Loading...
HomeMy WebLinkAbout120913_ca03Department of Public Works O Consent Agenda Page 1 of 2 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director, County Enginee Agenda Date: December 9, 2013 Subject: Local Agency Agreement Supplement #4 with Wash. State Department of Transportation For : Queets Bridge Painting, Bridge No. 8W, Clearwater Road MP 0.60 to M.P. 0.76, Project No. CR1881 Statement of Issue: A Local Agency Agreement Supplement #4 with the Washington State Dept. of Transportation is necessary in order to re- distribute existing federal funding to the Construction Engineering phase for the Queets Bridge Painting project. Analysis /Strategic Goals /Pro's Et Con's: This project consists of repainting the steel bridge girders and bracing members of the Queets Bridge. The work includes minor girder web bracing, abrasive blasting, treatment of pack rust, containment of wastes, and repainting with a primer and top coat paint system. Re- distribution of the existing funding from the Construction Contract category to the Construction Engineering category is necessary due higher construction engineering and inspection consultant costs required for an extended construction period. Fiscal Impact /Cost Benefit Analysis: The total project cost is estimated at $2,969,652, and is funded at 100% by the Federal Highway Administration. The total funding amount remains unchanged. This supplement moves $200,000.00 into the construction engineering line to pay for additional construction engineering administration and NACE level Paint Inspection by consultants. Recommendation: The Board is requested to sign the three original Local Agency Agreement Supplement #4 documents. One fully executed original will be returned to the Board after execution by the Washington State Dept. of Transportation. Department Contact: John Wayand, Project Manager, 385.9377. �1 r, I Ci�Y� 3 Date Washington State V/ Department of Transportation Local Agency Agreement Supplement Agency Supplement Number Jefferson County Public Works 4 Federal Aid Project Number Agreement Number CFDA No. 20.205 BHOS -16WA 001 LA 7393 (Cataicilof FederalDomesncnssstancc, The Local Agency requests to supplement the agreement entered into and executed on October 8, 2013 All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows Project Description Name Queets Bridge Painting Termini Clearwater Road milepost 0.60 to milepost 0.76 Description of Work ® No Change Length 0.16 The proposed work consists of repainting the steel girders and cross bracing This will include the following general items of work'. (I)pronding a containment system, (2) abmsrve blasting to remove esisting paint, (3) treatment of pack rust, (4) disposal of waste, (5) repainting with a pnmer and top coat painting system. (6) traffic control, and (7) minor girder web bracing in Span 1 and Span 4. Reason for Supplement Increase of CE Agency amount due to higher than originally estimated construction engineering administration and specialty paint inspection consultant costs. Construction time is estimated to be approximately 57 working days longer than original contract completion date, requiring additional CE and inspection costs. Supplement #4 shifts a portion of unused CN Contract amount to the CE Agency amount. Does this change require additional Right of Way or Easements? ❑ Yes ® No Type of Work yp Estimate cif Fundin (1) Previous A reement/su 1. (2> Supplement (3) Estimated Total Project Funds (4) Estimated Agency Funds (s) Estimated Federal Funds PE a. Agency 100 % b. Other c. Other Federal Aid d. State 295,355.00 0.00 295 355.00 0.00 295 355.00 _ 10 000.00 0.00 10 000.00 0.00 10,000. Participation Ratio for PE e. Total PE Cost Estimate (a +b+c+d) 305 55.00 305,355.00 305,3`.5.00 Right of Way f, Agency Other as Federal Aid h. Other Participation Ratio for RW 1. State j. Total RAW Cost Estimate (f+g +h A M Construction k. Contract 2,219,705.00 -200 000.00 2,019,705M 0.00 2,019,70-5.0-0 I. Other m.11 100 % n. Other Federal Aid _ Participation o. Agency 434 592.00 200,000.00 634 592.00 0.00 634 592.00 Ratio for CN P. State 10,000.00 10 000.00 10,10 Total CN Cost Estimate k+l+lw 2 664 97 oo 2 664 9100 2 664 97.00 r. Total Project Cost Estimate e*i+Q) 2,969,652.00 2.969652.001 2,969,657 00 The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official By Title DOT Form 140 -041 EF Revised 03/2011 Washington State Department of Transportation By Director of Highways and Local Programs Date Executed