Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, Public Works Director/ County Engineer
Agenda Date: 10/7/2013
Subject: Civil /Traffic Engineering Standard Consultant Agreement for
Safe Routes To School (SRTS) SR19 It West Valley Road Project
Statement of Issue:
Standard Consultant Agreement with SCJ Alliance of Olympia, WA for providing engineering services
for the SRTS,SR19 Et West Valley Road project.
Analysis /Strategic Goals /Pro's & Con's:
This project is included in the officially adopted 2013 -2018 Transportation Improvement Program
and 2013 Annual Construction Program as Item No. 8. The purpose of this project is to improve the
Chimacum School crossings at SR 19 and West Valley Road and their associated approaches. This
project also includes Education, Encouragement and Enforcement components.
This agreement will provide engineering services by SCJ Alliance, throughout the entire project. The
required engineering services for this project may consist of: signal Ft intersection design, signage,
signal warrant, crosswalks, accessible landings, curbs, sidewalks, trails and stormwater design.
Fiscal Impact/Cost Benefit Analysis:
This Standard Consultant Agreement, for surveying services, is for $54,891.00
This project is funded by a $438,669 SRTS grant.
Recommendation:
The Board is asked to execute the three (3) originals of the Professional Services Consultant
Agreement with SCJ Alliance, and return (2) signed originals to Public Works (attn. Eric Kuzma).
Department Contact:
Eric Kuzma, Project Manager, (360) 385 -9167
Reviewed By:
Philip Morley, Cou ty Administrator Date
t_-
Local Agency
Standard Consultant
Agreement
❑Architectural /Engineering Agreement
❑ Personal Services Agreement
Agreement Number
LA7839
Federal Aid Number
Agreement Type (Choose one)
❑ Lump Sum
Lump Sum Amount $
❑ Cost Plus Fixed Fee
Overhead Progress Payment Rate %
Overhead Cost Method
❑ Actual Cost
❑ Actual Cost Not to Exceed %
❑ Fixed Rate
Fixed Fee $
®Specific Rates Of Pay
® Negotiated Hourly Rate
❑ Provisional Hourly Rate
❑ Cost Per Unit
Index of Exhibits (Check all that apply):
Shea Carr Jewell, Inc. (dba SCJ Alliance)
2102 Carriage St SW, Suite H
Olympia, WA 98502
Project Title And Work Description
Civil & Traffic Engineering for
Safe Routes To School (SRTS)
SRI & West Valley Road
DBE Participation
❑ Yes ®No %
Federal ID Number or Social Security Number
20-4834444
Do you require a 1099 for IRS % Completion Date
❑ Yes ®No 12/31/16
Total Amount Authorized $ 54,891
Management Reserve Fund $ 0
Maximum Amount Payable $ 54,891
®Exhibit
A -1 Scope of Work
❑Exhibit
G -2 Fee -Sub Specific Rates
❑Exhibit
A -2 Task Order Agreement
❑Exhibit
G -3 Sub Overhead Cost
❑Exhibit
B -1 DBE Utilization Certification
®Exhibit
H Title VI Assurances
®Exhibit
C Electronic Exchange of Data
®Exhibit
1 Payment Upon Termination of Agreement
❑Exhibit
D -1 Payment — Lump Sum
®Exhibit
J Alle ed Consultant Design Error Procedures
❑Exhibit
D -2 Payment — Cost Plus
®Exhibit
K Consultant Claim Procedures
®Exhibit
D -3 Payment — Hourly Rate
❑Exhibit
L Liability Insurance Increase
❑Exhibit
D -4 Payment — Provisional
®Exhibit
M -la Consultant Certification
®Exhibit
E -I Fee Consultant Fee Determination
®Exhibit
M - Ib Agency Official Certification
®Exhibit
E -2 Fee Specific Rates of Pay
®Exhibit
M -2 Certification — Primary
®Exhibit
F Audited Overhead Rate
❑Exhibit
M -3 Lobbying Certification
❑Exhibit
G Subcontracted Work
[—]Exhibit
M -4 Pricing Data Certification
❑Exhibit
G -1 Subconsultant Fee
[-]App.
31.910 Supplemental Signature Page
THIS AGREEMENT, made and entered into this day of
between the Local Agency of Jefferson County , Washington, hereinafter called_ the "AGENCY ", and the
above organization hereinafter called the "CONSULTANT"
DOT Form 140 -089 EF
Revised 3/2008
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Pagel of 34
WITNESSETH THAT:
WHEREAS, the AGENCY desires to accomplish the above referenced project, and
WHEREAS, the AGENCY does not have sufficient staff to meet the required commitment and therefore
deems it advisable and desirable to engage the assistance of a CONSULTANT to provide the necessary
services for the PROJECT; and
WHEREAS, the CONSULTANT represents that he /she is in compliance with the Washington State Statutes
relating to professional registration, if applicable, and has signified a willingness to furnish Consulting services
to the AGENCY,
NOW THEREFORE, in consideration of the terms, conditions, covenants and performance contained herein,
or attached and incorporated and made a part hereof, the parties hereto agree as follows:
I General Description of Work
The work under this AGREEMENT shall consist of the above described work and services as herein defined
and necessary to accomplish the completed work for this PROJECT. The CONSULTANT shall furnish all
services, labor, and related equipment necessary to conduct and complete the work as designated elsewhere in
this AGREEMENT.
II Scope of Work
The Scope of Work and projected level of effort required for this PROJECT is detailed in Exhibit "A" attached
hereto and by this reference made a part of this AGREEMENT.
III General Requirements
All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals
shall receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups,
and /or individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination,
progress and presentation meetings with the AGENCY and /or such Federal, State, Community, City or County
officials, groups or individuals as may be requested by the AGENCY. The AGENCY will provide the
CONSULTANT sufficient notice prior to meetings requiring CONSULTANT participation. The minimum
required hours or days notice shall be agreed to between the AGENCY and the CONSULTANT and shown in
Exhibit "A."
The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will
outline in written and graphical form the various phases and the order of performance of the work in sufficient
detail so that the progress of the work can easily be evaluated.
The CONSULTANT, and each SUBCONSULTANT, shall not discriminate on the basis of race, color,
national origin, or sex in the performance of this contract. The CONSULTANT, and each
SUBCONSULTANT, shall carry out applicable requirements of 49 CFR Part 26 in the award and
administration of USDOT- assisted contracts. Failure by the CONSULTANT to carry out these requirements is
a material breach of this AGREEMENT that may result in the termination of this AGREEMENT.
Participation for Disadvantaged Business Enterprises (DBE), if required, per 49 CFR Part 26, or participation
of Minority Business Enterprises (MBE), and Women Business Enterprises (WBE), shall be shown on the
heading of this AGREEMENT. If D /M/WBE firms are utilized, the amounts authorized to each firm and their
certification number will be shown on Exhibit "B" attached hereto and by this reference made a part of this
AGREEMENT. If the Prime CONSULTANT is a DBE firm they must comply with the Commercial Useful
Function (CUF) regulation outlined in the AGENCY'S "DBE Program Participation Plan ". The mandatory
DBE participation goals of the AGREEMENT are those established by the WSDOT'S Highway and Local
Programs Project Development Engineer in consultation with the AGENCY.
All Reports, PS &E materials, and other data furnished to the CONSULTANT by the AGENCY shall be
PW_Forrns /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 2 of 34
returned. All electronic files, prepared by the CONSULTANT, must meet the requirements as outlined in
Exhibit "C."
All designs, drawings, specifications, documents, and other work products, including all electronic files,
prepared by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of
service for this PROJECT, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting
through or on behalf of the AGENCY of any such instruments of service, not occurring as a part of this
PROJECT, shall be without liability or legal exposure to the CONSULTANT.
IV Time for Beginning and Completion
The CONSULTANT shall not begin any work under the terms of this AGREEMENT until
authorized in writing by the AGENCY.
All work under this AGREEMENT shall be completed by the date shown in the heading of this
AGREEMENT under completion date.
The established completion time shall not be extended because of any delays attributable to the
CONSULTANT, but may be extended by the AGENCY in the event of a delay attributable to the AGENCY,
or because of unavoidable delays caused by an act of GOD or governmental actions or other conditions
beyond the control of the CONSULTANT. A prior supplemental agreement issued by the AGENCY is
required to extend the established completion time.
V Payment Provisions
The CONSULTANT shall be paid by the AGENCY for completed work and services rendered under this
AGREEMENT as provided in Exhibit "D" attached hereto, and by reference made part of this AGREEMENT.
Such payment shall be full compensation for work performed or services rendered and for all labor, materials,
supplies, equipment, and incidentals necessary to complete the work. The CONSULTANT shall conform to all
applicable portions of 48 CFR Part 31.
A post audit may be performed on this AGREEMENT. The need for a post audit will be determined by the
State Auditor, WSDOT External Audit Office and /or at the request of the AGENCY' S PROJECT Manager.
VI Sub - Contracting
The AGENCY permits sub - contracts for those items of work as shown in Exhibit "G" attached hereto and by
this reference made part of this AGREEMENT.
Compensation for this sub - consultant work shall be based on the cost factors shown on Exhibit "G."
The work of the sub - consultant shall not exceed its maximum amount payable unless a prior written approval
has been issued by the AGENCY.
All reimbursable direct labor, overhead, direct non -salary costs and fixed fee costs for the sub - consultant shall
be substantiated in the same manner as outlined in Section V. All sub - contracts shall contain all applicable
provisions of this AGREEMENT.
With respect to sub- consultant payment, the CONSULTANT shall comply with all applicable sections of the
Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.011.
The CONSULTANT shall not sub - contract for the performance of any work under this AGREEMENT
without prior written permission of the AGENCY. No permission for sub - contracting shall create, between the
AGENCY and sub - contractor, any contract or any other relationship. A DBE certified sub - consultant is
required to perform a minimum amount of their sub - contracted agreement that is established by the WSDOT
Highways and Local Programs Project Development Engineer in consultation with the AGENCY.
VII Employment
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 3 ol'34
The CONSULTANT warrants that they have not employed or retained any company or person, other than a
bona fide employee working solely for the CONSULTANT, to solicit or secure this contract, and that it has
not paid or agreed to pay any company or person, other than a bona fide employee working solely for the
CONSULTANT, any fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent
upon or resulting from the award or making of this contract. For breach or violation of this warrant, the
AGENCY shall have the right to annul this AGREEMENT without liability or, in its discretion, to deduct from
the AGREEMENT price or consideration or otherwise recover the full amount of such fee, commission,
percentage, brokerage fee, gift, or contingent fee.
Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work
or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the
CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen's
Compensation Act on behalf of said employees or other persons while so engaged, and any and all
claims made by a third party as a consequence of any act or omission on the part of the CONSULTANT'S
employees or other persons while so engaged on any of the work or services provided to be rendered herein,
shall be the sole obligation and responsibility of the CONSULTANT.
The CONSULTANT shall not engage, on a full- or part-time basis, or other basis, during the period of the
contract, any professional or technical personnel who are, or have been, at any time during the period of the
contract, in the employ of the United States Department of Transportation, or the STATE, or the AGENCY,
except regularly retired employees, without written consent of the public employer of such person.
VIII Nondiscrimination
During the performance of this contract, the CONSULTANT, for itself, its assignees, and successors in
interest agrees to comply with the following laws and regulations:
Title VI of the Civil Rights Act of 1964
(42 USC Chapter 21 Subchapter V Section 2000d through 2000d -4a)
Federal -aid Highway Act of 1973
(23 USC Chapter 3 Section 324)
Rehabilitation Act of 1973
(29 USC Chapter 16 Subchapter V Section 794)
Age Discrimination Act of 1975
(42 USC Chapter 76 Section 6101 et seq.)
Civil Rights Restoration Act of 1987
(Public Law 100 -259)
American with Disabilities Act of 1990
(42 USC Chapter 126 Section 12101 et. seq.)
49 CFR Part 21
23 CFR Part 200
RC W 49.60.180
In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of
Exhibit "H" attached hereto and by this reference made part of this AGREEMENT, and shall include the
attached Exhibit "H" in every sub - contract, including procurement of materials and leases of equipment,
unless exempt by the Regulations or directives issued pursuant thereto.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 4 of 34
IX Termination of Agreement
The right is reserved by the AGENCY to terminate this AGREEMENT at any time upon ten (10) days written
notice to the CONSULTANT.
In the event this AGREEMENT is terminated by the AGENCY other than for default on the part of the
CONSULTANT, a final payment shall be made to the CONSULTANT as shown in Exhibit "I" for the type of
AGREEMENT used.
No payment shall be made for any work completed after ten (10) days following receipt by the
CONSULTANT of the Notice to Terminate. If the accumulated payment made to the CONSULTANT prior to
Notice of Termination exceeds the total amount that would be due when computed as set forth herein above,
then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any
excess paid.
If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the
CONSULTANT, the above formula for payment shall not apply.
In such an event, the amount to be paid shall be determined by the AGENCY with consideration given to the
actual costs incurred by the CONSULTANT in performing the work to the date of termination, the amount of
work originally required which was satisfactorily completed to date of termination, whether that work is in a
form or a type which is usable to the AGENCY at the time of termination, the cost to the AGENCY of
employing another firm to complete the work required and the time which may be required to do so, and other
factors which affect the value to the AGENCY of the work performed at the time of termination,
Under no circumstances shall payment made under this subsection exceed the amount, which would have been
made using the formula set forth above.
If it is determined for any reason that the CONSULTANT was not in default or that the CONSULTANT'S
failure to perform is without the CONSULTANT'S or its employee's default or negligence, the termination
shall be deemed to be a termination for the convenience of the AGENCY. In such an event, the
CONSULTANT would be reimbursed for actual costs in accordance with the termination for other than
default clauses listed previously.
In the event of the death of any member, partner or officer of the CONSULTANT or any of its supervisory
personnel assigned to the PROJECT, or dissolution of the partnership, termination of the corporation, or
disaffiliation of the principally involved employee, the surviving members of the CONSULTANT hereby
agree to complete the work under the terms of this AGREEMENT, if requested to do so by the AGENCY.
This subsection shall not be a bar to renegotiation of the AGREEMENT between the surviving members of the
CONSULTANT and the AGENCY, if the AGENCY so chooses.
In the event of the death of any of the parties listed in the previous paragraph, should the surviving members of
the CONSULTANT, with the AGENCY' S concurrence, desire to terminate this AGREEMENT, payment
shall be made as set forth in the second paragraph of this section.
Payment for any part of the work by the AGENCY shall not constitute a waiver by the AGENCY of any
remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the
CONSULTANT, or for failure of the CONSULTANT to perform work required of it by the AGENCY.
Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those
rights with respect to any future act or omission by the CONSULTANT.
X Changes of Work
The CONSULTANT shall make such changes and revisions in the complete work of this AGREEMENT as
necessary to correct errors appearing therein, when required to do so by the AGENCY, without additional
compensation thereof. Should the AGENCY find it desirable for its own purposes to have previously
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3120 /2013 Page 5 of 34
satisfactorily completed work or parts thereof changed or revised, the CONSULTANT shall make such
revisions as directed by the AGENCY. This work shall be considered as Extra Work and will be paid for as
herein provided under Section XIV.
XI Disputes
Any dispute concerning questions of fact in connection with the work not disposed of by AGREEMENT
between the CONSULTANT and the AGENCY shall be referred for determination to the Director of Public
Works or AGENCY Engineer, whose decision in the matter shall be final and binding on the parties of this
AGREEMENT; provided, however, that if an action is brought challenging the Director of Public Works or
AGENCY Engineer's decision, that decision shall be subject to de novojudicial review. If the parties to this
AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under the
procedures found in Exhibit "J ", and disputes concerning claims will be conducted under the procedures found
in Exhibit "K ".
XII Venue, Applicable Law, and Personal Jurisdiction
In the event that either party deems it necessary to institute legal action or proceedings to enforce any right or
obligation under this AGREEMENT, the parties hereto agree that any such action shall be initiated in the
Superior court of the State of Washington, situated in the county in which the AGENCY is located. The parties
hereto agree that all questions shall be resolved by application of Washington law and that the parties to such
action shall have the right of appeal from such decisions of the Superior court in accordance with the laws of
the State of Washington. The CONSULTANT hereby consents to the personal jurisdiction of the Superior
court of the State of Washington, situated in the county in which the AGENCY is located.
XIII Legal Relations
The CONSULTANT shall comply with all Federal, State, and local laws and ordinances applicable to the
work to be done under this AGREEMENT. This contract shall be interpreted and construed in accordance with
the laws of the State of Washington.
The CONSULTANT shall indemnify and hold the AGENCY and the STATE and its officers and employees
harmless from and shall process and defend at its own expense all claims, demands, or suits at law or equity
arising in whole or in part from the CONSULTANT'S negligence or breach of any of its obligations under this
AGREEMENT; provided that nothing herein shall require a CONSULTANT to indemnify the AGENCY or
the STATE against and hold harmless the AGENCY or the STATE from claims, demands or suits based solely
upon the conduct of the AGENCY or the STATE, their agents, officers and employees; and provided further
that if the claims or suits are caused by or result from the concurrent negligence of (a) the CONSULTANT' S
agents or employees, and (b) the AGENCY or the STATE, their agents, officers and employees, this indemnity
provision with respect to (1) claims or suits based upon such negligence (2) the costs to the AGENCY or the
STATE of defending such claims and suits shall be valid and enforceable only to the extent of the
CONSULTANT'S negligence or the negligence of the CONSULTANT S agents or employees.
The CONSULTANT'S relation to the AGENCY shall be at all times as an independent contractor.
The CONSULTANT shall comply with all applicable sections of the applicable Ethics laws, including RCW
42.23, which is the Code of Ethics for regulating contract interest by municipal officers. The CONSULTANT
specifically assumes potential liability for actions brought by the CONSULTANT'S own employees against
the AGENCY and, solely for the purpose of this indemnification and defense, the CONSULTANT specifically
waives any immunity under the state industrial insurance law, Title 51 RCW.
Unless otherwise specified in the AGREEMENT, the AGENCY shall be responsible for administration of
construction contracts, if any, on the PROJECT. Subject to the processing of a new sole source, or an
acceptable supplemental agreement, the CONSULTANT shall provide On -Call assistance to the AGENCY
during contract administration. By providing such assistance, the CONSULTANT shall assume no
responsibility for: proper construction techniques, job site safety, or any construction contractor's failure to
perform its work in accordance with the contract documents.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 6 of 34
The CONSULTANT shall obtain and keep in force during the terms of the AGREEMENT, or as otherwise
required, the following insurance with companies or through sources approved by the State Insurance
Commissioner pursuant to Title 48 RCW.
Insurance Coverage
A. Worker's compensation and employer's liability insurance as required by the STATE.
B. Commercial general liability and property damage insurance in an aggregate amount not less than two
million dollars ($2,000,000) for bodily injury, including death and property damage. The per
occurrence amount shall not exceed one million dollars ($1,000,000).
C. Vehicle liability insurance for any automobile used in an amount not less than a one million dollar
($1,000,000) combined single limit.
D. Professional liability (Errors and Omissions) policy in an amount of not less than one million dollars
($1,000,000.00) combined single limit if any employee, agent or representative of the CONSULTANT
undertaking work in furtherance of or pursuant to this Agreement holds or is required to hold a
professional license issued by the State of Washington or any other state.
The Consultant shall include all subcontractors as insured under its insurance policies or shall famish separate
certificates and endorsements for each subcontractor. All insurance policies provided by or on behalf of any
subcontractor of the Consultant shall comply with all terms and conditions of this "Legal Relations" section.
All contracts between the Consultant and their subcontractors for work to be performed in furtherance or
implementation of this contract shall contain the insurance provisions found herein.
Failure of the Consultant to take out and /or maintain any required insurance shall not relieve The Consultant
from any liability under the Agreement, nor shall the insurance requirements be construed to conflict with or
otherwise limit the obligations concerning indemnification.
It is agreed by the parties that insurers shall have no right of recovery or subrogation against the County ,
including its employees and other agents and agencies. It is further agreed by the parties that insurance
companies issuing the policy or policies required by this Agreement shall have no recourse against the County
(including its employees and other agents and agencies) for payment of any premiums or for assessments
under any form of policy. It is further agreed by the parties that any and all deductibles in the above described
insurance policies shall be assumed by and be at the sole risk of the Consultant.
Excepting the Worker's Compensation Insurance and any Professional Liability Insurance secured by the
CONSULTANT, the AGENCY will be named on all policies as an additional insured. The CONSULTANT'S
insurance required by this Section shall be in all circumstances primary to any insurance available to the
AGENCY. The CONSULTANT shall furnish the AGENCY with verification of insurance and endorsements
required by the AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all
required insurance policies at any time.
All insurance shall be obtained from an insurance company authorized to do business in the State of
Washington. The CONSULTANT shall submit a verification of insurance as outlined above within fourteen
(14) days of the execution of this AGREEMENT to the AGENCY.
No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the
AGENCY.
The CONSULTANT'S professional liability to the AGENCY shall be limited to the amount payable under
this AGREEMENT or one million ($1,000,000) dollars, whichever is the greater, unless modified by Exhibit
"L ". In no case shall the CONSULTANT'S professional liability to third parties be limited in any way.
The AGENCY will pay no progress payments under Section V until the CONSULTANT has fully complied
with this section. This remedy is not exclusive; and the AGENCY and the STATE may take such other action
as is available to it under other provisions of this AGREEMENT, or otherwise in law.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 7 of 34
XIV Extra Work
A. The AGENCY may at anytime, by written order, make changes within the general scope of the
AGREEMENT in the services to be performed.
B. If any such change causes an increase or decrease in the estimated cost of, or the time required for,
performance of any part of the work under this AGREEMENT, whether or not changed by the order,
or otherwise affects any other terms and conditions of the AGREEMENT, the AGENCY shall make
an equitable adjustment in the (1) maximum amount payable; (2) delivery or completion schedule, or
both; and (3) other affected terms and shall modify the AGREEMENT accordingly.
C. The CONSULTANT must submit any "request for equitable adjustment', hereafter referred to as
"CLAIM ", under this clause within thirty (30) days from the date of receipt of the written order.
However, if the AGENCY decides that the facts justify it, the AGENCY may receive and act upon a
CLAIM submitted before final payment of the AGREEMENT.
D. Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in
this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed.
E. Notwithstanding the terms and conditions of paragraphs (A) and (B) above, the maximum amount
payable for this AGREEMENT, shall not be increased or considered to be increased except by specific
written supplement to this AGREEMENT.
XV Endorsement of Plans
If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other
engineering data furnished by them.
XVI Federal and State Review
The Federal Highway Administration and the Washington State Department of Transportation shall have the
right to participate in the review or examination of the work in progress.
XVII Certification of the Consultant and the Agency
Attached hereto as Exhibit "M- I (a and b)" are the Certifications of the CONSULTANT and the AGENCY,
Exhibit "M -2" Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary
Covered Transactions, Exhibit "M -3" Certification Regarding the Restrictions of the Use of Federal Funds for
Lobbying and Exhibit "M -4" Certificate of Current Cost or Pricing Data. Exhibit "M -3" is required only in
AGREEMENTS over $100,000 and Exhibit "M -4" is required only in AGREEMENTS over $500,000.
XVIII Complete Agreement
This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by
the parties. No agent, or representative of either party has authority to make, and the parties shall not be bound
by or be liable for, any statement, representation, promise or agreement not set forth herein. No changes,
amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the
parties as an amendment to this AGREEMENT.
XIX Execution and Acceptance
This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed
to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements,
representations, warranties, covenants, and agreements contained in the proposal, and the supporting material
submitted by the CONSULTANT, and does hereby accept the AGREEMENT and agrees to all of the terms
and conditions thereof.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 8 of 34
In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the
"Execution Date" box on page one (1) of this AGREEMENT.
Shea Can Jewell
Consultant (Please print)
COUNTY OF JEFFERSON
BOARD OF COMMISSIONERS
John Austin, Chair
Phil Johnson, Member
David W. Sullivan, Member
A roved alto lqtm only:
q 6
David Alvarez Date
Deputy Prosecuting Att ney
onte Reorders, PE Date
Public Works Director, County Engineer
PW_Forrns /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 9 of 34
Exhibit A -1
Scope of Work
Safe Routes to School (SRTS) SR19 & West Valley Road
PROJECT #: 18019170
Overview
The objective of this project is to prepare final engineering design plans, specifications and estimates (PS &E),
environmental documentation, permitting, utility coordination, and right of way acquisition for pedestrian
crossing improvements across the south leg of the SR 19 /West Valley Road intersection, and mixed -use trail
improvements along the east side of SR 19 from West Valley Road to Fern Way. The project is funded state
Safe Routes to School (SRTS) funds administered by the Washington Department of Transportation (WSDOT).
The work will consist of the following tasks:
• Project management
• Preliminary Design
• Public Involvement
• SEPA Documentation
• Permitting
• Rights of Way Acquisitions
• Final design
• Bidding and Pre -award Assistance
• Construction Management (future work)
Assumptions
1. The project does not include federal funds. However, federal funds may be added to the project to
fund bus pull -out improvements. Federal funds may also be added to help fund traffic signal
improvements if a traffic signal is selected for intersection control (see Phase 2, Task 1 (2)). If federal
funds are added, environmental work specific to federal funding will be added to the work by scope
and budget amendment, and the Consultant will adjust the schedule to account for the added
services. This will likely extend the schedule.
2. The County will provide topographic survey (including a digital terrain model (compatible with
AutoCAD Civil 3D) and rights of way mapping.
3. The County will provide the pavement section for the mixed -use trail. Geotechnical services are not
included in the scope of work.
4. The County will provide all public involvement services.
5. The County will prepare legal descriptions and exhibits, and provide right of way acquisition services
(including appraisals and review appraisals).
Phase 1 Project Management
This phase includes tasks to plan, manage, and administer the work; attend project meetings with County;
and provide quality assurance /quality control.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 10 of 34
Task 1 Project Management
1) Management: Manage the project by directing and supervising staff and reviewing work for the
duration of the project. This management is for the overall work rather than specific tasks.
2) Schedule and Budget: Develop a critical path project schedule to match the scope of work. Review
and update the schedule on a monthly basis. Monitor earned value and actual costs on a bi- weekly
basis. Provide monthly billing statements to the County including overall budget and schedule
confirmation and review for each progress billing period.
3) Weekly Progress Reports: Prepare and submit a weekly progress report. Weekly progress reports
will show: (1) work performed last week, (2) work planned this week, (3) schedule and budget status
(including a 3 -line earned value chart), (4) a summary of scope changes /added value, and (5) items
needed from the County and /or others.
4) Progress Billings: Prepare a monthly progress bill with weekly progress reports attached. Bills will
show staff hours for each phase (i.e., Phase 1: Project Management).
Task 2 Project Meetings
1) Project Status Meetings: Attend up to three meetings in Port Townsend to discuss the status of the
project, present draft materials in progress, and coordinate with County staff. Meetings will be
attended by the Consultant project manager.
Task 3 Quality Assurance /Quality Control
1) Quality Control: Provide senior level review of task deliverables before submittals.
2) Quality Assurance: Audit quality check activities and documentation on a periodic basis.
Phase 1 Understanding
• Project management will be provided over a 6 -month time frame and the estimated number of
meetings and project coordination is reflected in the budget.
• Progress billings will be submitted monthly to the County.
Phase 1 Deliverables
• Weekly Progress Report submitted via email in PDF format.
• Progress billings submitted monthly submitted via US Mail.
• MS Project schedule updates submitted via email in PDF format.
• Minutes for meetings submitted via e-mail in PDF format.
Phase 2 Preliminary Design
Task 1 Preliminary Design
The following tasks and the deliverables noted below comprise the 30% Design submittal.
1) Trail Layout: Prepare horizontal and vertical layout for the mixed use trail (east side of SR 19 from
West Valley Road to Fern Way), and sidewalks (southwest bulb -out curb return and southerly down
the west side of SR 19 for approximately 17S feet, including a bus shelter pad). Coordinate with
WSDOT Olympic Region to verify proposed improvements are compatible with future improvements
envisioned by the SR 19 /SR 20 Corridor Plan (2011).
2) Signalization: Evaluate the following alternatives for signalization at the pedestrian crossing for the
south leg of the SR 19 /West Valley Road intersections. Evaluate signal warrants for a traffic signal
per MUTCD Chapter 4C (Warrants 1, 2, 3, 4 and 5) and WSDOT Design Manual Section 1330.05.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page I I or 34
Prepare a simple Intersection Control Analysis memorandum (ICA) per WSDOT Design Manual
Chapter 1300.06(1)(a) through 1300.06(i)(f). Evaluate existing intersection lighting against current
standards per WSDOT Design Manual Chapter 1040.
• Traffic signal
• Pedestrian signal (with potential future conversion to a traffic signal)
• Mast arm mounted HAWK signal (activated)
• Mast arm mounted flashing beacon (activated)
3) School Entrance: Develop one concept for pedestrian improvements at the west curb return of the
entrance to the school from West Valley Road. Prepare plan view layout and concept level cost
estimates. Prepare a technical memorandum summarizing the concept.
4) Stormwater: Evaluate existing drainage infrastructure (i.e., dry well on the southwest corner) and
define improvements based on the proposed sidewalks /mixed use trail. Prepare a basin analysis and
quantify the amounts of runoff. Prepare a technical memorandum documenting the stormwater
design for the project
5) School Zone Flashing Beacons: Site two solar powered school zone flashing beacons along West
Valley Road. Coordinate the software of flashing beacons for compatibility with existing flashing
beacons.
6) Right of Way Plan: Prepare a Right of Way Plan in accordance with the WSDOT Local Agency
Guidelines (LAG) Chapter 25 for the mixed -use trail between West Valley Road and Fern Way.
7) Plan for Approval: Prepare a Plan for Approval (PFA) for channelization for SR 19, including curb
return modifications in the southwest corner of the SR 19 /West Valley Road intersections. The PFA
will be prepared in accordance with WSDOT Olympic Region Plan for Approval Checklist.
8) Cost Estimate: Prepare a preliminary project cost estimates for the proposed improvements to
compare to available funding.
Phase 2 Understanding
• The County will provide vehicle and pedestrian counts at the SR 19 /West Valley Road intersection.
• Stormwater design will be based on the Department of Ecology, 2012 Stormwater Management
Manual for Western Washington (SMMWW).
• Water quality treatment will not be required and flow control will not be required based on Figure
2.4.2 of the SMMWW.
• Run -off tributary to the southwest corner will be collected /conveyed to dry well(s) (existing and /or
proposed).
• Run -off from the mixed use trail will be collected within a grassy Swale between the trail and SR 19
pavement.
• No hard improvements are included on the north side of West Valley Road at the school entrance.
Phase 2 Deliverables
• Intersection Control Analysis technical memorandum submitted via email in PDF format.
• School entrance technical memorandum submitted via email in PDF format.
• Stormwater technical memorandum submitted via email in PDF format.
• Right of Way Plan submitted via email in PDF format.
• Plan for Approval submitted to WSDOT (hard copy size and numbers in accordance with the Plan for
Approval Checklist).
• Cost estimate submitted via email in PDF format.
PW_forms /Standard Consultant Agreement with Exhibits Revised 320 /2013 Page 12 of 34
Phase 3 Bus Pullout
Task 1 Bus Pullout
1) Bus Pullout: Develop one concept for a bus pullout on the east side of SR 19, north of West Valley
Road. The geometry of the pullout will generally conform to WSDOT Design Manual Exhibit 1430 -6.
Prepare plan view layout and concept level cost estimates. Prepare a technical memorandum
summarizing the concept.
Phase 3 Understanding
• None.
Phase 3 Deliverables
• Bus pullout technical memorandum submitted via email in PDF format.
Phase 4 SEPA Documentation
Task 1 SEPA Documentation
1) SEPA Checklist Technical Data: Provide technical data as requested by the County for use in
preparing a SEPA Checklist.
Phase 4 Understanding
• The County will prepare the SEPA Checklist.
• The SEPA Checklist will receive a declaration of non - significance (DNS).
• NEPA documentation is not included. If federal funds are added to the project, NEPA documentation
will be added to the scope and budget by amendment.
• A NPDES General Construction Permit is not required since the project disturbs less than 1 acre.
Phase 4 Deliverables
• SEPA Checklist Technical Data submitted via email in PDF format.
Phase 5 Final Design
Task 1 Final Design
1) Utility Conflicts: Identify utilities requiring relocation and notify the County. Prepare a brief
technical memorandum documenting potential conflicts.
2) Trail Layout: Finalize horizontal and vertical alignment of mixed use trail and sidewalk per comments
received during Phase 2. Provide detailed grading of access ramps.
3) Stormwater: Finalize collection /conveyance design.
4) Earthwork: Create a proposed surface model to calculate earth work and determine cut /fill limits.
5) Signal/ Illumination /Channelization /Signing: Design signal and lighting improvements for the SR
19 /West Valley Road intersection. Design channelization and signing for approaches to the SR
19 /West Valley Road intersection for the north, south, and east legs. Prepare a Traffic Signal Permit
(DOT Form 242 -014 EF) per WSDOT Design Manual 1330.04(1). The school zone flashing beacons will
be shown on the Channelization and Signing Plans.
6) Design Report: Prepare a memorandum to document the basis for design and major design decisions.
PW_Forms /Slandard Consultant Agreement with Exhibits Revised 320/2013 Page 13 of 34
Task 2 PS &E Documents
1) Prepare the following 90% plans:
• Cover Sheet (1 sheet)
• Summary of Quantities (1 sheet)
• Horizontal Alignment Plan (1 sheet)
• Typical Sections (1 sheets)
• Removal Plans (2 sheets @ 40 scale)
• Temporary Erosion and Sediment Control (2 sheets @ 40 scale)
• Roadway and Drainage Plan and Profiles (3 sheets @ 40 scale)
• Grading Plan (2 sheets @ 20 scale)
• Signal and Illumination Plan (4 sheets @ 20 scale)
• Channelization and Signing (2 plan sheets @ 40 scale and 1 detail sheet)
• Traffic Control Plans (2 sheets @ 40 scale and 1 detail sheet)
2) 90% Engineer's Estimate: Develop quantities based on the 90% plans. Assign unit costs for quantified
item and assign lump sum costs to other items based on professional judgment. Develop a 90%
construction cost estimate that includes a 10% contingency.
3) 90% Contract Documents: Write specifications for all non - standard items. Compile the WSDOT
General Special Provisions, and the special provisions into one Project Manual document.
4) Final Comment Resolution: Respond to 90% review comments in a matrix format. Attend one
meeting with the County to resolve comments from the 90% review.
5) Final Plans: Update the plans per the 90% review comments.
6) Final Engineer's Estimate: Update the quantities to reflect the plan updates. Prepare Unit Price
Worksheet including item descriptions, unit, quantity and cost. Update the engineer's estimate with
revised quantities.
7) Final Contract Documents: Assemble the General Provisions, Special Provisions, and Unit Price
Worksheet into one Project Manual document.
Phase 5 Understanding
• For budget purposes it is assumed utility coordination is limited to 24 hours.
• Signal design is based on the assumption a traffic signal will be selected for the intersection (from
Phase 2, Task 1 (2)).
• Lighting improvements are limited to lighting for the intersection.
• The County will provide boiler plate documents for the Project Manual,
Phase 5 Deliverables
• 90% PS &E submitted to WSDOT on 11x17 paper (10 copies) and submitted to the County via email in
PDF format.
• Final PS &E submitted to WSDOT on 11x17 paper (5 copies) and submitted to the County via email in
PDF format.
• Approved PS &E submitted via email in PDF format.
• AutoCAD base files for the design described above.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20 /2013 Page 14 or34
Phase 6 Bidding and Pre -Award Services
Task 3 Bidding Services
1) Bidding Services: Support County staff during the bidding period as directed. For budget purposes, S
hours of support are assumed.
Future Tasks
Phase 6 NEPA Documentation
This phase is intended to provide NEPA services if federal funds are added to the project.
Phase 7 Trail Design
This phase is intended to provide design services for extending the trail from Fern Way to HJ Carroll Park,
Phase 8 Construction Management
This phase is intended to provide construction management services for the final PS &E package prepared.
END OF SCOPE OF SERVICE
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 15 of 34
Exhibit C
Electronic Exchange of Engineering and Other Data
In this Exhibit the agency, as applicable, is to provide a description of the format and standards the
consultant is to use in preparing electronic files for transmission to the agency. The format and
standards to be provided may include, but are not limited to, the following:
1. Surveying, Roadway Design & Plans Preparation Section
A. Survey Data
B. Roadway Design Files
C. Computer Aided Drafting Files
D. Specify the Agency's Right to Review Product with the Consultant
E. Specify the Electronic Deliverables to Be Provided to the Agency
F. Specify What Agency Furnished Services and Information Is to Be Provided
11. Any Other Electronic Files to Be Provided
111. Methods to Electronically Exchange Data
A. Agency Software Suite
B. Electronic Messaging System
C. File Transfers Format
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 16 of 34
Exhibit D -3
Payment (Negotiated Hourly Rate)
The CONSULTANT shall be paid by the AGENCY for completed work and services rendered under this
AGREEMENT as provided hereinafter. Such payment shall be full compensation for work performed or
services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the
work. The CONSULTANT shall conform to all applicable portions of 48 CFR 31.
Hourly Rates: The CONSULTANT shall be paid by the AGENCY for work done, based upon the
negotiated hourly rates shown in Exhibits "E" and "F" attached hereto and by this reference made part of
this AGREEMENT. The rates listed shall be applicable for the first twelve (12) month period and shall
be subject to negotiation for the following twelve (12) month period upon request of the CONSULTANT
or the AGENCY. If negotiations are not conducted for the second or subsequent twelve (12) month
periods within ninety (90) days after completion of the previous period, the rates listed in this
AGREEMENT, or subsequent written authorization(s) from the AGENCY shall be utilized. The rates
are inclusive of direct salaries, payroll additives, overhead, and fee. The CONSULTANT shall maintain
support data to verify the hours billed on the AGREEMENT.
Direct Non -Salary Costs: Direct Non -Salary Costs will be reimbursed at the Actual Cost to the
CONSULTANT. These charges may include, but are not limited to the following items: travel, printing,
long distance telephone, supplies, computer charges, and sub - consultant costs.
a. Air or train travel will be reimbursed only to economy class levels unless otherwise approved by the
AGENCY. The CONSULTANT shall comply with the rules and regulations regarding travel costs
(excluding air, train, and rental car costs) in accordance with the AGENCY'S Travel Rules and
Procedures. However, air, train, and rental car costs shall be reimbursed in accordance with 48CFR
Part 31.205 -46 "Travel Costs."
b. The billing for Direct Non -Salary Costs shall include an itemized listing of the charges directly
identifiable with the PROJECT.
c. The CONSULTANT shall maintain the original supporting documents in their office. Copies of the
original supporting documents shall be supplied to the AGENCY upon request.
d. All above charges must be necessary for the services provided under this AGREEMENT.
3. Management Reserve Fund: The AGENCY may desire to establish a Management Reserve Fund to
provide the Agreement Administrator with the flexibility to authorize additional funds to the
AGREEMENT for allowable unforeseen costs, or reimbursing the CONSULTANT for additional work
beyond that already defined in this AGREEMENT. Such authorization(s) shall be in writing and shall
not exceed the lesser of $100,000 or 10% of the Total Amount Authorized as shown in the heading of
this AGREEMENT. The amount included for the Management Reserve Fund is shown in the heading of
this AGREEMENT. This fund may not be replenished. Any changes requiring additional costs in
excess of the Management Reserve Fund shall be made in accordance with Section XIV, "Extra Work."
4. Maximum Total Amount Payable: The Maximum Total Amount Payable by the AGENCY to the
CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this
AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized,
and the Management Reserve Fund. The Maximum Total Amount Payable does not include payment
for Extra Work as stipulated in Section XIV, "Extra Work." No minimum amount payable is guaranteed
under this AGREEMENT.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 17 of 34
Monthly Progress Payments: Progress payments maybe claimed on a monthly basis for all costs
authorized in I and 2 above. The monthly billings shall be supported by detailed statements for hours
expended at the rates established in Exhibit "E ", including names and classifications of all employees,
and billings for all direct non -salary expenses. To provide a means of verifying the billed salary costs for
the CONSULTANT'S employees, the AGENCY may conduct employee interviews. These interviews
may consist of recording the names, titles, salary rates, and present duties of those employees performing
work on the PROJECT at the time of the interview.
Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will
be made promptly upon its verification by the AGENCY after the completion of the work under this
AGREEMENT, contingent upon receipt of all PS &E, plans, maps, notes, reports, electronic data and
other related documents which are required to be furnished under this AGREEMENT. Acceptance of
such Final Payment by the CONSULTANT shall constitute a release of all claims for payment, which
the CONSULTANT may have against the AGENCY unless such claims are specifically reserved in
writing and transmitted to the AGENCY by the CONSULTANT prior to its acceptance. Said Final
Payment shall not, however, be a bar to any claims that the AGENCY may have against the
CONSULTANT or to any remedies the AGENCY may pursue with respect to such claims.
The payment of any billing will not constitute agreement as to the appropriateness of any item and at the
time of final audit, all required adjustments will be made and reflected in a final payment. In the event
that such final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund
such overpayment to the AGENCY within thirty (30) days of notice of the overpayment. Such refund
shall not constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by
the AGENCY of overpayment. The CONSULTANT has twenty (20) days after receipt of the final
POST AUDIT to begin the appeal process to the AGENCY for audit findings.
Inspection of Cost Records: The CONSULTANT and their sub - consultants shall keep available for
inspection by representatives of the AGENCY, STATE, and the United States, for a period of three (3)
years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and
all items related to or bearing upon these records with the following exception: if any litigation, claim or
audit arising out of, in connection with, or related to this contract is initiated before the expiration of the
three (3) year period, the cost records and accounts shall be retained until such litigation, claim, or audit
involving the records is completed.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3202013 Page 18 of 34
Exhibit E -1
Consultant Fee Determination — Summary Sheet 1
PROJECT: Safe Routes to School (SRTS) SR19 & West Valley Road
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 19 of 34
Protect
Management
n.MY x..•9•m..i
,. ,.,, ..,
..
..
vo
..
a.•9n n...,�aio,.6rc.m,.�
p.n�n c..em
fio
e o
W 1., A-1..
10
9
x.. 11 AN .
a.SEUa. �mtl.
11,
I
Iso.o
2,742 0
Preliminary
Design
Y.wrY.w•
ana en
x0
•.
I
v0
^u
m...,
1. 9
.o Z ... , in •awn,
S.0
6
• .n
90
.r nr.
11.0
B
C.at E,4m•u
9.0
609
660
.• .ura uY,
39
1099
9YI E,IIm.1.
I6o0
Bua Pullout
90
I.., .... AN
.Yx. I
1.
SEPA Documentation
• mw.m.mn..
a o.Y
110 1
o
10
NO
r.oe...Y U S.m.a.:
so
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 19 of 34
Exhibit E - 1
Consultant Fee Determination — Summary Sheet 2
PROJECT: Safe Routes to School (SRTS) SR19 & West Valley Road
Fines Design
doe.
wro c..nw.
le
A
Tall ..
xo
A P
1.e
,mw..,
.
E.nn...k
To
to
.nmwmm.no.zcm...n =. e..zslv.«•v
3.0
uo
0
.6o
0
T
I
es0
Past
T
al,..l
. o
s.mm.n AT D.......
. o
4.0
l—I A4,mllt Pill
a
.o
Ill.., S.no..
I
t, t
ile
m.
la
T2
ua
m.ury Enabn.,. i.a. tC.n4ol
x3.0
• w. .n ... . • 11.n Poll.
c..aieO 11—
.n
xo0
240
.. ..a nmm...O., PI...
zoo
n.D
0.0
<n....maw..w A.....
120
1..11[ CoMOI Pa..
n n•u i fto—l•
90n C-1-ot Desum.nu
10.0
.mm•n • u n
4.0
s
al ...
Root Enp....r. E.om.0
10
.a
Ea
Fn.I COnV.n DOwm.nu
SuEre4l e.ur.:
III .0
30x.D
xle.0
o..o.,.>Y S.EU,ks:
1 .0
ES.m.I•
xts.0
0
Ma. 0
l0.zl6a
Bidding and Pre -Award Services
.Amy s.,....
Total
..o
.
..0
cu t E.vm.,.
zxno
t o
I
VIA
Total ..,.All Ptl—
Total Ea.m.Y PII Pfau.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 20 of 34
Exhibit E -2
Consultant Fee Determination - Summary Sheet
(Specific Rates of Pay)
Fee Schedule
Actuals Not To Exceed Billing Rate Table (ANTE)
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 21 of 34
Job Classifications
Direct Labor
Rate Ranges
NTE
: Overhead
177.03%
NTE
Fee
31.00%
NTE
Total Hourly
Billing Rates
NTE
Principal Engineer
$84.00
$148.71
$26.04
$258.75
Principal Planner
$74.00
$131.00
$22.94
$227.94
Associate Principal
- $62.00
$109.76
$19.22
$190.98
Senior Consultant
$68.50
$121.27
$21.24
$211.00
Sr. Project Manager
$68.00
$120.38
$21.08
$209.46
Project Manager
$47.50
$84.09
$14.73
$146.31
Project Engineer I
$38.50
$68.16
$11.94
$118.59
Senior Designer
$37.50
$66.39
$11.63
$115.51
Design Engineer
$32.25
$57.09
$10.00
$99.34
Sr. Planner
$41.50
$73.47
$12.87
$127.83
Planner
$34.25
$60.63
$10.62
$105.50
Sr. Transportation
Planner
$48.00
$84.97
$14.88
$147.85
Traffic Analyst
$32.25
$57.09
$10.00
$99.34
Engineering Tech II
$28.50
$50.45
$8.84
$87.79
Project Coordinator II
$32.00
$56.65
$9.92
$98.57
Project Coordinator II
$25.25
$44.70
$7.83
$77.78
Administrative Assistant
$24.75
$43.81
$7.67
$76.24
Project Accountant
$46.00
$81.43
$14.26
$141.69
Actuals Not To Exceed Billing Rate Table (ANTE)
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 21 of 34
Exhibit F
Breakdown of Overhead Cost
Shea Cnrr & Jewell, Inc.
Overhead Schedule
For the Year Ended December 31, 2011
Description
Financial
Statement
Amount
Sliest Carl- &
Jewell, Isle. WSDOT
Adj. Adj.
Rec
Accepted
Ammnd
^/„
Direct Labor
$1,229,074
$1,229,1174
100.00°/
Fringe Benefits:
Vacation, Sick, & Holiday
$208,432
($2,734)
I)
$205,698
16.7451,
Payroll Taxes
184,113
(27848)
U
181,265
14.75°/
Health Insurance
226,497
(2,832)
1)
223,665
18:!0°/
Workers' Comp. Insurance
13,864
13,864
1.13 °G
Profit Sharing(401 -k)
56,272
(638)
1)
55,635
4.53 ° /
Total Fringe Benefits
$689,178
($9,051) $0
$680,127
55.34°/
General Overliead:
Advertising
Bad Debt
Contributions
Entertainment
Indirect Labo
Proposal Labor
Payroll Variance
Rent
Maintenance & Repairs
Travel /Automobile
Insurance
Telephone
Utilities
Taxes & Licenses
Depreciation & Amortization
Licenses and Dues
Employee Train /Recruit /Moving
Professional Fees
Interest
Lease Equipment
Computer
Miscellaneous -Bank Fees
Supplies
Total General Overhead
Total Overhead Costs
Overhead Rate
$17,522
6,366
14,898
36,577
772,412
264,096
(49,124)
181,111
2,777
74,928
52,514
35,589
19,075
88,414
98,291
31,518
14,345
28,432
3,868
12,067
65,952
($15,385)
(6,366)
(14,898)
(36,577)
(33,302)
(2,769)
(15,050)
117
(1,234)
(831)
(12,953)
(3,868)
IJ
I.
G
P.
(139,416) D,O,Q,T
1)
M
(36,444) R,V
A
B,I
(4,954) C,U
N
3,K
F
6,682
(1,236) F
72,073
(7,433) (22,116) D,11,S
$1,850,382
($151,785) ($202,930)
$2,539,561
($160,836) ($202,930)
206.62% 193.54%
Shea Carr Jewell- Revlewed & Accepted 8 -7 -11 A
"Overhears Rate still subject to WSDOT Andh"
$2,137
0
(0)
(0)
599,694
264,096
(49,124)
178,342
2,777
38,484
37,464
35,589
19,075
88,414
98,408
25,330
13,514
15,479
(0)
12,067
65,952
5,446
42,524
$1,495,667
$2, 175,794
177.03%
0.17%
0.00%
0.00 ° /
0.UO%
48.79%
21.49°/
- 4.009/.
14.510/,
0.23°/
3.13%
3.05°/
2.90°/
1.55°/
7.19°/
8.010/.
2.06 °°
1.109/
126°/
0.00°
0.989/
5.37°/
0.44°/
3.46%
121.69°/
177.03°/
This Jln)i roes aot have a system in place that identifies and a chines unallmvable costs as required by 48 CFR 31.101 -6.
Page I
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 22 of 34
Shen Carr & Jewell, Inc.
Overhead Schedule
For the Year Ended Decunnber 31, 2011
Financial Shea Carr&
Statement Jewell, Inc. WSDOT Accepted
Description Amount Adj. Adj. Ref. Amount %
References
Shea Carr Jewell Adjustments:
Shen Carr Jewell FYE 2011 Overbeatt Schcrinle prepared by Lisa !licks, Ninunre Manager.
A Key person life insurance unallowable per 48 CPR 31.205- 19(c)(2)(v).
B Amortization of goodwill un ilowable per 48 CFR 31105 -49.
C Costs of memberships in civic and community organization unallowable per 48 CFR 31.205 - 1(1)(7).
D Public relations and advertising unallowable per 48 CFR 31.205 -1.
E Meals and Entertainment unallowable per 48 CFR 31.205 -14.
F Interest unallowable per 48 CFR 31.205 -20,
G Contributions unallowable per 48 CPR 31.205 -81.
H Other Unallowable expenses per 48 CI'R 31.205 -14.
1 Depreciation based on Straight Line per CFR 31.205-11.
J Legal Organization and Reorganization costs unallowable per 48 CI'R 31.205-27(a).
K Tax Preparation Fees unallowable per 48 CFR 31.205 -41(b) and 31.201- 6(cl). (S Corporation)
L Bad Debt unallowable per 48 CFR 31105 -3.
M Common Control Rent Calculation unallowable per 48 CFR 31.205- 36(b)(3).
N TraininglEducatioh unallowablc per 48 CPR 31.201 -3
O Sales Performance bonus unallowablc per 48 CFR 31.205 -6(Q and 48 CI'R 31201 -4.
P Payroll Variance reconciles out 4/4/5 billing schedule to our monthly payroll
WSDOT Adjustments:
Q Firm voluntarily reduced indirect labor by 13 %, or 5130,888, to bring indirect labor to a reasonable amount per
48 CFR 31.201 -3 and 2010 AASHTO Audit Guide Ch. 6.3. (due to decrease in direct labor base)
R At our request, firm made a second attempt to remove unallowable amounts from travel & supplies accounts.
Firm voluntarily removed $10,054 removed from Travel and Holel accounts for unallowable entertainment and tips
and gratuities per 48 CFR 31.205 -14 and alcohol per 48 CFR 31,205-5 1, including travel directly -
associated with unallowable company retreat per 48 CPR 31.205 -14, and 31.201 -6
S Firm voluntarily removed $22,116 from Supplies account for unallowablc enterlainment, local meals, gifts, and
unallocable expenses per 48 CFR 31.205 -14, 31.205 -13, 31.201 -2 and 31.201 -4
T Remainder of Bonus unallowable per 48 CFR 31205 -6(f). Total bonus paid for 2011 - $13,528.18.
We were unable to verify that bonus is based on individual employee performance, and that individual performance
goals were communicated to the employees prior to work being performed, per 48 CFR 31.205 -6 (f), and
Chapter 7.12, AASHTO Audit Guide. Finn included bonus in indirect labor.
U Removed portion of dues related to lobbying per 48 CFR 31.205.22,
Expenses for 2012 not allocable to overhead for 2011 per 48 CFR 31.201 -4,
Chamber of Commerce memberships unallowable per 48 CFR 31.205 -1 and 31.205 -22, and
Expense for Reception unallowable per 48 CFR 31105.14.
V We noted further unallowable costs in Travel & Hotel account after firm's adjustments in references R & S.
Removed costs for first class airfare, lodging in excess of allowable amount, alcohol, retail shopping expense,
and unsupported travel - insufficient business purpose.
Page 2
PW_Forns /Slandard Consultant Agreement with Exhibits Revised 3/20/2013 Page 23 of 34
A1►
T�.�/� Washington State
Department of Transportation
Paula J. Hammond, P.E.
Secretary of Transportation
August 7, 2012
AUG 0 9 2012
Perry Shea, President
Shea Carr Jewell
2102 Carriage Drive SW, Building I I
Olympia. WA 98502 -1049
Re: Shea Carr Jewell Overhead Schedule
Fiscal Year End December 31, 2011
Dear Mr. Shea:
Transportation Building
310 Maple Park Avenue S L
P.O Box 47J00
Olympia, WA 98'04 0100
3607057000
TTY. 1 800 833 6388
vnvw wsdot wa Gov
We have completed a desk rcvicw of your 0vcncCad schedule for the above referenced
fiscal year. Our review included the documentation provided by Shea Carr Jewell,
The reviewed data included, but was not limited to; the schedule of the indirect cost rate,
a description of the company, basis Of accounting and description of Shea Carr Jewell's
accounting system and the basis of indirect costs.
Based on our work, we are issuing this letter of review establishing Shea Carr Jewell's
overhead rate for the fiscal year ending December 31, 2011, at 177.03% of direct labor.
Costs billed to actual agreements will still be subject to audit of actual costs.
Please check with the WSDOT Consultant Services Office (11Q) and/or the WSDO'I'
Area Consultant Liaison to determine when this reviewed rate will be applicable to your
WS DOT agreement(s).
Also, remember that when you provide next year's overhead schedule to our office, you
will also need to submit either your internally prepared Canpensation Analysis for our
review, or use the National Compensation Matrix (NCM) format to prepare your
alternate analysis and we will review that. The NCM is a tool that establishes
compensation amounts presumed reasonable for certain executive positions. The
Compensation Analysis and NCM are described further in the AASHTO Audit Guide,
Chapter 7. We will need your C'onrpensolion Ana1)�Sis, or alternative analysis based on
use of the NCM, in order to complete our review of your overhead schedule.
Mr. Shea
Page 2
August 7, 2012
If you, or any representatives of Shen Carr .levvell, have any questions, please contact
Martha Roach, Jeri Sivertson,.or Steve McKcrncy at (360)705 -7003.
Sincerely,
-)VKaZ4--1 42�-elk
Martha S. Roach
Agreement Compliance Audit Manager
MR:ds
Enclosures
cc: Steve McKerney, Director of Internal Audit
Jeri Siverlson, Assistant Director of Internal Audit
Lary Schofield, MS 47323
Fi le
Exhibit H
Title VI Assurances
During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, and successors in
interest agrees as follows:
Compliance with Regulations: The CONSULTANT shall comply with the Regulations relative to non-
discrimination in federally assisted programs of the AGENCY, Title 49, Code of Federal Regulations,
Part 21, as they may be amended from time to time (hereinafter referred to as the "REGULATIONS "),
which are herein incorporated by reference and made a part of this AGREEMENT.
Non - discrimination: The CONSULTANT, with regard to the work performed during the
AGREEMENT, shall not discriminate on the grounds of race, color, sex, or national origin in the
selection and retention of sub - consultants, including procurement of materials and leases of
equipment. The CONSULTANT shall not participate either directly or indirectly in the discrimination
prohibited by Section 21.5 of the REGULATIONS, including employment practices when the
AGREEMENT covers a program set forth in Appendix B of the REGULATIONS.
Solicitations for Sub - consultants, Including Procurement of Materials and Equipment: In all
solicitations either by competitive bidding or negotiations made by the CONSULTANT for work to be
performed under a sub - contract, including procurement of materials or leases of equipment, each
potential sub - consultant or supplier shall be notified by the CONSULTANT of the CONSULTANT'S
obligations under this AGREEMENT and the REGULATIONS relative to non - discrimination on the
grounds of race, color, sex, or national origin.
4. Information and Reports: The CONSULTANT shall provide all information and reports required by
the REGULATIONS or directives issued pursuant thereto, and shall permit access to its books,
records, accounts, other sources of information, and its facilities as may be determined by AGENCY,
STATE or the Federal Highway Administration (FHWA) to be pertinent to ascertain compliance with
such REGULATIONS, orders and instructions. Where any information required of a CONSULTANT
is in the exclusive possession of another who fails or refuses to furnish this information, the
CONSULTANT shall so certify to the AGENCY, STATE or the FHWA as appropriate, and shall set
forth what efforts it has made to obtain the information.
Sanctions for Non - compliance: In the event of the CONSULTANT'S non - compliance with the non-
discrimination provisions of this AGREEMENT, the AGENCY shall impose such AGREEMENT
sanctions as it, the STATE or the FHWA may determine to be appropriate, including, but not limited
to:
• Withholding of payments to the CONSULTANT under the AGREEMENT until the
CONSULTANT complies, and /or;
• Cancellation, termination, or suspension of the AGREEMENT, in whole or in part
6. Incorporation of Provisions: The CONSULTANT shall include the provisions of paragraphs (1)
through (5) in every sub - contract, including procurement of materials and leases of equipment, unless
exempt by the REGULATIONS, or directives issued pursuant thereto. The CONSULTANT shall take
such action with respect to any sub - consultant or procurement as the AGENCY, STATE or FHWA
may direct as a means of enforcing such provisions including sanctions for non - compliance.
Provided, however, that in the event a CONSULTANT becomes involved in, or is threatened with,
litigation with a sub - consultant or supplier as a result of such direction, the CONSULTANT may
request the AGENCY and the STATE enter into such litigation to protect the interests of the
AGENCY and the STATE and, in addition, the CONSULTANT may request the United States enter
into such litigation to protect the interests of the United States.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3202013 Page 26 of 34
Exhibit I
Payment Upon Termination of Agreement
By the Agency Other Than for
Fault of the Consultant
(Refer to Agreement, Section IX)
Lump Sum Contracts
A final payment shall be made to the CONSULTANT which when added to any payments
previously made shall total the same percentage of the Lump Sum Amount as the work completed at
the time of termination is to the total work required for the PROJECT. In addition, the
CONSULTANT shall be paid for any authorized extra work completed.
Cost Plus Fixed Fee Contracts
A final payment shall be made to the CONSULTANT which when added to any payments
previously made, shall total the actual costs plus the same percentage of the fixed fee as the work
completed at the time of termination is to the total work required for the Project. In addition, the
CONSULTANT shall be paid for any authorized extra work completed.
Specific Rates of Pay Contracts
A final payment shall be made to the CONSULTANT for actual hours charged at the time of
termination of this AGREEMENT plus any direct non salary costs incurred at the time of
termination of this AGREEMENT.
Cost Per Unit of Work Contracts
A final payment shall be made to the CONSULTANT for actual units of work completed at the time
of termination of this AGREEMENT.
PW_Forrns /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 27 of 34
Exhibit J
Alleged Consultant Design Error Procedures
The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design
error is of a nature that exceeds the accepted standard of care. In addition, it will establish a uniform
method for the resolution and /or cost recovery procedures in those instances where the agency
believes it has suffered some material damage due to the alleged error by the consultant.
Step I - Potential Consultant Design Error(s) is Identified by Agency's Project Manager
At the first indication of potential consultant design error(s), the first step in the process is
for the Agency's project manager to notify the Director of Public Works or Agency
Engineer regarding the potential design error(s). For federally funded projects, the Region
Highways and Local Programs Engineer should be informed and involved in these
procedures. (Note: The Director of Public Works or Agency Engineer may appoint an
agency staff person other than the project manager, who has not been as directly involved
in the project, to be responsible for the remaining steps in these procedures.)
Step 2 - Project Manager Documents the Alleged Consultant Design Error(s)
After discussion of the alleged design error(s) and the magnitude of the alleged error(s),
and with the Director of Public Works or Agency Engineer's concurrence, the project
manager obtains more detailed documentation than is normally required on the project.
Examples include: all decisions and descriptions of work; photographs, records of labor,
materials and equipment.
Step 3 - Contact the Consultant Regarding the Alleged Design Error(s)
If it is determined that there is a need to proceed further, the next step in the process is for
the project manager to contact the consultant regarding the alleged design error(s) and the
magnitude of the alleged error(s). The project manager and other appropriate agency staff
should represent the agency and the consultant should be represented by their project
manager and any personnel (including sub - consultants) deemed appropriate for the alleged
design error(s) issue.
Step 4 - Attempt to Resolve Alleged Design Error with Consultant
After the meeting(s) with the consultant have been completed regarding the consultant's
alleged design error(s), there are three possible scenarios:
It is determined via mutual agreement that there is not a consultant design
error(s). If this is the case, then the process will not proceed beyond this point.
It is determined via mutual agreement that a consultant design error(s) occurred.
If this is the case, then the Director of Public Works or Agency Engineer, or their
representatives, negotiate a settlement with the consultant. The settlement would
be paid to the agency or the amount would be reduced from the consultant's
agreement with the agency for the services on the project in which the design
error took place. The agency is to provide H &LP, through the Region Local
Programs Engineer, a summary of the settlement for review and to make
adjustments, if any, as to how the settlement affects federal reimbursements. No
further action is required.
There is not a mutual agreement regarding the alleged consultant design error(s).
The consultant may request that the alleged design error(s) issue be forwarded to
PW_Forms /Standard Consultant Agreement with Exhibits Revised 31202013 Page 28 of 34
the Director of Public Works or Agency Engineer for review. If the Director of
Public Works or Agency Engineer, after review with their legal counsel, is not
able to reach mutual agreement with the consultant, proceed to Step 5.
Step 5 - Forward Documents to Highways and Local Programs
For federally funded projects all available information, including costs, should be
forwarded through the Region Highways and Local Programs Engineer to H &LP for their
review and consultation with the FHWA. H &LP will meet with representatives of the
agency and the consultant to review the alleged design error(s), and attempt to find a
resolution to the issue. If necessary, H &LP will request assistance from the Attorney
General's Office for legal interpretation. H &LP will also identify how the alleged error(s)
affects eligibility of project costs for federal reimbursement.
If mutual agreement is reached, the agency and consultant adjust the scope of
work and costs to reflect the agreed upon resolution. H &LP, in consultation with
FHWA, will identify the amount of federal participation in the agreed upon
resolution of the issue.
If mutual agreement is not reached, the agency and consultant may seek
settlement by arbitration or by litigation.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 29 of 34
Exhibit K
Consultant Claim Procedures
The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement.
The following procedures should only be utilized on consultant claims greater than $1,000. If the
consultant's claim(s) are a total of $1,000 or less, it would not be cost effective to proceed through
the outlined steps. It is suggested that the Director of Public Works or Agency Engineer negotiate a
fair and reasonable price for the consultant's claim(s) that total $1,000 or less.
This exhibit will outline the procedures to be followed by the consultant and the agency to consider
a potential claim by the consultant.
Step 1 - Consultant Files a Claim with the Agency Project Manager
If the consultant determines that they were requested to perform additional services that
were outside of the agreement's scope of work, they may be entitled to a claim. The first
step that must be completed is the request for consideration of the claim to the Agency's
project manager.
The consultant's claim must outline the following:
• Summation of hours by classification for each firm that is included in the claim;
• Any correspondence that directed the consultant to perform the additional work;
• Timeframe of the additional work that was outside of the project scope;
• Summary of direct labor dollars, overhead costs, profit and reimbursable costs
associated with the additional work; and
• Explanation as to why the consultant believes the additional work was outside of the
agreement scope of work.
Step 2 - Review by Agency Personnel Regarding the Consultant's Claim for Additional
Compensation
After the consultant has completed step I, the next step in the process is to forward the
request to the Agency's project manager. The project manager will review the consultant's
claim and will meet with the Director of Public Works or Agency Engineer to determine if
the Agency agrees with the claim. If the FHWA is participating in the project's funding,
forward a copy of the consultant's claim and the Agency's recommendation for federal
participation in the claim to the WSDOT Highways and Local Programs through the
Region Local Programs Engineer, if the claim is not eligible for federal participation,
payment will need to be from agency funds.
If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT
Highways and Local Programs (if applicable), and FHWA (if applicable) agree with the
consultant's claim, send a request memo, including backup documentation to the
consultant to either supplement the agreement, or create a new agreement for the claim.
After the request has been approved, the Agency shall write the supplement and /or new
agreement and pay the consultant the amount of the claim. Inform the consultant that the
final payment for the agreement is subject to audit. No further action in needed regarding
the claim procedures.
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3/20/2013 Page 30 of34
If the Agency does not agree with the consultant's claim, proceed to step 3 of the
procedures.
Step 3 - Preparation of Support Documentation Regarding Consultant's Claim(s)
If the Agency does not agree with the consultant's claim, the project manager shall prepare
a summary for the Director of Public Works or Agency Engineer that included the
following:
• Copy of information supplied by the consultant regarding the claim;
• Agency's summation of hours by classification for each firm that should be included in
the claim;
• Any correspondence that directed the consultant to perform the additional work;
• Agency's summary of direct labor dollars, overhead costs, profit and reimbursable costs
associated with the additional work;
• Explanation regarding those areas in which the Agency does /does not agree with the
consultant's claim(s);
• Explanation to describe what has been instituted to preclude future consultant claim(s);
and
• Recommendations to resolve the claim.
Step 4 - Director of Public Works or Agency Engineer Reviews Consultant Claim and Agency
Documentation
The Director of Public Works or Agency Engineer shall review and administratively
approve or disapprove the claim, or portions thereof, which may include getting Agency
Council or Commission approval (as appropriate to agency dispute resolution procedures).
If the project involves federal participation, obtain concurrence from WSDOT Highways
and Local Programs and FHWA regarding final settlement of the claim. If the claim is not
eligible for federal participation, payment will need to be from agency funds.
Step 5 - Informing Consultant of Decision Regarding the Claim
The Director of Public Works or Agency Engineer shall notify (in writing) the consultant
of their final decision regarding the consultant's claim(s). Include the final dollar amount
of the accepted claim(s) and rationale utilized for the decision.
Step 6 - Preparation of Supplement or New Agreement for the Consultant's Claim(s)
The agency shall write the supplement and/or new agreement and pay the consultant the
amount of the claim. Inform the consultant that the final payment for the agreement is
subject to audit.
PW_ Forms /Standard Consultant Agreement with Exhibits Revised 3/20 /2013 - Page 31 of 34
Exhibit M -I(a)
Certification Of Consultant
Project No. 18019170
Local Agency
I hereby certify that I am eA and
duly authorized representative of the firm of Shea Carr Jewell whose address
is 2102H Carriage Dr. SW, Olympia, WA 98502 and that neither I nor the
above firm 1 here represent has:
(a) Employed or retained for a commission, percentage, brokerage, contingent fee, or
other consideration, any firm or person (other than a bona fide employee working
solely for me or the above CONSULTANT) to solicit or secure the AGREEMENT;
(b) Agreed, as an express or implied condition for obtaining this contract, to employ or
retain the services of any firm or person in connection with carrying out this
AGREEMENT; or
(c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide
employee working solely for me or the above CONSULTANT) any fee, contribution,
donation, or consideration of any kind for, or in connection with, procuring or
carrying out this AGREEMENT; except as hereby expressly stated (if any);
1 acknowledge that this certificate is to be available to the Washington State Department of .
Transportation and the Federal Highway Administration, U.S. Department of Transportation in
connection with this AGREEMENT involving participation of Federal -aid highway funds, and is
subject to applicable State and Federal laws, both criminal and civil.
zs Zoi3
D to
�L
Signa r
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 32 of 34
Exhibit M -I(b)
Certification Of Agency Official
I hereby certify that 1 am the AGENCY Official of the Local Agency of Cie Cat ,
Washington, and that the consulting firm or its representative has not been required, directly or
indirectly as an express or implied condition in connection with obtaining or carrying out this
AGREEMENT to:
(a) Employ or retain, or agree to employ to retain, any firm or person; or
(b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution,
donation, or consideration of any kind; except as hereby expressly stated (if any):
I acknowledge that this certificate is to be available to the Washington State Department of
Transportation and the Federal Highway Administration, U.S. Department of Transportation, in
connection with this AGREEMENT involving participation of Federal -aid highway funds, and is
subject to applicable State and Federal laws, both criminal and civil.
Name Monte Reinders, PE Public Works Director, County Engineer
(please print)
Signature Date p 7 Z ra
PW_Forms /Standard Consultant Agreement with Exhibits Revised 3120/2013 Page 33 of 34
Exhibit M -2
Certification Regarding Debarment, Suspension, and Other Responsibility
Matters - Primary Covered Transactions
1. The prospective primary participant certifies to the best of its knowledge and belief, that it and its
principals:
A. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from covered transactions by any federal department or agency;
B. Have not within a three -year period preceding this proposal been convicted of or had a
civil judgment rendered against them for commission or fraud or a criminal offense in
connection with obtaining, attempting to obtain, or performing a public (federal, state, or
local) transaction or contract under a public transaction; violation of federal or state
antitrust statues or commission of embezzlement, theft, forgery, bribery, falsification or
destruction of records, making false statements, or receiving stolen property;
C. Are not presently indicted for or otherwise criminally or civilly charged by a governmental
entity (federal, state, or local) with commission of any of the offenses enumerated in
paragraph 1( B) of this certification; and
D. Have not within a three (3) year period preceding this application/proposal had one or
more public transactions (federal, state, or local) terminated for cause or default.
11. Where the prospective primary participant is unable to certify to any of the statements in this
certification, such prospective participant shall attach an explanation to this proposal.
Consultant (Firm): Shea Carr Jewell (dba, SCJ Alliance
p )
Name Imo �Zrf J ew C l 1
Signature: President
Consultant
y zs G
Date
PW_Forms /Standard Consultant Agreement with Exhibits Revised 320/2013 Page 34 of 34