HomeMy WebLinkAboutBLD2008-00029 Jefferson County Building Dillon Permit Numb BLD08-00029
Applicant: RUIDL
BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2006 International Building Codes
To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection.
Requests received after 7:00 AM will not be scheduled for that day's inspections.
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Setbacks
Erosion Control
Foundation Footing
Footing Drains
Foundation Stem Wall
Underground Plumbing
Straps(hold downs)
Ext. Shear Wall Nailing
Rough-in Plumbing
Framing
Airseal
Insulation:Walls
Insulation:Floors
Insulation:Ceiling
Int. Shear Wall Nailing
Wallboard Nailing
Gas Line: Interior
Gas Line: Exterior
Propane Tank
Heat/Chimney Clearance
Drywell/Alt Drainage SEE CONDITION I FOR SPLASHBLOCK DESIGN CRITERIA
Address Posted
FINAL INSPECTION
FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
• •
CONDITIONS for Building Permit# :BLD08-00029
1.) SPLASHBLOCK DESIGN CRITERIA
A VEGETATED FLOWPATH OF AT LEAST 50 FEET SHOULD BE MAINTAINED
BETWEEN THE DISCHARGE POINT AND ANY PROPERTY LINE, STRUCTURE,
STEEP SLOPE, STREAM, WETLAND, LAKE OR OTHER IMPERVIOUS SURFACE.
SENSITIVE AREAS BUFFERS MAY COUNT TOWARD FLOWPATH LENGTHS.
A MAXIMUM OF 700 SQUARE FEET OF ROOF AREA MAY DRAIN TO EACH
SPLASHBLOCK.
A SPLASHBLOCK OR A PAD OF CRUSHED ROCK (2 FEET WIDE BY 3 FEET LONG
BY 6 INCHES DEEP) SHOULD BE PLACED AT EACH DOWNSPOUT DISCHARGE
POINT.
NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT.
FOR SITES WITH SEPTIC SYSTEMS, THE DISCHARGE POINT MUST BE
DOWNSLOPE OF THE PRIMARY AND RESERVE DRAINFIELD AREAS.
2.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
3.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
4.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP)
Elements#1 through #12 of the Department of Ecology's Stormwater Management
Manual for Western Washington to control stormwater, erosion and sediment during
construction. BMPs shall address permanent measures to stabilize soil exposed during
construction, and in the design and operation of stormwater and drainage control systems.
5.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
6.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
7.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened
from view of neighboring dwellings and rights-of-way. Such screening shall meet all
applicable performance and development standards specific to the district in which the
storage is kept, and shall be in keeping with the character of the area. Screening shall
meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor
vehicles is prohibited except in those districts where specified as an autormobile wrecking
yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter
18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile
wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor
vehicles be stored in a critical area.
8.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
9.) Residential developers and individlibuilders shall be required to preserve shoe
vegetation and reduce the associated risk of erosion during construction and any future
activity which may impact the stability of the shoreline.
10.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
11.) Minimum setback from Quarry Road right-of-way shall be 20 feet. Minimum side yard
setbacks shall be 5 feet. Minimum shoreline setback per the submitted site plan is 205
feet to the foundation addition.
12.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
13.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
14.) The building height is not to exceed 35 feet.
��¢SON ca�� JEFFERSc COUNTY 0
A ,� DEPARTMENT OF COMMUNITY DEVELOPMENT
)' 'N "N 621 Sheridan Street • Port Townsend •Washington 98368 JAN 2 4 2008
360/379-4450 • 360/379-4451 Fax
I c5 www.co.jefferson.wa.us/commdevelopment
HrN d ..,li u `,1r t�b..
Master Permit Application MLA: c)g- tta'7
Project Description (include separate sheets as necessary):
HOME JAM i11uN
Tax Parcel Property
Number: 9-'i1 SU 2 Size: -��
d0'i /2.Glick, S l= (acres/square feet)
Site Address and/or Directions to Property: S lc? SS's ,� � 5�,u ftt QaK Bccy 1 �" Okyy�rolA
Y
41 C.,)Lk A.UN f:U RI) PV MT uAc 1 r J, L'J , 9 9.3 ID �`�'
Property Ow er(s)of Record: SuHK P`UWDL BLit11tE 14UE F RIaSN Hu>3hti1 4 iNtFE�
Telephone: `i D) 43.7 `�C7 5 0) Fax: email: �c;�nrsJ t'uttl M 0 3L�( .f ',vt
Mailing Address: 4[ U 1 k8( `( C11) PT L[Al)LU ) IOA , y J' IoS
Applicant/Agent(if different from owner): !J/A
Telephone: 1\1 l k Fax: M/ \ email: N /A
Mailing Address: N /A
What kind of Permit?(Check each box that applies
❑Building 0 Variance (Minor, Major or Reasonable Economic Use)
0 Demolition Permit 0 Conditional Use[C(a), C(d),or C]**
a Single Family 0 Garage Attached/Detached 0 Discretionary"D"or Unnamed Use Classification
0 Manufactured Home 0 Modular 0 Special Use(Essential Public Facilities)**
0 Commercial* ❑ Boundary Line Adjustment
❑ Change of Use 0 Short Plat**
❑ Address ❑ Road Approach ❑ Binding Site Plan**
❑ Home Business ❑ Cottagelndustry 0 Long Plat**
❑ Propane 0 Planned Rural Residential Development(PRRD)/Amendments**
❑ Sign 0 Plat Vacation/Alteration**
❑Allowed "Yes"Use Consistency Analysis a Shoreline Master Program Exemption/Permit Revisions**
❑ Stormwater Management 0 Shoreline Management Substantial Development**
❑ Site Plan Approval Advance Determination (SPAAD)* 0 Shoreline Management Variance
❑ Temporary Use 0 Comprehensive Plan/UDC/Land Use District Map Amendment
❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium ❑ Tree Vegetaion Request
*May require a Pre—Application Conference **Requires a Pre-Application Conference
Please identify any other local, state or federal permits required for this proposal, if known:
3� . tD� DESIGNATION OF AGENT
I hereby designate to act as my agent i matters relating to this application for permit(s).
OWNER SIGNATUR ''Li: 6 l I U+ - 10 Date: 1 -2 .L)
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his, her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application
review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the
time of the ap ti n ear wants prior n e. ,, �J t
Signature: Nc� G� 14. ; V2 _` Date: l 2 "(L )
The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you are in with the Jefferson County development coce.The Applicant acknowledges that he,she or it holds individual
and non-transfera rs sipilit .or adheri? 7t. 4_L
and complying with e ESA. Tie plicant as read this disclaimer and signs and dates it below.
Signature. u1� .t�:7tiA Date: I' 23_VO
G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc
BUILDER STATEMENT•
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be ass in spons. ility of the General Contractor for e prop sed project.
Signatur . � � !�i ` t'ik 1. t -
l �l ate i-2. 'l.1
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: Fax:
( ) ( )
MAILING ADDRESS: EMAIL:
CONTRACTOR'S LICENSE WAINS
NUMBER: NUMBER
ARCHITECT/ENGINEER: PHONE ( ) FAX: ( )
MAILING ADDRESS: EMAIL
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
0 New X. Wood Existing: Z ❑ Sewer
lit Addition ❑ Steel Proposed: i Bank ❑ Community System
❑ Alteration/Remodel ❑ Concrete Total: 3 Height: Individual System
CI Repair ❑ Masonry SEP Permit# 5cfSEE' Z- j
❑ Demolition ❑ Other: Bedrooms: Water Supply:
Existing: 3 Setback: I( Private well 0 Two Party
Type of Heat: Proposed: ' ❑ Public
r`L EO-Zt lr Total: 3 215 Name of System:
If this is a Commercial Protect you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed ,
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
I Underground Tank I Above ground Tank Size of Propane Tank: JAN R 4 2008
I Heat Stove i Cook Stove I Woodstove i Fireplace Insert I Hot Water Tank 1 Pellet Stove I Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines, tank location and size, distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage Current Proposed .For.`Office UseOnly;,.z.: '. _ **,.
Main Floor Heated EH BId App Review:
i33 t= 44 du,14 b. tip
2nd Floor Heated t � Consistency Review:
Other Heated Base fee: R50. -15
Mezzanine
, S 0,11.- .,Zxrni 3 b7.a0
Heated Basement nL s� Plan Check fee: (0o4.
O4. Q
LA 30 rii3 5a (p q -1
Unheated Basement State Surcharge fee: /I 5
Other Unheated Pot Water Review fee: `�
c&hw�SPIi(,E I i 9 a, t4a; —__---
Garage/Carport SUBTOTAL
552 a 134.a4-
Decks (.EW.)1/E ,, .1 911/Rd Approach fee: —____, —
�'(t5i. iJECK � u1L11113'43 ��7L ‘"�' %, L tits‘
Other TOTAL: $ a 134 a4
Receipt Number: ci 5 13
Cash/Check Number: ,1 15
ESTIMATED COST(REQUIRED) C'Dirli,14,4Clate: �-{ ,b g•Fair market value of all labor and materials founi
65/000 ct� -= Initials:
G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc
! . 3
• •REcEivED
$°NcIfIo
%, JEFFERSON COUNTY JAN 2 4 2008
kg. :._ DEPARTMENT OF COMMUNITY DEVELOPMENT CC D n�t
621 SheridanfIEnIJ91 � Uidll
mum
\LN,,, � ,� Street • Port Townsend •Washington 98368 CO
C? 360/379-4450 . 360/379-4451 Fax
NC' http://www.co.jefferson.wa.us/commdevelopment/
-41141_STORMWATER SITE PLAN SUBMITTAL TEMPLATE
MLA# QQ'. Z7 PROJECT/APPLICANT NAME: .TOIAN lutOL.
Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the
applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a
separate stormwater site plan map.
Project Overview
1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the
site map.
CD ,TUf.T A 443 SF NM'Ti()0 1,6tT-1 A Z-06 sF Cove& o
17E(ts TO No EXt St no C1 -.E(3li)cpCE
Existing Conditions Summary
2. Describe the existing topography. Indicate contours on the site map.
5Lo is TOeDGy2Pcft4 Y f-"2oM A 0,0 ELEVATION PST SHOCELIOL:
"CU a AD,O. ELEvRT too /iT Tit E - OuSE ( Mfr- RN z5O` efts-T.‘?
' SZ_ofPtUCx To A 30,0 EL-aimS(01.) ao l PcT e)(1E OF fiWE'RT
3. Describe the existing vegetation. Indicate native vegetation areas on the site map.
t,OT vi SOUT N k'O i6U"/cv vF wEST eo AN A► .te% .AQt= CUvE1Q.Eh IA)rr14
!' M'LC /kL R_, R- 'Do UC1LR C1� /5 Y) Rego (._60frR . AinvT 1ow41...
` C,2u u)) CovHe lot LutL s OREC--,o3 e)tikeE Pr JO FRWS
4. Describe the existing soils. Indicate soil type on the site map.
if sU iL I S MOST L.`( S ik t.7a`( I,OArfA hiv) PLe ME Asu. SOIL
PER Rt roe 'N1r i ci a1) PjRLYsi
5. Describe the existing site hydrology(i.e., drainage; behavior of water on the site—above, below, and on the ground). Indicate
existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if
applicable,and indicate acreage of each.
T kE £UtL ' tfritu5 VPYLY LAJ LL IA) IT (4 tUb STf}t\). i1J(1 GoPt'R'lk
APPROVED
6. Describe any excess levels of noise generated by the proposed use or activity: STORM WATER PLAN
J,stiL.`( NKIAI .L Not Se °C..0(AR 1L) 1 & ik 61 Covsi-KLACTot)
APR 2 5 2008
1
Stormwat'r i If w tS 1EFFER CO TY
Required lit _I 1. DEPT.OF cq Y D V .LO MET
SIGNATURV
stormwater site plan template—rev.10/1/2003 4111115
• •
7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams,
steep slopes,etc.)on the site. Indicate location on the site map.
T HE NtDPe&T`( SLoQI S 1AP C'Pory T1iE vVk1m To A EtxVRT(o?J
of 40.0 F E T 6010 t=r' -c (wrath, 2_49o`) Pitvo "rt-i i S uvee5 "hvwu
al //T tc),) OP 30,0 eitc,-r6p ) E000
8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads, and sensitive/critical areas
(streams,wetlands,lakes,steep slopes,etc.).
T 4 C- 120 Pf^kT`( 4s LocP Ot-s T 1-re Sot c (t L=ksT Coc.tJ02 CA",- MST S MRTS
` hY isoJo is Si,otrLD wo o -} Nott—►t SukkrN "RN 1-kuAES t.o1r 11
VA4,-RpT LW() kd\Jn &toR-,RR`( \2DKIP TU "T4i C-ks-r
Permanent Stormwater Control Plan
This portion of the Stormwater Site Plan consists of the selection and installation.of the appropriate stormwater control BMPs
and facilities to remain in place after construction of the project is completed.
"Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious
surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control
facilities are not exceeded.
g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30
in the Manual)or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas
within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities.
ALL STDZ/v0wPTt . LotLL C2)C EALLY 715vFYpsL1l) IIJ TaE tVq--Tu1 A/
VEG TM iOtJ
10. If the project requires the use of stormwater treatment facilities,describe the types of stthri r e ment'faditit; l roposed
for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is
normally for"large"projects or projects that involve the potential for dispersion of contaminants
.
DAl COUNTY DUD
11. Describe the performance goals and standards applicable to the project.
pc) Jai Ivc V -.c�(\ io 3 w(L.L )tsTIAKo y3 400 010LY
Mi of iu(Rkt_ SOIL 1) s-c u\Wro3LE CL kvo t))
12. Describe the flow control system. •
iJ L 9T10(. rt_u605 Iry (t_L, gE RFi=LC.TC-r . 5TO(le itiUA-Tt
) L i TVSQ zSE T k-M J%L UP�-ETA-T/00
` •
.
stormwater site pltmi template.-rev.i0/1'/2603 6
• •
RECEIVED
13. Describe the water quality system.
jA JAN 2 4 2008
J{FFE SON CfNil OCR
14. Describe the conveyance system analysis and design.
'1- OSt To ENcv e c Ejk 1ST ItJ() T)oU) )S€vU T S ikT t{'E NftTiA142
VECle►R-c IOK) -10m-c-qkTkok1 ` -aek3CtiE.
15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material.
1JO SILL (:Q A\YLtO
16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the
Uniform Building Code.
FU1.liv9l-T1ut-3 w\LL ?a1 S&ND tANVVO 5LPi ' cOat(f\-LL1
w to S',LD Co d tct, UJ
17. Describe the proposed surfacing material.
18. Describe methods for restoration of the site.
N i
19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for
"large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals
here.
20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan.
21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include
conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or
restrictions here.
t•)11ELi)
stormwater site plan template—rev.10/1/2003 7
• •
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP)
The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the
template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for
preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater
Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential
development.
SECTION I—CONSTRUCTION SWPPP NARRATIVE
1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or
will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable
to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page
2-15).
12 Required Elements—Construction SWPPP
1. Mark Clearing Limits. EC -1-1VD�
No GLEy���I", RL Ctrut�tr\n .� 1L Jl�r Jul
JAN 2 4 2008
2. Establish Construction Access.
tE'k -tt0 C- Wit.1Vt wa-‘( 1S IL) PLk(,t_= fEFFE.RSii COHNIY DCD
3. Control Flow Rates.
-DitZFt tN)S i iUAy ftLLY T v 1 tc i,J6Y1 by �ItL1 S
Tv "NA' /may S` oktAwRt RtAvcr-r=
4. Install Sediment Controls.
m2z c i-t ie 5 mom✓) t ' A-c gt:n Item
5. Stabilize Soils.
6 1( Clf\t 5 ,Ns rE v.iva -I) TO P if Ec.-r c rzvlik ui,couo
6. Protect Slopes.
t.0 aS� S Lc) 15 i 9) F-Vz Ld ATra . ALL OT 2 /e- -S
M2 FL 11-i r -DaotttK 01+12 t*kr PtA Pe(4 IA ue r/)
7. Protect Drain Inlets.
T Itt�l2 NeE fJo A-10 i tiLt'1 S ri Uw\ Am . c-t'LI re--) t5
stormwater site plan template—rev.10/1/2003 8
RECEIVED•
12 Required Elements—Construction SWPPP(continued) JAN 2 4 2008
8. Stabilize Channels and Outlets.
jEFFEETIE011iiii BCD
9. Control Pollutants.
S'Vtt_l VAT TO 6E UN S To CO ECi QaLLL&T(-►.)t
10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site).
NJ A-
11. Maintain Best Management Practices(BMPs).
C.v TU R_ FVU iD Su b C 00 1-R1'rC.\ U 4-S (.t_C. vo)L km-IF I t o
v N S k i C 9C�U i�� S 'f PRA LT(CL
12. Manage the Project.
1 6� lv\' e)00LARA CopTrZKCT7vc LJ\LL y 0t3 CkTE
Tr) eoloJZCE TRe Y3)vW'
2. Adjacent Areas.
a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential
areas, roads).
i tre Si'1 L ANt,5 k c)C Tliz S(TI NRLE kES 1.0 3 to
�l(PAC- \/ c tWr tct3 7 TO Tt+E i=A 3 T ;j- J D PANT S MA-TS \S
Tv TIfE K
b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400
yards).
I&e o 2O() io Rik"( 5 ANci5 Rt
3. Environmentally Sensitive Areas.
a. Description of environmentally sensitive areas that are on or adjacent to the site.
tAkTS Ears tet-y t$ I'Pi(?O ZOOr To -cite weir
--' . PPv PO ED pro o 'i(d(L)
stormwater site plan template—rev.1 CV1/2003 9
• •
b. Description of special requirements for working in or near environmentally sensitive areas.
4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site
soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure).
NONE' Zoatst-e i . 5 it (3 1ZY k10
SLNf3 w(LL f3i O&3 c-AA-1Lc. lA)iT11 $trLCQL1
FOukLlom I0N
5. Construction Phasing.
a. Construction sequence
stTe r'( t3, FoUNopi-T ioNa C=VmIAIN(7 ►20OF(k.)6) ) 10 1O12 Fiulsw
b. Construction phasing(if proposed)
IQ IA,
6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual).
Provide a proposed construction schedule.
t3l=CIIP IAMIC It 1j ( k UR_ Af'P.IL
II. Wet Season Construction Activities.
a. Proposed wet season construction activities.
No5s\\eLC FoukJ tht-T iO j wc)\RK RIJo '6ASeMex� �RR�I Icy
b. Proposed wet season construction activities for environmentally sensitive areas.
K VA
7. Financial/Ownership Responsibilities.
a. Identify the property owner responsible for the initiation of bonds and/or other financial securities.
JO ) hit) WO we VW" USt-)
b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation
impacts.
PEPsOU.lt(r IRE-WOK)Sk&LIT Y
8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. N/A
a. Sediment Ponds/Traps. /'�
b. Diversions.
c. Waterways.
d. Runoff/Stormwater Detention Calculations
JAN 2 4 2008
JEFFEt91J D [ N'y [)CD
stormwater site plan template—rev.10/1/2003 10
• •
Stormwater Site Plan Changes
If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be
submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised
drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change.
Final Corrected Plan Submittal
If the project included construction of conveyance systems,treatment facilities,flow control facilities, or structural source control BMPs
(not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is
completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as
constructed.
APPLICANT SIGNATURE
By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and
correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all
owners of t affecte operty.
u4e, i-24 08
(LAN NER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE)
THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED:
RECEIVED
JAN242006
IL CDiJs�JyDCD
stormwater site plan template—rev.10/1/2003 12
>W $ ` `,\ \. I
• I I I —r------,--- AN tu. za ...., 1 1 ! NW ' ' all
x.,,, _ -, ki,R111,1.*11111,144,.,\!\1\\1111.E • IP_,. ', ... -el= . IIII
1 , • . . ikrir 0 _,.....,„,„,......—K71,.......„,„0, .._ \ . 1 ity,..„.
i !. ; , , , . 1 itfroK--.""--\,, \ ! \ ivy; , , -,..*.. ..enk, :_.. , _ ,-_,
• --- -- --+ \ I 1 \' r - ' V
i I" II ,�i �� l 1 ilk !.., It I
1 likkj, /. ' I i \ `�� 1
iCl1 % 1II i I , ! U
,,.........6.. . ,
. ,
I I I j am— ( , _____., r�� ` �T—. \I-,,,,,. . „, , : \� i I I ■ z 1
! I I I_ �. i • ` ,� 11 �� Q 3
i � Jt � ; I
. , ' , 3
I i 1 i7 --- I I .... 2 I - —_ 1 _ ■ Z
T ---1
+' V
1 I 1 1 0 1\ ''`Y' ai \� 1 1 I 1
--Q P . .-- - - . .& -- ---- IME W p
1
�._ � I � i � I 1 liJ
r i
1 i
- Z i r `
J �
i 34n '' ' 0 U: v . tiW A 2,FL\ I X R i W 2
i Cr
66
4 , „cc ¶: iI
a.i
rh . H____r__,. .. .._._..h._ ............__ _Q*._ 1 _i_ .._uo:, 1,. . , . t
ft4)4.,, ,..4,,4,.\.. \• \\ g_i_' __r_• !-,4 . • , , •
g3t-Fn 1 4-: • `J';
: . r---7--- "-- —7.—f 7 1--:'1.1-,-\jj r„
,4,1 — z cc'`j ' - . BA...Nivilk ._____-_
' I •! 1 ._ 1 , _4"'•' `nib $I __ 1 I 4 �O
I I ;Ld 1 j. i I j i ah
kaiti.t:k 11qt6N i,„ I • �_
I IArlili.._ ;"'1/4u1116. , , :. 1 .
I
, .I ' i , 7_ ..:. ._ _., _, i , 1 t" 1 ar
,i, , ___,t_.,_, ....„ _lik,,,ct\
' 1 2
1 'OMEN
I
I .
. Q
er _. -
NI\ i, - - - I A:JMPJ
- -
LIJ
Z I I
-, _
1 . frz '2, 1-I./ C/i.jfi. , \ 4 Ct: ; 1 0 17 b
, ; . , 1 v)- - I w . I . . •iN\IN. 4117 ' '1. U1 P Z dlt vl .4t
1 1 I 1 1 I
I --T
•
j i j 1 I; + I , - —, — I -- j 1
Ic- •
i ; �— 1 I �T I -
tn
I i r
_TT i CO
_
_ I
01
I
. • r1.,4 41E_ i d _ . r •
jI
•
. . f I l I 1 w
, i, I I, .. . ,, ,1 \ 1 (IA.& 9
z 1 i C�
1 I.'11 \'. \' I 1 1
i tJQ - I —. _ ! y 7
,
•
1 Cr _ -- - �- 1 _ rili 1.
Q _�
�i I I ...I
fuiJ
11 N
I I 1 1 10 • 1 I ��,; - \I i I + I I rJ In
r . ce
• I j--- - --.0-- 1,1 —, .. 1 I ' i; il ii I \ i 1 Lam` a c�
I I a GI
I i 1 : ' lk . • ''•-- n ' -1 \i'N ' . :lei \II
: 1 ,_____:. _ .. , __,_, __14,.____ ' _ . I--
\ I I �I I i i I—
Q AQO `� z v'4 • / %D/ I Ili we
�, O
QQ. =
' ire► _ --II
' i
a
1 II
IE. .G. ' . .
1 2:1_u
'
1
I A
II
i lil
i'
ii
i► iI /.,.1. N m 1 e. I I I i p rrr wA N w7rp!Fr i I--- -a-wAn . 1 D N p
I. -,-, A
EX.STEPS V
101
, I
' IX 1E1 '09M
�`- pr
10'-0"x 10'4" ,i I
$p / /AT/ 7 4 e:00 -2
/II .ivny-Tpr
OP
All 00
IAligiliFihge> IVPPI2F110
al
I/ .A : RlkwA'd...AAA I I9'_11„x4,_11„ I - � Ix�,_��, , _
idro . _ AL._-- I■I II ,ICII /: I � I
IA- -�-_ II -ir AEX.STEP`� �� � �� �
VI/A,, 1
4ArMir POI 1 47 P—IIM 661
Ippor ghl
6�_�„x4�_5,� 101 , Yr�� _
�01,rwirLT III J ENTRY
8'-0"x 13,_0„
c � I:I_'dJ1J
2'-4"x 1. -4"
0?
i v
LINE OF EXISTING 111111
• BtiILDING 0I VAULT
LIVING
12'-4"x 1T_11" A4„t_pr.....]
11
VAULT
DINING
12'-4"x 10'-0"
IIIIIiiIIII ■ ■
PROPOSED 1ST FLOOR PLAN Scale 3/16"= r-o"
r
EXISTING=832 SQ.FT.
• PROPOSED HEATED BASEMENT=312 SQ.FT.
PROPOSED HEATED 1ST FLOOR=312 SQ.FT.
PROPOSED COVERED DECK=208 SQ.FT.
PROPOSED UNCOVERED DECK=220 SQ.FT.
C) d
co c'
Co
z
Q
44 G� L1
.14C Co
7 w
rg '_+._
W
.'--7
E - S G r • i
I
/
I
X L E I 9'-1"x 4'-9"
15'-7"x 10'-4" / .X. i AT 1
5'-11"x 6'-7"
P
II
"111
r
li
/ IT► /I 0 /// 1/ w —11
ill
/ I\ / /LA II-
PROPOSED
STORAGE
/ . S N G
fp LINE OF EXISTING I / P f I
BUILDING
z
O
H PROPOSED LIVING
A
A
A
W
C �-
O
a
O
g ( .
I
a
I
•
LINE OF PROPOSED DECK ABV
■ ■ ■
PROPOSED BASEMENT PLAN Scale 3/16"= 1'-0"
r
S