Loading...
HomeMy WebLinkAboutBLD2008-00029 Jefferson County Building Dillon Permit Numb BLD08-00029 Applicant: RUIDL BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks Erosion Control Foundation Footing Footing Drains Foundation Stem Wall Underground Plumbing Straps(hold downs) Ext. Shear Wall Nailing Rough-in Plumbing Framing Airseal Insulation:Walls Insulation:Floors Insulation:Ceiling Int. Shear Wall Nailing Wallboard Nailing Gas Line: Interior Gas Line: Exterior Propane Tank Heat/Chimney Clearance Drywell/Alt Drainage SEE CONDITION I FOR SPLASHBLOCK DESIGN CRITERIA Address Posted FINAL INSPECTION FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • • CONDITIONS for Building Permit# :BLD08-00029 1.) SPLASHBLOCK DESIGN CRITERIA A VEGETATED FLOWPATH OF AT LEAST 50 FEET SHOULD BE MAINTAINED BETWEEN THE DISCHARGE POINT AND ANY PROPERTY LINE, STRUCTURE, STEEP SLOPE, STREAM, WETLAND, LAKE OR OTHER IMPERVIOUS SURFACE. SENSITIVE AREAS BUFFERS MAY COUNT TOWARD FLOWPATH LENGTHS. A MAXIMUM OF 700 SQUARE FEET OF ROOF AREA MAY DRAIN TO EACH SPLASHBLOCK. A SPLASHBLOCK OR A PAD OF CRUSHED ROCK (2 FEET WIDE BY 3 FEET LONG BY 6 INCHES DEEP) SHOULD BE PLACED AT EACH DOWNSPOUT DISCHARGE POINT. NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT. FOR SITES WITH SEPTIC SYSTEMS, THE DISCHARGE POINT MUST BE DOWNSLOPE OF THE PRIMARY AND RESERVE DRAINFIELD AREAS. 2.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 3.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 4.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements#1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 5.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 6.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 7.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an autormobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area. 8.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 9.) Residential developers and individlibuilders shall be required to preserve shoe vegetation and reduce the associated risk of erosion during construction and any future activity which may impact the stability of the shoreline. 10.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 11.) Minimum setback from Quarry Road right-of-way shall be 20 feet. Minimum side yard setbacks shall be 5 feet. Minimum shoreline setback per the submitted site plan is 205 feet to the foundation addition. 12.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 13.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 14.) The building height is not to exceed 35 feet. ��¢SON ca�� JEFFERSc COUNTY 0 A ,� DEPARTMENT OF COMMUNITY DEVELOPMENT )' 'N "N 621 Sheridan Street • Port Townsend •Washington 98368 JAN 2 4 2008 360/379-4450 • 360/379-4451 Fax I c5 www.co.jefferson.wa.us/commdevelopment HrN d ..,li u `,1r t�b.. Master Permit Application MLA: c)g- tta'7 Project Description (include separate sheets as necessary): HOME JAM i11uN Tax Parcel Property Number: 9-'i1 SU 2 Size: -�� d0'i /2.Glick, S l= (acres/square feet) Site Address and/or Directions to Property: S lc? SS's ,� � 5�,u ftt QaK Bccy 1 �" Okyy�rolA Y 41 C.,)Lk A.UN f:U RI) PV MT uAc 1 r J, L'J , 9 9.3 ID �`�' Property Ow er(s)of Record: SuHK P`UWDL BLit11tE 14UE F RIaSN Hu>3hti1 4 iNtFE� Telephone: `i D) 43.7 `�C7 5 0) Fax: email: �c;�nrsJ t'uttl M 0 3L�( .f ',vt Mailing Address: 4[ U 1 k8( `( C11) PT L[Al)LU ) IOA , y J' IoS Applicant/Agent(if different from owner): !J/A Telephone: 1\1 l k Fax: M/ \ email: N /A Mailing Address: N /A What kind of Permit?(Check each box that applies ❑Building 0 Variance (Minor, Major or Reasonable Economic Use) 0 Demolition Permit 0 Conditional Use[C(a), C(d),or C]** a Single Family 0 Garage Attached/Detached 0 Discretionary"D"or Unnamed Use Classification 0 Manufactured Home 0 Modular 0 Special Use(Essential Public Facilities)** 0 Commercial* ❑ Boundary Line Adjustment ❑ Change of Use 0 Short Plat** ❑ Address ❑ Road Approach ❑ Binding Site Plan** ❑ Home Business ❑ Cottagelndustry 0 Long Plat** ❑ Propane 0 Planned Rural Residential Development(PRRD)/Amendments** ❑ Sign 0 Plat Vacation/Alteration** ❑Allowed "Yes"Use Consistency Analysis a Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management 0 Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination (SPAAD)* 0 Shoreline Management Variance ❑ Temporary Use 0 Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium ❑ Tree Vegetaion Request *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: 3� . tD� DESIGNATION OF AGENT I hereby designate to act as my agent i matters relating to this application for permit(s). OWNER SIGNATUR ''Li: 6 l I U+ - 10 Date: 1 -2 .L) By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his, her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the ap ti n ear wants prior n e. ,, �J t Signature: Nc� G� 14. ; V2 _` Date: l 2 "(L ) The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in with the Jefferson County development coce.The Applicant acknowledges that he,she or it holds individual and non-transfera rs sipilit .or adheri? 7t. 4_L and complying with e ESA. Tie plicant as read this disclaimer and signs and dates it below. Signature. u1� .t�:7tiA Date: I' 23_VO G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc BUILDER STATEMENT• The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be ass in spons. ility of the General Contractor for e prop sed project. Signatur . � � !�i ` t'ik 1. t - l �l ate i-2. 'l.1 GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: Fax: ( ) ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX: ( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: 0 New X. Wood Existing: Z ❑ Sewer lit Addition ❑ Steel Proposed: i Bank ❑ Community System ❑ Alteration/Remodel ❑ Concrete Total: 3 Height: Individual System CI Repair ❑ Masonry SEP Permit# 5cfSEE' Z- j ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: 3 Setback: I( Private well 0 Two Party Type of Heat: Proposed: ' ❑ Public r`L EO-Zt lr Total: 3 215 Name of System: If this is a Commercial Protect you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed , IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: I Underground Tank I Above ground Tank Size of Propane Tank: JAN R 4 2008 I Heat Stove i Cook Stove I Woodstove i Fireplace Insert I Hot Water Tank 1 Pellet Stove I Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size, distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage Current Proposed .For.`Office UseOnly;,.z.: '. _ **,. Main Floor Heated EH BId App Review: i33 t= 44 du,14 b. tip 2nd Floor Heated t � Consistency Review: Other Heated Base fee: R50. -15 Mezzanine , S 0,11.- .,Zxrni 3 b7.a0 Heated Basement nL s� Plan Check fee: (0o4. O4. Q LA 30 rii3 5a (p q -1 Unheated Basement State Surcharge fee: /I 5 Other Unheated Pot Water Review fee: `� c&hw�SPIi(,E I i 9 a, t4a; —__--- Garage/Carport SUBTOTAL 552 a 134.a4- Decks (.EW.)1/E ,, .1 911/Rd Approach fee: —____, — �'(t5i. iJECK � u1L11113'43 ��7L ‘"�' %, L tits‘ Other TOTAL: $ a 134 a4 Receipt Number: ci 5 13 Cash/Check Number: ,1 15 ESTIMATED COST(REQUIRED) C'Dirli,14,4Clate: �-{ ,b g•Fair market value of all labor and materials founi 65/000 ct� -= Initials: G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc ! . 3 • •REcEivED $°NcIfIo %, JEFFERSON COUNTY JAN 2 4 2008 kg. :._ DEPARTMENT OF COMMUNITY DEVELOPMENT CC D n�t 621 SheridanfIEnIJ91 � Uidll mum \LN,,, � ,� Street • Port Townsend •Washington 98368 CO C? 360/379-4450 . 360/379-4451 Fax NC' http://www.co.jefferson.wa.us/commdevelopment/ -41141_STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# QQ'. Z7 PROJECT/APPLICANT NAME: .TOIAN lutOL. Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. CD ,TUf.T A 443 SF NM'Ti()0 1,6tT-1 A Z-06 sF Cove& o 17E(ts TO No EXt St no C1 -.E(3li)cpCE Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. 5Lo is TOeDGy2Pcft4 Y f-"2oM A 0,0 ELEVATION PST SHOCELIOL: "CU a AD,O. ELEvRT too /iT Tit E - OuSE ( Mfr- RN z5O` efts-T.‘? ' SZ_ofPtUCx To A 30,0 EL-aimS(01.) ao l PcT e)(1E OF fiWE'RT 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. t,OT vi SOUT N k'O i6U"/cv vF wEST eo AN A► .te% .AQt= CUvE1Q.Eh IA)rr14 !' M'LC /kL R_, R- 'Do UC1LR C1� /5 Y) Rego (._60frR . AinvT 1ow41... ` C,2u u)) CovHe lot LutL s OREC--,o3 e)tikeE Pr JO FRWS 4. Describe the existing soils. Indicate soil type on the site map. if sU iL I S MOST L.`( S ik t.7a`( I,OArfA hiv) PLe ME Asu. SOIL PER Rt roe 'N1r i ci a1) PjRLYsi 5. Describe the existing site hydrology(i.e., drainage; behavior of water on the site—above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. T kE £UtL ' tfritu5 VPYLY LAJ LL IA) IT (4 tUb STf}t\). i1J(1 GoPt'R'lk APPROVED 6. Describe any excess levels of noise generated by the proposed use or activity: STORM WATER PLAN J,stiL.`( NKIAI .L Not Se °C..0(AR 1L) 1 & ik 61 Covsi-KLACTot) APR 2 5 2008 1 Stormwat'r i If w tS 1EFFER CO TY Required lit _I 1. DEPT.OF cq Y D V .LO MET SIGNATURV stormwater site plan template—rev.10/1/2003 4111115 • • 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the site. Indicate location on the site map. T HE NtDPe&T`( SLoQI S 1AP C'Pory T1iE vVk1m To A EtxVRT(o?J of 40.0 F E T 6010 t=r' -c (wrath, 2_49o`) Pitvo "rt-i i S uvee5 "hvwu al //T tc),) OP 30,0 eitc,-r6p ) E000 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads, and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.). T 4 C- 120 Pf^kT`( 4s LocP Ot-s T 1-re Sot c (t L=ksT Coc.tJ02 CA",- MST S MRTS ` hY isoJo is Si,otrLD wo o -} Nott—►t SukkrN "RN 1-kuAES t.o1r 11 VA4,-RpT LW() kd\Jn &toR-,RR`( \2DKIP TU "T4i C-ks-r Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation.of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30 in the Manual)or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. ALL STDZ/v0wPTt . LotLL C2)C EALLY 715vFYpsL1l) IIJ TaE tVq--Tu1 A/ VEG TM iOtJ 10. If the project requires the use of stormwater treatment facilities,describe the types of stthri r e ment'faditit; l roposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for"large"projects or projects that involve the potential for dispersion of contaminants . DAl COUNTY DUD 11. Describe the performance goals and standards applicable to the project. pc) Jai Ivc V -.c�(\ io 3 w(L.L )tsTIAKo y3 400 010LY Mi of iu(Rkt_ SOIL 1) s-c u\Wro3LE CL kvo t)) 12. Describe the flow control system. • iJ L 9T10(. rt_u605 Iry (t_L, gE RFi=LC.TC-r . 5TO(le itiUA-Tt ) L i TVSQ zSE T k-M J%L UP�-ETA-T/00 ` • . stormwater site pltmi template.-rev.i0/1'/2603 6 • • RECEIVED 13. Describe the water quality system. jA JAN 2 4 2008 J{FFE SON CfNil OCR 14. Describe the conveyance system analysis and design. '1- OSt To ENcv e c Ejk 1ST ItJ() T)oU) )S€vU T S ikT t{'E NftTiA142 VECle►R-c IOK) -10m-c-qkTkok1 ` -aek3CtiE. 15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material. 1JO SILL (:Q A\YLtO 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. FU1.liv9l-T1ut-3 w\LL ?a1 S&ND tANVVO 5LPi ' cOat(f\-LL1 w to S',LD Co d tct, UJ 17. Describe the proposed surfacing material. 18. Describe methods for restoration of the site. N i 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. t•)11ELi) stormwater site plan template—rev.10/1/2003 7 • • CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. EC -1-1VD� No GLEy���I", RL Ctrut�tr\n .� 1L Jl�r Jul JAN 2 4 2008 2. Establish Construction Access. tE'k -tt0 C- Wit.1Vt wa-‘( 1S IL) PLk(,t_= fEFFE.RSii COHNIY DCD 3. Control Flow Rates. -DitZFt tN)S i iUAy ftLLY T v 1 tc i,J6Y1 by �ItL1 S Tv "NA' /may S` oktAwRt RtAvcr-r= 4. Install Sediment Controls. m2z c i-t ie 5 mom✓) t ' A-c gt:n Item 5. Stabilize Soils. 6 1( Clf\t 5 ,Ns rE v.iva -I) TO P if Ec.-r c rzvlik ui,couo 6. Protect Slopes. t.0 aS� S Lc) 15 i 9) F-Vz Ld ATra . ALL OT 2 /e- -S M2 FL 11-i r -DaotttK 01+12 t*kr PtA Pe(4 IA ue r/) 7. Protect Drain Inlets. T Itt�l2 NeE fJo A-10 i tiLt'1 S ri Uw\ Am . c-t'LI re--) t5 stormwater site plan template—rev.10/1/2003 8 RECEIVED• 12 Required Elements—Construction SWPPP(continued) JAN 2 4 2008 8. Stabilize Channels and Outlets. jEFFEETIE011iiii BCD 9. Control Pollutants. S'Vtt_l VAT TO 6E UN S To CO ECi QaLLL&T(-►.)t 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). NJ A- 11. Maintain Best Management Practices(BMPs). C.v TU R_ FVU iD Su b C 00 1-R1'rC.\ U 4-S (.t_C. vo)L km-IF I t o v N S k i C 9C�U i�� S 'f PRA LT(CL 12. Manage the Project. 1 6� lv\' e)00LARA CopTrZKCT7vc LJ\LL y 0t3 CkTE Tr) eoloJZCE TRe Y3)vW' 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). i tre Si'1 L ANt,5 k c)C Tliz S(TI NRLE kES 1.0 3 to �l(PAC- \/ c tWr tct3 7 TO Tt+E i=A 3 T ;j- J D PANT S MA-TS \S Tv TIfE K b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). I&e o 2O() io Rik"( 5 ANci5 Rt 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. tAkTS Ears tet-y t$ I'Pi(?O ZOOr To -cite weir --' . PPv PO ED pro o 'i(d(L) stormwater site plan template—rev.1 CV1/2003 9 • • b. Description of special requirements for working in or near environmentally sensitive areas. 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). NONE' Zoatst-e i . 5 it (3 1ZY k10 SLNf3 w(LL f3i O&3 c-AA-1Lc. lA)iT11 $trLCQL1 FOukLlom I0N 5. Construction Phasing. a. Construction sequence stTe r'( t3, FoUNopi-T ioNa C=VmIAIN(7 ►20OF(k.)6) ) 10 1O12 Fiulsw b. Construction phasing(if proposed) IQ IA, 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). Provide a proposed construction schedule. t3l=CIIP IAMIC It 1j ( k UR_ Af'P.IL II. Wet Season Construction Activities. a. Proposed wet season construction activities. No5s\\eLC FoukJ tht-T iO j wc)\RK RIJo '6ASeMex� �RR�I Icy b. Proposed wet season construction activities for environmentally sensitive areas. K VA 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. JO ) hit) WO we VW" USt-) b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. PEPsOU.lt(r IRE-WOK)Sk&LIT Y 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. N/A a. Sediment Ponds/Traps. /'� b. Diversions. c. Waterways. d. Runoff/Stormwater Detention Calculations JAN 2 4 2008 JEFFEt91J D [ N'y [)CD stormwater site plan template—rev.10/1/2003 10 • • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of t affecte operty. u4e, i-24 08 (LAN NER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: RECEIVED JAN242006 IL CDiJs�JyDCD stormwater site plan template—rev.10/1/2003 12 >W $ ` `,\ \. I • I I I —r------,--- AN tu. za ...., 1 1 ! NW ' ' all x.,,, _ -, ki,R111,1.*11111,144,.,\!\1\\1111.E • IP_,. ', ... -el= . IIII 1 , • . . ikrir 0 _,.....,„,„,......—K71,.......„,„0, .._ \ . 1 ity,..„. i !. ; , , , . 1 itfroK--.""--\,, \ ! \ ivy; , , -,..*.. ..enk, :_.. , _ ,-_, • --- -- --+ \ I 1 \' r - ' V i I" II ,�i �� l 1 ilk !.., It I 1 likkj, /. ' I i \ `�� 1 iCl1 % 1II i I , ! U ,,.........6.. . , . , I I I j am— ( , _____., r�� ` �T—. \I-,,,,,. . „, , : \� i I I ■ z 1 ! I I I_ �. i • ` ,� 11 �� Q 3 i � Jt � ; I . , ' , 3 I i 1 i7 --- I I .... 2 I - —_ 1 _ ■ Z T ---1 +' V 1 I 1 1 0 1\ ''`Y' ai \� 1 1 I 1 --Q P . .-- - - . .& -- ---- IME W p 1 �._ � I � i � I 1 liJ r i 1 i - Z i r ` J � i 34n '' ' 0 U: v . tiW A 2,FL\ I X R i W 2 i Cr 66 4 , „cc ¶: iI a.i rh . H____r__,. .. .._._..h._ ............__ _Q*._ 1 _i_ .._uo:, 1,. . , . t ft4)4.,, ,..4,,4,.\.. \• \\ g_i_' __r_• !-,4 . • , , • g3t-Fn 1 4-: • `J'; : . r---7--- "-- —7.—f 7 1--:'1.1-,-\jj r„ ,4,1 — z cc'`j ' - . BA...Nivilk ._____-_ ' I •! 1 ._ 1 , _4"'•' `nib $I __ 1 I 4 �O I I ;Ld 1 j. i I j i ah kaiti.t:k 11qt6N i,„ I • �_ I IArlili.._ ;"'1/4u1116. , , :. 1 . I , .I ' i , 7_ ..:. ._ _., _, i , 1 t" 1 ar ,i, , ___,t_.,_, ....„ _lik,,,ct\ ' 1 2 1 'OMEN I I . . Q er _. - NI\ i, - - - I A:JMPJ - - LIJ Z I I -, _ 1 . frz '2, 1-I./ C/i.jfi. , \ 4 Ct: ; 1 0 17 b , ; . , 1 v)- - I w . I . . •iN\IN. 4117 ' '1. U1 P Z dlt vl .4t 1 1 I 1 1 I I --T • j i j 1 I; + I , - —, — I -- j 1 Ic- • i ; �— 1 I �T I - tn I i r _TT i CO _ _ I 01 I . • r1.,4 41E_ i d _ . r • jI • . . f I l I 1 w , i, I I, .. . ,, ,1 \ 1 (IA.& 9 z 1 i C� 1 I.'11 \'. \' I 1 1 i tJQ - I —. _ ! y 7 , • 1 Cr _ -- - �- 1 _ rili 1. Q _� �i I I ...I fuiJ 11 N I I 1 1 10 • 1 I ��,; - \I i I + I I rJ In r . ce • I j--- - --.0-- 1,1 —, .. 1 I ' i; il ii I \ i 1 Lam` a c� I I a GI I i 1 : ' lk . • ''•-- n ' -1 \i'N ' . :lei \II : 1 ,_____:. _ .. , __,_, __14,.____ ' _ . I-- \ I I �I I i i I— Q AQO `� z v'4 • / %D/ I Ili we �, O QQ. = ' ire► _ --II ' i a 1 II IE. .G. ' . . 1 2:1_u ' 1 I A II i lil i' ii i► iI /.,.1. N m 1 e. I I I i p rrr wA N w7rp!Fr i I--- -a-wAn . 1 D N p I. -,-, A EX.STEPS V 101 , I ' IX 1E1 '09M �`- pr 10'-0"x 10'4" ,i I $p / /AT/ 7 4 e:00 -2 /II .ivny-Tpr OP All 00 IAligiliFihge> IVPPI2F110 al I/ .A : RlkwA'd...AAA I I9'_11„x4,_11„ I - � Ix�,_��, , _ idro . _ AL._-- I■I II ,ICII /: I � I IA- -�-_ II -ir AEX.STEP`� �� � �� � VI/A,, 1 4ArMir POI 1 47 P—IIM 661 Ippor ghl 6�_�„x4�_5,� 101 , Yr�� _ �01,rwirLT III J ENTRY 8'-0"x 13,_0„ c � I:I_'dJ1J 2'-4"x 1. -4" 0? i v LINE OF EXISTING 111111 • BtiILDING 0I VAULT LIVING 12'-4"x 1T_11" A4„t_pr.....] 11 VAULT DINING 12'-4"x 10'-0" IIIIIiiIIII ■ ■ PROPOSED 1ST FLOOR PLAN Scale 3/16"= r-o" r EXISTING=832 SQ.FT. • PROPOSED HEATED BASEMENT=312 SQ.FT. PROPOSED HEATED 1ST FLOOR=312 SQ.FT. PROPOSED COVERED DECK=208 SQ.FT. PROPOSED UNCOVERED DECK=220 SQ.FT. C) d co c' Co z Q 44 G� L1 .14C Co 7 w rg '_+._ W .'--7 E - S G r • i I / I X L E I 9'-1"x 4'-9" 15'-7"x 10'-4" / .X. i AT 1 5'-11"x 6'-7" P II "111 r li / IT► /I 0 /// 1/ w —11 ill / I\ / /LA II- PROPOSED STORAGE / . S N G fp LINE OF EXISTING I / P f I BUILDING z O H PROPOSED LIVING A A A W C �- O a O g ( . I a I • LINE OF PROPOSED DECK ABV ■ ■ ■ PROPOSED BASEMENT PLAN Scale 3/16"= 1'-0" r S