HomeMy WebLinkAbout031014_ca05Department of Public Works O Consent Agenda Page 1 of 2 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director /County Engineer Agenda Date: March 10, 2014 Subject: Supplemental Consultant Agreement #2 with Exeltech Consulting, Inc. Queets Bridge Painting, CR1881 Co. Rd. No. 107508, M. P. 0.60 to M. P. 0.76 BHOS- 16WA(001) Statement of Issue: The issue is requesting execution of the Supplemental Consultant Agreement #2 with Exeltech Consulting, Inc. of Lacey, WA. for providing additional construction engineering administration support services for the Queets Bridge Painting, CR1881 project. Analysis /Strategic Goals /Pro's & Con's: This project consists of repainting the steel bridge girders and bracing members of the Queets Bridge. The work includes minor girder web bracing, abrasive blasting, treatment of pack rust, containment of wastes, and repainting with a primer and top coat paint system. Additional construction engineering administration support services are necessary due to project delays. This supplemental agreement will provide additional construction engineering administration support services by Exeltech Consulting, Inc., through the end of the construction engineering closeout phase. Fiscal Impact /Cost Benefit Analysis: The maximum amount payable for consultant services under this Supplemental Consultant Agreement #2 is $7,500.0 0. These consultant services will be eligible for reimbursement from the Federal Highway Administration, Bridge Rehabilitation Off System funding at the rate of 100%. Department of Public Works O Consent Agenda Page 2 of 2 Recommendation: The Board is asked to execute the three (3) originals of the Supplemental Consultant Agreement #2 with Exeltech Consulting, Inc., and return two (2) signed originals to Public Works (attn. John Wayand). Department Contact/: John Wayand, Project Manager, 385 -9377 Reviewed By: Philip Morley, County Ad in' trator Date The Local Agency of Jefferson County, Washinglon desires to supplement the agreement entered into with Exeltech Consulting Inc. and executed on April 1, 2013 and identified as Agreement No. Queets 2013 -1. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section II, SCOPE OF WORK, is hereby changed to read: As specified in Exhibit "B ". II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 31, 2014 III Section V, PAYMENT, shall be amended as follows: Original Agreement: $186.237.33 ( April 1. 2013) Supplemental Agreement #1: $42,522.34 (November 18, 2013) Supplemental Agreement #2: $7,500.00 (Requested) New Agreement Maximum Amount Payable: $236,259.67 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. Page 1 of 4 Revised 8/9/2013 Organization and Address Supplemental Agreement Number 2 Exeltech Consulting, Inc. 8729 Commerce Place Drive NE, Suite A acey, WA. 98516 60- 357 -8289 Agreement Number Queets 2013 -1 Project Number Execution Date Completion Date CR1881 December 31, 2014 Project Title New Maximum Amount Payable Queets Bridge Painting, Bridge No. 8W $236,259.67 Clearwater Road M.P. 0.60 to M.P. 0.76 Description of Work Provide additional Construction Engineering Administration support services for the closeout phase of the Queets Bridge Painting project. The Local Agency of Jefferson County, Washinglon desires to supplement the agreement entered into with Exeltech Consulting Inc. and executed on April 1, 2013 and identified as Agreement No. Queets 2013 -1. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section II, SCOPE OF WORK, is hereby changed to read: As specified in Exhibit "B ". II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 31, 2014 III Section V, PAYMENT, shall be amended as follows: Original Agreement: $186.237.33 ( April 1. 2013) Supplemental Agreement #1: $42,522.34 (November 18, 2013) Supplemental Agreement #2: $7,500.00 (Requested) New Agreement Maximum Amount Payable: $236,259.67 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. Page 1 of 4 Revised 8/9/2013 46 If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. Exeltech Consulting, Inc. Consultant Consu t' re /1Z slic I+ Date COUNTY OF JEFFERSON BOARD OF COMMISSIONERS John Austin, Chair Phil Johnson, Member David W. Sullivan, Member /11f roved as to f only: k'W' David Alvarez Date Deputy Prosecuting Attorney Mon ers, P.E. Date Public Works Director /County Engineer Page 2 of 4 Revised 8/9/2013 Exhibit "A" Summary of Payments Basic Agreement Supplement 01 Direct Salary Cost $169,787.73 $40,247.34 Direct Non -Salary Costs $16,449.60 $2,275.00 Total $186,237.33 $42,522.34 Page 3 of 4 Revised 8/9/2013 Supplement #2 Total $7,124.80 $217,159.87 375.20 $19,099.80 $7,500.00 $236,259.67 ti. 1 Exhibit "B" Scope of Work The scope of work for this Supplemental Agreement contains the following additional work: 1. Additional construction engineering administration work for the project closeout phase. This additional work includes all work as specified in the original consultant agreement: project administration for the construction engineering phase, project management, project meetings, and construction documentation. The additional work is due to an anticipated extended closeout phase duration. Page 4 of 4 Revised 8/9/2013 QUEETS BRIDGE PAINTING, CR1881 Clearwater Road M.P. 0.60 to M.P. 0.76 Prepared by: J. Wayand JEFFERSON COUNTY PUBLIC WORKS Date: 2/11/2014 Version: 1 PRELIMINARY COST ESTIMATE WORKSHEET CONSTRUCTION ENGINEERING ADMINISTRATION WITH EXELTECH CONSULTING, INC. TOTAL: $7,500.00 _ SUPPLEMENT #2 Project Document CE Clerical Estimated CONSTRUCTION ENGINEERING Manager Engineer Administrator Hours PROJECT ADMINISTRATION (office) (office) (on -site) (office) Work Description Roger Horton Bill Alton Jerry Schlie $156.04 $107.48 $11_9.14 $84.65 Per Hour Total TASKS Per Hour Per Hour Per Hour 2014 _ 8 Additional C.E. support if needed. CONSTRUCTION ENGINEERING I CLOSEOUT PHASE MARCH THROUGH DECEMBER Construction Engineering Administration, Project Closeout consultation 0 0 8 0 Documentation Engineering 0 32 0 0 32 Additional C.E. support if needed. Project Management 12 0 0 0 12 Additional C.E. support if needed. Clerical 0 0 0 0 0 Travel time 0 8 0 0 8 4 R.T. x 2 hrs. /R.T.= 8 hrs. P.A. to P.T. 12 1 40 8 0 60 1 Hours Hours 12 40 8 0 60 j 1� Dollars $1,872.48 $4,299.20 $953.12 $0.00 $7,124.80 DIRECT NON - SALARY COSTS REPRODUCTION, COMMUNICATION & MISC. $167.28 MILEAGE eltech Document Engineer $207.92 4 R/T x 92 miles/Rfr x $0.565 /mile $207.92 Sub Total Direct No Salary Costs $375.20 Notes:_ Total $7,600.00 • Hourly rates include overhead and profit • Estimated hours are for potential additional engineering support that may needed for an extended project closeout phase.