? w _ _ : : I ?'Tn _ I« 1 y Im (.. t? ie yc tv a°`^3 m o' _... _..._ 'o, OW IS2 F_ __ _. _._.. __. .. .... __ __ _.. _ __.... __.. ._. ?sl 1 ? L ?I M ?fo;{ Ilk, i w?'I 1 of n ^? I ,n NCI { { 33NN'? . ? ? z dYj I o? t a y'v a ? i wl NON ? i 2 N ? 'L =1?i ? 3 ? N u { : I ?n x m v: _ w m w e N w .u O1 I.n m n n m m m m m m ao '$ - . w a w . j N N c c o c c_ c c a a o c n a n ti 45 a a i ? LL LL i $ LL LL LL $ .? $ € . . .- . . . .. .. F i 5 .T e .? .l a n a .3 .3 a C o f f ? F .- ? t- -.? _ E f !- ? - ?- h r LL LL LL LL LL LL Y, LL LL LL f A ?' v f a $ pp 9 v'. pp y 9 ; 3 e !! pp w v E m ; a' m b 3N ; O n N 3 3 3 3 o J f ? f $ a ? E ? ? -'a c 4' m a u I i e Q? i5 V m .e ? e o 6 2 g ? Ai ? ? ? ? " U ?o ? m °U c gJ ? o a i U N ? ? ? ? .°? E - ° ? ' u `? E s w 8 c n K u 2 44 a' a .p b :in i n a d l U S I wU - °' c $ u s E aco E 6 a K Z n Pri E $ F- = c ?/Sl ? w -:? -€ m ? m ? X a ? c ? 3 _N m $ h d E n a ?£ 'g b s '? °? -?- ? W a ? o ? a O c Y ? ? V 6 LL Q d ? N $ LL ? '.U $ U Q .e LL g QQ O m C . r6 -6 K ? ? -? N ci U w ? ' O ? ? $ N - - 2 N ? E U m ':2 Q pp : c ? ? :g Y' -? S e U Ti m B: i ? If E _? U? rc U? ? w° ? U Q LL m LL Z le `O+ In 6 un ' r n T. ? n ? ?n W Exhibit C Electronic Exchange of Engineering and Other Data In this Exhibit the agency, as applicable, is to provide a description of the format and standards the consultant is to use in preparing electronic files for transmission to the agency. The format and standards to be provided may include, but are not limited to, the following: Surveying, Roadway Design & Plans Preparation Section A. Survey Data: cadastral, topographic, and construction surveying: ASCII format or Land XML containing point numbers, coordinates in Washington Coordinate System Grid, point descriptions. B. Roadway Design Files: Agency's current Engineering computer program file format or Land XML format. C. Computer Aided Drafting Files: AutoCAD file format in the Agency's current version or older as agreed upon. D. Agency's Right to Review Product with the Consultant: The Agency shall have the right to review the submitted files with the Consultant at the Agency's discretion. E. Electronic Deliverables to Be Provided to the Agency: All Surveying data, maps, and plans; Preliminary engineering studies, calculations, computer program results, analyses, reports, correspondence, reviews, and photos; Preliminary, intermediate and final Permits, Cross-sections, Profiles, Plans, Specifications, Estimates, Schedules, Contract Documents, and Construction engineering and management documents. II. Any Other Electronic Files to Be Provided: As needed. III. Methods to Electronically Exchange Data A. Agency Software Suite: Microsoft Office (2007 or newer) programs, Autodesk AutoCAD 2009 through 2012 and/or Civil 3D 2012 programs, Eagle Point design programs. B. Electronic Messaging System: Microsoft outlook C. File Transfers Format: ASCII, Microsoft Office program formats, Autodesk program formats, Eagle Point program formats. D. Physical media: Transfer all data to the Agency on optical media: CD or DVD format PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 16 of 42 Exhibit D-3 Payment (Negotiated Hourly Rate) The CONSULTANT shall be paid by the AGENCY for completed work and services rendered under this AGREEMENT as provided hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work. The CONSULTANT shall conform to all applicable portions of 48 CFR 31. Hourly Rates: The CONSULTANT shall be paid by the AGENCY for work done, based upon the negotiated hourly rates shown in Exhibits "B" and "F" attached hereto and by this reference made part of this AGREEMENT. The rates listed shall be applicable for the first twelve (12) month period and shall be subject to negotiation for the following twelve (12) month period upon request of the CONSULTANT or the AGENCY. If negotiations are not conducted for the second or subsequent twelve (12) month periods within ninety (90) days after completion of the previous period, the rates listed in this AGREEMENT, or subsequent written authorization(s) from the AGENCY shall be utilized. The rates are inclusive of direct salaries, payroll additives, overhead, and fee. The CONSULTANT shall maintain support data to verify the hours billed on the AGREEMENT. 2. Direct Non-Salary Costs: Direct Non-Salary Costs will be reimbursed at the Actual Cost to the CONSULTANT. These charges may include, but are not limited to the following items: travel, printing, long distance telephone, supplies, computer charges, and sub-consultant costs. a. Air or train travel will be reimbursed only to economy class levels unless otherwise approved by the AGENCY. The CONSULTANT shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with the AGENCY'S Travel Rules and Procedures. However, air, train, and rental car costs shall be reimbursed in accordance with 48CFR Part 31.205-46 "Travel Costs." b. The billing for Direct Non-Salary Costs shall include an itemized listing of the charges directly identifiable with the PROJECT. c. The CONSULTANT shall maintain the original supporting documents in their office. Copies of the original supporting documents shall be supplied to the AGENCY upon request. d. All above charges must be necessary for the services provided under this AGREEMENT. Management Reserve Fund: The AGENCY may desire to establish a Management Reserve Fund to provide the Agreement Administrator with the flexibility to authorize additional funds to the AGREEMENT for allowable unforeseen costs, or reimbursing the CONSULTANT for additional work beyond that already defined in this AGREEMENT. Such authorization(s) shall be in writing and shall not exceed the lesser of $100,000 or 10%0 of the Total Amount Authorized as shown in the heading of this AGREEMENT. The amount included for the Management Reserve Fund is shown in the heading of this AGREEMENT. This fund may not be replenished. Any changes requiring additional costs in excess of the Management Reserve Fund shall be made in accordance with Section XIV, "Extra Work." 4. Maximum Total Amount Payable: The Maximum Total Amount Payable by the AGENCY to the CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized, and the Management Reserve Fund. The Maximum Total Amount Payable does not include payment for Extra Work as stipulated in Section XI-V, "Extra Work." No minimum amount payable is guaranteed under this AGREEMENT. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 17 of 42 Monthly Progress Payments: Progress payments may be claimed on a monthly basis for all costs authorized in 1 and 2 above. The monthly billings shall be supported by detailed statements for hours expended at the rates established in Exhibit "E", including names and classifications of all employees, and billings for all direct non-salary expenses. To provide a means of verifying the billed salary costs for the CONSULTANT'S employees, the AGENCY may conduct employee interviews. These interviews may consist of recording the names, titles, salary rates, and present duties of those employees performing work on the PROJECT at the time of the interview. 6 Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be made promptly upon its verification by the AGENCY after the completion of the work under this AGREEMENT, contingent upon receipt of all PS&E, plans, maps, notes, reports, electronic data and other related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to the AGENCY by the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may pursue with respect to such claims. The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time of final audit, all required adjustments will be made and reflected in a final payment. In the event that such final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment to the AGENCY within thirty (30) days of notice of the overpayment. Such refund shall not constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY of overpayment. The CONSULTANT has twenty (20) days after receipt of the final POST AUDIT to begin the appeal process to the AGENCY for audit findings. 7. Inspection of Cost Records: The CONSULTANT and their sub-consultants shall keep available for inspection by representatives of the AGENCY, STATE, and the United States, for a period of three (3) years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon these records with the following exception: if any litigation, claim or audit arising out of, in connection with, or related to this contract is initiated before the expiration of the three (3) year period, the cost records and accounts shall be retained until such litigation, claim, or audit involving the records is completed. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 18 of 42 Exhibit D-4 Payment (Provisional Hourly Rate) [Applies to Subconsultant Greenman - Pedersen, Inc. only] The SUBCONSULTANT shall be paid by the AGENCY for completed work and services rendered under this AGREEMENT as provided hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work. The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31. Hourly Rates: The SUBCONSULTANT shall be paid by the AGENCY for work done based upon the provisional hourly rates shown in Exhibit "G-2" and "G-3" attached hereto and by this reference made part of this AGREEMENT. The actual hourly rates will be determined by an audit of the SUBCONSULTANT'S last completed fiscal year and/or their current projected fiscal year. The provisional and/or audited rates listed shall be applicable for the first twelve (12) month period and shall be subject to negotiation for the following twelve (12) month period upon request of the SUBCONSULTANT or the AGENCY. If negotiations are not conducted for the second or subsequent twelve (12) month periods within ninety (90) days after completion of the previous period, the rates listed in this AGREEMENT, or subsequent written authorization(s) from the AGENCY shall be utilized. The rates are inclusive of direct salaries, payroll additives, overhead, and fee. The SUBCONSULTANT shall maintain support data to verify the hours billed on the AGREEMENT. In the event re-negotiation of the hourly rates is conducted, the AGENCY reserves the right to audit for any change in the overhead rate currently in use by the SUBCONSULTANT and modify the hourly rates to be paid to the SUBCONSULTANT subsequent to the re-negotiation accordingly. Any changes in the SUBCONSULTANT'S fixed hourly rates may include salary or overhead adjustments. 2. Direct Non-Salary Costs: Direct Non-Salary Costs will be reimbursed at the Actual Cost to the SUBCONSULTANT. These charges may include, but are not limited to, the following items: travel, printing, long distance telephone, supplies, computer charges and sub-consultant costs. a. Air or train travel will be reimbursed only to economy class levels unless otherwise approved by the AGENCY. The SUBCONSULTANT shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with the AGENCY'S Travel Rules and Procedures. However, air, train, and rental car costs shall be reimbursed in accordance with 48 CFR Part 31.205-46 "Travel Costs." b. The billing for Direct Non-Salary Costs shall include an itemized listing of the charges directly identifiable with the PROJECT. C. The SUBCONSULTANT shall maintain the original supporting documents in their office. Copies of the original supporting documents shall be supplied to the AGENCY upon request. d. All above charges must be necessary for the services provided under this AGREEMENT. 3. Management Reserve Fund: The AGENCY may desire to establish a Management Reserve Fund to provide the Agreement Administrator with the flexibility to authorize additional funds to the AGREEMENT for allowable unforeseen costs, or reimbursing the SUBCONSULTANT for additional work beyond that already defined in this AGREEMENT. Such authorization(s) shall be in writing and shall not exceed the lesser of $100,000 or 10% of the Total Amount Authorized as shown in the heading of this AGREEMENT. The amount included for the Management Reserve Fund is shown in the heading of this AGREEMENT. This fund may not be replenished. Any changes requiring additional costs in excess of the Management Reserve Fund shall be made in accordance with Section XIV, "Extra Work." PW Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 19 of 42 4. Maximum Total Amount Payable: The Maximum Total Amount Payable by the AGENCY to the SUBCONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized, and the Management Reserve Fund. The Maximum Total Amount Payable does not include payment for Extra Work as stipulated in Section XIV, "Extra Work." No minimum amount payable is guaranteed under this AGREEMENT. Monthly Progress Payments: Progress payments may be claimed on a monthly basis for all costs authorized in 1 and 2 above. The monthly billings shall be supported by detailed statements for hours expended at the rates established in Exhibit "G-2" including names and classifications of all employees, and billings for all direct non-salary expenses. To provide a means of verifying the billed salary costs for the SUBCONSULTANT'S employees, the AGENCY may conduct employee interviews. These interviews may consist of recording the names, titles, salary rates, and present duties of those employees performing work on the PROJECT at the time of the interview. 6. Final Payment: Final Payment of any balance due the SUBCONSULTANT of the gross amount earned will be made promptly upon its verification by the AGENCY after the completion of the work under this AGREEMENT, contingent upon receipt of all PS&E, plans, maps, notes, reports, electronic data and other related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by the SUBCONSULTANT shall constitute a release of all claims for payment, which the SUBCONSULTANT may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to the AGENCY by the SUBCONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that the AGENCY may have against the SUBCONSULTANT or to any remedies the AGENCY may pursue with respect to such claims. The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time of final audit, all required adjustments will be made and reflected in a final payment. In the event that such final audit reveals an overpayment to the SUBCONSULTANT, the SUBCONSULTANT will refund such overpayment to the AGENCY within thirty (30) days of notice of the overpayment. Such refund shall not constitute a waiver by the SUBCONSULTANT for any claims relating to the validity of a finding by the AGENCY of overpayment. The SUBCONSULTANT has twenty (20) days after receipt of the final POST AUDIT to begin the appeal process to the AGENCY for audit findings. 7. Inspection of Cost Records: The SUBCONSULTANT and their sub-consultants shall keep available for inspection by representatives of the AGENCY, STATE, and the United States, for a period of three (3) years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon these records with the following exception: if any litigation, claim or audit arising out of, in connection with, or related to this contract is initiated before the expiration of the three (3) year period, the cost records and accounts shall be retained until such litigation, claim, or audit involving the records is completed PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 20 of 42 Exhibit E-2 Consultant Fee Determination - Summary Sheet (Specific Rates of Pay) Fee Schedule [Applies to Consultant Integrity Structural Engineering, PPLC only] Discipline or Job Title Project Manager/ Bridge Consultant Hourly Overhead Profit Rate Rate @ % @ % Per Hour 130.00 0.00 0.00 130.00 PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 21 of 42 INTEGRITY STRUCTURAL ENGINEERING PLLC 4124 INTERLAKE AVENUE NORTH SEATTLE, WA 98103 TEL: (206) 547-1379 FAx: (206) 547.1381 EMAIL: INTEGRITYSE@ATT.NET February 9, 2012 Mr. John Wayand Project Manager Jefferson County Department of Public Works 1322 Washington St. P.O. Box 2070 Port Townsend, WA 98368 RE: Queets Bridge Painting Project in Jefferson County (on Clearwater Rd. M.P. 0.60 to 0.76) Professional Services Approval Request for Hourly Billing Rate Dear Mr. Wayand: I am the owner, principal engineer, and sole employee of Integrity Structural Engineering, PLLC (ISE). Please consider this letter request for approval and use of a Billing Rate for ISE. This covers consulting work for Project Management, Bridge, and Structural Engineering for Jefferson County. ISE is a one (1) employee firm with no calculated overhead rate. ISE charges a flat hourly billing rate for services that is the fully burdened billing rate and includes all applicable costs of direct salary, overhead, and fee. The hourly fees offered for this contract are the lowest fees we offer for preferred clients, as supported by previously provided copies of invoice billing instruments. I also confirm that all direct non-salary expenses would be invoiced at cost without mark-up. - Ken Wilson PE SE, Project Manager/Bridge Consultant - $130/hr ISE will comply with the rules and regulations regarding travel costs in accordance with Washington State Department of Transportation Accounting Manual M13-82, Chapter 10 Travel Rules and Procedures, and revisions thereto. Thank you for this opportunity to submit my approval request. Please feel free to call me (Ken Wilson) at 206-547-1379 with any questions. Sincerely, Kenneth M. Wilson, PE SE Project Manager/Bridge Consultant w H O Q W tD N ap N M N M N m ? n N W fW0 M a N N W I V 1 W I N df N I I ' i I I ? I I I ! I f9 I I ? @ I L ES N 'o i i I I i I i I ? j I I l j i I i l ! I I `r I ? I i i I j ! I ? I I i I v , I i I Ca7 m 0 ! =1 l ? ! ai a I ol f ol l ol l ol j o i o, I oI I OI WI I oI W W h I I oI o i ? is i W o ' o I ' I `v I° ? I i a l I j l I I I I I ' ? I I U I I I I I ! I a UI q m L N o x o 0 0 0 0' I 0 0 I 0 0 0 0 $ 0 0 I ° U z ' 0 0 0 0 0 o c F d 0 d m o' I I o m x ! o o . o I 0 0 0 0 0 0 0 0 °0 0 0 o f o 'r o N n Oct m ! j l i a O n m c m U ? o ?I o = d I I l oI i ! I I I oI 1 I o i ' 0 I o i ! I I 'o l ( 0 ii 0 l ' I o v `D (6 ( I o f i I o - I I lo I I j o ' I ! I I _? I o I m a v I I I I l j j a ? ? ?5 av ? i l I i I! I ? I l ? i l ? I I I I ? ? ? I I I ' i I I ! I I j '` ! I ? I I h i I ' i j I I _ a Oi ? '? v I j ?= C ? M Nf o O S ` I l ! ! I V I I V I I (O I O I D' W I I ? 10 ! 1 O ( ' W ' N 01 n ! 1 ' I W W I`- I I I W I I 0 I I 0 I' N ao 1W N 05 I i ! ? aI , ' a a vi! ? w a lI 1 i I I I I - I I I I I ! I i i l l m ?'A I I I I I I i i j ' i i ? I l ,? '? ! I ?? I ' ' I I I I I I I' I ? I i I ? I I I , I I ° m q " o W °_ ?' ° 0 ca 0 LL I I O' . O j O O I O ID I O O W V N o r O I O O O I O O O ° vi I I i ? t ? I I ' - I I I I I ' I I ? I I I ,, 9 cc o S 1 - 5 S M S V N N ' W N N N V N NN 0 N W N O tp N I N ° t°p I L W U) T ? a c Y ? d I : I j I ? I? ? I I C I (? C j I ? ! I l z ° z o ? g j I ? R ? 5 F ( a x p I I i j x 0 r W ( O z l I ! W Iw °I 100 I CO I N ( W ? I t Q 2 IJ i? l O } ' I I I z O z ! j C) 0 '? 0 w i z I I I I I V n (o o Y CC C! 0 t9 4 I I i I I O K O I p l M ice O . ; I rn r l F- ml I J h o - !° o Iz x ia l ! O q I I 1 ! w Q I I I U U} I ! IU I l m I iv j I I I I ?I _Z ~ !Y O U m w iN F ? I l I cb Z ~ Q ( ILL ° . I Ol zl rl IIn x1_ !O Iz I j j ! F O I i rn I I O O j I j O a z I W l !Z I? ' I •Y z Q w' l a °) Z. C7 I I ° w X a W d. F aa z (? > ! d a ? 13 u u I US a v LL z < ° 4 '? w o f r IW v z ' w I IX O ' I j ! a F' F z w z Q IS 3 • a m , a I l wq al U ' ! 01 I z o W I xj r; z w ° W m 12 U ¢ r O z I p ' i °I } ? }, - I I x r - a w Q ID N K O U iQ !x ILL ! (9 1 ! W K W U ° r o w a. w r ml ; W! x N I l OI 0 Q) l r it w (9 I ' z w z za I z OU I L r z $ z 0 ''F- !N IZ o f I I ! C9 Q to I ¢ r a w w I (7 a a r al rl WI 21 l o Z ! It I , a I r w a ? w O 2 w LLI 2 ?I J I II r c7 nl m H to ? w • i W N W z z ¢ l '? O z aL I I Z - U a r UI w I I I l r UI w' a OI z J qI I } JI x I I R\I ?! z (7 9 U T aC m J w I w a _ uj CI W o! } F I i m U U LU I O I Iv Z Z I i 2 r ?? l¢ ' w of I w l CI z o ? o ix a I l p ? x a j Y U ? i t oI W o I ! zI O, 2I ' I I ? xi oI r U z a z rl mI > =_ C ° ?I o i ° e h 8 I rJ U I I t m x mm Z {p w 0 r wI ' LLI O Z ZI Z rl z 4 I LL I _ W U) w J Z O mo z( a I LL I LL z { I S?l 5 DI ?I I I w ! I I 0 O lz UI w I a.! r? , zl OI I ? I ?j . ! a , YnI a Fn O zl I J W p 0 I w ?I t ? U c ol ' l (D Z 1 0 z O z? I I ?I CI . i - ? w w ! ! I m l a - a I a: of a z W 01 ? I J V) Z l J > V) z i J > j V) ZI I a r UI In a I I O _ r < I I ? - J a r ! _ --I a) ai w a Z $ w c r U) w - . ° r CI ' I O r ? U) ml q i w l g r a J a I Y ? I ' J a 1= 1 I I W n mi l I a a a, WI OI UI mr 1 , 0 - U m I o O U ' W O 1 I 61 I i a WI J W W q ' ° ; f m I 0 . , N ' Y I i d 0 r o J I j a. Wi ' I 1 ¢ a a W I } } CI al ! I w l Q r l O r I a h- I Zj U) ( ?; a ?I Ui U • ? U) ?I a? i ?I 0 ! ?? • ? al wLj l WI ! Ki ' wI ! ' oI < m ?I _ a r v) F- LL m ? a d 0 r U) I i i I I l l i ? I ' I I I I ' I ° ' mo 7 o I F I WI N ? O N m O N I ? W CI N; N W O O O N N N W pp N M W N O N O W x I d 9 4 ' E N o = 0 ° m = a 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 U I! i a U ? aa ' a x I I I ! I ( I I 1 I ! I I i ' I t I f o I 1 O I Z a ro ml I a o l 0 oI oI of o oI l ot o o I o l 0 0 0 j ol l o; l ol o ° o o o 1 1 1 I m il i i i I i l i l l ! ! ! I ? ' I I j i ! j ml m ym , 0 a I I W o I ii ' I ( I 1 r l $ = m 0 z m m m m a I" I i oi ! I oI ! ! o I o l 0 0 0 of oI l I o ! ? o t I o of o' ( o of of 0 I 0 I ° i o o o w ? `W m ' l l 1 I I I 1 I o. ? °o o I 1 1 1 I I I I I I I l i I I a O ' t U x u`5 a o 0 o O o 0 0 0 0 0 0 oI o l I oi ! o ? t o o I f o ° o 0 ° 0 a ? ? m I I I I ! I w m m N 0 f = 1 1 i I I I I I I i i OO ' i I ! u ? I- o ? im ? 0 it I ° ! I o ' ' I ° I ° l I ° I I o l I j o l i ? o ?l o ! . i I O ,i I I O o i I° I ; I oI o , I I I o I i o to ; Io I 1 IM ! I ( 9? I I j ' I I I i I I I I ( I i' 1 ' ' I i I I l i I I l ! ' , I I I I I I I I I i I ' j I i ; ! I ! OI o a I I ? I I I I ! ' ° yl is .p wol o ?? ? I O V I N O I O O O ? f O O O O O O 0 O ? O ? ? c o ? iw l a 0 I 3 , iI I ' ! I J A I C Q j I I ! I I ! I I I O i? _ Im l6 Q .?I vI ' 5 g yM a I v W W I N I I V iN ( ?2 I I O ' N IO O i O I N IN I N W I I ? I I '- ? N '? M I ? j a I, m I I ! I : I I I I i I I - I ' ; ? LL I ° l i I I ? , ; ' ! I j j l j I( l I F Iz :a ' I ( w 3 w 1 N w I '3 ! I a ? p I J > p ! I i la l l . 3 a 1 IJ a I I 1 ! v p m g ! Z I I? w ! O LL h I I j > w a w _ U w w w r L . I O r a a l ! I' I? U Io > i¢ Id I I ! x J o ! I I w l o a l I I to a a a It Im l a w I IC I IF a I W O z I l ¢ h O l 3 I I ( a 3 7I a LL 3 z N I a j m a o w ?o O N R O w Q F I J I> a a J w > 1 I O a I J > p a N ' J j r p z O o U O m Z (n in Z- LL O U . 0 3 W w r Q I 1 l j 1 ? w I a J Of p I r F- t a a w o O F a U a U -' U - U U z z S Q J w 2 r J I : I 1 ; i a p s J 3 LL 3 ! m R m a z ¢ g m a . a a CL a a a ¢ z p J a o a o r F z w "' 3 a f o 'j so co m Y n 7 z . I Q a Z a J > m r I m r , i O LL 0 I 1 > a 0 l N O LL U ~ a F O . a it a Z O I g z o W w > w w a o f C! Q EL 3 0 O I I 1! Y N w o o I a m M : n o f g l oz o o o a I w al r v a > w a a z id' mi W Z w I V) Q U lz o a f l ~ F a a IV w Y O ' o O 0 F ¢ U U r ¢ a W r I a a w I aI la w a a' a a a z W Z 0 a w w l v Im o 1- Q O LL ! F? w > z m m a o Ix U W x p I I r I w a a jp r o z ¢ 3 r ¢ I r - ? w z w z a o W w r z I t U > ! O o Z I h J N 7) r O a ¢ ¢ I I r J IU o w a O W w 3 W a J W 1 _ J W r 0 CW'.) a p U I II W m 2 m W 0 m ? l n w . Iw Q ~ icv w V o t f w m I i w I j 10 w I z 0 lm I lw rl la .U ; , ?I zl O r rn O r w. t 0 x [n I O, x! w al l w a z a ° ?I J ¢ I r! ?I l J F ..ww v1 _F W LL I I F- (n I W g , W r : CJ !? {F- LL 16 ' LLl J I¢ ? l I L I l m 'J Ia x IU . - - Ia 0 Z w I 0 171 Q I< I !J 'a Ia I I , I pi - r! , r- a 71 J I I ? r.i ¢. ?? ry ' ml JI ai W ZI J I w i I G w Z I g p I L! W• . !m W w O IU Z L Z I I ILL 'a C l I Z Ii i l 7) . I ? O : Iz LL ¢ Ia . ; l o 0 I i0 ¢ ! I vl I l a al a a - z w a x r OI OI N u7 U ! { ZI W I? W 'w I l O I o , I LL 0 i ' LL 0 I U I w i . LL i0 I 1 LL I 0 ? W I i l m W a 3 1 7 LLI 0l a IW I r i al a LL of LL LL O I r I LL o ll LL O O NI i LL I 0 J I I a . al '? I IO I z o F„ f Z Z ! : I J Z l IZ v iJ ' i a O LL Z 7 i ¢ ; ¢ w ZI Z I j r n J Z Z J' I z N .J zl I I : 1 I p m I ! ( W M Z O FQ O F ¢ z O F-Q O FQ ' ) Z ¢ I U LLJ Q >S O F ' g a OI F' O rF ' I ¢. Z_ a O 1= O QF ¢ Z_ a O Qr ¢ U U 7)I ¢ W J W -1 la-I I I ' I a a ¢ ¢ F K a K a r I- of a W a ¢ r a a a a' a' w i (y Q w r ? : a w a w m a w a w ? m ! a w L) a w m w a w a w m a w a w o a w o a ; ¢I o r5 r w o a a a a w a a a a ? m a a a Q. N ¢ a a a a m a a a a m a a < o a r O I F 0 1 F I ! V I I N; N O I M1 I M W i MI ! m I N ?? NI i 0 M I I VI NI j ?I l i a t0 ( I WI p MI I N! ' 0ryp N I I I i w ( I i ? i I I i I I i I I I I I I I n t9 c I I I U 4 .2 E wr ? o oI l o, 0 0 0 0 t o i , o of o o? '• 0 0 0 0 0 0 o I o 0 o I o o 0 U c a f I i I p I + ? ?I w l a w = m N l 2 I , I O? I 1 I 0' I I O OI O I OI i I l Oi I OI I I O O 1 0 O ` O I O l i O O O O O O O , O O O l ; Z c o v+ a i ! ( ( I I I I I f l I vi i I I I ! i ? I 'I ? i I I I ? I I j l i i f I ? ? N N - I j I ! j , ' I j ' I ! I I j • I I ? I 1 = m m Z y W ? x I O ( O I O O O t O O O I O V N' O! Of I OI ' ' OI I OI N OI O N O I 0 0 1 1 i 'uf w E w ?I a I ? f I I I I I I I I I I , t I f I . - 1 I I t o h I I ( I i I I a o I `m w c o • ? I 'I ? I I I I; I I I I I -: I ? 1 ? ? I I I I I ? ?? i i I i I I I I 4 I I I I I i h - x Wx WI m U ?l a I I I VI l i l Ni i i O Oi . OI NI ? I O I Oj O i 0 O_ I WI I W I 11 p I I O I I W IO I fO I f0' l 10 1 W I !? l i P d l i ! i ? 0 jf ? Q N O 2 N ' I (O ? W I O Q N I NI I ' O 1 i 0[ I I O ? O I ? CIO N I V IN i N I j IWI ? O ' I Oi I ! O i ( I I i IN 1 i O O W i I O W N N i I i I ? a V ¢ w a I I I I I I I I i I l I' j l ? j I l I I vi i 1 I I? I hi I 21 la c I I t i I l l l I ( I I I I ? l i t i i I j , ! I I I I I I i i i !a" a' V o U -0 =?q J o 0 M r 1 o' i x m O I O 1 O O O O •O O I O O 'O J O O O O O O O O O O 0 o W 0 _`m w r `9 a ! 3 J a N m W> O O = M W O O 10 W c W M IC I IW ? W ? W IW W c ) N W '- W ' IW O W O W ? I M M (00 LO ° c Y a I r I I ? t I i 1 I 0 r a m 1 1 ' _ - - I ' i I ? ? ? I I I 1 1 I I ? I i ? ~ zI i I - I j i I I i iW = ( ( I i I U) z. a CO 0 0 I 100. I I C iLu I I. I I f I I l ! l I j F • ' IF "" I Iv I I I I I I ! ! I I . w = U ICD' !?- ,a i? r? y ?Y ; l 'G! W IOC •(9 I I j t ? Z a ! ' ( I W x co a x rn o W 2 U v X O a I ' f i I N w V o d ?O to t F. z w r Q l z l w I X O x 0 ) 'X ' O I a a ro I l I I ' z p F- v? ¢ Z I? U (W FI ! F N w ! W I a a a a a Z a I I l I ` g 3 c9 W a ?~ :o tD LO 7 I? Y 7 t/1 Z ! j N y W D { l w I i v~i a W F- w z (o l l IU IW ¢ ?(o z N z I IN j z z O ? I V I U Z ! ! I ' w ! i I > I v J ¢I W > o U m F I Ito Q . LL CL IX 10 , OI UI Y z Q I l w r- N t ' > O I I I 3 r U) > . ¢ n z p I g a g a l g a l F U w z 0 O F I ( j ! j a < ! I m U >> F ? WI J ! p z I U w . a z W ?I Q (0 N i , W W Ur ; O W W Z Z Z ' I K I l N '? Z N z a U W I ) w (o rn r l it p Z W R ('? o O U IF" a OLL f' D I I z w O F r n z F a I t- w UO O F U O F U 0 O f F U I- w z ' I> O a 0 F p F , G. U WI t- a Is ; r aI : ! w ? y I rn aI z <? 1 zl 0 I o- r ¢ U) G Z E F.. O Z' r_ Q I z l Z ? . ~ Z pU O J 0 a' , . r ?w Q la' p U a J ¢ ¢ U 4 a U LL I a NI ! r- NI W HI LL, W i j Ol Ui F- z w I O ?I ! I z WI F- O ?- ?. S Co im o ) W I .W U a ' Z ~ i - Iv~i Y U a p U IL Iz 1 0 H z l F Iz F- 'z J Z U w U w I w U l J ¢ 51 I r ; U ?: rn . J a z ' I ? I Z 7 0j 1 I JI zl UI 0 ;H I C W W LL . . ~ m .w ?Z g ? U W t I 0 U I ED m t i la LL I p i LL i O Q ? a o Z f r Z I I i z i p ! O u E ' O i u O U ? I t ILL o a v1 ° I a m l a U I I LL I o 1 0 U O U. LL o I ' U pI ? i m JI al ( ¢ ? p I Zi C7 W LL U d W w ; i 0 U 0 ! ZI I M (n W > , W I> . I I- I U1 ¢ K ¢ a ! U I t d m roo Om l - lot i e? !o- lah o IW I o of to o'; Imo t d° o ?! o l i o I ? ZI LLt i I U I ! O U W ' W I N rn a ;I • h ¢ W p a to W x w L L O ; L O LL O I LL O l L :O L O - L O , LL O o LL O rn LL 0 L m F I L : ? z ¢ LL N Z ?- W O ( I Z d m ? m o x 2 r 1 4a z z I z . z ; z z z I z z I z O z UI a I 0 zI Z I 5 O LL ! I a 2 w x a a O Q O F¢ i O FQ O F-Q O a?a O F O FQ 0 ?Q O Fa O rFQ, O F- 4 Z O ?- N ¢ ¢ ( a J a I m Z Z Z Z Z z Z K ¢ K ¢ K K a K K K K K a 0 U U LL F - O Y Q t _7 w 0 C _ w 0 _U' N 0 _'J C N 0 C _') O 0 U_' w 0 _ U rn 0 a w a a w a ¢ a w ¢ a w ¢ a w ¢ a w ¢ a w ¢ a w ¢ a w a a w ¢ a w J ¢ a w J a ch ? t - a a a a a a a a a a LL 0 o i I ' i I ? i ! °w Q I 1 ! I O I I I O g O O I IO N N O ? ~ c N N ? N N g N p f O N r C7 N ? W vi en n w t - ?qp C V j = O O N- N O l Q o ° ° c O N d . ? N » N U a U Z q m L ? q ? o O °ol ?i o d °o o p o p O o Io p i C i i l O O I i 1 I 1 j i l , o I I i I t I ? I I i ; I ' ' I l ! i . v y~y??? U m c C n c m w z N m o 2 i °p O l $i 61 o N ? W °° p o ° °o Vi t p V q u?? w E! v, N a ! w N !9 W -- -r---- ?-- ?- r ` T? m • •' 1 • ia ? q{}? llil I ??° g ' ° I ° ? I I $ i i° ° I ° IN ° o N i C7 j ... • I IU uvi e i = d i .o <o i ? Ip ° o o o oo N I i I ; la , ? n I ; ° c?i I I I a m 1 Q? N N = O N pNj 9 0 ° O O N O (1 O 2 d iH d { pp itl' tN0 i 0 H N •- I Q I t9 i t9 i `y N N I '? I l i I, I i i i I ? • ? m a I f I i I o I o i i 8 '- c o ? l 9 ) Ig o p oo IA ? o 0 ° o r o °m Ih o I o 6 q w 0 o fM O ` w J d' d a i N p f9 ^ w 6 m o , i i I a m N y C W ?I yOO = • j i0 ° O ° p p ? ° p R ° ° o o 8 0 I > M i IN i ? N M ° O Q ItA I ? is m ( ? I. ' I I I 1= x ? x ? K 7 ? V) (n i l0 5 o 0 5 °o o g 0 = g 00 :: x A 0 I 1 I w 1 z ? 0 C7 w ? 0 jco III W I I z I- Wa' F' m g 0 m oc V j? Y at M Q ? ° o z w W J f g .a 0 w zz I o w Q o Q z Q 6 O t- Q Q Z ? r U J W - F ! j o z Q a I , } N ( zl U I- to = d) J ? W z p ? z U >? i ¢ I Z O d 0: O Z u ; ?" w V) d 0. } Z W U I I i Q ' . Q N w p J U a W v ? ?- 0: O ~ CO z w a i , N z N O K U z a f LL z I N w > > I ? W 2 i ZI !m A N W W Q z ? ¢ a p > a vl (D W F W l l w zI i z I ? NI ?W I U Wi 0 OI z i ? 'p Q I I M Y F Imo. I W 1 ! i ¢? I I U F I i o I N w m l li . ? ? i I i ! I i p < ? w n 0 = I o ! I I I ( I I , I I I I I I I I I I I l m t i I N 5 I I I I I I i U ` ? a ? ? I i I I 1 U ! I I I i I- < a L m , ° ( j j l I ! l I i I I I j C7 4 Z p I ! I I ? a ? I I I ! I p I-- I' I ? I ? I i ! I ? , I ,? l i ! yI ? I I t ( I ? ! l i I I I i I I I j! I I i I cl c z m. _° l l j i ? g w UJ 0 11 m . ? a I l I l fi i I I I a w .mcc ?? 'o I i ' I I ! ! ? ! ' I I I l I I I l m al I i m 3' in a I i I I I I I I I I I ! i I I I I ? i i ? - i I! I 1 I .! I I I I i : ! f 1 l Ia p ? ? I l N o 1 ° f I I V I I I I l i I l I ! I I I I l I i j I I l l I l i j I I a l u a h ? l o_ I ' I ? I ? i ! ! I I' I! I I ' i I l i j I I I I I I I I I I i 1 i I I I j ? I ' I I O 0 o o 0 f of 0 (n 0 o 0 o 0 IO 0 o f . o LQ t 0 I O 00 I V' I ? N n ? N ! 0o 0O 0o 00 00 0 0 O 04 ' i I I i 3 l o ? W l `m a m 0 O o o Lf) O N N EA M .o N IfA _ C N V fA IO . O : Ln E9 d7 ° V) N (.- fA ro O M V) ) W c-) L I I? M 00 leo O N v n (U I- N LO ) N t o O C °i W 0 0 O 0 V)O 0 N .- OD r O O mo' T- N !' i t R' I? o qq 1 I J I I = m (fl I I f9 I b9 61, op (O to V> N fA f9 b9 fA C'T W P M I" 2S W ? a ) I U) CV) ^ I ? ? CD CM rl- I I 3 I? I 69 fA r I I I i ?( I I I i ? I , ? { ? i I i I 1 U J rn d m c N I c a O O s i I I I w I V I y h p 0 U U RS *1 O N p U I R r 40 I OI O I ( I l I I l ! !! I I a W W U T M= 1 : r I C; i ! I p I I I^ F• I I I ' IN I mp Yhi a I I I I I ? iN' ! ? R ? j I ? ? ro t f=1 IV ! I i r; + I E 1 ? T zr mIo o r ? O ! r }- +- I , O Z , ! z ? i F' ! i rv clj ° ':; i 7 N o CS I N Q I ,? j I z W j 1 !OI I I ? ? ! I N U I! p Ico l •' W' I w j l l ? 1 wj ! bl I I I I I 'w p y I I Q 0 p U I ! I{ lr ,(p y ,. V oar j 0 R' ¢ j 1 1 ? :' i W o ° F- 0 - m $ 1- J LL ui 'i d I a of 3 2 LL t- I IH, Z' I iI I I I I I ? I I I "' ! I I ? I I I I ? ? 0 m ?n V) i I 0 Z aO+J IFom w S w J = INI ! m ) h m h vl o m F- m e U) O II ?I I Z (o = LL Y v1 Z I I so I m v I o' I l Z ° = 1_ I U I I L ?a ZI !? j 3 v I o a a d ?, ? 3 m 3 ? l " ?! ? ' ? ?? 3 l i u? ? o f Q v ? 9 ? ? 5 I , 'III W =I ? IF ; LL ~ 'z ?I , t ; T l 1 - wl I yl I O UI Ip ? Q I t7 I 0 7 z . r Ui? a r. g ' Z 4 IF I 1 I ? m I m ?+ l Zl v a ? N z! QI ? m r I? : l i 1 i i U I ? I ? ? ? o H o vi K I F I zl I I ;0: t!ol uJ im IK w F i I O of al dS gI (n 1, .W U 2 p 1- ' ice cn Z ! =l ,a . O u F- W (I 0 M?I I O. Z, M y• Z. a, u'f O F- l 1 1 44 JI 4. Ql V I W J w N I -a u rI O FI Qi F..I J-I =I 1 ! H CIWI FIN LL! d LL; ' v1 I IO Z? C F Z. QIO1 0 ln ZI U?Z 4 _rl Q. m: a. JN I O 0 (ll ! F Z 1 a' Z a ? : ? W' 'LLI 0 , F- 1 U Z f. m a w 0, U_ m. 1- Z Z 4 a J Z. ? QI -I N! N ? :,I J wl a I N Z, O ' W w U- + W, -, U I Z w ' Z (n'• J OI Z Mo O J: Z 1A 4 1 N J 4 J- I 71 M' _ z (n J I in J I O J i V a! M ? J ! FI J 7 IU M Z I I OI Z H Z O v> o w W i O I C F O • W I I , ! - i ?: j Imo o? I I ?i=ilz?o r v 0' w 0 c r w ?z °U o co Q w ?I I r wz0 I a ?I w z:o ° m I 1 I v 1w, a OZ rm = ad I I- s oo I o? z ? I z N l z ?l g Q z voi o o w O w U c> w W LL W j i O O 0 co 3 Q 0 rn 3 J ~ p rn v ! Z O N 3 Z W O d J w LLLL , W Z Z> J = > Z > 2 > ! m = > > w J O 1 V1 !Y W d K w a w a v 1 w a 0. LL = F a m Exhibit G Subcontracted Work The AGENCY permits subcontracts for the following portions of the work of this AGREEMENT: Bridge Painting Subconsultant Engineering Review Subconsultant Environmental Subconsultant Archaeological Services Subconsultant (if necessary) PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 22 of 42 Exhibit G-1 Subconsultant Fee Determination - Summary Sheet (Mandatory when Subconsultants are utilized) Project: Queets Bridge Painting;, CR1881 Sub Consultant: Exceltech, Inc. DIRECT SALARY COST (DSC): Classification Man Hours Rate = Bridge Eng,r. / Str. Reviewer 64.0 x 45.00 Director of Bridge & Struct. 0.0 x 59.44 Lead Bridge Inspector 0.0 x 47.84 OVERHEAD (OH cost - including Salary Additives): OH Rate x DSC of 136.47% x $2,880.00 FIXED FEE (FF): FF Rate x DSC of 30% x $ 2,880.00 REIMBURSABLES: Itemized SUBCONSULTANT TOTAL GRAND TOTAL PREPARED BY: C. Ernest Nelson - Exceltech, Inc. x x x x x TOTAL DSC = Cost $2,880.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $ 2,880.00 $ 3,930.34 _ $ 864.00 50.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 = U,724.34 DATE: February 9, 2012 PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 23 of 42 Exhibit G-2 Subconsultant Fee Determination - Summary Sheet (Specific Rates of Pay) Fee Schedule Subconsultant Exceltech, Inc. Discipline or Job Title Hourly Rate Overhead 136.47% Profit 30.00 % Rate Per Hour Bridge Engineer / Structural Reviewer 45.00 61.41 13.50 119.91 Director of Bridges & Structures 59.44 81.12 17.83 158.39 Lead Bridge Inspector 47.84 65.29 14.35 127.48 PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 24 of 42 Exhibit G-3 Breakdown of Subconsultants Overhead Cost Exceltech, Inc. Account Title $ Beginning Total % of Direct Labor Direct Labor 1,678,318.00 100.00% Overhead Expenses: FICA 256,446.00 15.28% Unemployment Health/Accident Insurance 107,536.00 6.41% Medical Aid & Industrial Insurance HolidayNacation/Sick Leave 209,069.00 12.46% CommissionBonus/Pension 59,035.00 3.52% Total Fringe Benefits 632,086.00 37.66% General Overhead: State B&O Taxes 78,989.00 4.71% Insurance 90,162.00 5.37% Administration & Time Not Assignable 775,477.00 46.21% Printing, Stationery & Supplies 32,828.00 1.96% Professional Services 13,547.00 0.81% Travel Not Assignable 25,440.00 1.52% Telephone & Telegraph Not Assignable 57,213.00 3.41% Fees, Dues & Professional Meetings 32,206.00 1.92% Utilities & Maintenance Professional Development Rent 280,054.00 16.69% Equipment Support 61,235.00 3.65% Office, Miscellaneous & Postage 189,527.00 11.29% Total General Overhead 1,636,678.00 97.52% Total Overhead (General + Fringe) 2,268,764.00 135.18% Facilities Capital Cost of Money 21,625.00 1.29% Overhead Rate (Total Overhead / Direct Labor) 136.47% PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 25 of 42 Exhibit G-1 Subconsultant Fee Determination - Summary Sheet (Mandatory when Subconsultants are utilized) Project: Queets Bridge Painting, CR1881 Sub Consultant: Wetland Resources, Inc. DIRECT SALARY COST (DSC): Classification Man Hours Rate = Principal Ecologist 136.0 x 135.00 Senior Ecologist 0.0 x 115.00 Technician 0.0 x 65.00 x x x x x TOTAL DSC = Cost $18,360.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $18,360.00 OVERHEAD (OH cost - including Salary Additives): OH Rate x DSC of 0% x $18,360.00 = $ 0.00 FIXED FEE (FF): FF Rate x DSC of 0% x 18,360.00 = $ 0.00 REIMBURSABLES: $ 827.50 Itemized = $0,000.00 $0,000.00 $0,000.00 $0,000.00 SUBCONSULTANT TOTAL GRAND TOTAL = $19,187.50 PREPARED BY: John Laufenberiz - Wetland Resources, Inc. DATE: February 9, 2012 PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 26 of 42 Exhibit G-2 Subconsultant Fee Determination - Summary Sheet (Specific Rates of Pay) Fee Schedule Subconsultant Wetland Resources, Inc. Discipline or Job Title Hourly Rate Overhead xxx.XX% Profit xx.xx % Rate Per Hour - ?Cn Lfl f?15T 135.00 0.00 0.00 135.00 Senior Ecologist 115.00 0.00 0.00 115.00 Technician 65.00 0.00 0.00 65.00 PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 27 of 42 Wet/and Ar Delineation ' Mitigation J Restoration f Habitat Creation t Permit Assistance February 9, 2012 Jefferson County Dept. of Public Works Attn: Mr. John Wayand 1322 Washington St. P.O. Box 2070 Port Townsend, WA 98368 Dear Mr. Wayand, 9505 19th Avenue S.E. Suite 106 Everett, Washington 98208 (425) 337-3174 Fax (425) 337-3045 Please consider this letter to be a statement of rates for Wetland Resources, Inc. It covers environmental consulting work for the repainting of the Queets Bridge in Jefferson County, Washington (Clearwater Road M.P 0.60 to M.P. 0.76). Wetland Resources, Inc. is a five- person firm with no calculated overhead rate. We charge a flat hourly fee for services that is all-inclusive of direct salary, overhead and fee. The hourly fees offered for this contract are the lowest fees we offer for preferred clients. I also confirm that all direct nonsalary costs will be invoiced without mark-up. Work will primarily be completed by me, as provided in the estimate, but below is a listing of employees that could be authorized to work on this project: • John Laufenberg, Principal Ecologist - $135.00 per hour • Scott Brainard, Principal Ecologist- $135.00 per hour • Louis Emenhiser, Senior Ecologist - $115.00 per hour • Andrea Bachman, Senior Ecologist - $115.00 per hour • Zachary Wrzeszcz, Technician - $65.00 per hour Wetland Resources, Inc. will comply with the rules and regulations regarding travel costs in accordance with Washington State Department of Transportation Accounting Manual M13- 82, Chapter 10 Travel Rules and Procedures, and revisions thereto. Please call John Laufenberg at 425.337.3174 if you have any questions. Sincerely, John Laufenberg Principal Ecologist, President Professional Wetland Scientist john@wettandresources.com Exhibit G-1 Subconsultant Fee Determination - Summary Sheet (Mandatory when Subconsultants are utilized) Project: Queets Bridge Painting=CR1881 Sub Consultant: Greenman - Pedersen, Inc. DIIECT SALARY COST (DSC): Classification Man Hours Rate = Paint Expert/Vice President 88.00 x 58.50 Project Mgr./Paint Expert 258.00 x 40.00 NACE Inspector 0.0 x 32.50 Clerical 20.0 x 24.50 OVERHEAD (OH cost - including Salary Additives): OH Rate x DSC of 128.31 % x $15,958.00 FIXED FEE (FF): FF Rate x DSC of 35% x $ 15,958.00 REIMBURSABLES: x x x x TOTAL DSC = Cost $5,148.00 $10,320.00 $0,000.00 $490.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 $15,958.00 $20,475.71 _ $5,585.30 Itemized SUBCONSULTANT TOTAL GRAND TOTAL $4,314.00 $0,000.00 $0,000.00 $0,000.00 $0,000.00 = $46,333.01 PREPARED BY: Alec Angus - GPI Project Mir. DATE: February 17, 2012 PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 28 of 42 Exhibit G-2 Subconsultant Fee Determination - Summary Sheet (Provisional Hourly Rate - applies to Subconsultant Greenman - Pedersen, Inc. only) Fee Schedule Subconsultant Greenman - Pedersen, Inc. Discipline or Job Title Hourly Rate Overhead 128.31% Profit 35.00 % Rate Per Hour Paint Expert / Vice President 58.50 75.06 20.48 154.04 Project Manager / Paint Expert / Asst. VP 40.00 51.32 14.00 105.32 NACE Inspector 32.50 41.70 11.38 85.58 Clerical 24.50 31.44 8.58 64.52 PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 29 of 42 Exhibit G-3 Breakdown of Subconsultants Overhead Cost Greenman - Pedersen, Inc.. Account Title $ Beginning Total % of Direct Labor Direct Labor 34,198,319 100.00% Overhead Expenses: FICA 3,657,498 10.69% Unemployment 544,710 1.59% Health/Accident Insurance 5,377,286 15.72% Medical Aid & Industrial Insurance 0 0.00% HolidayNacation/Sick Leave 6,132,700 17.93% Comm issionBonus/Pension 10,090,286 29.51% Total Fringe Benefits 25,802,480 75.45% General-Overhead: State B&O Taxes 73,119 0.21% Insurance 1,583,016 4.63% Administration & Time not Assignable 10,245,109 29.96% Printing, Stationery & Supplies 430,746 1.26% Professional Services 731,323 2.14% Travel not Assignable 734,709 2.15% Telephone & Telegraph not Assignable 193,446 0.57% Fees, Dues & Professional Meetings 293,510 0.86% Utilities & Maintenance 327,531 0.96% Professional Development 167,325 0.49% Rent 1,317,893 3.85% Equipment Support (incl Depr & FCCM) 1,676,240 4.90% Office, Miscellaneous & Postage 303,122 0.89% Total General Expenses 18,077,089 52.86% Total Overhead (General + Fringe) 43,879,569 128.31% Overhead Rate (Total Overhead / Direct Labor) 128.31% PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 30 of 42 Exhibit H Title VI Assurances During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, and successors in interest agrees as follows: Compliance with Regulations: The CONSULTANT shall comply with the Regulations relative to non- discrimination in federally assisted programs of the AGENCY, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time (hereinafter referred to as the "REGULATIONS"), which are herein incorporated by reference and made apart of this AGREEMENT. 2. Non-discrimination: The CONSULTANT, with regard to the work performed during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of sub-consultants, including procurement of materials and leases of equipment. The CONSULTANT shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the REGULATIONS, including employment practices when the AGREEMENT covers a program set forth in Appendix B of the REGULATIONS. Solicitations for Sub-consultants, Including Procurement of Materials and Equipment: In all solicitations either by competitive bidding or negotiations made by the CONSULTANT for work to be performed under a sub-contract, including procurement of materials or leases of equipment, each potential sub-consultant or supplier shall be notified by the CONSULTANT of the CONSULTANT'S obligations under this AGREEMENT and the REGULATIONS relative to non-discrimination on the grounds of race, color, sex, or national origin. 4. Information and Reports: The CONSULTANT shall provide all information and reports required by the REGULATIONS or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by AGENCY, STATE or the Federal Highway Administration (FHWA) to be pertinent to ascertain compliance with such REGULATIONS, orders and instructions. Where any information required of a CONSULTANT is in the exclusive possession of another who fails or refuses to furnish this information, the CONSULTANT shall so certify to the AGENCY, STATE or the FHWA as appropriate, and shall set forth what efforts it has made to obtain the information. Sanctions for Non-compliance: In the event of the CONSULTANT'S non-compliance with the non- discrimination provisions of this AGREEMENT, the AGENCY shall impose such AGREEMENT sanctions as it, the STATE or the FHWA may determine to be appropriate, including, but not limited to: • Withholding of payments to the CONSULTANT under the AGREEMENT until the CONSULTANT complies, and/or; • Cancellation, termination, or suspension of the AGREEMENT, in whole or in part Incorporation of Provisions: The CONSULTANT shall include the provisions of paragraphs (1) through (5) in every sub-contract, including procurement of materials and leases of equipment, unless exempt by the REGULATIONS, or directives issued pursuant thereto. The CONSULTANT shall take such action with respect to any sub-consultant or procurement as the AGENCY, STATE or FHWA may direct as a means of enforcing such provisions including sanctions for non-compliance. Provided, however, that in the event a CONSULTANT becomes involved in, or is threatened with, litigation with a sub-consultant or supplier as a result of such direction, the CONSULTANT may request the AGENCY and the STATE enter into such litigation to protect the interests of the PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 31 of 42 AGENCY and the STATE and, in addition, the CONSULTANT may request the United States enter into such litigation to protect the interests of the United States. PW_Forms/Standard Consultant Agreement with Exhibits Revised i inli 1 Page 32 of 42 Exhibit I Payment Upon Termination of Agreement By the Agency Other Than for Fault of the Consultant (Refer to Agreement, Section IX) Lump Sum Contracts A final payment shall be made to the CONSULTANT which when added to any payments previously made shall total the same percentage of the Lump Sum Amount as the work completed at the time of termination is to the total work required for the PROJECT. In addition, the CONSULTANT shall be paid for any authorized extra work completed. Cost Plus Fixed Fee Contracts A final payment shall be made to the CONSULTANT which when added to any payments previously made, shall total the actual costs plus the same percentage of the fixed fee as the work completed at the time of termination is to the total work required for the Project. In addition, the CONSULTANT shall be paid for any authorized extra work completed. Specific Rates of Pay Contracts A final payment shall be made to the CONSULTANT for actual hours charged at the time of termination of this AGREEMENT plus any direct non salary costs incurred at the time of termination of this AGREEMENT. Cost Per Unit of Work Contracts A final payment shall be made to the CONSULTANT for actual units of work completed at the time of termination of this AGREEMENT. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 33 of 42 -i- Exhibit J Alleged Consultant Design Error Procedures The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is of a nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage due to the alleged error by the consultant. Step I - Potential Consultant Design Error(s) is Identified by Agency's Project Manager At the first indication of potential consultant design error(s), the first step in the process is for the Agency's project manager to notify the Director of Public Works or Agency Engineer regarding the potential design error(s). For federally funded projects, the Region Highways and Local Programs Engineer should be informed and involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an agency staff person other than the project manager, who has not been as directly involved in the project, to be responsible for the remaining steps in these procedures.) Step 2 - Project Manager Documents the Alleged Consultant Design Error(s) After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the Director of Public Works or Agency Engineer's concurrence, the project manager obtains more detailed documentation than is normally required on the project. Examples include: all decisions and descriptions of work; photographs, records of labor, materials and equipment. Step 3 - Contact the Consultant Regarding the Alleged Design Error(s) If it is determined that there is a need to proceed further, the next step in the process is for the project manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged error(s). The project manager and other appropriate agency staff should represent the agency and the consultant should be represented by their project manger and any personnel (including sub-consultants) deemed appropriate for the alleged design error(s) issue. Step 4 - Attempt to Resolve Alleged Design Error with Consultant After the meeting(s) with the consultant have been completed regarding the consultant's alleged design error(s), there are three possible scenarios: It is determined via mutual agreement that there is not a consultant design error(s). If this is the case, then the process will not proceed beyond this point. It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case, then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement with the consultant. The settlement would be paid to the agency or the amount would be reduced from the consultant's agreement with the agency for the services on the project in which the design error took place. The agency is to provide H&LP, through the Region Local Programs Engineer, a summary of the settlement for review and to make adjustments, if any, as to how the settlement affects federal reimbursements. No further action is required. There is not a mutual agreement regarding the alleged consultant design error(s). PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 34 of 42 The consultant may request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5. Step 5 - Forward Documents to Highways and Local Programs For federally funded projects all available information, including costs, should be forwarded through the Region Highways and Local Programs Engineer to H&LP for their review and consultation with the FHWA. H&LP will meet with representatives of the agency and the consultant to review the alleged design error(s), and attempt to find a resolution to the issue. If necessary, H&LP will request assistance from the Attorney General's Office for legal interpretation. H&LP will also identify how the alleged error(s) affects eligibility of project costs for federal reimbursement. If mutual agreement is reached, the agency and consultant adjust the scope of work and costs to reflect the agreed upon resolution. H&LP, in consultation with FHWA, will identify the amount of federal participation in the agreed upon resolution of the issue. If mutual agreement is not reached, the agency and consultant may seek settlement by arbitration or by litigation. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 35 of 42 .11._ Exhibit K Consultant Claim Procedures The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following procedures should only be utilized on consultant claims greater than $1,000. If the consultant's claim(s) are a total of $1,000 or less, it would not be cost effective to proceed through the outlined steps. It is suggested that the Director of Public Works or Agency Engineer negotiate a fair and reasonable price for the consultant's claim(s) that total $1,000 or less. This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential claim by the consultant. Step 1 - Consultant Files a Claim with the Agency Project Manager If the consultant determines that they were requested to perform additional services that were outside of the agreement's scope of work, they may be entitled to a claim. The first step that must be completed is the request for consideration of the claim to the Agency's project manager. The consultant's claim must outline the following: • Summation of hours by classification for each firm that is included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Timeframe of the additional work that was outside of the project scope; • Summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; and • Explanation as to why the consultant believes the additional work was outside of the agreement scope of work. Step 2 - Review by Agency Personnel Regarding the Consultant's Claim for Additional Compensation After the consultant has completed step 1, the next step in the process is to forward the request to the Agency's project manager. The project manager will review the consultant's claim and will meet with the Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the FHWA is participating in the project's funding, forward a copy of the consultant's claim and the Agency's recommendation for federal participation in the claim to the WSDOT Highways and Local Programs through the Region Local Programs Engineer, if the claim is not eligible for federal participation, payment will need to be from agency funds. If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Highways and Local Programs (if applicable), and FHWA (if applicable) agree with the consultant's claim, send a request memo, including backup documentation to the consultant to either supplement the agreement, or create a new agreement for the claim. After the request has been approved, the Agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. No further action in needed regarding the claim procedures. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 36 of 42 r.. If the Agency does not agree with the consultant's claim, proceed to step 3 of the procedures. Step 3 - Preparation of Support Documentation Regarding Consultant's Claim(s) If the Agency does not agree with the consultant's claim, the project manager shall prepare a summary for the Director of Public Works or Agency Engineer that included the following: • Copy of information supplied by the consultant regarding the claim; • Agency's summation of hours by classification for each firm that should be included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Agency's summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; • Explanation regarding those areas in which the Agency does/does not agree with the consultant's claim(s); • Explanation to describe what has been instituted to preclude future consultant claim(s); and • Recommendations to resolve the claim. Step 4 - Director of Public Works or Agency Engineer Reviews Consultant Claim and Agency Documentation The Director of Public Works or Agency Engineer shall review and administratively approve or disapprove the claim, or portions thereof, which may include getting Agency Council or Commission approval (as appropriate to agency dispute resolution procedures). If the project involves federal participation, obtain concurrence from WSDOT Highways and Local Programs and FHWA regarding final settlement of the claim. If the claim is not eligible for federal participation, payment will need to be from agency funds. Step 5 - Informing Consultant of Decision Regarding the Claim The Director of Public Works or Agency Engineer shall notify (in writing) the consultant of their final decision regarding the consultant's claim(s). Include the final dollar amount of the accepted claim(s) and rationale utilized for the decision. Step 6 - Preparation of Supplement or New Agreement for the Consultant's Claim(s) The agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 37 of 42 ,n Exhibit M-1(a) Certification Of Consultant Project No. CR1881 Local Agency I hereby certify that I am a ??lL 1t1'4WX6z.*LI and duly authorized representative of the firm of Integrity Structural Engineering PLLC whose address is 4124 Interlake Ave. N., Seattle, WA. 98103 and that neither I nor the above firm I here represent has: (a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT) to solicit or secure the AGREEMENT; (b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out this AGREEMENT; or (c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out this AGREEMENT; except as hereby expressly stated (if any); I acknowledge that this certificate is to be available to the Washington State Department of Transportation and the Federal Highway Administration, U.S. Department of Transportation in connection with this AGREEMENT involving participation of Federal-aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. 311'? /? 2- Date Signature PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 38 of 42 h Exhibit M-3 Certification Regarding The Restrictions of The use of Federal Funds for Lobbying The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. 2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure, The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts which exceed $100,000 and that all such sub-recipients shall certify and disclose accordingly. Consultant (Firm): Integrity Structural Engineering PLLC Name (please print) tgnature: President or Authorized Official of Consultant Date PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 41 of 42 7 V Exhibit M-4 Certificate of Current Cost or Pricing Data This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 15.401 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing, to the contracting officer or to the contracting officer's representative in support of are accurate, complete, and current as of 2 Z 7- - l Z- **. This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between the offer or and the Government that are part of the proposal. Firm Integrity Structural Engineering, Name lyxz-5px-' (please print) Title -1--,,4(6--4 Signature Date of Execution*** -,7?-l ;;P--/ l 2- Identify the proposal, quotation, request for price adjustment, or other submission involved, giving the appropriate identifying number (e.g., RFP No.). * * Insert the day, month, and year when price negotiations were concluded and price agreement was reached. *** Insert the day, month, and year of signing, which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to. PW_Forms/Standard Consultant Agreement with Exhibits Revised 11/7/11 Page 42 of 42