Loading...
HomeMy WebLinkAbout092412_ca02Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Frank Gifford, Public Works Director,Gy ~,~~ Agenda Date: September 24, 2012 Subject: Hoh Shop Equipment Shed Project Execution of Contract Change Order #1 County Project No.: 180 543 1858 Statement of Issue: Execution of the Change Order #1 to the Contract for Construction, dated August 6, 2012, with Evergreen Framers, of Sequim WA, for the Hoh Shop Equipment Shed Project. This Contract Change Order will provide a metal roof with an extended service life as compared with the base bid. Analysis/Strategic Goals/Pro's 8 Con's: The alternate roofing system provided by Change Order #1, will extend the service life of the metal roof by (15) fifteen to (20) twenty years, for a reasonable cost increase. Fiscal Impact/Cost Benefit Analysis: With the addition of this net cost increase of $8,720.00, the new contract amount will be $92,770.99. This project is funded with local funds. Recommendation: We recommend that this Contract Change Order #1 be signed the BoCC. Please sign all three (3) Change Order originals and return two (2) originals to Public Works, retaining one original for your records. Department Contact: Gordon D. Ramstrom, Architectural Projects Planner, 385-9380 Reviewed By: p Morl~, County inistrator ~~s~~ Date JEFFERSON COUNTY sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change Hoh Shop Equipment Shed Project 1 Date: 4-Sep-12 CHANGE ORDER #1 order No. Ordered by County Engineer under terms of ^X Division 0 of the Project Manual Contract No.: 180 543 1858 ^X Change proposed by Contractor To: Ever reen Framers g ATTN: Jeff Belfield Endorsed by: Evergreen Framers, Sequim, WA 690 N. Priest Rd. Contractor FirmNa Z, Sequim, WA 98382 i ature Date Jeff Belfield, Sole Proprietor Title Consent given by Surety: (when required) Project Title Hoh Shop Equipment Shed Project By: Attorney-in fact Date You are directed to perform the following described work upon receipt of an approved copy of this change order: Proceed with this change to the Contract, inclusive of labor, materials and equipment, as follows: 1. Install a roof structure system composed of roof trusses 24" o.c., a full layer of 5/8" thick exterior grade oriented strand board (OSB), a full layer of 30# felt with a 26 ga 'Snap-Loc' metal roofing system, per the samples and submittals. The costs for this system are outlined on the attached continuation sheet . These extra costs are reduced by the credit for the base bid system. 2. The Agency will receive a credit for the roof system as shown in the bid plans and project manual. The costs associated with the base bid roof system are credited on the continuation sheet toward the extra costs associated with this contract change. ppprQV~d as ~r for- only: ~r J ~~~ y Prosecu Office Co ff . erson Je All work materials and measurement to be in accordance with the provisions of the standard specifications and s ecial provisions for the type of construction involved. ORIGINAL Ci.JRRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $84,050.99 $84,050.99 $8,720.00 $92,770.99 , ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME CONTRACT TIME CHANGE (Add/Del) TIME 55 working days 55 working days no change 55 working days APPROVAL RECD NDED APPRO COMMENDE / ~ t `'r' f l ~ •~, /fi Pro ct Manager: Date County sneer Date AP RECOMMENDED APPROVED Engineering Services Manager Date Chair, Jefferson County Commissioners Date JEFFERSON COUNTY Contract No. 180 543 1858 sheet 2 of 2 , DEPARTMENT OF PUBLIC WORKS Hoh Shop Equipment Shed Project Change Date: 4 i4-Sep-12 CHANGE ORDER No. 1 order No. I ESTIMATED ESTIMATED ITEM GROUP DESCRIPTION: ~ UNIT UNIT QUANTITY AMOUNT NO. NO. Modifications to roof ing and roof framing MEASURE PRICE CHANGE CHANGE I DELETE 1 16 Trusses ; ($3,3()().{)0) I ($3.300.(){}} 2 2 1/2" insulation ($1,315.00} t ('1,315.00) 3 2x6 purlins ($1,{}E~4.25} 1 ($1,064.25} 4 Labor (3) men ($2,40{).E)0} 1 (±~2,4(){).{}()} 5 24 ga metal roof p anels ($•1, 3{g0,{}()} 1 {$4,360.Ot}} I 6 SUBTOTAL (!~12 4,9 25} ADD 7 46 trusses $6,052.80 1 $6,052.80 8 5/8" ext oriented strand board (OSB) roof sheathi ng $2,309.38 I $2,309.38 9 301b. roofing felt $512.16 I $512.16 10 Labor (3) men $4,190.40 1 $4,190.40 11 26 gametal 'Snap-loc' roofing $7,374.51 1 $7,374.51 12 ADD SUBTOTAL $20,439.25 13 NET INCREASE TO CONTRACT AMOUNT $8,000.00 15 WSST 9.00% 9.00% $720.00 I 18 NET TOTAL CHANGE w/WSST $8,720.00