Loading...
HomeMy WebLinkAbout111912_ca06 SUPPLEMENTAL AGREEMENT CONSULTANT ADDRESS/TELEPHONE: NUMBER 5 Tetra Tech, Inc. 1420 Fifth Avenue, Suite 600 WA 98101 AGREEMENT NUMBER: Tetra Tech - Upper Hoh Road Phone: (260) 883-9300 PROJECT NUMBER: X01736, XO1781, and MAXIMUM AMOUNT PAYABLE: XO1821 $504,254.51 PROJECT TITLE: Upper Hoh Road Culvert COMPLETION DATE: January 30, 20.14 Replacements The County of Jefferson, State of Washington, desires to supplement the agreement entered into with Tetra Tech, Inc. and executed on January 19, 2010 and identified as: Tetra Tech - Upper Hoh Road All provisions in the basic agreement remain in effect except as expressly modified. by this supplement. The changes to the agreement are described as follows: II Section II, SCOPE OF WORK, shall be amended by creating a new task for Alder Creek -- Task No. 8, Construction Administration Assistance. The items of work that will be done under Construction Administration Assistance are set forth in the attached Exhibit A - Alder Creek Culvert, and by this reference made a part of this supplement. There will be no change to the scope of work for Dismal Creek and Spruce Creek. Iv Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the date for completion of the work to read: This contract will expire on January 30, 2014. Upper Hoh Rd. Culvert Replacements Pagel of 3 Supplement No. 5 V Section V, PAYMENT, shall be amended as follows: For Alder Creek, Task No. 8, Construction Administration Assistance, will have a maximum amount payable of $21,509.00. The new, total maximum amount payable for Spruce Creek will be $182,759.00, as shown below. There will be no change to the maximum amount payable for Dismal Creek and Spruce Creek. Alder Creek Culvert Replacement: Task Description Current Maximum Amount Payable Supplement #5 New Maximum Amount Payable EXISTING TASKS: Project Management $10,899.00 $0.00 $10,899.00 Preliminary Design Report $13,607.00 $0.00 $13,607.00 Plans, Specifications, & Est. $60,770.00 $0.00 $60,770.00 Geotechnical Analysis $1,334.00 $0.00 $1,334.00 Hydraulic Analysis $20,055.00 $0.00 $20,055.00 Environmental Services $42546.00 $0.00 $42,546.00 Topographical Survey $8,739.00 $0.00 $8,739.00 Expenses $3,300.00 $0.00 $3,300.00 Subtotal $161,250.00 $0.00 $161,.250.00 NEW TASKS: Construction Assistance $0.00 $21,509.00 $21,509.00 TOTAL $161..250.00 $21,509.00 $182,759.00 Tetra Tech Agreement: Site Current Maximum Amount Payable Supplement #5 New Maximum Amount Payable Alder Creek Tributary $161,250.00 $21,509.00 $182,759.00 Dismal Creek $147,945.51 $0.00 $147,945.51 Spruce Creek $173,550.00 $0.00 $173,550.00 Total $482,745.51 $21,509.00 $504,254.51 Upper Hoh Rd. Culvert Replacements Page 2 of 3 Supplement No. 5 If you concur in this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. Tetra Tech, Inc. Consultant Date COUNTY OF JEFFERSON BOARD OF COMMISSIONERS John Austin, Chairman Phil Johnson, Member David W. Sullivan, Member Approved as to form only this Prosecuting Attorney Frank Gifford Public Works Director Upper Hoh Rd. Culvert Replacements Page 3 of 3 Supplement No. 5 EXHIBIT A SUPPLEMENT NO.5 -- SCOPE OF WORK ALDER CREEK TRIBUTARY CULVERT REPLACEMENT INTRODUCTION This supplement provides for additional professional services necessary to provide support during construction for Jefferson County. The additional effort is described per major task category below. Jefferson County will provide all construction inspection. One site visit by the project's geotechnical engineer is budgeted to observe footing conditions as described below. 1. Assist County with final revisions to Contract Documents: The Consultant will assist the county in performing minor revisions to the contract documents prior to bid advertisement. 2. Review Shop Drawings and Culvert Calculations: The Consultant will perform review of shop drawing and calculations for the precast concrete box culvert and footings. The Special Provision reference is 6-02.3 Construction Requirements, Shop Drawings. A limited time allocation is established to respond to questions. 3. Respond to Questions during Construction: The Consultant will assist the County in answering questions that may arise during construction. It is anticipated that the majority of these requests will be responded to by the County. A limited time allocation is established for the Consultant to respond to questions when requested by the County. 4. Geotechnical Construction Support: Time is allocated for one site visit by the team's geotechnical engineer, AMEC Environmental & Infrastructure, Inc., to observe footing conditions and to provide recommendations for the placement of the precast concrete footings. Alder Creek Tributary Colvert Replacement Supplement No. 5