HomeMy WebLinkAbout021014_ca04Department of Public Works
O Consent Agenda
Page 1 of 2
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, P.E., Public Works Director /County Engineer,,_
Agenda Date: February 10, 2014
Subject: Supplemental Consultant Agreement #2 with Integrity Structural
Engineering, PLLC
Queets Bridge Painting, CR1881
Co. Rd. No. 107508, M.P. 0.60 to M.P. 0.76
BHOS- 16WA(001)
Statement of Issue:
The issue is requesting execution of the Supplemental Consultant Agreement #2 with
Integrity Structural Engineering, PLLC of Seattle, WA. for providing additional
construction inspection and construction engineering support services for the Queets
Bridge Painting, CR1881 project.
Analysis /Strategic Goals /Pro's ft Con's:
This project consists of repainting the steel bridge girders and bracing members of the
Queets Bridge. The work includes minor girder web bracing, abrasive blasting, treatment
of pack rust, containment of wastes, and repainting with a primer and top coat paint
system. Additional inspection and construction engineering support services are necessary
due to the contractor's delay of project completion by approximately 4 months.
This supplemental agreement will provide additional construction engineering support
services by Integrity Structural Engineering, PLLC, through the end of the construction
phase. The additional required engineering support work for this project consists of: NACE
level Paint Inspection services, technical Paint Expert services, and Engineer of Record
services.
Fiscal Impact /Cost Benefit Analysis:
The maximum amount payable for consultant services under this Supplemental Consultant
Agreement #2 is $12,901.62. These consultant services will be eligible for reimbursement
from the Federal Highway Administration BHOS funding at the rate of 100 %.
Department of Public Works
O Consent Agenda
Page 2 of 2
Recommendation:
The Board is asked to execute the three (3) originals of the Supplemental Consultant
Agreement #2 with Integrity Structural Engineering, PLLC, and return two (2) signed
originals to Public Works (attn. John Wayand).
Department Contact: John Wayand, Project Manager, 385 -9377
Re>few
—�P ip Morle u tyn Adminic* r Date
The Local Agency of Jefferson County. Washington desires to supplement the agreement entered into
with Integrity Structural Engineering, PPLC and executed on April 8, 2013 and identified as Agreement
No. Queets 2013 -2.
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 11, SCOPE OF WORK, is hereby amended to read:
As specified in Exhibit "B ".
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of
calendar days for completion of the work to read:
June 30, 2014
III
Section V, PAYMENT, shall be amended as follows:
Original Agreement: $185,143.68 (April 8, 2013)
Supplemental Agreement #l: $146,817.65 (October 28, 2013)
Supplemental Agreement #2: $12,901.62 (Requested)
New Agreement Maximum Amount Payable: $344,862.95
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
Pagel of 4
Organization and Address
Supplemental Agreement
Number 2
Integrity Structural Engineering, PLLC
124 Interlake Ave., N.
Seattle, WA. 98103
06 -547 -1379
Agreement Number
Oueets 2013-?
Project Number
Execution Date
Completion Date
CR1881
June 30, 2014
Project Title
New Maximum Amount Payable
Queets Bridge Painting, Bridge No. 8W
$344,862.95
Clearwater Road M.P. 0.60 to M.P. 0.76
Description of Work
Provide additional construction inspection and engineering support services for the Construction Engineering phase of the
Queets Bridge Painting project.
The Local Agency of Jefferson County. Washington desires to supplement the agreement entered into
with Integrity Structural Engineering, PPLC and executed on April 8, 2013 and identified as Agreement
No. Queets 2013 -2.
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 11, SCOPE OF WORK, is hereby amended to read:
As specified in Exhibit "B ".
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of
calendar days for completion of the work to read:
June 30, 2014
III
Section V, PAYMENT, shall be amended as follows:
Original Agreement: $185,143.68 (April 8, 2013)
Supplemental Agreement #l: $146,817.65 (October 28, 2013)
Supplemental Agreement #2: $12,901.62 (Requested)
New Agreement Maximum Amount Payable: $344,862.95
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
Pagel of 4
If you concur with this supplement and agree to the changes as stated above, please sign in the
appropriate spaces below and return to this office for final action.
Inteerity Structural Engineering PLLC
Consultant
Consultant's Signature
/ /3o
COUNTY OF JEFFERSON
BOARD OF COMMISSIONERS
John Austin, Chair
Date Phil Johnson, Member
David W. Sullivan, Member
Approved as to form only:
David Alvarez Date
Deputy Prosecuting Attorney
0",4 1 /2'y /ZO)L�
Monte Reinders, P.E. Date
Public Works Director /County Engineer
Ir
Page 2 of 4
Direct Salary Cost
Direct Non -Salary Costs
Total
Exhibit "A"
Summary of Payments
Basic Agreement
$160,589.29
$24,554.39
$185,143.68
Supplement #1
$127,526.77
.l
$146,817.65
Page 3 of 4
Supplement #2 Total
$11,181.70 $299,297.76
$1,719.92 $45,565.19
$12,901.62 $344,862.95
Exhibit `B"
Scope of Work
The scope of work for this Supplemental Agreement contains the following additional work:
1. Additional work as specified in Change Order Directive #3 consisting of Paint Inspector services,
Paint Expert services, and Engineer of Record services, required for the Contractor's extended project
schedule. The additional work will require an estimated 7 additional days of services and the
associated travel expenses as specified in Exhibit A.
Page 4 of 4