Loading...
HomeMy WebLinkAbout112513_ca04Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director Agenda Date: November 25, 2013 Subject: Local Agency Agreement Supplement with the Washington State Dept. of Transportation ( WSDOT), Upper Hoh Road MP 3.338 Culvert Replacement, CR1896, Federal Aid Project No. PLH- A160(001) Statement of Issue: The attached Local Agency Agreement Supplement with WSDOT is necessary in order to proceed with construction of the Upper Hoh Road, MP 3.338 Culvert Replacement project. Analysis /Strategic Goals /Pro's Et Con's: This project consists of replacing the substandard, failing culvert at Upper Hoh Road MP 3.338 with a new 48 -inch diameter steel culvert. The new pipe is to be installed by pipe ramming through the fill adjacent to the existing culvert in order to keep the road open and lower costs. This Supplement is for the construction contract and construction engineering. Fiscal Impact /Cost Benefit Analysis: This project has 100% funding through the Public Lands Highway Discretionary fund, administered by the Federal Highway Administration. Recommendation: The Board is requested to sign the three originals of the Local Agency Agreement Supplement, and return to Public Works. Department Contact: Mark Thurston, P.E., Project Manager, 385 -9160. R e4ie P p M ; y- Coan Administr for Date AMkk '00 vftoamliic I, stw* wro nglpl -*Md0fTrMVqW n Local Agency Agreement Supplement Agency Supplement Number Jefferson County Public Works 1 Federal Aid Project Number Agreement Number CFDA No. 20.20.5 PLH -A160 001 LA 7591 (Catalog of Federal Domestic Assistance The Local Agency requests to supplement the agreement entered into and executed on September 23, 2011 All provisions, in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows: Project Description Name Upper Hoh Rd. Access Preservation: Milepost 3.338 Culvert Replacement Length 0.40 Termini Upper Hoh Road MP 3.20 to MP 3.60 Description of Work ❑ No Change Culvert replacement on Upper Hoh Road at MP 3.338 including maintenance and safety upgrades as necessary. Prior $600,000 obligated for PE at 3 sites under one project. This project is now separated into 3 project sites for RW and CN only. Reason for Supplement This supplement is for the construction contract and construction engineering, to be performed by agency staff and consultants., Does this chanoe reauire additional Rioht of Wav or Easements? ❑ Yes ® No. Type of Work Estimate of Funding Previous A reement/Su I. (l Supplee ment Estimated Total Project Funds Estimated) Agency Funds Estimated Federal Funds PE a. Agency 590 000.00 590 000.00 0.00 590 000.00 100 % b. Other c. Other Federal Aid d. State 10 000.00 10 000.00 0.00 10 000.00 Participation Ratio for PE e. Total PE Cost Estimate (a +b +c +d) 600 000.00 600,000.00 600,000.00 Right of Way f. Agency .Other Federal Aid h. Other Participation Ratio for RW i. State j. Total R/W Cost Estimate (f +g +h +i) Construction. k. Contract 712 551.00 712 551.00 0.00 712 551.00 I. Other m. Other 100 % Federal Aid n. Other Participation o. Agency 75 050.00 75 050.00 75 050.00 Ratio for CN . State 10 000.00 10 000.00 10 000.00 q. Total CN Cost Estimate k+l+m+n+o 797 601.00 797 601.00 797 601.00 r. Total Project Cost Estimate e ' The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washington State Department of Transportation By Title DOT Form 140 -041 EF Revised 03/2011 By Director of Highways and Local Programs Date Executed A-Ppoved to only .[^ Jefferson Co. ProMut /ors ✓ . David Alvarez, Chief. Civil D A