Loading...
HomeMy WebLinkAbout110413_ca03Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director /County Engineer/V—_ Agenda Date: November 4, 2013 Engineer/ —� Subject: Temporary Road Closure on Snow Creek Rd., MP 3.74 to MP 3.82, County Road No. 352909 Statement of Issue: A planned culvert replacement on Snow Creek Road will be best served by a temporary road closure. Analysis /Strategic Goals /Pro's Et Con's: The existing culverts at Snow Creek Road MP 3.78 are failing and a new structure is needed to accommodate fish passage. The culverts will be replaced with a 24 ft. span precast, reinforced concrete three -sided structure. Construction is scheduled for 2014. The Department of Public Works has determined that a temporary road closure is appropriate for this project. Closure of Snow Creek Road will allow the work to be completed in a shorter time period, at lower cost, and will not significantly impact the travelling public and adjacent landowners. Beyond the project site, Snow Creek Road serves National Forest land, Dept. of Natural Resources Land and private timber land owned by Pope Resources. These entities have been notified and are agreeable to the road closure. Their properties are accessible via other forest roads. There are no residences beyond the project site. The closure will be for a maximum of 28 consecutive calendar days. Given the location, availability of alternate routes, and advance warning to the public through signage and publication, road closure is the best alternative. Fiscal Impact/Cost Benefit Analysis: This project has 100% funding through the Forest Highway Program, administered by the Western Federal Lands Division of the Federal Highway Administration. Recommendation: The Board is requested to approve the road closure, and return a copy of the resolution to Public Works for further processing. Reviewed By: . ' orely, ou�y A mi ator - ate STATE OF WASHINGTON COUNTY OF JEFFERSON In the matter of: Temporary Closure of Snow Creek Road, County Road No. 352909 RESOLUTION NO. WHEREAS, a planned culvert replacement at Snow Creek Road, Milepost 3.78, County Road No. 352909, Project No. 1805951899, shall cause interruption and unavoidable delays to traffic, and WHEREAS, as potential hazard exists to the motoring public and the workers, and WHEREAS, alternate routes are available to the motoring public, and WHEREAS, notice of closure will be published in the area newspaper, and provided by signage at the site not less than 3 days prior to closure, as required by law, and WHEREAS, Chapter 47.48 R.C.W. authorizes closure of roads, IT IS HEREBY RESOLVED that said Snow Creek Road be closed between milepost 3.74 and milepost 3.82 to all traffic for a period not to exceed twenty -eight consecutive calendar days between July 1, 2014 and September 30, 2014 for culvert replacement work. PASSED AND ADOPTED THIS DAY OF, 2013 . JEFFERSON COUNTY BOARD OF COMMISSIONERS John Austin, Chair SEAL: Phil Johnson, Member ATTEST: David W. Sullivan, Member Carolyn Avery Deputy Clerk of the Board PROJECT VICINITY MAP