HomeMy WebLinkAboutBLD1994-00501 r „0_,00t
' I •
U,
„0-,0z
,.,., z.. __,
naay panaasaei 1
I
I
J
0, A
1
i t ,<0-,Ot I
„9—,0 t--
■
Ct
4
E <,2—,bl
Z "/;)
„6—,9 t
}j 'bS 00171
„2—,7 t -1 _
r
'3d 'bS tbt ____ •
r
,
1
I
oP 10f'TV �/0 w�
o
4goN JEFFERSON COUNTY
y�� DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street I Port Townsend,WA 98368 I Web:www.co.jefferson.wa.us/communitydevelopment
4. , Tel:360.379.4450 I Fax:360.379.4451 I Email:dcd@co.jefferson.wa.us
'WIN G'G
Building Permits&Inspections/Development Consistency Review 1 Long Range Planning(Watershed Stewardship Resource Center
July 26, 2013
GREG AND PATRICE BARRY
163 W PATISON ST
PORT HADLOCK, WA 98339
RE: Building Permit No. BLD94-00501, Parcel No. 994200028
Dear GREG AND PATRICE BARRY,
In January of this year a letter was mailed out to all of our expired permit holders, including you. In this
letter we gave owners the option to renew their building permit at the cost of one year, and any additional
unpaid fees would be reversed. We did not hear back from you regarding your expired permit. At this
time you owe $228 in order to renew your permit and complete your building project. If you choose not
to renew your permit you have until December 30, 2013 to pick up your building plans or they will
be destroyed.
Once your permit is renewed, you are again eligible to receive County inspections with the goal of
completing the building review process over a one-year time period. As of January 1, 2013, if your
permit is less than five years old, additional renewals may be approved. Any permits older than five
years must have their work finalized by our inspectors one year from your renewal date, or your permit
will be cancelled. Having your building receive and pass all of its required inspections is valuable to you
as it is your assurance that your building meets adopted standards for quality and safety. Additionally,
having documentation that your building has passed required inspections may be required from lenders
or buyers if you ever decide to sell or re-finance your building.
If your renewal of$228 is not paid by December 30, 2013 your building permit and all
associated land use permits will be cancelled and your plans will be destroyed.
This is the only notice you will receive Once cancelled, if you later decide to renew your permit, you will
have to apply for an entirely new building permit, pay all associated fees, and comply with current
building and zoning code requirements. In the event that your building permit is cancelled and your
construction is not finalized by the building inspectors, the County may choose to record a "Notice to
Title" on the property, to document the property is out of compliance with the County's development
codes.
Please make your check or money order payable to: Jefferson County DCD and include your building
permit number on your check. You may also pay at our office with check, money order, cash, or credit
card. http://www.co.jefferson.wa.us/commdevelopment/Credit%20Card.htm
On the reverse side of this letter is a list of the inspections required to receive final approval. If you have
any questions about this offer, you may call our office at: (360) 379-4450 and ask for a Permit
Technician.
Sincerely,
coe„ JEFFERSON COUNTY
621 Sheridan Street I Port Townsend,WA 98368 I Web:www.co.jefferson.wa.us/communitydevelopment
DEPARTMENT OF COMMUNITY DEVELOPMENT� Tel:360.379.4450 I Fax:360.379.4451 I Email:dcd@co.jefferson.wa.us
rNo
Building Permits&Inspections J Development Consistency Review f Long Range Planning 1 Watershed Stewardship Resource Center
Carl Smith, Director
RESIDENTIAL FINAL INSPECTION LIST, INCLUDING BUT NOT LIMITED TO:
➢ One complete and operational bathroom; All bathroom fans and whole house fans
must be operational.
➢ The cooking appliances and hood fan to be installed and operational.
➢ Fan in laundry room to be installed and operational.
➢ Sheetrock must be taped and sealed.
➢ All plumbing lines must be in and approved; Hot and cold on correct sides; Dishwasher to be
provided with air gap.
➢ Septic system to be finaled by Environmental Health Department.
➢ Heating system must be operational.
➢ All electrical outlets must be covered. No exposed wires.
➢ Stairways and decks must be equipped with handrails and guardrails.
➢ Smoke detectors must be operational and interconnected.
➢ Drainage system must be operational with downspouts tightlined in. (unless approved alternate
method is to be used).
➢ Siding must be on and painted if not treated.
➢ Garage door must be installed.
➢ 911 placard (address) must be posted.
➢ Manuals must be available with permanent appliances.
➢ Waterlines in unheated spaces must be insulated.
➢ Hotwater pressure relief valve vented to exterior with elbow pointed down at end.
➢ Firewall between house and garage with 20 minute rated door.
➢ Any holes in firewall/sheetrock where pipes, wires or ducting penetrate are to be sealed with
approved materials.
➢ Crawl space and attic access sealed with weather stripping and insulated.
➢ Attic access in garage must be fire rated.
➢ Provide insulation certificate verifying R-values.
➢ Exterior doors must be tight fitting and threshold checked for airleaks.
➢ All glass in hazardous locations must be tempered.
➢ Masonry fireplaces must have glass doors installed.