Loading...
HomeMy WebLinkAbout021014_ca04Department of Public Works O Consent Agenda Page 1 of 2 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director /County Engineer,,_ Agenda Date: February 10, 2014 Subject: Supplemental Consultant Agreement #2 with Integrity Structural Engineering, PLLC Queets Bridge Painting, CR1881 Co. Rd. No. 107508, M.P. 0.60 to M.P. 0.76 BHOS- 16WA(001) Statement of Issue: The issue is requesting execution of the Supplemental Consultant Agreement #2 with Integrity Structural Engineering, PLLC of Seattle, WA. for providing additional construction inspection and construction engineering support services for the Queets Bridge Painting, CR1881 project. Analysis /Strategic Goals /Pro's ft Con's: This project consists of repainting the steel bridge girders and bracing members of the Queets Bridge. The work includes minor girder web bracing, abrasive blasting, treatment of pack rust, containment of wastes, and repainting with a primer and top coat paint system. Additional inspection and construction engineering support services are necessary due to the contractor's delay of project completion by approximately 4 months. This supplemental agreement will provide additional construction engineering support services by Integrity Structural Engineering, PLLC, through the end of the construction phase. The additional required engineering support work for this project consists of: NACE level Paint Inspection services, technical Paint Expert services, and Engineer of Record services. Fiscal Impact /Cost Benefit Analysis: The maximum amount payable for consultant services under this Supplemental Consultant Agreement #2 is $12,901.62. These consultant services will be eligible for reimbursement from the Federal Highway Administration BHOS funding at the rate of 100 %. Department of Public Works O Consent Agenda Page 2 of 2 Recommendation: The Board is asked to execute the three (3) originals of the Supplemental Consultant Agreement #2 with Integrity Structural Engineering, PLLC, and return two (2) signed originals to Public Works (attn. John Wayand). Department Contact: John Wayand, Project Manager, 385 -9377 Re>few —�P ip Morle u tyn Adminic* r Date The Local Agency of Jefferson County. Washington desires to supplement the agreement entered into with Integrity Structural Engineering, PPLC and executed on April 8, 2013 and identified as Agreement No. Queets 2013 -2. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 11, SCOPE OF WORK, is hereby amended to read: As specified in Exhibit "B ". II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: June 30, 2014 III Section V, PAYMENT, shall be amended as follows: Original Agreement: $185,143.68 (April 8, 2013) Supplemental Agreement #l: $146,817.65 (October 28, 2013) Supplemental Agreement #2: $12,901.62 (Requested) New Agreement Maximum Amount Payable: $344,862.95 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. Pagel of 4 Organization and Address Supplemental Agreement Number 2 Integrity Structural Engineering, PLLC 124 Interlake Ave., N. Seattle, WA. 98103 06 -547 -1379 Agreement Number Oueets 2013-? Project Number Execution Date Completion Date CR1881 June 30, 2014 Project Title New Maximum Amount Payable Queets Bridge Painting, Bridge No. 8W $344,862.95 Clearwater Road M.P. 0.60 to M.P. 0.76 Description of Work Provide additional construction inspection and engineering support services for the Construction Engineering phase of the Queets Bridge Painting project. The Local Agency of Jefferson County. Washington desires to supplement the agreement entered into with Integrity Structural Engineering, PPLC and executed on April 8, 2013 and identified as Agreement No. Queets 2013 -2. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 11, SCOPE OF WORK, is hereby amended to read: As specified in Exhibit "B ". II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: June 30, 2014 III Section V, PAYMENT, shall be amended as follows: Original Agreement: $185,143.68 (April 8, 2013) Supplemental Agreement #l: $146,817.65 (October 28, 2013) Supplemental Agreement #2: $12,901.62 (Requested) New Agreement Maximum Amount Payable: $344,862.95 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. Pagel of 4 If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. Inteerity Structural Engineering PLLC Consultant Consultant's Signature / /3o COUNTY OF JEFFERSON BOARD OF COMMISSIONERS John Austin, Chair Date Phil Johnson, Member David W. Sullivan, Member Approved as to form only: David Alvarez Date Deputy Prosecuting Attorney 0",4 1 /2'y /ZO)L� Monte Reinders, P.E. Date Public Works Director /County Engineer Ir Page 2 of 4 Direct Salary Cost Direct Non -Salary Costs Total Exhibit "A" Summary of Payments Basic Agreement $160,589.29 $24,554.39 $185,143.68 Supplement #1 $127,526.77 .l $146,817.65 Page 3 of 4 Supplement #2 Total $11,181.70 $299,297.76 $1,719.92 $45,565.19 $12,901.62 $344,862.95 Exhibit `B" Scope of Work The scope of work for this Supplemental Agreement contains the following additional work: 1. Additional work as specified in Change Order Directive #3 consisting of Paint Inspector services, Paint Expert services, and Engineer of Record services, required for the Contractor's extended project schedule. The additional work will require an estimated 7 additional days of services and the associated travel expenses as specified in Exhibit A. Page 4 of 4