COUNTY OF JEFFERSON STATE OF WASRN'GTON IndrehhatterofAdoptionofthe Six -Year ) Transformation Improvement Program for } 2013 -2018 and Amendment of the } Program for 2012 -2019 } RESOLUTIONNO. 49 -12 WHEREAS, State law obligates the legislative authority ofeachcowry to adopt on an annual basis six -year transportation improvement progmw holding a public hearing prior to adoption, the purpose of which is to "assure that each county shall Irerpetually have available advances plans looking to the future for not less than six years as a guide in carrying out a coymno d eanaponation program' (RCW 3681.121(I)),and; WHEREAS, Me Board of County Commissioners, Jefferson Cowry, Stara of Washington, has reviewed Me nansporlation priority army and bridge condition report as prepmi by Me Department of Public Works, and has conducted a public hearing in Me corresponding proposed] sixteen transportation improvement progmar, is well as proposed amendments W Me existing program; IT N IMREBY RESOLVED not the Board of County Commissioners does approve and adopt the Six -Year Transportation Improvement Program for Me years 2013 through 2018, inclusive. IT IS FTIRTFIER RESOLVED that wit respect m Me items lined in Me Program the County Engineer is auMOtined to make revision to indindpal project scope, length not termini, riming and fueling may be required from resources time time due to additional es becoming available or unavailable and is naecmdwce with RCW 3681.130 and WAC 13616, without Me Hoard of Cowry Commissioners having W conduct a public hearing or adopt a resolution m earned Me Program. IT IS FARTHER RESOLVED that the p ja+s number 11],18,19, and 20 in Me adopted 2013- 2018 Pentagon are added mMe existing 2o12- 2017 Program asp text numbers 31, 32,33, and 34. AOO w PIEDdsigned Mh Lddgyof udi 2012. JEFFERSON COUNTY 1y .t Jt7r �u Cumi/ !i PUNS,' S' /J � 2013 -2018 SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM Oak Bay Road culvert replacement, milepost 8.94], Amil 2011 JEFFERSON COUNTY PUBLIC WORKS 623 SHERIDAN STREET PORT TOWNSEND, WA 98300 PHONE: 360.385.9160 WN W.CO.JEFFERSON. WA.USIPUBLIC W ORKS Table of Contents Letter of Introduction from the County Engineer .............................2 Jefferson County Board of County Commissioners: Resolution to Adopt Six -Year Transportation Improvement Program (TIP) 2013- 2018 ..............................3 Capital Projects Narrative Summary ........................... ..............................7 Project Briefs with vbinty maps..... ...... _..._..... ...... .......... 9 Bridge Condition Report ........................... ............................... 39 Guide to Codes and Acronyms ....................... ............................... 41 TIP Project List ............................................. .............................43 This Maras is Me 'nuts and bolts' of the Transportation Improvement Program. The spreadsheat includes essential protect infomlatlan, including funding sources and anticipated dmelins for completion of project phases. Budget and Funding Information 2013 -2018 Six -Year TIP by Project Category ......................47 TIP summary table in %hicin pojecia are diNded into caagodes: Emergency Repirs and Munson. Road and lnt<B<eGOn Impmsmin e, Culvert and Bridge ReplacemMt/R< pair, Nor- Motovzed Tmnspodation, add Planning and Cou"We Programs. Funding Breakdown by Program ....... ............................... 49 Pia cbarta illustrating pmgmm funding; and expenditure Information. Six -Year County Road Fund Projections ............................ 51 The County Road Fund ProjMbna hare and asscc9ted graph depict Me entire "Roads' budget proAcsons Mmugh 2018, mtluding parcapital project expenditures such as need maintenance doner functions and general made program administration. Locator Map for Capital Projects A wall -size map 10 supplement Me sanity maps on the pmjact briers is loped on Me Internet at hUDAws& . co afferson sa vsxuIbIicwsdivftWVT1PM1 3-201 &ma . tlr Jefferson County Department of Public Works 1 a Fornk G?fctl O`s N Wanks 0{ttebr �•. � store aw mss, AE, c bF Welcome to the 2013-2018 Six -Year Transportefion Improvement Program (TIP). The Six -Year TIP is a "rolling' plan that is updated each year to provide direction to transportation improvementsonlefferson Cowry's 399 -mile public toed system. Developmentofthe Ulsisaprocess that identifies needs, primitives those needs, develops projects m meet the needs, and rolls some offense projects into a plan that should occur over the next six years. A range of different project types is included in the TIP. The TIP is strongly influenced by the availability of funding, and many of the projects lined do not, as yet, have secured Pomding. Asa result, some ofdteprojects inthe TIP may not be wmplmed within six years; however, they must be included on the TIP to be eligible for funding. Historically, projects on Ieffer or Count's TIP have averaged about 700/, funding from State and Federal sources. This means that by investing $1 oflefierson County's money in a project, an additional $2 or more can be brought into our community to put people or wodc m improve our infrastructure. Many non -local transportation revenue sources, however, only fund certain types of improvements on certain types or roads, and the result is that Federal and State priorities strongly influence what actually gets accomplished. This TIP reflects a project average of over 9W, funding from Stare and Federal Sources, primarily due to decreasing availability of local dollars for capital improvements. Jefferson County is relatively mml and sparsely populated. Local transportation revenues are among the lowest in western Washington when measured in terms ofdollars available Per mad mile. Timber harvest receipts historically played a key role in the County's transportation revenue stream. To offset revenue losres resulting from the native in this industry, the federal government has provided payments to rualdollar counties over the last two decades which are currently expected ill appear in 2012. This will result in an immediate 20a/ loss oftranspormtion revenue for our County. Additionally, the meant ofnon -local revenue thatthis money could have marched will no longer be available either. Asaresult. the Road Fund Projections combined in this document show that service levels and project work will need to be stated back subsantially. The Six -Year TIP, like arty other capital improvement plan, is only a plan for what should be done provided adequate trading is available. It shows what funding must he sought and/or what revenue wermes must be developed. Decisions about which Projects actually get advanced are made through the annual County budgeting process. Since the Six-Year TIP is updated normally, it can be changed to reflect new needs, priorities, and changed budgetary conditions I hope you find this document useful in understanding Jefferson County's Transportation Improvement Program. If you would like more information, feel fide to commit the Jefferson County Public Woms office, located at 623 Sheridan Street, m (360) 385 -9160. Sincerely, Monte grinders, P.E. County Engineer COUNTY OF JEFFERSON STATE OF WASHINGTON In the Matter of Adoption of the Six-Year } Transportation Improvement Program Mr } 2013 -2018 and Arrnendm ®t of the } Program for 2012 -2017 } RESOLUTION NO. WHEREAS, Stale law obligates the legislative authority of ash partly to adopt on an annual basis a six -year transportation improvement progen, holding a public hearing prior in adoption, to purpose of which is to "assure Mat each cowry shall perpetually have available advanced plane looking to the future fm not less than tie years as a guide In carrying out a cooNlnated troopmmtion program "(RCW 36F 1.121(0), aM; WHEREAS, the Beard of County Commissioners, Jeff County, State of Washington has viewed to oauportation pn" now, aM bridge condition report as prepared by the Department of Public Works, and has conducted a public heading on to corresponding proposed six -year tlansp irmtion improvement program, as well ns proposed ameMmmts to the existing pin; IT IS HEREBY RESOLVED that the Board of County Commissioners does approve and adopt the Six -Year Transportation Improvement Program for to years 2013 trough 2018, initiative. IT IS FDRTHER RESOLVED Nat, with respect b the ikma listed in the Progron to County Engineer is vMorizN to make revision to individual project wipe, length and intern, timing and Ending sources, as may be retained Dom hnre to time due m additional resources becmnmg available or unavailable and accordanee wit RCW 36.81.130 our WAC 136 -16, wiNmst to Beard of County Cammissioners baving m coMucta public hearing or adopt a resolution to amend to Frogen. IT IS FURTTI RESOLVED M# the p jziw numbered 17, 18, 19, and 20 in Me adrpled 2013- 2018 Prugmm are added in to axis W g 2012-2017 Program as project numbs 31, 32, 33, end 34. ADOPTED and signed this dayof 2012. JEFFERSON COUNTY BOARD OF COMMISSIONERS Jahn Austin Chair Phil Johnson, Member ATTEST' Rains Randall David Sullivan, Member Deputy Cherkoffle Board Jrrnaasan Lrunry PUBLIC Nronrs ADOPTION OF THE 2013 -2018 TIP COUNTY OF JEFFERSON STATE OF WASHINGTON In the Matter of Adoption of the Six-Year } Transportation Improvement Program Mr } 2013 -2018 and Arrnendm ®t of the } Program for 2012 -2017 } RESOLUTION NO. WHEREAS, Stale law obligates the legislative authority of ash partly to adopt on an annual basis a six -year transportation improvement progen, holding a public hearing prior in adoption, to purpose of which is to "assure Mat each cowry shall perpetually have available advanced plane looking to the future fm not less than tie years as a guide In carrying out a cooNlnated troopmmtion program "(RCW 36F 1.121(0), aM; WHEREAS, the Beard of County Commissioners, Jeff County, State of Washington has viewed to oauportation pn" now, aM bridge condition report as prepared by the Department of Public Works, and has conducted a public heading on to corresponding proposed six -year tlansp irmtion improvement program, as well ns proposed ameMmmts to the existing pin; IT IS HEREBY RESOLVED that the Board of County Commissioners does approve and adopt the Six -Year Transportation Improvement Program for to years 2013 trough 2018, initiative. IT IS FDRTHER RESOLVED Nat, with respect b the ikma listed in the Progron to County Engineer is vMorizN to make revision to individual project wipe, length and intern, timing and Ending sources, as may be retained Dom hnre to time due m additional resources becmnmg available or unavailable and accordanee wit RCW 36.81.130 our WAC 136 -16, wiNmst to Beard of County Cammissioners baving m coMucta public hearing or adopt a resolution to amend to Frogen. IT IS FURTTI RESOLVED M# the p jziw numbered 17, 18, 19, and 20 in Me adrpled 2013- 2018 Prugmm are added in to axis W g 2012-2017 Program as project numbs 31, 32, 33, end 34. ADOPTED and signed this dayof 2012. JEFFERSON COUNTY BOARD OF COMMISSIONERS Jahn Austin Chair Phil Johnson, Member ATTEST' Rains Randall David Sullivan, Member Deputy Cherkoffle Board Jrrnaasan Lrunry PUBLIC Nronrs 2013 -2018 SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM NARRATIVE SUMMARY FOR CAPITAL PROJECTS The 2013-2018 Six -Year Transportation Improvement Program (Six -Year TIP) includes all planned capital transportation projects for the years 2013 through 2018, including environmental mitigation (projects 1 through 3) associated with past emergency repairs. Below a a brief description of each of Me planned capital projects. There are 398.589 miles of county rcaRmay in Jefferson County. The Poorly Rating Program eSablishes a process am syffiem for pnor ding projects. Plenty raM1tgs ate established through ncetls identification and screening, tedtnlcal evaluation and ranking, and policy direction them Me Board of County Gommi5rdsome L ALDER CREEK TRIBUTARY CULVERT REPLACEMENT ..................................... ..............................9 Replace an aging 5 -foot diameter steel culvert atA Ater Creek Tributary with a box culvert. 2. DGWANS CREEK ROAD RELOCATION..................................................... - ..... ................................. 10 Gowan Creek Road failed at MP 12 as a result of a 20M thru lge. Relocate a section of Me road to provirle secure access to residences at westerly entl. 3. QUINAULT40WH SHORE ROAD EMERGENCY REPAIR ................................. ............................. 11 Permanent reatoration of 2010 storm damage between MP 1.14 and 128 large woody debns, bank roughening, and other measures per Slate Integrated Streambank Protected Guidelines. 4. RUN- UFFROAU AND INTERSECTION SAFETY PROJECT .............................. ............................... 13 Improve sahty on major and minor collector: trade signs, guardrail, tra musmar rumble range, entl similar measures through 2010 County Read Safety Program. S. PARADISE BAY ROAD - PHASE 2 ....................................................................._ ......I........................ 13 Rehabilitate roadway strudure and pave with asphalt concrete, pave and widen shoulder, deal guaMail and budgets other roadside hazares 8. URRYSCO117TRAIL- SEGMENT4 .................................................................. ............................... 14 Construct a mufti-use trail from South Discavery Road at Discovery Bay Golf Course M Milo Curry Road, representing Me final segment of the Larry Scott Trail. T. RICK TOLLEFSON MEMORIAL TRAIL- PHASE I(CHIMACUM VALLEY) ........... 15 Construct off of multi use, non - motor ized trail writhing HJ Carroll Park to Bob Bates Fields Urough Chlmawm Valley S. SAFE ROUTES TO SCHOOL- SR 19 AND WEST VALLEY ROAD ......................................... ....... -15 Install pedestranactivatod overhead worming header and pavement making far SR 19 chening and Impove other pedestnan facilities in school vicinity . S. SNOW CREEK ROAD CULVERT REPLACEMENT ..................... ................................................... -..1] Replace Me Andrews Creek cueed at Snow Creek Road MP 3.3 with a flak- passable culvert . 10. DUCKABUSH ROAD PAVEMENT PRESERVATION ........................................... .........................._..19 Chip seal and e9 seal treatment with Forest Highway program funding. 11. DUEETS BRIDGE PAINTING - CLEARWATER ROAD ....19 Raping [he steel girme and crossibrecing of Me Comets Brig CI ���-����������� ^������������ Clearwater Roatl MP 0.80 to 0 78. 12. ACCESS PRESERVATION: HON RAIN FOREST, OLYMPIC NATIONAL PARK ............................. 20 Program funding for replacement of substandard faking culverts on Upper Hour Roatl. JBITERwn COUNTY Phase Watts 2013 -2018 SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM P.dKn frONTIMED 13. DONKEY CREEK CULVERT- CLEARWATER ROAD.. Pardapec in salmon enhancement group nab passage. 14. SOUTH DISCOVERY ROAD REALIGNMENT.............. . ... ....................................................................... 22 Perform minor horizontal realignment, grading and surfacing to provide adequate setback from con8nuing natural bluff erasion. MP 3S2 to 4.00 15. SOUTH DISCOVERY ROAD REALIGNMENT -GOLF COURSE SEGMENT ......... ............................... 23 Rehabilitate roadway sburture and pave with asphalt concrete, pave and warfare shoulders, and address spot safety needs. MP 2.65 to 364 15. COUNTYWIDE MINOR IMPROVEMENTS......... .................. ....... ......................................... .................... 24 Various minor proleas mungreale Involvng Safety, culvert replacement, drainage, entering Upgrades, petleaNan and beycH facilities, or other improvements. 17. CENTER ROAD ASPHALT OVERLAY -PHASE 5 .................................................. ............................... 25 Asphalt overlay between Chim soum Crossroads and SR 104 overbal MP GOD W MP 2.28 18. CENTER ROAD ASPHALT OVERLAY -PHASE 6 .................................................. ............................... 25 Asphalt overlay between Chimscum Crossroads and SR 104 overoasa. MP 438 M MP 6.88 19. SOUTH DISCOVERY ROAD -FOUR CORNERS SEGMENT .................................. ............................... 21 Resurface and leaders roadway, widen select shoulders, and address spot safety needs. MP 400 to 404 20. SOUTH DISCOVERY ROAD REALIGNMENT - GOLF COURSE SEGMENT ......... _ ......... _ ................ 28 Resurface and restore roadway as a simpler alternative to project 15. 21. WEST SPRUCE A EAST ALDER STREETS SURFACE UPGRADE .................................. _ ................. 28 Chip seal gravel roads in Ferrtlise Ray Estates. 22. OUILCENE PEDESTRIAN 8 BICYCLE PROJECT. PHASE 1 ............................................. _ ........ _...311 Crosswalk improvements, sidewalks, blcyae lanes, and slreelarape feaNree on US 101 through Ouilcene village cen er. 23. OUILCENE PEDESTRIAN 8 BICYCLE PROJECT- PHASE 2 ............................... ............................... 31 Second phase of Ouikene sVeayaoipe and nonmolorizM transportation project. 24. URBAN GROWTH AREA PEDESTRIAN & BICYCLE PROJECT ........................... ............................... 32 Crosswalk improvements and mulM1USe facilities involving SR 116 businesses and the Tollefsen Tral. 25. RICK TOLLEFSON TRAIL - PHASE 21CONNECTION6) ....................................... ............................... 33 Extend multi -use trail with Chimacum Read crossing to Bales Fields', wastewater segment mute to SR 116, library, and si and Lower Hadlock waterfront 28. DISCOVERY BAY ESTUARY TRAIL CONNECTION- PLANNING......... ................ 34 Planning end pratlesgn for rims use Olyri Discovery Tr it connection amuM Discovery Bey. 27. DISCOVERY BAY ESTUARY TRAIL CONNECTION - MAYNARD ........................ ....................I.......... 35 Conslructeon of 0.375mile Ohnni Discovery Trail section eastward from OM Gardiner Road. 2013 -2018 SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM 28. WESTVALLEY ROAD CULVERT REPLACEMENT -NAYLOR CREEK 36 Replace culvert at Naylor Creek wit fish - pesards a culvert. 28. SNOW CREEK ROAD CULVERT REPLACEMENT -MP 0. 8A ............................... ............................... 37 Replace deterlamMd metal culvert . 30. "UGA ROADMAP" PLANNING PROJECT .............................................................. ............................... 38 Planning process to develop a vision and development Standards for trunsportedon inkastructure In the Imndale and Pod Hadlock Urban Garath Arce (UGA). J[rcrosaNCOUNTY PUeuc MR" Project Location and Setting NEer Creek TnWtary aNUl is Nood W unrest (MP) 215 on Upper HM Road in Weal Jeffemcn GuMY, and "a been iJeMfell by Ma Washirpbn Dgarlrred of R 6WiMlib(WDRM1rf as a fish amposebamrt and a high marry for repiattrearl NUer Crack eanneC15 Be the Him RNer. Project Scope This prged will ca sinW reprcist an aging 5400t diameter steel when M NMr Creek TnMMry with a 25,15om morels, boxnutren Project Impetus Jelkmn County is required bytyet to peForm enNmnmenlal m egatun far npraP placed in the HM Ritter dining emergmry rwd opera al Upper Hoh Road MP ] T to MP ] 8. Jefferson County and W➢FW hwe agreed INt this mitimblen will be satia ed by amadi gNn when at Upper Hoh Real MP 2.15 with a WDFN approved fish mumable shupure. Status JBfle18M Wumy en11CIp8188 ¢OneINCtlM In 2013 Funding l8 pnmlpally Fedeml Hlghuay Adminlelmtlnn (FHWA), leveraged aim dollars f e m IM Stale and the Cwnry Read Fund. Project Stagstiu Road Number__._._________. 914297 Milepost ._.. .................. .........._.. 215 TMac Count (AVemge Daily Traffic) Project estimate PmliMnary Efgineei ng..... IF 238.522 convmern_ ..............._.$ 734420429 TOTAL ....................$ a 970.942 Project TimNlre Preliminary EngineeNg..... 2010.2012 Construction 2013 Poled Funding Federal Highway Admmi&retion—ER ........... $ 838,135 Core (humid Annual Pmg.)..$ 91,327 Local Road Funds ...... ..... a 41,48) Vlctmry MAP uruw. ^m..rai... o.p®r JEFFERSON Wf PUBLIC Waeus Project Location and Setting Owrene Creek Road Is a gravel local across Mad in West Jefferson Coumy. TM1e pro%[i Maii I$ Eely een MP O BC and MP 1.O7 . Project Scope It le newtinmy W mWtaatlaat W4 JI, age of Donal, Ci Roetl In amid b provide sesurn a sessb raNSCea at the weskdy eM ofNe mad. The mw mad will M grovel surfaced and W16 ft. wide wall Wmi ft a antkAastad teat funding All bet 75 %FEMA. 12 5% and 125%ICMII Project Impetus In January 200$ a land &Ne owned at MP 12, coming a com i mad leilure and amn0 oR ass to residences for appranmaMly one wasi Public Wages responded immedlely by wrsOUCting a anus ry dodow a ndred Me sloe, and men began a paces; a de'xlap plans and aMein emimnmenml parmie aid damof- was he wrmenem road education away from me aide area Status PublkwaMa Is commumt; to Ask Mrouan emimmooned and debt- of-way requirement, for Me sad relocation aided n is anbcaudea Nat mad recall will occur in 2014. Wdm Works b morntodrg ens maintaining Me temporary detour to moved¢ Moore to red 4nces unN pemamend mad relorslbn is mmdmed. Project Statistics Road Numbs_._. _.__._____ le Mile" Send ............... ................_0& $ ma ego MIIe W st End. ......... ......... ....... 147 Taal Mileage_._______________ O Be cassava Canditiarm 20102013 lane Madder .__gapmM swultler WMlb e ........................... Or Tm lc Count 2005 eatimma .......................100 ADT Project EstimaM undiminmy Engineering ...... $ 101.554 RigMOR Way_._____.._... $ 319,m4 Doneuacson... ... ............... $ ma ego icTU_ ................... $1,033.10 Projectrmatim Preliminary Engineering ... ...... 20102013 rli0n4of-War ........................... W13 CoMNKeon _._____.._...._.......12014 Project Fuming Fedemi EEMA) ..................$ n4,699 stale (Emeryenot Management DeeaMrerdl..... $ 129.150 LOW ROa] FUMC _..__.._..$ 129,10 JeeeERSCn COUNT PUBLIC WOers 10 Vmmny MM e Project Location and Setting This proacti81up1W on he Guinwit -it x$Fore Roa]E¢x @n MP 114 and MP 128 atljacem W Ne 0uinauH Riaer, Project Scope This am udgency reaper in Ann 2010 wrism atl of placement of 370 g. armoM ock We add bank proleclbn, aM re& idgeon 0We r0&Wey lass¢ and sur eang. Permanent 2eWxlim machine mitigetm fiN emergency bank prd¢Ctlm per Waelabglan Department of Fish 8 WItlIRe (WDFVO Inagmted SYream Bark Probction Guiidelines anni as rpuiretl by emerbi HydreWic Prgeci APProval(HPA) . Project Impetus A high waxreveMweeM1ed OW a added One f uinauXSOUM there Road in Januery2010. Project Statue The emergency repair pi of Me tnrsimc0dn work Is amalettd The design br Meamironmemal mitigation is In the adoring phase. Projectstatlatics Road Number 811507 miliggentsbarb 114 Milepost End. ................. .......128 Towl masses ... .................. ��...� �__._ 014 Ealfig CendM s Lane49lanw_..I _... _.1..1..6agrevl Shoulder Wish_ .............................4fl Traffic Count 2005 estimate ........................1M AM Project EMimaM Preliminary EnOlreedrg.. ... $ 183.WJ Right s 14 Condensation ..................... NO $ gta3oo TOTAL .......... $ 1.tW.330 ProjeUTlmeNre Prellmirary Engineering ..... ..... 201021113 Constructed .... . .. ..... _ ...................2015 Pmfecl Funding; Federal(FHWA)... ... ..... ...... $ 957,015 Loom ROSY Funds _... _.. S 149.480 VICIPIry MAP ©Uyng)OR pAa48 to o a0 fPau1: c� ^vim ©d �OOe VA d Os ARB Uom yJa/L•J ..wsousawi. Read r mQ ia.en RNrr mms adimm W the I chase Road, aeokds and! m xae ®xrameaancdmro. Project Location and Setting [Rome maMUya far Nis funding mdum, major and minor coledors in East and West Jefferson County. Project Scope T om*willwnsidOtbe Md Ing '. upgradesigns, addguardrail, addtmnseorumbledOpAandotersmllar salary impmvenents. Project Impetus Washington State's Stall HpMrey Sakry Plan MH3Pj TwortlEem damages mmo&mad crashes as plenty one and intenecbon. eaW vaznes as priority on, Sbtendelocal al one For these tad crash types iteans; that M % coal m washy matls (urban yid among end miscellaneous ma3aays. The 2010 County ftwtl Sal Program is targeted 1W/ard low.wst, monasterial an praam mnuflYOad ash interaction elated crashes. Jetlemen County is Higible far $925.000 far sffi improvements W As wm ered by the end of 2013. NO local match is required. Status Jefferson County is currency in the preliminary englncedng pleas of this paled. Cons W dun is Planned far 2012 and W13. Funding is 100 % Federal through awmanNm of Highway Safety Improvement Program 1HSIP) ash High Risk Rural Reed Program (HRRRP) funds an programmed through Me Washington $tale OBpenwaMMTmnspmtatian. Project Statistics VICINrt"Mrs Raears; kEya' Furtma' (.7maifisaA'n (FFC) m RurnalMirearAmemad oT ...East Major O011etlor W _ _Ere Minor Cdlel Project [Estimate PMImi ry Engineering— . It 100.000 coomn lw $ 825 P'O TOTAL $ 925Q"O ProjadT Preliminary Engineering ...20112012 cmSrml 2013 Project Funding Federal HiaMrey Administration .............. $ Wagon The map dep:a major and near wneawa In call Marton County Ttia Cl Read Safely Pmgrm4g9a Ratlorw]naya. Vol in 5ti 4 .n. 9y,°hyb ti[.0 1rfil.rChri �i� weY .....�usa6r�e� fS JF FM K COUNT" PUBLIC WORKS 12 Project Location and Setting The prgM deation is Paradise Bay Road Four; MP 032 br tllow Creek) W 1.53 Use lake FIRM, Project Scope The ground sill oamtrY LflnnJe Moulders and overlay Me mad rnm arembet Immu a Fragment Road Road Fund Collars and Stab Rural Atonal Program tuna arc sawrctl for Mls projeG. Projectlmpetus Pavement condition and title usably have deteri0rated an how "It tnvaletl coral collator roadeary. Widening and paving Me mad shoulder wil provide for a safer d ruing evperienm aid allow be the safer use of Me aMUldx by nonmooraed Ausers The project cogs may sense when the ncnhswsl region of combat and was rweNed Slab Rual Arle'lal Trust ccru d grant ems in the 2M 2011 Llenmom. Status Enginewring Lyon in 2011. Construction R eaFetlm In 2014. Project Statistics Road Number _._ ._503MB Mike l5bn .... ....0.37 MlkpotEM ..... ...d.53 Total Mileage, __118 Eahg IiC rr la WPM 11 ft0ovetl IB3T) !considerations . . .......laflgmxl Po Retl 0120]M. _.....51 -1W Traffic c Count 200K.- ..... ..... .......... .. 3, 103 ACT 5-Year Aboaddrand Rbbry (2000.2808)) PmPerly ..... 7 Injury __. _ 0 Firta .... ...0 Propct Eafimals Prelonfireary E 9 rib ......$ 220.583 RigmafWay .. .......E ROAD Cn wadn ....s 91 TOTAL ......E 1,298.335 Proje tT Preliminary Eng Mrg..._ 2011-012 Plant of WaY .............. 013 Construction ...... ........ 2014 Pmje t Funding Brute(RUral Mount Prop ) ........$ 1.188,501 mass Road Funds... - a 128.634 VICINITY MAP :R $ 5 'r.y Mai I1f t 1qi Port r a Bay m ,V Hood (V M•yw] Gnat ni it \✓ Pa Bary, Road Phase 2 as "Was a saw "wine summer, and JurmsOa (%wi Pueuc WOays Project Location and Setting The project is Ini approximately 8tral more firm Rs warnin0 in Pod TCxnmM and mndnuea for appronmalely 15 Mal miles It will Mend Me -arm Scoll Tied d-ST) Man the cmnlnq at Sam Dross ry Road netl b ea Oismvery Bay Own Course 0whom Mllo Cmry Roan mcels South OumvayI mar Four Corners. Project Scope Engineering and canstruc0on of the final ag08rt M 1111 LST, IMWng a and halnnad an Mib Grant, Round FuMing includes awro ingnon Wltllib and Reioatin Prcyrmi antlieg and Ii finds. Project Impetus An authorities pubs; review Wcceas discontented the need for a pu01k had woman in our munp. The Larry Simi Tad is pad on a warned rail lrcnryoaned as a p"dny in the A%Rermn County NmMdodo daM RKYeaSM¢I Tans %an. Status Right of way acquisition IS Washita Erglamong and washroom are expeMd to begin in 2011 and consume In 2013 Project Statistic ROed Norm l _.... _.... _.__..__. 86310 Project Birthday y Preliminary Ensiineedng._ ... $ 55.864 RigMOIANay ................... $ 137.520 Construction __ _. _. $ 388159 TOTAL........... $ 540A13 Project Thai Pastures, Engineering.... ....2011 Conslmtllon ..................... 2012 -2013 Proper Funding Steve Mastercard Wddlih8 Reaea11on Pmgrard .. $ 280411 Lod Fast FUM............ $ 280.412 JFFaansaN C0iP WwxS 14 vlcwlrvduP N:�4Igatl Y. YN. �' Itl'[U:IId�1:L111O9aaRYil�Itl:IIr LgNl1' \a /nleey9J�A Project Location and Setting The Bob Bares Remunerated FlNEe are nodded ivlb Me BbeMPS Many on Cbimaam Radio aloud entourage "in C6M81 Port Hal lOtk.Im, Inlgel segment of the RiM Tankfurt Tral vdll ¢Nand hard Chingdo m ROey across from ore Bares Finds wedval Mmugb Me Channel Valley W HJ Cwmil Pad. cowing Cbimaam Cr 4along lee way. Project Scope Engineering, part men$Aian and condrvd'cn Ma multipurpose Dail connecting CNnacum Road near to Bob Bares Rhododendron FINES 10 HJ Carroll Pad. The rail ki gM Be Mis first pbaze WII be appvotlma @y 1 o Edge and ncludee omeirg Chimacum Cmek. %tans 2 wlll makeconnedlma seats the Bob Batas Finds and nodhtOwtal Pon HillOek anchor the CWnry r1Mery, The Trau will also connect north ro Me mein Crams msmad Cemµa. Project lmpetBs Been HJ Carmll Park and Me Bob Berea Rrowa4onal Fund are well -used Senator in our murder People wanting to ravel bowmen them ant to points beyond, wU as moral and the center W Pod Haddock, are fwrec to was Be roadways 00 Grumman Road antl SR 19. A Boiver under pat far boys ids and restaurants connecting home damages vwld enact¢ rm-morOgsed travel that avoids Me dow ward The overall gal of the surgery is to common an a uddive, unneareally whammed antl "ll-u ec moniyse"I that U hat n0nmonal reMOd annecTrg Pod HadW with the Tirkma Community Center. Grange and CNmawm edcds on SR 19 Mreugh HJ Canmll Pad. S1ate6 Preliminary engireerig la mdmvey. Riantof my acquisition is understand in 2013 who conduction In 2013 antl 2010 Project Statistics Propeot Estimate Preliminary Eminnedering . ..... $ 223,352 RI9M fWay ....$ 81,508 COMMban $ 913259 TOTAL........... $1.497A85 Project TlmNlne Prelimnary Engineered ......... gold 2012 Right of Way ...................... Pit -2013 CnmAUCtian ......._ ...............20112014 Project Fu"i FedeM(SFP)_.. _._a 917,201 Bbb (Paiubian antl>lB BafeNprogmm) ............ $ 4,11 /000 LOgR Road Funds _... _.......$ 139,234 wtg�. CoNdemod renLedgoIf the re Rid oerins Sunn roan Red Bull amough me Con,.... vi mmxiTV SEE Core« E JEFFERSON C WNry PuauO WORKS Project Location and Setting mid project is lccalea on bases banned iSRU 19 in the runts of the Cnimaam School Campus and Intersections with West valley Road and Fare Way. Proposed" 'Safe Routes b Sdrool project indudirg petlealWanamvwalls and school forces imprommmts, as wall as aepamkd real an the east eels AGR 19 W enhance conned Win I IJ Carrell Park and! fine Rick TdleMn fruit Project Ins"tus The Jefferson Comedy Trend Sa"Task Fane —a Pearson oipanners lncirding Me SheMPS Office. PUbk Wdrka. State Pefml, WSOOT Operakns, Counts Libraryard the Chimaam SClml Oiaind— has idennfittl this area as a good candidate for aaMy improvements for Westnans and hayaisd, and in parrueer, whool ari new status Pudic Works apgied far Me grant Nude is 2010 and ended up on the Pat nge cy list the Sees Barred Me Oounts in 2012 that compHiN2'Safe RoNa to School' BLee he" been searded for this pried, when affil be initiated in 2013. Project Statistics VNOmiTy um Road _ ................Sea@ Route 19 Try cCount Project Est PrenminarrEn0lrerminti ..$ 132,968 Right -Of- Way. ....... .__. _.$ 29,95 Co inudl.... .............. $ 305.601 TOIPL ....................$ 46!,844 Project TlmNlm RigMOINhXrea- �............... .... . . 2013 Condensation . .............. ............. Preheat Funding Soak (fare Panama School Program) _ -- $ 439.6% Local Faso Funds ............ $ 26.95 Cwmalk Impowmem Mrn oxen an ee NYy valets bwtl Inkoetlbn kW1e¢ m oversee padeNmnetir'etM Vremiip ¢12ne1 JEFFERSON COUmv PUBLIC WorixS 16 Project Location and Setting RepMrenentola falling cMVenlar MOmrs Creek al MP 3 S on Snow Crcek Ro J, wMcn iadealgnaled Forear HigM1way 443 through a FMeal program associated with Nab reel Foreale. Project Scope ReWace the III reeling advert min a Aeeded wnmete bra sadden mat roll men Washington Droanment m Fish s VifiMNb(wDFwO rkagn wart for Mh passage. Project Impetus The ANTwa CreekouMrt at 111 38 on Sn se Crcek Road h hiling and the wXn is a fish passes¢ carer. Culvert regamment b aigiMefor Forest Hlghuay gogram lunch Nrcugh me Weaiem FederaHanda Highway Omdon MMe Fedeml Highway Adminiaincor This projection both wmtl a fish postage horirard alkwbrwr'vnued "onal FORat access on grew Creek Road. Status Jefferson Counts has aewtedfuntla through tM Forest HigMday program. Prellminaryergineedng, inducting Federal pointing, began in 2012. Cmstrucbn is anodpat d in 2010. Project Stagadcs 30.1 Road Number . .........................352909 desm MIIeseme . ... ............................... 38 PreliminaryErshreering..... $ 180,712 Cov9wfion .................... $ 30.1 TO1TL__.. _.... _...... a desm Pmjectr Frrw Preliminary Engineering ... ... ... ..... 2012 CMaWwoa.. _.. __. _.. ____. 2016 Sncw Cre[h Pm]. MP A]P Oulkt PfAren CrM NnxnMAP r r,+, -aww cpunr. wa<IC wpm5 Project Location and Selling Duckal RWtl aentes as the northernmost amry pant to the Olympic Nahasse Forest N southeast Jefferson County. Tae Olympic National Found pmui0ea brat management and recreational op{aWnPoU for IM lam! community and for tuuxata. Throughout Rwd pmndes alas to Me Dartmouth River, Duccub sa Tail, Brothers N idarna a and Orymgc National Park. Project Scope Thu kabusa Road will header ship heal and to deal kmtmenl nor the NII length done Jeffienew County poNan of the toed. Work WII he done by County cave. Project Impetus Jefferson COUnys Fream ent Maragemenl System (Peal amMy makers thel Me m aement ism "good" common with a sereembe permanent Canadian India (PCI) Rome of 88. The system shore a typical dedire onto Me mal mar seal in 2001. DommordM1On rill aerateA Mb point unlms a nae meal b applied. The timing is amorphous kr a Mip seal and Mg seal treatment in comer to prepare the pavement ablus of Me impclaM Forest Hotwry. Status The natural Road pwmenl assessment projel"a awarded NMS through a terminate pareea under Me Washington Fore9 Highway Program. JaHweon County has entered into a Mward agrecrnenl with Me Federal Hight AdmmiMrelim. WoM1bprcgammed for2013. Project Statistics Nmxlty Met Road Number ........... ....... ....... 27flt9 subornation ............................. OW Milepost EM ... ...... ....... ..__..__....366 12,PU Tonal Mileage ____ ....................... 366 Extreme CwM flow OTU______._I - Lane WMba_... ...... 11 it pa (BST) Shoulder Widen_ ...... ..._2 it gravel Pavement Paid (21111) .............. _.... SS Tnmc Count 2609.. ____. .......350 Proper Ramada Preliminary Engineering _.. $ 12,PU Construction ................... $ 192.4.13 OTU______._I - -$ 1941615 ProjettTMeline Preliminary Ertymemi g._..__....... 2013 Counse n_____. _._ ............... 2013 Project Funding Fedeal(WaNingrot Format Highway Program... ... ......... ..$ 182.815 Lare ROM Feel __--- .... It 12,000 JEafaamN COUNTY Pueuc VMtIS F t" *. "f HnJ Cmrml Project Location and Setting TM Quells Sel spans are Queers River. It Is loreled in West JeRmon Cral on Chamahr Read E&ween MP 080 and 076. Project Scope The heard sape IncWdes development or plans, sped learbns and ergineering (deal parmi rng', comeacr ad and leads. and ormunadian. Project Repeaters Quceb Br i is in need W repainting. The paint wit iMn is such had me, radial is elir for 100 %Fesxal heard bar moral annual Status MapplicationwassuEm bMe Federel H9M yBrN program Ines 2010. JaRwmn Loursywas axaNes gran) Nnde in late 2010. Canervctim is anticipates In 2013. Project Statiatica Road Number. _______________601506 Milepold Stan .... ............................... 080 Mill EM ....... ............................ 076 Total Mile age.. 1 ... 11_1 ... ........... .. .... ._. 0.16 Eximi CBndltioM tare Wdars, 1 11._ 11ItGmRk Berk 6MukMr WMNe..........6 aGrcrete OeM Pavement Radial('1G161 .............. 67 -1W Project Estimate PrellmiraryEnplllg.....i 320,355 Conswclun ... $gall 297 TBWL .................... $ 2.gS0.M2 Project Tinrellrn Preliminary Ergmeedng. -- - -2012 Con &rvdrcn _...._........_......_....2013 Product Funding Fee l(Singer) .............$ 2.961 Vidal MM C�ec:4nwe.ca�.rnw and amnb�rcene roomed W a d, mail JesrnreMx Cqunry Puauc V iorl Project Location and getting The Upper Hall Rwtl srowass 185 miss man 05101 in West JeRxeon Counts to the HM Rain Foreai YVror Cantor in Olgmpk National Park RMI Je eon CmnN menages the fie 12 miles a"Upper Hoh Read Project Scope Do real efMe pR1°A A to Melmer aware erresYJems, businesses antl OUR Aaba an Upper HM Road The County has secured Fedoal Binding through IM PuGi icur s Highways Oisamlimary IPLHIS program to regerchas g whouns on Upper Koh Road. This funding will enable at less one and sommuslly Free cuNede to be maireed depending on Me edufons Rguired at eaT Iocefian, own MII be delannned through Preliminary Engineering Project Impetus There ere mudre lo® along the road Nat require culvert measured The highest pdmily at inches is&AP 3.33810 admires ongoing another, aamdmted with failure of the existing when, want staining under30 met of fill. The se¢atl whenre aW Mphoney 1881 MP 4375 and the mid is at MP (Cape. stags This period is cmrenfiy in the pro design grame. Al alive solubona are being analyretl for each of Me three m arty side. Factors d Consider Maude we, I0ngmry, eonmtriman pry, and whether permits can be aw,uired from mu9lge worries Project statistics V CMTY WP Rwtl Number... I 91!207 forecasts ............ 3338,4.379,8.919 Existing Condihona MP 3339 —OUT domI stems when - badlyM oM MR a 379 & 8 949 — fregceM stomm related gore& tlexems, on msdway culverts uwewa &dale om Traffic Crum 2095... ...... ...... ... _........__. Mli Project Easm.m Prurmnary Enginmdng ..... $ What RigMMfini ..................$ 100.000 Oonstmdmn_. ___........ $ 3890591 TOTAL ........ S 3.425,M2 Project Trmalim Prelimir9(y Engineering- -- 2011 -2013 essaf Way......... ....... ........ .... . W13 Constructed _ ........................... 2014 Projact Funding Federal ...... ............... $ 3.425,442 d c. �x rww..u...xwa.rmanh ^ pxa i —INRr HIM Roof cxMn MP 3.a38. 9wxin9MRoonttd began MR WN. JEFFERSON COUNTY PUBLIC WI 20 Project Location and Setting Donkey Creek Colven IS backed at MP 129 on Correction Roe l in Word Jefferson County. Tine culvert has Orion identified by Me Washington Slate Department of F¢M1 and NfbtllXe Mti as a fish paes=ge border And a high purrhar for mdaremeM. Dearbey Cr eek IS a Mondry ro the Cleanvetx Rbvx. Project Scope no FaGfl¢ Groat bedroom Cddbgidn(P CSC) has ,amd d gmnl m the dmi of¢920,1a9 has Me fears, Rrrmmy Forcing Bi (SRFS) to onci this coked wMn a 3aNSl cmvek fork crash in order b Improve PSb passage. Jefferson Counts Wil b ornab ft 15% (up W a purpoum of E52,000) an a rambureable Was Aar¢oreoaskjon is completed. The btal automate] project ed m Sal 4, 042. JeRarson County roof also wovida atom tone for plan reviev and project ov&SgM, vabu¢d M approolmebdy 55,000. In 200&21110, Jackson County aM the PCSC sho essli partnered To repbam a similar r1Md on Me Upper TO Road. Project Impetus Donkey Creek Culvert is high-pnodry fish passage canner. The PCSC h the project sparsor and vnll manage Me Morgan and wmtruction. Sbtus The PCSC is currently in the reach phase of this proled. Construct on send occur In 2013. project Statistics Read Numher ... ............ .... ...... . 100504 MllepwL ....... ............................129 Euetlng lard s Fish tamer CUNert TreMC Count 2005 .... ..... ...... ............ ...... . 133P11T Project Eetmm — LaosI Road Fund preliminary Ergieashruf g 5,000 Construction... ..... ............ 8 TOTAL .................... $ V,000 prokotTMreblre 67,030 Preliminary Engineering— .... 2011 -2012 Conatrvdkn_.........__._...____ 2013 Project Funding —Fa Funds Paci &Great Salmon Coalition .._ ..................... S n1,,00 Local Rorl Food ............... S 67,030 Ober... _.. _._... _... _.... 5 25,000 VICINITY MAP wnby Cronrui Clmm%rflw] W 129 JFFFFASOa Cori `ui WMke Project Location and Setting This project is beelel neWeen MP 3.62 and 4.00 on $wN Discovery Road adjacent W Discovery Bay. Protect Scope The prajeal is to ¢ns"Via minor r�ignmsnl of a portion of Soun Doorway Road to farmers atlequsle aelba ks from the emerging neWrad Bud ammon al the loodm. Project aromas enermay ing and III very acpuadi Local Rpds and Stele Ruml Menal pogrom funds are secured for roes last Project Impetus Smer atoms in Me paid wverN years have caueW a asarn of this secNar W Dhwvery Bay bond. Mm ening Nia parlbn of Boom Dmwvay Road. The mad raids to be Round landward to provide modem Moving mill and to incranum atery. Blame Minor repmis same the lam alarm damage nave been wmplated. Ties phase of Me overall proust is sclreduled far Compares in 2515, doe pnnapmly, he delep in conform marr ey. Project Statlstlu Road Number agree Milepost Sen ...362 Milepost End I .. ..003 Tool Rumors .. ...0.30 Exhinang Cormom Project Eatima tane'Va 10 fl pmad(BSi) Should rnidR¢ 2 f gavel pavarmard Raen0(2JA) .. 6195 5 -Year RCadenl Nlsbry(200a-N1119) timpani 2 Ross ..... ..... 2 Fala lees...... .. ........... ............... ..... 0 Project Eatima Prebminary Ergiiwr'ag.....$ 221,319 Rightof-Way - -- - -$ ready CoiutrwWn .....................$ 1`91 TONAL. ................. s 1.147.559 Projectlimeline Preliminary Engineering__. _ 2009 Right of- Way ............................. 2014 Canatution ... .... ......... ............ 2015 Project Fundlig Blame (Rural M M Pmgrem)_ ......................$ IWB.aW Local Road Funds ..... E 45L054 JEFFER80N COUNTY PUBLIC WORKS Vlcwm Mee I \^nwo RKi Disr very Bny swoiwe.nweuvea'+� 1 3 Project Location and Setting The polled is ]orated m SoNh barrel Read beNreen Douglas Way, W MP IN and Cape Gal Read at MP 381, in the andante of Me oismvery ear Golf Course Project San" The prgad MII Impose safety b) reaauel of real abstrutims, veal and paving of amid shout he four feel, resfoal'rca NMe base material and command b impal due al lily. Project Imperial Thin aegmenl of South Goodyear Raise is substandard in terms W vddlh and pavement mndh®n. There are also drainage annual deep tlikMS, and coastal in iM dear same, an awhich prpem so" hoards. staws This polled has been areaAt competitive Rural Arleritl Program (RAP) footling. The paged is programmed for the 2015-2016 brefome. See face& 2n far an aternmee far this segment that valued anal of pavement prema4on street shoulder widening and alignment correGlon.Implementation of the almpkq less responded paged aMmebve is mnOngent Taw sewing remember RAP funding. Project Statletiche VICIx11YMas Road Number 11 ..... ..601500 all Sol ....... .265 shaped E d .... _J64 Total Mileage .... .0.99 Ealstng Co Moses tereWMNS _............+0flpavad)BST) Shadmar NAdW __. ..2flgrzvel PavemeMRmng(20U8) 67- +W Tnmc Could 2008 ... . ....................... ....... .050 ACT 5-YeRANdidend Hbtery (2094 -20116) propeary ..... e ini Cadbury, o Project control Preliminary Engirresmy ...... 1 ]0,000 Wghtut WaY ..... ...$ IREN, c mmeo ..... TOTAL ....._._s +6]s 400 Project notable Preliminary Engirrearing ......_..... 2015 RlghtM- WeY — - — ._2015 Ocnstpul ............... . 2016 Project Funding codes(Ruml Medal assured .........................$ +,507,500 Local Read Funds .. .... ...... $ 167,500 i s'yi t�a it 3 J 4 jo... 4 � sV 0e.t .._ oge y nv .F ., p 5 xwuaa..nu.e.r.uar . spw ... . ..._.._.�� Yld- r 23 JEFFERSON Couen PUauc Vi Project Location and Setting Courdyuide. Projectscope This is a programmed calepry far varnme minor impmvemeMe Mat may he neressnry m managing Me Coul many 400 mile road system. I'miwultl address your sal neatly, drainage issues, antl refuting, or other inner makers Local rude would most likely be the mume Mr mina problems under Nis medgmy Project Impose This proaremmeNC cat pry Is required b provld Ne County the geology, b wntlud mlw mgtal Improuemeres, as nestled during Na year Stara Information from crash nvmtiasliam is wminu usly romoiled. Development and pardoner of eared, Mgeds himes, evaleg ion of this informal Project Statistic Project Fatimaes... ......... .... E 34pp Project Tlm etlne ........................ 2013 Project Funding taaid] Fred! Fare Damped quaNrell as a court d a aan . ya' guaNrae man rewmtr m en. JEFFERSON COUNTY PUets WOnaS 24 iCENTER ROAD ASPHALT OVERLAY — PHASE 5 P,RNt 17 Project Location and Setting The aepbeX Overe, pmjM a loolded between MP OOJ and 2.26 on Center Read The protect[egins At Me crossunaft intenedbn wM $R 19 and CM1lmawm Road. Project Escape This protect wiu Amount of pevemem gunning and pr lJ Nng, bummed by a 2-inch asphalt o ay, gravel moulder does ing, new lnteneclion gvemem measure and new panel lane Meng. Project Impetus Center Road a ore of Jeftrs Coum(s most heady most madweye. This project is one phase of The Mgaing Center Road pavement ne iMenanas and improvement program. Phase 5 will The Me ned phase of esprtet ovarley AS Center Road should eddi rural funds ro aeeiMble Inmugh ones and Fedeml BpYFe, . Status Tha project requires Self, anNw FM Rl furde. The County will appry ter wmp&Nve Road Arterial Progam (RAP) NMIn9 through Me Slade of Washington. If wwxsstul, Fe Surtace Tmnwfttin Prrymm (STP)Regional funds on provide the mqulred mate or RAP funding. Project Statietica 2.900 AOT Roa]Number I ..931507 Mllepal Son ..... .....000 Mlle End... ....... ....226 Toml Mileage ........ ...228 Existing C moms, FRmUwkI tt itmixn(nsin Shoulderinfiefthat ...... 8 fl dreal MET) 2010____._..._._..11 _1 2.900 AOT Protect EV6mNe Preliminary Egineering......... It 780.b ConBWctbn____ ............... $ 855 TOTAL ........................ S 933.No Project Timafirn Preliminary Ememeadng ..................2016 ConsWAnw_______.. _...____ 2015 Project Furdi g Femand(Surt Tanspmlatun Program) .................$ 91.300 Smte(Ruml ARenal Program).$ 639,700 Vlcmm MAP P T umne, Hamwr,w So 4 Oak gay ud.M.Awe ' NTmI ase RAISE an Cwter Rml. ryplN a ban north And somnbon.i rams doe m theavy vatice m(no. 25 JEFFERSON COUNTY PUBLIC WOVE CENTER ROAD ASPHALT OVERLAY — PHASE 6 P,�T�r 18 Project Location and Setting TheaspbaMoverlaypmje Islova Careen MP4naW6WonC ester Road Thepgectrodsar Me SR104 maxi Project Scope This project MII mnsist of pavement mnnEm9 aid prNevNing, forlosew by a 2anM orphan money, gravel amoral drawn, new Internal lowwri manmg = =na new wee woe uusi Project Inva a Gender Rma Is One m Jethelnon Cwntys most bee•Ay hard maderms. This Wmsect Is one prose of Me ongoing center Road pavement maintenance and employment program. Foliating comes 5, poster swil be possible should emotional fur be available through Sisk and Found whose. Status This prefers requires State honest Fedexel funds. The Cwndywill apply Am omrses live Rural Arterial program (RAP) fuM'mg through Me Stre of WashingM. asumdssful, Federal Surtere Transourbdion Program (STP) Regional funds ran pmvide de required me" for MP flndlrg. Project Statistics 2.903 ACT Road Number 931507 Milepost Stan .. ..639 Milepost End 686 Total Mleage .2 .OT Errbnrg Lmdlb Lane Vigi llflpamd(BBTt ShwlderWMM ... 89 peued (SST) Triple come 2010 .......................... 2.903 ACT Project EeNnate preliminary Erglrming... ... ... $ 85,000 Combustion ........................ $ 930900 TOTAL.._ ................... $1,0160.00 PrgeoRmenne Prellmim-y Erglneemg ................. 2014 COnAmIXUn _.. _ ......................... 2015 Protest Fuming Federal oune2 T2ngaalim Program) .................$ 101,500 $lale(Ruml Rrtmal PmOmm)_$ 913 end BoH pgsoo.� `ylT 1 1 �a AJ f � . l 1 { Je Lw5on O0un tt PUeu c WORK6 28 SOUTH MCOVERY ROAD — FOUR CORNERS SEGMENT Probect 19 Project Location and Setting Too pmjac a located iii the and ore+med slrelch of South Oosrmery Read on Oistrvery Bay, pelwren MP 0.00 antl I Bf the pmi area begins just x t of the Sound Olacovery Road ReAgnnreM project end comes to the imeRegiM with BR 20 and Four Comers Road. Project Scope The project consists W road mute ing am reatomon blmpmve me queliy The project ifwlWes slat shoulder Weeding and spot skly immersions. b. Total prat e9p I$&540.00. Project Impetus INS reopen of South Lour ry Road has subsdndand pauamedtwMitbn . no Lary art Tail ends at Milo Curry Rod, partway Mrough this empanel. Sddltbrai shoulder Birth to eosmnaeMe nomm o zee transportation may he Included f¢m the taillm] to Four Come could the Rojed safe BAR forcing. Statue Produce session is planded Be 2019 with co strLeson in 2018. This meet is dependent upm aewdng mmpoidwe Rua1 Pnerel Program meng. Project Statistics Road N La 01508 Released Sled _ 60 MllepoutE d .. ...689 Total Mleege ... _OB9 Existing Conditions; SONG Lan wNN ... 1042 it MW (BELL) Sfro MerlMdtlla 2 -9 it Omval Pauament Rnro ()(B) ... .......... .. M-100 not CduM 209_.____.. .._ .......................2,801 SXwr Aaftlem Hiafory (nW40 08) Proper Injury ..._.. ......0 alNFales ............... ... ....................... .. 0 Project Eanmam Preliminary En ring.......$ 5e,tt0 co spas ............... $ 435 TOTPL ........... $ 590.00 Rratectnanelzu PM nary ENi a N.. ......... 2011 Consumer _ ......... ......... 2018 Fission Funding stab (RUN Medal Prop own) .....................5 908000 tum Road Funds ....... .... ... a 54,00 Now ry Mw a 4.4 I � 1 s4,v Ri 19oa� {F•,,' f SONG Oiri JL a� sue+ ?} 27 JEffeasoN COUNT PUBLIC WORKS Project Location and Setting The Project is located on 6oulh Diswwry Road barren Douglas Way, al MP 2.65, and Cape Gmge Road a1 MP 364, In the severe of Me Deanery Bey Golf Cwrse. Project Scope The pmjM serves Ot maw manicuring and reabre4on to impoue ride quality. Total that eatinata is $593,000. Project Imperial; This Em00n Of 60016 Diermi Read has fubAOMeN pavement condiOn. As bnprovem9it that Meters remmal of roatlatla hname, shoulder widening, and agnmed consistent has Answers partial Stale footling. (See project 15t However, in order t0 earned its project deirmser cimirette Me need yid dgi way occurrence. and save foal fraud funtls, the County is pursuing this aiinper pavement preservation atemMwa Be this Proposal. Steals The County yell appry Mrcarpenters Bad Meiel Pmpmm funding W"a pavement pecervalicn argued. The reiterated mhardi shows phypert mitlaton in the 2016-2017 timefreme. Project SWSSCs Road Number ..... 601503 Milepost Stan .......... ....z05 Milepost End �_. 364 Total Mleag ......................... 0.99 Existing Cmtlilien Lane Wdlhs ...10 fl paved jB6n ShoulderVidephs 1 1 __.2 it gravel movement Rating (2006).... ..67 -1On TnTC Count 2006 1050 ADT 5-Year A dG t that (2004296$) Posters .... .... 6 injury 2 FataIN _ - ._. 0 Prajest ESh b Preliminary Engi11m111q.....$ 59.000 CaMnw4on .....................$ 530600 $ 593,600 P ypeet TYneltne Preliminary Engirteenryt .............. 2016 Conahuemn. ___....._.......... _.. 2617 Project Funding 61814(Ronal Adetel prepare) .... ..... ...... ......... $ 51 Local Ram FUMa.. .... ... ... $ 50," Nclpry MAP IL Aw 1 as iAL, Discovery r Say j I 5 xwo.eyaow. aem ewsynx Project Location and Setting Paradise Bay Panama, lor d along Oak Bay andi M Pod Ludlow. Project scope Inn grnjM in to chip Ideal these gravel roads in Paradise Bay Effli Project Impetus Won Spu[e and East AMar stme6 are mnyed highly on the Cwnty's 9rauel rood upgrade Onodty, army. Statue PMiminary en0ineedng is antitlpaletl'rn 2017 will wmtruction in 2018. Pending availabiYN. local mad funds All be emgoyed Projsct5tatktics Rretl Num[as ...... _.... 50550aM Mileage 1W,W3 Wen Spmsn............. ......... ,......0,17 East Akbr ....... ............ ... ........ ... 0,13 Tate Mil ge ........ ..........................11.30 Existing CarMNms Lane Wsirm Wm1SIOnse" ad Ean Nder . ._ ..... ....................... Ofl Tmmc cannot in WOO WI Spi ............... _.._SO AOT East Few... ........................ . W ADT Project ESlli Preliminary Engineering ....... a 10.000 Conom ain_ ..................; g0011] TOTAL._.... _._._.._.E 1W,W3 Pmjecl Tlmellre Inlbate_ ............. .......... .. ....... 2017 Project FUMing Local Rand FUMs.._.___. a 1040.'U vmwnYewa 29 JEFFERSON COUNTY PUBLIC CYCLES Project Location and Setting Phase t of the Questions PatlsLian & Inches Praised accuses on Us Highway lot as it resses through Me QWrene illege center in South Jefler an County. Project Scope The project will More Me puikene community will petlest an and aln eSir and other annocen pe improMTeMS along US Highs" 101 to enhance mmntage worry, IMahlllly, and cotinis Sir ewromlc development The project will include enhanced Pollmttias eeinga. sausages on the east aide, and Montle lanes on both miles of US tot. me plekd will also include Maintaining and peaas0ies large rghbng and Maher Ilanaliry grawassai The andet development Phase wul incwae design cMrted691yle workshops that fiber the epWmmity far design vieuaualbn and consensus budding among residents, adjacent business scorn. and the Washindon Stare Departure or Trarepodation affigi An educational component evil consist of produce a video to aoamam me not bead community engagement. W design , to conaVUNOn that can be used Me a denpmbaton Ice In other commundee. Project Impetus The WSOOT ogympk Rated hid damaged Me causing School Zone as pearly leaAim fer rotation eatery Improvement. The OuiNxne ammunily has eammunkakN a Made a formrafsmpe Impmuements along US 101. Status Jefferson County has appied Sir grant funding Through to Show Pleasant and &ryck Pregram. Funding dtt6om ufll be announi in 2013. Ponied inflation a intended in 2016 WalrvlMa Project Stated" Road _. 1 .. _.... _.. _US Highway IDt Mileposb ... ............ ...... ... 299.51bamo r Prot mmm Preliminary Engineering __$ 125,000 Right oEWay ....................$ 25.00O C ngrrnxdflom .... ___...$ and. TOTN .....................$ 650.000 Project Thndlne Project Funding State IWSOOT) ............... 6 US" Lased Road FUMS ........... a 25,O'b "events Flow Project Location and Setting Phase 2 Mee Ou icane Pedestrian & Sii Pri will imove US Highway through the vOla8ecemar, as well as otlic guicere area mess as needed to mmgalea nonmomnsed(ar bdW) hanapona0on remark in the community. Project Scope PPuaeuetl during Bdder immat tomlvanaMnetmtled demand of acomprenenalve Cassava moral Man m he ty pmeeea of Phase 1. The eWpe for Phase 2 will W determined upon comgMlm of Phase 1(profeet n) Project Imperial The Oulkene coml nity has conversation! a desire fOr disclosure improvements alone US 101, as won m resonance and mwsle malites on adjacent County ruadwrys as Wait Ma n muescrised mamas ation nsMpk in ere commoner. status This is an -out year project . Sol harder are pmpmmmed fur AM8lo Indies preliminary "ineenng. Coat asumatea are Provides LAW Acted use asumaces area Ire determined, This project relies on gam funding. Project Statistics ftwds_.... _.___. _. US Farrel 101 thu ugh Quil l9 & other puilsom area loads Trams Court 2011 (US 101) .................... 3,900 AoT Project Eagmate Preliminary Erglawarst.._$ 125,000 RgS<AWay ....................It 25.000 Constmdan .....................$ 500000 TOTAL ... ... ............. $ 850.000 ProjeclTmellm Ind ale ....... ............................... 2018 ProHM Funding State(Wl _... __. 8 U51e0o Laval Read Funds .... ....... $ 25,003 Vicinity MA, erredw rweuu. a x.p. nqu rte a earld drier br US 101 amue Laos,en JLrrusax COUNTY Pueuc Mi Project Location and Setting The umncorprmd urban gr area(IICA) in Jefferson CwMs o celled the [models and Pon Hatllo4 Ech The e¢inily map hHow indicates the UGA LOuMe In the ThArear M the puimper Peninsula. Project Scope The moral Is N compl0a a non r dmd tmnspwlatlon neMnrk In the UGA, Inch trail cometlbm, eldeaalks bmyde lanes and dedicated cedestdan School Ransil impr ee nts are to be dearmined through predesign ,the preparation W grant applientlhem. and prellmeary engineering. Project Impetus The Imndale and Pad Hadlock UGA is an wbanzing area Commustan of a wastm treatment laciliry is expected to bws development and red¢velcp in Me UGA. There are limited edsti ng pedestrian and hieree htllities In Me ea. AdtlNmwl trail connec0am. sitlenalks. dcybe lanes, and dedcabtl pedestrian comairga rrenm, Facilities would armed neghWrhoMS, the Ckmkeum Creek Primary School, the Jefferson County tArthe Waineaess, also me Rick Tolpyon TRIP status Engineering is suffered far M16 with wmbuction in 2017. This pmjeer is depart Mufm searing grand Funds shough programs such as Safe Rauch to Effect and Me Sate Petlasbian and Bill Program, Project Statistics VICINITY Mw Ronk: Pike, InM SR ne SR and Cmmawm Ro91,Ircndak RCed, end Ce]arAVMUe Existing Condlfons Finntod FBI connections, sltommilu, bcyckl and detlmsed pedestrian cromangs in Me USA Protect EW I Prel'mn rr En ng ...$ 100.003 Right -of Way ...E 10,000 Caueucbon ...................... a M mAL ___E $ low Protect Financial Engineering ......... W16 Constmtlmn .. ... ........ 1D17 Pralecfrundlrg State(So% Ronnie to School, Pe Wan and &gcke,or similar Pmgmm)....... $ 490.000 Loml Read Funds ._. _.$ ID,0.'U JEFFERSON CCUNTV PUBLIC WORKS 32 : i. 4^✓m tS b �a L� $ IT y nY t 3. am �lk A 1 - .c.. A.n JEFFERSON CCUNTV PUBLIC WORKS 32 SRN' ikl' iP] MtiyS4Ud� $: &11�J:Lgi'�laYa101dlYNltaldp Project Location and Setting Line central barhNre of Me BAR Trail epeMS Ben HJ Candl Pan M cangh Me Cbimaarm Valley W ad Hadock Baer. MF00 from Me Bob Bataan Reveetiorel Fack, A key trail m neciun is planned W connect Flume 1 M Me Tdlefson Trail to he Jefferson Courdy Library antl Chlmawm Creek Primary School on SR 118, Projea Scope A muXl path will be planretl and wmtrucled Mann where Me Rkk Tdleafern Tend ml ad FodKKk Rota north to Me library and Me school. The agenda mine and trad all ielail[e datwmiro thrauah preliminary erginal Project lropeWa The Overall goal OI Me WG madman Trail IS b enjoy an adracttue, unlarselly suppmtal and welWSed multiuse trai Met Is pan of a mmmoWived Leal mnnMirq Port Hadloi whin the Td -Area Community Center, Grange and Chioaum sctmda on SR iB Mmugh HI Canod Park, This Phase 2 "Connection' limited frwsea On the segreard LeMeen Old HEdook RpsU and Me Jefferson County Lldary end Saarland in Creek Primary Shchi an SR 118 The wmecdon all enable Ilmary{ehWB and sWtlaMa Basin ordke W and from HJ Cermll Pak and Channown IBM lea been BW,WRd and is planned W be acquired for Me wmdnnc� on W a wort water treatment phand W support development in the Imatlale and Pon Bell Urban Gerald Area AJ(og Line Inatepegam of sever lines may whrcoe uiMMe constmclpn of Tolleflon Trail segmema. Stable Preliminary engineering s anticipated W begin In 2018 Win wMVCtlan In 2018. This pmjeG is tleperdeM Open formum grant forms through foreigners Such as Safe Rai to School and the Age PedesNan and Biepcla Program. Project Standard" Protect Estimate Preliminary Engineering _.__.$ 125,000 Cmstrucdon ....................... 5 425 TOTAL. IS fabled Propct Timehhne, Preliminary Engirseenrej ......... 201 6-2017 Curmudgeon 201 Project Funding State (Sank Raines W BMCd, Pedestren and anyone or iharp ]rang__..$ 750.000 9:3 Cman almndMn VtMMUNRlM T nerannT lco,sw g cnimawm and abhnrx mmevn Be Chknaenm valev Vcwmdda r all, JesseasON Couury PUAC WORKS IIA4Kt 9fiV -9Si 4dIIIIXA I;LIILIUT.RI4wli ICS Will 101Pled ®A Project Location and Setting Men completed, Me Olympic Diamvery Trot (ODT) will Smash 120 miles ham PM Townsend Togas Pass Ocean. A rouse amund the bead M DMevery Bay between Pewderand US highway 101 is pad orMevision. Project Scope Planning and pra design far the Spontaneously cremi a ODT Bad segment amund the head of Redovery Bay. The Pretax Mil induM deaden to Randomness ant atapNoll surveying and amendment ent investigation, ant dome feaaibiiry anarysis ant mi stimssed. The most Step would be Nandi grant strong far conasmmon. Project Impetus The habitat reposition community IS arrently explMng palm opWns for the eery of Snow and Salmon Creeks at Me head of Dismuery Sry, Tl`awas Options moves removal 0 the sxblang nlread Made test was Initlelfy aw6zned far Val disablement. The Peniicub Trails Castilian (PTO) and Jefferson Caumy believe it is impotent to engage In ball planning ant development at this time in ostler to ensure Me viaahly, of Mrs non- motonmed tansportmon smear and To Shade modest partners to insists trail design and constructed with shoreline mornew ion projects. Though offer segments of the DDT have yet to be compared this segment is a many hearse of the potential for optimal mNe options Be be preduded by projects MIh wmpping abjepivee. The goal Me past is to Mtl a solutan that enables MM transponders and �b ton objeNVes to be achieved "a peters. Statue This props depends on acquiring; gamending. Jefleren Bounty applied M giant Sending to 2012 Nrcugb the State Rearward and Businessman Office (RCCS Funding demands and be made in 2J13. Project Statistics mcli MM Reatl.. _.. _. _.... _.. $pis ROWp 101 A W Project lammam Femmlrary Ergineenst __ 8 110 OgO TOTAL. a 110" Project Tmelfns preliminary EngiRionnat .. 20112014 Projest Future Slade (Reseeded and Conservation Oman)......... a 100,000 Loral Road FuMa ... ......... a 10000 (In the iMn of irvkbd ffiR mad) imposing mluary, and highways. JEFFERSON Caavrc MMUCA/i 34 Olsmrury dry Project Location and SeWng Lehman wmplHM, Na Olympk0iacaveryTrail(ODD all stre 136 mike from PMTmm d false Pacific Ocean.A name around IM heed M necessary Bey freWxen Me w and US Higawny, 101 is pen of the make. The Maynard xec0an begins at ON G in finer Road and heads mouth beMCtm the Impetus and Me Mghwdy, on WgHnglon Stele Oepadment of Transportation (W60OT)bght-of-way and pm"" managed by Me Washiigbn Demme -I tof Fish and All I E)"AF; for annaervahon objectives. Project SCOpa Commandoes Ma 0375-mik mule me pain that waNd become a cdMel link olse OUT The prgeat is linked to a shoreline reaWatlon N dMat indudu raKKrdon W a welw6ne F the wrreM reprwtl grade IapiW in the m ary. The entire prolenl will he managed Ly the Nmls Olympia Salmon Condon (NOSCI. Project Impetus NOSC a pur fig a about resNatim period Mal includes mmwal of the evialino imposed pane and bridge spanning MeeMrance W Me lagwn. JeRenon Cwnry, W➢FW, WSOOT, Penireula TraAa Cmlilron (PTC), and aTa padnomI ecollaboratedinaneflonbmnMWathSWy ODTsegmentwncurmnrlywils MermKK bnprajed. J¢Rerson County Me applied he grant Nina to cooperate to Me mean project "I& NOSC will manage. Status, PrOled inhigon l9 WMenvely planned for W13. Thin Meant is subject N grand NMbg from Me Boom Recma( n and Conservation Once (RCO) and permMBn k use MOOT dgM -o4wmy for troll conalrudlon. Project Statiatics Read......... .............. sLk Rome 101 8OWGeMirerRwd Project ESUMab Prelimnary Eg'neei W....$ 50.000 Comedbn_..____.__. 4 a5o0oo TOTAL .................... a 500.000 ProjecLTnmelire Preliminary Engineemg ............ ... 3013 Cmawmon_ ............_ ..............3014 Projatt Fulling Same (Resonance & Consensual Cffce)......5 `A3.Ba0 I Other Nnda, including eaknmg Nnds, to be supplied by Me pejad sponaom, Me Nino Olympic Salmon Cm ton Bel and the VVMMmlm Department 0Ran and W l(WOFW). Total pasom mM bar part ¢mW coon M the "and s gment is then - mekdtoMET5Oi00 {{ f q �J sc.andalw wan kr Ma narnery ofMe Mohamed flat n•tl Ponditedes youltyMna WEST VALLEY ROAD CULVERT REPLACEMENT — NAYLOR CREEK v -ace 28 Project Location and Setting This culvert is locaratl at Milepost 2.5550n Won Vail" Road at Royal Creek. Project Scope Fears it St eri0r811ng skH culvert won a new fish- passehle aluminum or concrete Wx cull Project Impetus The existing shrel culvert is detenomtin0 and will eventually cullepes, The talent s also lucid as a barrier ro fish. suws This -W-year Road as Slate and /or Formed ful far Pis pmgY vul W required. Funds wound li cone man State saloon recovery grogi Engineering is anticipated to begin in W17. Project Statistics Road Number . .___........_.... ... ... .5191119 Suggest ...... ...... ..... ... ....... ....... ...... 2555 Estates Conditions Lmre WHNe....... .... 9 it caved fil Shoultier 4NJIbs .................. 2 fl small T2 cCourrl 2005 .......................... 500 ART Product bemab F¢IlmNal Engineered - -$ 50,¢O Constmtlkn... ... ... ........ ... $ 45nro0 rorni.._............_.$ sd9,g90 Proienrmemre Rudest Funding SUM Salmon Necessary Programs. ..._.._________$ S .coo NCli hw course cul sa wkg woes, denX[nhm er mwll In to Imver Send A drop A as outlet as a call NNh mlpaum. Project Location and Setting A Name culvert Be MErevrs Creek at MP 084 on Snow Creek Road, when is designated Forest Highw ryA3 through a Federal program associated win Nali rel Lomats. Project Scope Repbae Me "sling feting wNeli by moral (or Tai a new pipe into Me existing fill or amaling a onnambe box cu rem. The appropriate, column cull Wdetermimtl through a pre design spore, The cast earade bekw may element the miler end of the met mines for albma5ves a Mid b aw bou Project Impetus TieaMn at MP 0.84 on Snow Cask Read is aging. Culvert replacement Is eligible for Forms Highway program funds through Me Western Federal Lands Hiarmy Division 4 M Famnl Highway Mminibafwn. This pursed well allow to wndnued resident and Nat" Forced aori on Snows Creek Reed. Status This is an °wt year inject that cull depend m securing binding through tire Fumat Higlmmy program. project initiaem if anlitlpated M 2017 . Project Statistics Read Number... ...... ........ ... ..... 352903 Milepost ... ... ......... ............ .......... .. 3.8 Ex4tlng Considers J ' Twn W Diameter CuNeds- Badly Deterlmated Traffic Come 2005__ .._._._.._..._ .............WALL J Project Fad mm preliminary Est ng.. E 250300 Consmcb .... E 2000 ..49 _. E 2,500,000 ProjectTimaillne Prelimmarp E greemg... -- W17 CwWw.SOn _ .......... ............. W18 Project Furnace i Federal Highway, ndmnlNrenw _._____.a 2.50o,aaa Wintry M 3u t aNSON COA n PueuC WORKS \ a! b J ' J e \RRR I i fyv�N Saw c,..naret„,..Pt. w 0 i ..._.._.�.. 3u t aNSON COA n PueuC WORKS Project Location and setting The unirmrgxetetlurn March area(UGA) in de mon County is call the Impose and PM Hadock USA The Wtiniry nap below indiaaha IM UGA Wunaarlea in the'TrLNte' ofNe Counter Peninsula. Project Scope The 'UGAR map' Point Is a community maiming and panning process that will result in adopted shipped approva leans and develcpmem standards Mal will guide public and pmate Infra&mdure inw &merit fw 116 ned 20 commempal was e Football will g ivc rporated into the Johnson JJohnson County COmpreoM1ennsave Pan and enemdl nMneghWd land we plennirg, benspadelim Improvements, and ennramneigal protection toward the Sol of aeagng a IivabN ammuniry Project ltnpatos The USA Is expelled to experience new urban development ape redevelopment when a wastewater treatment system goes on Mein 2016. The Rmmap would be adopted is rte and in time for wnwn¢nt ImplemenWm m aweakwel tt¢etm¢nt 5y919n Me1brAenn¢d brconstruction b/ 2018. Preaentt ytMU( iAbcksurbanlowisotsmvim —iweanilery ce,IewcuNantl Wu sidewalks, and inadequate slormwaler management Spirit an ud6mtlng and with a 2010{cµla11w002603. An Incremme In population, business development and employment i kMwc*d1wM Me capability of iary swrer service. The 2006 SUimper Peninsula Trarepor bn Study travel demand agdel access Mat new Eusims¢devebpmentwill double Me numberef employees in Me USA by Mehcmmn year 2031. Statue Too pmle r is pmammmd1 for 2018 and Is Miam upon securing funding Man an appropriate source, slot as the FetlINel Trar padetbn, Community, ape System Personal(TCSP) program. Project Statistic Roads: odiously SR 116, SR ig, Chim scum Road, and Irmdake Road Prefect Gaels 0 lmpro're mad, trail, and Ws efficiency My UI Paul businesses, and value 0 Rndum lmpsts to the moire Mas development and redevelopment of re rsuade! ape commercial areas take plain. 0 Del wind adopt dear lmnspadeMry related development standaus to Imprwa pubtie and P&Me wall development 0 Produce a rappel plan Mat language design concepts and cast estimates for improvements m to pdory seasonal d segments and mnmomdrea mmgrs identified in Pay yw was planning groups. 0 lingual Will Protect Eaam Prelim rylagneek"....A 2S4.irA ... ... .... E 250006 Protest TimNire Preliminary Engineenrg_.. __.... _. M16 Project Fulling Marks] (Trenspogtbn, Community. and System Presavation- asiMlarpmgrand $ Nolan Lord Rwtl Fund .. ... .......... $ 50.000 „a........ nmaar.lM Vsk iv MM Poll S end BOy BRIDGE CONDITION REPORT Jefferson County has 28 bridges in its Bridge Inventory . Each bridge is inspected every hero years by a State Ce deed Bridge inspector in accordance with the National Bridge Inspection Standards. During Vase inspections, various bridge conditions are evaluated, such as erosion around the bridge foundation, cracks at stress points, and cracks along the road surface at the bridge ends A copy of the 2013 Bridge Report follows. enryea ere'nsp vsi at kast every Mo yams pursuant to Sho, mlee. mom eWmee� ,�roi.eee.ft rmemi tome wp a MlOsO neplemmert "'Oto. Jem'eRxx CWnn PUeuc WeRxe 2013 -2018 SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM BRIDGE CONDITION REPORT Jefferson County has 28 bridges in its Bridge Inventory . Each bridge is inspected every hero years by a State Ce deed Bridge inspector in accordance with the National Bridge Inspection Standards. During Vase inspections, various bridge conditions are evaluated, such as erosion around the bridge foundation, cracks at stress points, and cracks along the road surface at the bridge ends A copy of the 2013 Bridge Report follows. enryea ere'nsp vsi at kast every Mo yams pursuant to Sho, mlee. mom eWmee� ,�roi.eee.ft rmemi tome wp a MlOsO neplemmert "'Oto. Jem'eRxx CWnn PUeuc WeRxe Jefferson County Department of Public Works Fbsnk G/9aM, Nbk WOrks Okelor Morale Revuhrrs, F. E., Counly£ngktee; MEMORANDUM TO: Board of County Commissioners FROM: Monte Reinders, P.E., County Engineer DATE: Febmary28,2012 SUBJECT: Bridge Condition Report 2012 In accordanm with WAC 136-20 -030, and the National Bridge Inspection Standards, Jorgensen County has completed the bieunial inspections for all bridges on the county road system and bs submitted the inspetlio t reports to the Washington Stare Department of Transportation. The findings of the bridge inspection effort art hereby fami shod W the county legislative authority per WAC 136 -20 -060. Structurally, all of the comay's bridges are in good condition with no Jor deficiencies and requires only routine maintenance. A repair projed was completed at Willoughby Creek Bridge on OPper Hoh Road in September, 2011. Willoughby Creek Bridge sustained erosion damage during Me January, 2009 flood event. The stream bank commoring underneath Me bridge was washed out, which caused erosion of Me slope and turnaround to undermine the approach runaway. The bank annonng caravan of Me bridge was also damaged. The repair consisted of conducting a tied back sheet pile wall around the west bridge approach, and reconstructing Me bank armoring underneath and upeream of Me bridge. This project was funded m 86.5% by the Federal Highway Admhuimmflon Emergency Relief program. Tower Creek Bridge is being moniored for potemial scour problems associated with doxmcutting of the strezmbed. The Tower Creek succumbed is becoming progressively deeper and wider In the vicinity of the bridge as a result of migration of Me Bob River, and repetitive high -flow events. In 2009, Public Works applied for, and was daded, Federal Highway Administration Emergency Relief hands re stabilize Me Hoh River stream bank as an attempt m protect Me Tower Creek Bridge and Upper Bob Rued. Duero lack of funding, there are no plane for preventative measures m thus tune. As sb4d in previous reports, Linger Longer Bridge is functionally deficiera because it cremes a restriction to Me flow ofthe Big Quilcen s River. This situation has Me potential to Ilueaten Me meanly of Me strucNre by scoming at Me abulmems, and is being monitored. The Linger Longer Feasibility Study indicated, among its' findings, Mat a longer bridge is warrented. Public Works continues to investigam various colmions to Me thread. and funding alcematives. In 2010, Public Works applied for and comment $2.97 million in federal reading to motor the Quests Bridge, which spans Me Queers River on Clearwater Road, pu limimiry engineering is corremly undsvay and bridge painting is scheduled for 2013. This project is 10W, funded by Me Federal Highway Administration. A new bridge was added to Me system in 2011. At Diamal Creek Upper Hoh Rand milepost 9.19, a 22 fl. span, prerasl, 3 -sidM concrete structure was constructed. This project corrected a fish - passage barrier, and satisfied mitigation requirements from an Upper Bob Road milepost 40 back prosection Rupert. The project was traded with 86.5% funding forms the Federal Highway Admivistraton. The following is a guide to codes and acronyms used in the TIP project spreadsheet for Jefferson County. FUNCnoNAL CLASS O6 Rural MinorA ral 09 Rural LocalA ss GUIDE TO CODES AND ACRONYMS L] GE 7 The following is a guide to codes and acronyms used in the TIP project spreadsheet for Jefferson County. FUNCnoNAL CLASS O6 Rural MinorA ral 09 Rural LocalA ss W Rual Mafor Calleaor L] Urban Col Mr 00 1 Rural Minor Collector 19 UNan Local Access IMPROVEMENT TYPES 01 New consWCion madwey 15 Prelimnary Engine nq 03 R wnstn non - added Capacity 16 Right- of-way 04 Remnant iron -no added capauty 17 Gonna on Engineering 05 4R Mainlnnanm - rasudacing 10 Planning O6 4R MdMenance- reatOravon S rahabilfatipn 10 Research 07 4R Maintenance - ralocadon 20 Envimnm bal only 00 Bndge -ne constmchon 21 Safety 10 BndWreplacement- addedcapaaty 22 R Vhlghway Crowing 11 Bridge replacement - no added capW4 23 Tronsil 13 Bridge rehabilitanion -adde capacity 24 Tro c ManagemenWngineenng -HW 14 endge rehabiNafron -no added capacfty FEDERAL FUND STATUS S= Secured (IUnded) l P= Planned (unfunded) Ls(I b .T.1'j C =Cable TV; G =Gas; 0 =0Me0 P= Power. S= Sewer, T= Telephone; w =water The following is a guide to codes and acronyms used in the TIP project spreadsheet for Jefferson County. PROJECT PHASE P.E= Preliminary Engerann ', RNJ =RgMaf -Way Const-Construction FEDENAL FUND CODES (applicable to Jefferson County) ER Emergency Relief FEMA Federal Emergency Management Agency STPS Surface Tmnspodation ProgmmSakty STP -R STP- Regional WAFH Washington Forest Highways program BHOS Arcae Replacement or Rehabilitation PLED PI Lands Highways Oiac dronary "Rer TCSP Transportation, Community, and System Preservation Program STATE FUND CODES ( appliable to Jefferson County) RAP Rund Adenal Pregmm END Emergenq Management Department WWRP Waahington Widiile RecreaVan program PBS reasoned and Bryde Safety Pmgmm SETS Safe Roues to School Program PBP Pedestrian and BxI Program NOVA Non - Highway and Off -Rcad Vehicle Activities Program ALFA Acuatic Lands Enhancement Account ENVIRONMENTAL TYPE CE Cateforpally Exempt DGE Documented Categorically Exempt EIS Environmental Impact SlaRment EA Environmental Assessment JErrtRaov COUNTY PUFF woalvt @ TIP PROJEGI S it a gc Sarc Q� C O CIO a h f w xg� U5 z r r K m NQ K F s' €0 Sa Y3 Lis, � 1111111111111111111111111111111111111111 � I 111111111111111111111111111111111111111 � 1111111111111911111111111111111111111111 �III��IIII�IIIIIIIIIIIII�IIIIIIIIIIII�IDm ® I�I�II��III��I�I�IO�I6�IIIII�El101111111 ® I�Ilhl�hl�l��l�l�l��lm�l�llld�ll�lllm�n� ® III' W�IIIIIIIIB�111111191111�101111111111 ® VIII111161111111111199a�lll�011llll9101; 11�11101130�IIIIIIIIIIIIEIIIIII�11969110101 �101o8l�llll����lllllllllllllllllll�lllll �I�I�II�D�II�D�II�I�I 'I'llllllll�l�lll'I' ®IMIMIMI'IM� �o ©000 ©oo r" m00000000 �000vor���s� PAGE �I sod z w a� xa� NOn Q K a N x z QU JE EKQN COUM' PUKE WORKS 6G �} llllllllllllllllllllllllllllllllll��lllll �IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII �IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII �IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIJ�IIIII �1111111111111111111111111111��1��1�11111 ® I�1��1111111�1111���1111�1��1�1111111111 �I�II�I�I��I� ��I����II��IIII1111111V11t �IIIIII�II�IIIIIIili1111��I����I���11V1� + �IIIIGIIIIGIIIIGIIIIYIIIIYIIIIYII�IGIIIIG IIIIIIIIIIIIIIIIIIIIIIIIII����I�J��11111 �1111111111111�1111111111113 �® »I ID�EI11111 mmuaIIIi,IaI6 I��� IIII1111111111111111 ' �131�1111�11�1 .11��0111111111111111111111 �11111131111111110911111111931110a6116101 �000v0000 i mooaaaaa© JE EKQN COUM' PUKE WORKS 6G m oo =a 0 as Ka M0 0 F F 0 R F V C i� u2 QU J�oP Gv P000cN n EMMMMMMM �1111111I111 @1 @ @1 @1 @ @Idl@ €III@ @1 @1�1 @ @ @@ X1111111111111@ @11111111@ @111111 @II @11111 X11111111111 @II @III @ @I @II @IIII111111111 @@ ®1111111111111111 @II @IIIIIIII@ @111111 @ @I@ ` ®III @@ III@@ IIII�11111111111 @ @I @IIII�IIII1�, �Il�l�lll��lllf IIII�I�II�II�1�1111�1111 �11111111111o1 @ €I @1 @ @I @1 @ €11 @1 @1111111 @1@ ® 111111110110131101�111111I�I�II�IIII�I�I ® I@ I�@ 101@ @IIII11111111111111111111111111 ® I�I�II� '�"I'I'llllll'lll'lll'llll"'I'I ®®EKMEEEM }�I�'���"�II"���I j iIMMEME �00000000 BpilAi�A��� maoaoao ©v J�oP Gv P000cN n �I <p 0 a z f WN NZn F pF Q6 C F N s' r �a {U JEFFF NCWxn PUeuc WOxxs J9 Mlllllllllllllllllllllllllllllll ® IllIIIIIIIIIIIIIIIIIIIIIIIIIIII 1111 �lllllllllllllllllllllllllllllll 1111 ��lllllllllllllllllllllllllllllll 1111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1111 ® IIIIIIlllllllllllllllllllllllll 1111 ® IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1111. ®I�Illl�lllllllllll�llllel 11111 11111 11111 1111WIililllNIN1111MINllllll IIIIYIIIIYIIIIYIIIIYIIOYIIIIY YYYYY IIIIIIVIIIIIIIEIIIIIIIIIIIIIII VIII illI�'�'I�I'Il�l�ll�l�ll�l�ll�ll' fIIII11911110101101011111111111 I'III® IIIIIIIIIIilllllllllllllll911111111 la "I'I'II'III"III�I�II�I'I IIII F IIIIa�00000v 000 ©000 JEFFF NCWxn PUeuc WOxxs J9 2013 -2015 SIX -YEAR TIP BY PROJECT CATEGORY ?:ego 1 Em c y Rs aim B MR1 Bon LDER CREEK TRIBUTARY CULVERT 1 FUND START TOTAL 39 60 FED - PROJECT IOg STATUS I YEAR I $1,000 LOCAL STATE ERAL Em c y Rs aim B MR1 Bon LDER CREEK TRIBUTARY CULVERT 1 5 2013 737 39 60 WS REPLACEMENT ROWANS CREEK ROAD RELOCATION 2 S 2013 722 SO 90 642 UINAULT -SOUTH SHORE ROAD 3 5 2013 1,107 148 0 958 REPAIR MITIGATION Cata9OY SUMTOMA 2,566 278 150 2,138 Ro BIntemecBan PARADISE BAY ROAD -MP 0.37-1.53 5 S 2013 1,129 113 1,016 0 PHASE DUCKABUSH ROAD PAVEMENT 1D S 2013 195 12 8 183 PRESERVATION 12 S 2013 SOO2 0 0 3,002 SOUTH DISCOVERY ROAD REALIGNMENT - BLUFF- 14 S W14 935 411 ON 0 MP 352400 13 S 2013 67 67 0 0 SOUTH DISCOVERY ROAD -GOLF 15 S 2015 1,675 188 1,508 0 COURSE SEGMENT -MP 2553 84 (20) CENTER ROAD ASPHALT OVERLAY- 17 p 2014 933 0 840 93 MP 000 -2 25 -PHASE 5 CENTER ROAD ASPHALT OVERLAY- 18 P 2014 1,015 0 914 102 MP 4.39-6.88- PHASE 6 SOUTH DISCOVERY ROAD -FOUR 18 P 201] 540 54 486 0 CORNERS SEGMENT -MP 4.004.84 EST SPRUCE B EAST ALDER 21 p 2017 100 100 0 0 STREETS - SURFACE UPGRADE CaNgW&$ Talals 6,522 858 5,288 378 CuI SBrWge RWm m4 Re vr SNOW CREEK ROAD CULVERT 8 8 2013 530 0 0 630 REPLACEMENT - ANOREWS CREEK UEETS BRIDGE PAINTING 11 S 2013 2,870 0 0 2,870 ACCESS PRESERVATION'. UPPER 12 S 2013 SOO2 0 0 3,002 HOH ROAD CULVERTS DONKEY CREEK CULVERT- CLEARWATER ROAD 13 S 2013 67 67 0 0 WESTVALLEY ROAD CULVERT 28 P 2017 500 500 0 REPLACEMENT- MP2.555 SNOW CREEK ROAD CULVERT 28 P 2017 2,500 0 0 2,500 REPLACEMENT -MP 084 Cal"arySutrTO is 8,288 67 500 8,702 JF3FEa50N Cw PURu WatiS I I LARRYSCOTTTRAIL- SEGMENT4 8 FUND START TOTAL 3 3 FED - PROJECT ID# STATUS YEAR 1 $1000 LOCAL STATE ERAL LARRYSCOTTTRAIL- SEGMENT4 8 5 2013 5 3 3 0 RICK TOLLEFSON TRAIL- PHASE 1 7 S 2013 971 0 289 683 (CHIMACUMVALIEY) 1S S 2013 30 30 0 SAFE ROUTES TO SCHOOL -SR 19 8 5 2013 465 28 439 0 CROSSWALK IMPROVEMENTS 20 P 2013 100 0 100 0 OUILCENE PEDESTRIAN B BICYCLE 22 P 2014 650 25 825 0 PROJECT -PHASE 1 30 P 2016 250 W 0 200 UILCENE PEDESTRIAN 8 BICYCLE 23 P 2018 25 0 25 0 PROJECT- PHASE2 URBAN GROWTH AREA PEDESTRIAN 24 P 2016 500 10 490 0 BICYCLE PROJECT RICK TOLLEFSON TRAIL- PHASE2 25 P 2015 250 0 750 0 CONNECTIONS) DISCOVERY BAY ESTUARY TRAIL 27 P 2013 500 0 500 0 NNECTION (ODT)- MAYNARD Cals9orySU0- Talahs 3,866 64 3,120 683 RUN -0FF -ROAD 8 INTERSECTION 4 1 5 2013 715 0 0 71 SAFETY PROJECT COUNTYWIDE MINOR 1S S 2013 30 30 0 IMPROVEMENTS DISCOVERY BAY ESTUARYTRAIL 20 P 2013 100 0 100 0 CONNECTION (ODT) - PLANNING "UGA ROADMAP" PLANNING PROJEC 30 P 2016 250 W 0 200 5 CasKroq SU9- TOtels 1,095 80 100 915 TRANSPORTATION IMPROVEMENT PROGRAM TOTALS 23,818 1,347 9,158 12,815 N41€ Pgea 20 is an altemale verelon of pmjW 15. Therefore. Me pmje led cast of project 20 (3593.000) Is not Include m! In these totals. JF ERSQN CW PUxO WORKS 48 FUNDING BREAKDOWN BY PROGRAM I 2013-201851X- YEARTRANSPOREATpN PROGRAM FUNDING BREAKDOWN PERCENTAGES BY REVENUE SOURCE U)(Al $1,36] 6% I TA S E RI $9.1m $u,m 39% ssx Pullarvaluoln31,W0a 201} 201851 X -YEAR TRANSPORTATION PROGRAM EXPENDNDRE BREAKDOWN AMOUNTS BY PROJECT GTEGORY Culverts E Bridges $9,269 69% Nannin i CountSyNa Transportation $3,666 16% Dollar values In SI.X S $6,521 E8% 49 JEFFERSON Courvry PUBLIC WORKS 2013 -2018 TIP FUNDING: SECURED V. PLANNED Planned! (Unfunded) $8.383 36% Funding 6ewreE $14.955 B4% collar Values in SLU]A 2013 -2018 TIP SECURED (FUNDED) PROJECTS: LOCAL V. OTHER FUNDS Loral ROnd Fund FMexl&Slale $1,108 $13849 ]% 93% mHrvaunm$L,mga 2013 -2018 TP PUNNED (UNFUNDED) PROIOCTS: LOCAL V. OTHER FUNDS Local ROa! Fund $239 4D 3% Federal& State $6,124 97% colt vacs T $LOo JElTEReON Cgxry Wazc WOnrs N °c a` a U m rl a R' : °•.yya§ °$ ° ° °° d9 °5 }$ °25g ° 5 ° & ° °$$?i iSSpi g xSA °� Hog 11101 5°a° °�5i q 5ie3 °S MY '_ -[z§ i @ ?iS § 5 S :B 4Ja [djp, Ed.� "E A; °A ® ° °`® 35gg $ §A•-- ° ?$!E9 }afiID',. $ - - - pgd� 6 dEi6i MA m�= 5 3 $$$$tlC ° xouw3 `9La E! $6 �x 3 $aF $$ !y! aS !! 9 $ `tL6 = 6E c E-x .01 c e .... 8§P 11 - o- 8 eb: c E £EIIe �z Est 3$ $ $ 9 y3M Ywumaoz yp PEl ,jigs 3 — TF 'Sg SSi y' W11i WEIs :811 Walt :818 W €lP njt Willl 7 if I all g$ S 3 €3 § g SS€ ji �.?$ 8$SByg j!� za$�$y 8� l3$cy�ala faa$ in 3S1 n � ) / / ��.........m. R z ( . . . . . . . !; |! . p . . . . ! `- @ III , ¢ ! ; .°!.... . /, \ � |mmm� /!,m IL IS JJ m,m, HIP m, me\, \!m, mp it � ) !• / � ) !. ) | H O / :! i \ \ §)� s` r. AN Ilm s� Mmmmmmmmm ©©■■■■■■ niiiiiiiiiii I IIIIIIMIIII 11111 IIIIIIIIIIIIIIIIIIII IIIIIIIINIIIIII1IIIIIII IIIIIIIIIIIIIIIIIIIIhIII IiIIIIIIIIIIIIIIII�� IIIIIIIIIIIIIIIIIIIIIIIJIM111111 IIIIII III ®III III IIIIIIIIIIIIIIINI IIIIIIIIII ® IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ® IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII =III MUM III IM I21II�II1��' ® IIIIIIIIIIIII�IIIIIIIM IIIIdIIIIII I� ® IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Old IIIII IIIIIIII IIIIII I hIId IIII �IIIII IIIDIIDIDIIDII11111119191101111�1�1 10=lliiiiiiiiiiiiiiiiiiiiiiillillillillII �00000000 �00000��� maaa000va �oa000aoa � ), # . |! ,'. .. .. ........ .. § . `••!! | -,! | | ; , ! ; ; J \! \.m, \!m, \! \ \ Department of Public Works O Regular Agenda: 10:00 AM Page 1 of Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Frank Gifford, Public Works Director Agenda Date: August 13, 2012 Subject Adopting a 2013 -2018 Six -Year Transportation Improvement Program and Amending the Existing 2012 -2017 Program Statement of Issue: Conduct a public hearing for the purpose of receiving public testimony concerning adoption of the 20132018 Jefferson County Six -Year Transportation Improvement Program (6 -yr TIP) and amendment of the existing 2012 -2017 TIP. Analysis / Strategic Goals / Pros B Cons: RCW 36.81.121 requires the annual adoption of a six -year transportation improvement program after holding a public hearing. The purpose of the law is to "assure that each county shall perpetually have available advanced plans looking to the future for not less than six years as a guide in carrying out a coordinated transportation program" (RCW 36.81.121(1)). The existing 2012 -2017 TIP is proposed to be amended in order to accommodate requirements of the Rural Arterial Program (RAP) as managed by the County Road Administration Board (CRAB). CRAB requires that projects proposed in 2012 for RAP funding in 2013 be on the existing 2012 -2017 TIP. Four projects proposed for the 2013 -2018 TIP (numbered 17, 18, 19, and 20) are proposed to be added to the 2012- 2017 TIP (as project numbers 31, 32, 33, and 34) to fulfill this obligation and enable Jefferson County to apply for RAP funding for two overlay projects on Center Road and two overlay projects on South Discovery Road. Fiscal Impact / Cost-Benefit Analysis: The actual impact depends on how many projects are completed and the amount of proposed grant funding that is received. The total cost of the projects listed on the 2013 -2018 Six -Year Transportation Improvement Program is $23.3 million. Six percent (6 %) of the revenue for the projects is anticipated from local Road Funds. The remaining 94% is anticipated from State and Federal sources. Department of Public Works O Regular Agenda Page 2 of 2 Recommendation: Approve by Resolution the proposed Six-Year Transportation Improvement Program and amendments to the existing Program. Return a signed copy of the Resolution to Public Works for further processing. Department Contact: Josh Peters, Principal Transportation Planner, 385 -9160 Reviewed By: Pi ti ®M g/8 /Y Philip Morley aunt dministrator Date