Agenda Date: August 12, 2013
Subject: Adopt the 2014 -2019 Six -Year Transportation
Improvement Program
Statement of Issue:
Adopt the 2014.2019 Jefferson County Six -Year Transportation Improvement Program (TIP).
Analysis / Strategic Goals / Pros it Cons:
RCW 36.81.121 requires the annual adoption of a six -year transportation improvement
program after holding a public hearing. The purpose of the law is to "assure that each county
shall perpetually have available advanced plans looking to the future for not less than six
years as a guide in carrying out a coordinated transportation program" (RCW 36.81.121(1)).
A public hearing was conducted on August 5, 2013. Public testimony included requests to
accelerate the programmed construction date for Project No. 23, W. Uncas Rd. culvert
replacement, from 2018 to 2016. This change has been made to the TIP but as was discussed
at the hearing, this project relies on obtaining over 85% of its funding from as yet
undetermined grant sources.
Fiscal Impact / Cost - Benefit Analysis:
The TIP relies heavily on the availability of outside grant and program funding from the State
and Federal government. Fiscal impact is evaluated through the annual budgeting process
including adoption of an Annual Road Construction Program.
Recommendation:
Approve by Resolution the proposed Six -Year Transportation Improvement Program. Return a
signed copy of the Resolution to Public Works for further processing.
Department Contact: Monte Reinders, Public Works Director /County Engineer, 385 -9242
Reviewed By.
PYWip Morle ', Co my Administra Date
COUNTY OF JEFFERSON
STATE OF WASHINGTON
In the Matter of Adoption of the
2014 -2019 Six -Year Transportation
Improvement Program
RESOLUTION NO.
WHEREAS, State law obligates the legislative authority of each county to adopt on an annual basis
a six -year transportation improvement program, holding a public hearing prior to adoption, the purpose of
which is to "assure that each county shall perpetually have available advanced plans looking to the future
for not less than six years as a guide in carrying out a coordinated transportation program" (RCW
36.81.121(1)), and;
WHEREAS, the Board of County Commissioners, Jefferson County, State of Washington, has
reviewed the transportation priority array and bridge condition report as prepared by the Department of
Public Works, and has conducted a public hearing on the corresponding proposed six -year transportation
improvement program;
IT IS HEREBY RESOLVED that the Board of County Commissioners does approve and adopt
the Six -Year Transportation Improvement Program for the years 2014 through 2019, inclusive.
IT IS FURTHER RESOLVED that, with respect to the items listed in the Program, the County
Engineer is authorized to make revision to individual project scope, length and termini, timing, and funding
sources, as may be required from time to time due to additional resources becoming available or unavailable
and in accordance with RCW 36.81.130 and WAC 136 -16, without the Board of County Commissioners
having to conduct a public hearing or adopt a resolution to amend the Program.
ADOPTED and signed this day of 2013.
SEAL:
ATTEST:
Carolyn Avery
Deputy Clerk of the Board
JEFFERSON COUNTY
BOARD OF COMMISSIONERS
John Austin, Chair
Phil Johnson, Member
David Sullivan, Member
Agency. Jefferson County SIX -YEAR Hearing Date 8/5/13
County No. 16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: Wxx/13
2014 -2019 Resolution No.xx -13
tl1
g
O
Li
Z
u
w
O
a
F
PROJECT IDENTIFICATION
A. Federal Aid No
B. ROadL Number -Brill Number
o9 ge
C. Be ginning and End M Repost
D. Project /Road Name
E. Description of Work and Total Cost(Ind. prlorlfuwre)
Z
f m
>
O
y.
to
¢
%
[)
W
i
w
E
Q
~O
H
umi
F
PROJECT COSTS IN DOLLARS
EXPENDITURE SCHEDULE
FEDERALLY
FUNDED
PROJECTS ONLY
w
<
n
t_
w
i
<
i ¢
€
Z w
i
Z y
FUN DING SOURCE INFORMATION
FEDERAL
FU NOS
STATE
FUND 5
OTHER
REVENUES
LOCAL
FUNDS
TOTAL
u.
O
w 0
~
U y
¢<
>:
K n
w>
as
-APP'
AT TA
T
YEAR 1
2014
YEAR 2
2015
YEAR 3
2016
YEAR 4
2017
YEAR 5
2018
YEAR 6
2019
TOTAL
2014 -2019
O¢
f w
5 w
Z
Z w Q
> i w
>
w 2
¢ 0
Z
m ¢O Z
07
1
93150 MP 0.00 -2.26
Cents Road Overtay- Phases
2R proled- Asphalt overlay on segment between Chum
Crossroads and beginning of 2009 caved.,.
Total= 5933,0(X)
05
S
2.26
P.E.
RIW
Coast
Total
0
DCE
N
1/13
0
0
0
0
0
0
5113
STP -R
83,000
RAP
747,000
0
830,000
830,000
830,000
83,000
747,000
0
0
830000
830,000
0
0
0
0
0
830000
07
2
93150 MP 4.394.86
Center Road Overlay- Phase6
2R project : Asphait.veday on segment between end of 2009
overlay and SR 104 overpass.
Total =51 015 000
05
S
2.47
P.E.
RIW
Const
Total
0
DCE
N
1113
0
0
0
0
0
0
5113
STPR
787,150
122,850
0
910,000
910,000
910,000
787,1501
122,11501
0
0
910,000
910,000
0
0
0
0
0
910,002
09
3
14680 MPO.84t0MP1.51
Dowans Creak Road Relocation
Dowans Creek RdhiledatMPl2asaresultof Jan2008
landslide. Rel....... n of road to provide severe
essto- dences atwestarl end T..1= 51,033,198
01
S
0.63
P.E.
RAW
Coast
Total
0
EA
Y
12113
W13
FEMA
37,500
END
Ill
6,250
50,000
50,000
50,000
8113
0
0
0
6/14
FEMA
487,500
EMD
81,250
81,250
650,000
650,000
650,000
525,000
87500
0
87,500
700,000
50,000
650,000
0
0
0
0
700000
07
4
91160
OulnaullSouth Shore Road Re pair
Large woody debris, bank roughening, and other measures
par Washingbn State Integrated Sbeambank Protect-
Guidelines as mi9 Bon for 2010 ra ir. Total= 51,107 300
20
5
NIA
P.E.
RIW
Coast
Total
0
DCE
Y
MIS
1113
ER
128,314
20,026
118,340
123,340
25,000
148,340
9/14
ER
8,650
1,350
10,000
10,000
10,000
6115
ER
790,870
123,431
914,300
914,300
914,300
927 834
0
0
144 807
1,072,640
123 340
]5 000
914 300
0
0
0
1,072,640
W
5
91420 MP 7.21. MP 6.9
Access Pr --tlon: Hoh Rain Forest Olympic Nat Park
2011 Publk: Lands Highways Dlacrakonery (PLHD)
Pmgmm funtling for replacement d substan card fai ling
culver.onU ,H.h Rtl. PE Phase Only) To.1 =5600,(X)0
15
s
NIA
P,T
P.E.
RIW
Coast
Total
0
DCE
N
(PE ONLY)
9111
PLH D
190,000
0
190,000
190,000
190,000
0
0
0
0
190,000
0
0
0
190000
190,000
0
0
0
0
0
190,000
07
6
91420 MP3.338
Access Preservation: Hon Rain Forest Olympic Net Park
2011 Public Lands Hlghweys Discrakonary (PLHD)
Program f-kng for replacementof substandard failing cuNen
at MP 3.3380 rHoh Rd. RW/CN Phase Total =5782,880
11
s
NIA
P,T
P.E.
RAW
Coast
Total
0
DCE
Y
W13
0
0
0
7113
PLHD
0
0
0
10113
PLHD
762,880
0
762,880
762,880
762,890
762880
0
0
0
762880
762890
0
0
0
0
0
762880
07
7
1120 MP {.38
9,42-
Access Preservation: Hoh Rain Forest Olympic Nat Park
2011 Publk Lands Highways D -b...q (PLHD)
Program funding for replacement of subtend, rd hi ling cuNen
at MP 4.380 ,Hoh Rd. RW /CN Phase Total= 5B8391�
11
S
NIA
P,T
P.E.
RAW
Const
Total
0
DCE
Y
6113
0
0
0
12113
PLHD
20,000
0
20,000
20,000
20,000
6114
PLHD
863,960
0
887,980
863,960
861,9fi0
883960
0
0
0
883960
20,000
863960
0
0
0
0
683960
07
8
91120 MP 6.95
Access Preservation: Hoh Rain Forest Olympic Nat Park
2011 Public Lands Highways Dls b-ary (PLHD)
Program.ndingfor rep1- rn.nt.fs.bdanca,dhil,ng culvert
at MP 695 U r Loh Rd. RW/CN Phase Total =51 ,163 520
11
5
N/A
P,T
P.E.
RIW
const
Total
0
DCE
Y
W13
0
0
0
12113
PLHD
201000
0
20,000
20,000
20,000
6114
PLHO
1,123,520
0
1,123,520
1,123,520
1,123,520
114] 520
0
0
0
1,143,520
20 000
1123 520
0
0
0
0
1,143,520
08
9
50]60 MP 0.37 MMP1.53
Peradlse Bay Road- Phese2
3R project Roadway structure rahabliited anti paved with
asphak wncrete. Shoulder paved and witlened Guardrail
rebofM1ted. Other madsida hazards mi5 ated. 7..1=51,791000
O6
S
1.16
P,T,C,
W
P.E.
RAW
Coast
Total
0
1,
6114
N10
RAP
67,500
7,500
75,000
75,000
75,000
1114
RAP
76,300
8,500
85,000
85,000
85,000
9/14
RAP
1,297,900
143,100
1,431,000
1,4]1,000
1,431,000
0
1,431,900
0
159,100
1591000
160,000
1431000
0
0
0
0
1,591,000
NIA
10
sTP(R)- 2016(018)
�RlS P(R)401 Trail - Phasel (Cttimacum Valley)
Muk -use trail from HJ Cano 11 Park to Bob Bates Fields.
sing Chimacum Creekand Chimacum Road.
T..I =$1 <63.171
01
5
0.30
TE.t
0
OCE
Y
9113
2/10
STP-R
34,911
P85
10,949
0
45,760
45,760
15,780
6112
0
0
0
311!
STPat
583,705
PBS
295,240
0
878,90.5
878,945
878,915
818616
306,039
0
0
924,705
924,705
0
0
0
0
0
924705
Last updated: 8/62013
Agency: Jefferson County SIX -YEAR Hearing Date: 815/13
County No 16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: W)W13
2014 -2019 Resolution No.xx -13
in rn
g
i
W
n
F
PROJEC T IDENTI FICATION
A. Federal Aid No.
B. Road Log Number - Bridge Number
C. Beginningand End Milepost
D. Project ARwd Name
E. Description of Work and Total Cost(Ind. pri- ftiure)
z
� w
a
E
j
G
y
G
LL
z_
w
E
a'
O
w
O
O
j
PROJECT COSTS IN DOLLARS
EXPENDITURE SCHEDULE
FEDERALLY
FUNDED
PROJEC TS ONLY
¢
4
w
a
< r
j<
m
Z w
fn
FUNDING SOURCE INFORMATION
FEDERAL
FUNDS
I STATE
FUNDS
OTHER
REVENUES
LOCAL
FUNDS
TOTAL
i
LL
¢p
p
W O
u~i
U�
¢ i
W >
m
RAP I
CAPPI
TIA /UATA
1
OPiHTER
STATE
COST BV
PHASE
YEAR
2014
YEAR
2015
YEAR
2016
YEAR
2017
YEAR
2019
YEAR
2019
TOTAL
2014 -2019
Of W
rc z a.
S w
w
H of
off_
¢ u f
06
11
�Slk 19151410 MP 9.54 SR 19
Safe Routes to School -SR 19 d West Valley Road
Safety protectte improve crosswalks and add pedestrian
facilitiesb, safe walkmgroutes m the Chimacum School
Campus and HJ Carrell Park Tota1= 5645,559
21
S
P,T
P.E.
RIW
Const
Total
g
DCE
Y
6n4
6113
SRTS
100,926
0
100,926
100,926
100,926
1114
28,775
26,775
26,175
16,775
7114
STPR
180,715
SRTS
]05,801
0
486,516
486,51fi
436,516
180,716
406,727
0
26,175
613,617
127,101
48651E
0
0
0
0
613,617
09
12
35290 MP 3.8
Sn ow Creek Road Culvert Raplacemen t
Replace Andrews C ree k culvert at Snow Creek Road M P T 8
with fish - stable ouNen. Fu road through Fore st Highway
Pro ram. Total =$866,872
11
S
P.E.
RIW
Const
Total
0
DCE
N
6112
WAFH
0
0
p
0
0
0
9113
WAFH
452,840
0
452,840
452,840
452,840
452840
0
0
0
452,840
452,840
0
0
0
0
01
452840
02
1]
SR 101 & multiple county rwES MP 294.7 US 101
Oullceoa Pedestrian i Bicycte Protect -Phase 1
Crosswalk impravementa8 mutt -use tacili0es involving:
US 101, county mads& separated paths. Connects school,
community center B W llfields. Tota l= 5884,165
21
P
PT
P.E.
RAN
Const
Total
p
1114
SRTSAPBP
188,815
0
188,815
26,500
162,015
188,875
1115
0
0
O
1Ag
SRTSAPBP
895,350
0
695,350
695,350
695,350
0
884165
0
0
$84165
26800
1fi 2015
695,350
0
0
0
884,165
08
14
10750 MP 1.29
Donkey Creek Culvert- Clearwater Road
ParSoq ,nPacific Coast Salmon Enhancement Groupfish
passage wNertreplacement project .Total= $72.000(County)
Pro - of Total =5450,000
11
3
P,T
P.E.
RIW
Const
Total
a
0
0
0
0
0
0
9114
62,000
62,000
62,000
62,000
0
0
0
62,000
62.000
62,000
0
0
0
0
0
62., 000
08
15
80150 MP 3.81to MP 4.00
South Discovery Road Realignment
Realign madvny away hom eroding sh-lms dun.
Project Total = $2,040,000
07
P
P,T
P.E.
WIN
Cwst
Total
0
1115
135,000
1 55,000
190,owl
20,000
20,000
75,000
75,000
190,000
ills
RAP
450,000
50,000
SOp,0o0
500,000
500,000
1119
RAP
1,350,000
150,000
1,500,000
1,500,000
1,500,000
0
1,935,000
0
255,000
1190 000
0
20.000
20,000
75,000
575 000
1,500,000
2 190 000
06
18
50380 MP 1.53 to MP2.96
Para dl- Bay Road- Pie se3
3R project Roadw yatruMnsnhaN1ftdanopaved w+th
asphalt concrete. Shoulder paved and widened. Other
roaoside hazards mi0gatatl. Total = $1600000
0E
P
1A3
P,T,C
P.E.
RIW
Const
Total
0
1115
RAP
180,000
20,000
200,000
50,000
100,000
50,000
200,000
1117
RAP
90,000
10,000
100,000
100,000
100,000
1/18
RAP
1,170,000
130,000
1,300,000
7,300,000
1,300,000
0
1,440,000
0
160000
1600000
0
50,000
loo,ow
150,000
1.300,000
0
1600000
07
17
83250 (Sidewalk & Separated Path )
Rick Toasts- Trail - Phase 2(Connections)
Extend mink -use trail /sidewalM/bike lane along Chimawm Road
hom Chu rch Lane to Reoeemer Way
Pro' ct Total = $750
21
P
0.62
P.E.
RAW
Const
Total
g
OCE
Y
6118
1178
SRTS/PBP
125,000
25,000
150,000
25,000
50,000
75,000
1501000
0
0
0
ills
STPR
200,000
SRTSIPSP
425,000
0
625,000
625,000
625,000
200000
550,000
0
25,000
775,022
0
0
25000
50.000
75,000
625000
775,000
09
18
50650 & 50660
Waist Spruce &East Alder Streets - Surface Upgrade
Chip seal gravel roads m Paradise Be, Estates. West
Spruce Stis0.17milesmlength East Alder Stis0.13.
Total = 5100,0110
05
P
0.30
P,T
P.E.
RAW
Coast
Total
0
0
0
0
0
0
0
1118
50,000
50,000
50,000
50,000
0
0
0
soma
50 000
0
50 000
0
0
0
0
50 000
WA
19
Diswvery Bay Estuary Troll COnnectlon- Planning
Pli mmng ono pra- design for multiuse Olympic Discovery
Trail connector a round Discovery Bay
Total = 5100,000
15,18
P
1.00
W
P.E.
RAW
Const
Total
0
7113
NOVA
100,000
0
100,000
25,000
75,000
100,000
0
0
p
0
0
0
0
700000
0
0
100,00
25000
75000
0
0
0
0
100,000
WA
20
Discovery Bay Estuary TrallConn -don- Maynard
Construction of trail sector for multiuse Olympic D-iny
Trail -nn-on amund Discovery Bay. Old Gardiner Road
easlvrard 0375 mi. TObl= $750,000
01
P
0.25
W
P.E.
RAW
Const
Total
0
7H3
ALEA
115,000
10,000
125,000
75,000
50,000
125,000
ALEA
20,000
5,000
25,000
25,000
25,000
1115
ALEA
975,000
0
975,000
875,000
975,000
0
1,770000
0
15,000
1125000
75,000
75,000
975000
0
0
0
7125,000
Last updated. 8/62013
Agency: Jefferson County SIX -YEAR Hearing Date: 8 /5/13
County No. 16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: xx/xx/13
2014-2019 Resolution No. xx -13
h
2
CS
i
PROJECT IDENTIFICATION
A. Federal Aid No.
C eg inn and
B oin p End Mlle pos t
c
E. DescHptlw of Work and Total Cos[(Incl. prior//
W
¢
Wf
F
G
F LL
W
a
W
u
PROJECT COSTS IN DOLLARS
EXPENDITURE SCHEDULE
FEDERALLY
FUNDED
PROJECTS ONLY
i
W
i
w~
r
O
FUNDING SOURCE INFORMATION
FEDERAL
FU Nos
STATE
FUND S
OTHER
REVENUES
LOCAL
F
TOTAL
2
u
W
uom w
RAP I
CAPPI
TIA I UAT A
I F
PWT
OTHER
STATE
PHASE
YEAR 1
YEAR 2
YEAR ]
YEAR 4
YEAR 5
0
YEAR
TOTAL
2014 -201
O
$
�¢
W
Z
»w
u
¢ ¢ f
09
21
51410 MP2.555
West ValleyRoad CU lvert Replawmen t- Nayla Creek
Replaceculvertat Naylor C reek with a bain- ssable cuNert.
Total = 5500,000
11
P
P.E.
RIW
Const
Total
OEM-
0
1/1B
OTHER
50,000
0
50,000
50,000
50,000
0
0
1
1 0
6/19
OTHER
450,000
0
150,000
450,000
450,000
0
500,000
0
0
500000
0
0
0
0
50,000
450000
500000
09
22
35290 MPO.81
Snow C-ARwd Cu lvert Rapiacemen t - MP 0.54
Replace debriorabd mebi cuNert with pckadlb ed -sing.
Total =b500,000
11
P
P.E.
RAY
Cwst
Total
g
DCE
N
1116
WAFH
50,000
0
50,000
50,000
50,000
0
0
0
6119
WAFH
450,000
0
450,000
450,000
450,000
500,000
0
0
0
500,000
0
0
0
0
50,000
450000
500,000
09
23
35290 MPO.64
W. UncasRwd Culvert Replacement -MP 0.504
Replace debdorated mebi culvert with concrete bax wlvert.
Fish pas -ge projed wiMi NOM Olympic Salmon CoaliOOn
Total= 5590,000
it
P
P,T
P.E.
RIW
Const
Total
0
1171
OTHER
75,000
15,000
90,000
15,000
75,000
90,000
0
0
0
1116
OTHER
460,000
$0,000
500,000
500,000
500,000
0
525,000
0
65.000
$90000
15000
75,000
500000
0
0
0
590000
07
24
93150 MP 1.356
Center Road Culvert Replacement
Replace de -,abd mebi pipe with boredfpcked casing
Total= $100,000
P
P.E.
RAN
Cons!
Total
0
1117
15,000
15,000
15,000
15,000
10,000
70,000
10,000
10,000
1116
75,000
75,000
75,000
75,000
0
0
0
100,000
100000
0
0
0
25,000
75000
0
100000
NA
25
91420 MPO.Oto MP 12.0
Upper Hoh Roadl Olymplc N-Park FLAP Pro)ect
2013 Federal Lands A�-ss Program (FLAP) lunding ($11 3M)
Matchfundingforinfrasb- prota- prof- peformed
Wesbm Federal Lands d.vision of FH WA. Total = E1297M
11
P
12.0
P,T
P.E.
RIW
const
Total
0
DCE
Y
50,000
70,000
120,000
40,000
40,000
40,000
120,000
40,000
40,000
10,000
40,000
500,000
0
500,000
500,000
500,000
0
550 000
0
110 000
660 000
40 000
40 000
50 000
500 000
0
O
660,000
NIA
26
Variws
Cwntywide Various Improvements
Various pml-a - untywide involving salary, culvert
mpla -me.t, drainage - rfaung upgrades, pedestrian and
tai de faults, or other im a ments. Tob1 =$W 000
P
P.E.
RIW
Const
Total
0
1113
10,000
10,000
5,000
5,000
10,000
0
0
0
1113
50,000
50,000
251000
25,000
50,000
0
0
0
60 000
60,00
30,000
0
0
30,000
0
0
60 000
27
P.E.
RIW
Const
Total
0
0
0
p
0
0
0
0
01
1 1
0
0
0
0
0
0
0
0
0
0
0
0
0
25
P.E.
R W
cones
0
0
0
p
0
0
p
o
o
0
0
0
0
0
0
0
0
tear •r�ara __ _ matmw mwiz !154'a+aARY)II
Last updated: 818!2013
OEM-
Last updated: 818!2013