Agenda Date: December 24, 2012
Subject: Amendment No. 1 to the Federal Highway Administration (FHWA)
Reimbursable Agreement
Snow Creek Road Culvert Replacement, MP 3.78, Project No. CR1899
FHWA Agreement No. DTFH70-11-E-00039
Statement of Issue: The attached Amendment with FHWA is necessary in order to
proceed with Preliminary Engineering for the Snow Creek Road Culvert Replacement
project.
Analysis/Strategic Goals/Pro's & Con's: The culverts at Snow Creek Road Milepost 3.78
are failing and in need of replacement. In 2011, Public Works was awarded a grant for
culvert replacement through the Federal Highway Administration (FHWA) Forest Highway
Program. In June 2012, a preliminary design report was completed, which recommends
replacing the existing culverts with a 24-ft. span, three-sided concrete box culvert.
Amendment No. 1 is to provide additional funds needed for preparation of the plans,
specifications, and estimates, and for completing the environmental process and
permitting.
Fiscal Impact/Cost Benefit Analysis: The original Preliminary Engineering grant amount
was $115,000. This amendment will add $55,000 to the Preliminary Engineering grant
amount. The total project cost is estimated at $624,600 and is funded at 100% by the
Federal Highway Administration.
Recommendation: The Board is requested to sign the four originals of the Amendment
and return all four originals to Public Works. After the Amendment has been executed
by FHWA, an original will be returned to the Board.
Department Contact: Mark Thurston, P.E., Project Manager, 385-9160.
R ie e By:
ip M rle County Adm' istrator
`y~~l ~/~
Date
Pa e 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION AGREEMENT No.
FEDERAL HIGHWAY ADMINISTRATION DTFH70-~1-E-00039
REIMBURSABLE AGREEMENT Amendment No. 1
PARTIES TO THE AGREEMENT
a. REIMBURSING ORGANIZATION ~ b. ORGANIZATION TO BE REIMBURSED
Federal Highway Administration Jefferson County Public Works
Western Federal Lands Highway Division 623 Sheridan Street
610 East Fifth Street Port Townsend, WA 98368
Vancouver, WA 98661-3893
a.l APPROPRIATION CHARGEABLE b.l APPROPRIATION REIMBURSED
151753Q4300Q1 531.PE.G2QQ.53 17530~Q00 25304
c. EFFECTIVE DATE:
Original: August 09, 2011
Amend No, 1; 1Nhen Fully Executed
d. AMOUNT:
$ 115,000.00 Original .
55,000.00 Amend No. 1
$ 170,000.00 Amended Total
Agreement Information: WA PFH 43[1). Snow Creek Road Protect
The purpose of this Amendment is to add funds and revise the statement of work for the
above referenced project due to revised PE estimate far the PS&E and Environmental
Services.
1. Cover Paoe, .Block 5. FUND AM4~: The Agreement is hereby increased by $55,000.00 from
$115,000.00 to amended total of $170,000.00 as stated in H. Cost Budget and by reason of this
amendment, See attachment 1.
2. I. INTRODUCTION. B. Background ~ II, STATEMENT OF WORK. E. Summary of Deliverables H.
Co Budget: The introduction and statement of work are amended to add attachment 1
and is hereby made a part of this agreement by reason of this amendment.
3. WFLHD will reimburse Jefferson County for all eligible costs incurred under this Agreement.
The current estimated cost of the work described in this Agreement is $170,000.00. In no
case shall the WFLHD and the County exceed this amount without a mutually agreed
upon modification of this Agreement.
4. ALL OTHER PRQVISIONS OF THE ORIGINAL AGREEMENT REMAIN THE SAME.
AUTHORIZED APPROVALS
a.3 REIMBURSING ORGANIZATION
b.3_ ORGANIZATION TO BE REIMBURSED
SIGNATURE
DATE ~ SIGNATURE
DATE
TITLE TITLE
Paul M. Wood, Contracting Officer .
Western Federal Lands.Highway Division _ _ Jefferson County __
Approved as ~ fo~n only:
~ 1~ ~:
Jefferson Co. Prosecutor's ffice
Attachment 1
I. INTRODUCTION
B. Background
Additional Project Development funding (PEj was requested and approved by the
"Programming Decision Committee" (PDCj for increased casts for County's consultant
for the PS&E and Environmental Services.
The Federal Lands Access Program of the Moving Ahead for Progress in the 21st Century
Act (MAP-21) authorizes FHWA to provide funding for specific projects. The PDC~
consisting of FHWA, the State of Washington, and the Association of Washington
Counties is designated to decide jointly upon the projects funded. The PDC has
determined to provide funding for the development of this project and to program the
project for construction in FY 2013 under the Washington State Access Program.
The matching requirement under MAP-21 will be provided by the Washington
Department of Transportation ~WSDCJTj in the form of Toll Credits. In the state of
Washington, this match is 13.5 of the project cost. This amendment will fund all of the
additional PE funding. FHWA will track the toll credits and report back to WSDOT.
II. STATEMENT OF WORK
E. Summary of Deliverables
Replace with the fol,~wrn, Revised Schedule:
Task Delirvery Due Qn or
Before Date
8. PRELIMINARY DESIGN
1. DESIGN
* Submit a copy of the preliminary plan package and Submitted July 18,
preliminary cost estimate 2012
2. ENVIRDNMENTAL COMPLIANCE
• Submit a cultural resources report for FHWA review March 8, 2013
• Submit a report identifying the presence or absence of March 8, 2013
jurisdictional wetlands . Based on the preliminary analysis,
the county plans to submit a short report documenting that
no potential wetlands were observed in the project area.
• Submit a report documenting T&E and EFH species findings March 8, 20.3
.for FHWA. Based on the preliminary analysis, the county
plans to submit a Threatened and Endangered Species "No
Effect" letter.
• Submit other environmental surveys, studies, and Nat applicable
assessments as needed to support environmental
compliance to FHV11A. Based on the preliminary analysis, no
other environmental documents appear to be warranted.
C. FINAk DESIGN
1. DESIGN
• Submit final plans, specifications, and construction estimate September 30, 2013
2. ROW ACQUISTION
• Submit certification of rights-of-way and/or easements to
FHWA -or- include certification that all work will occur
within existing right-of--way as part of the administrative
record September 30, 2013
3. UTILITY RELOCATION
• Submit certification of Utility Relocation September 30, 2D13
4. PERMITS
• Submit a list of all permits necessary for construction to
FHWA September 30, 2013
• Submit copies of all completed applications for necessary
permits to FHWA September 30, 2013
• Submit copies of approved permits September 30, 2013
5. ADVERTISEMENT
• Submit Notice of Contract Award to FHWA March 31, 2014
D. CONSTRUCTION
• Submit before, during, and post construction photographs to
FHWA ongoing
• Submit copy of the Final Construction Acceptance Letter December 31, 2014
H. Cost Budget
The cost of the work is IVot to Exceed $170.000.00 for preliminary design, unless an amendment to the
Agreement is made in writing and agreed to by both parties. Jefferson County shall submit all
invoices to FHWA for actual and reasonable casts incurred for reimbursement. See Section IV, D.
Method of Billing and ProQer Submission of Invoices
Preliminary Engineering Buc~aet
PE 1 8,000.00 ,0000.00 L.S. To o ra hic Surve Contract
PE 1 12,p~.00 12,000.00 L.S. Geotechnical Investi ativn -Contract
PE 1 $40,000.00 $4p,000.00 L.S. Hydraulic and Structural Design and PS8~E .Bid Package -
Contract
PE 1 $30,000.00 $30,000.00 L.S. Preporation of NEPA and/or SEPA Documents and JARPA -
Contract
PE 1 $25-000.00 $25,000.00 L.S._ County Staff Time - Project Management and PSS~E Bid
and Award
PE 1 $55,000.00 $55,0.00 Additional Funds for PS&E and Environmental Services