HomeMy WebLinkAbout052714_ca03Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders P.E., Public Works Director /County Engineer�4 Agenda Date: May 27, 2014 Subject: Execute Project Agreement for; Dosewallips Slide Repair, MP 1.60 - 1.75 County Road No. 25000 County Project No. CR1944 8 (TBD) Statement of Issue: Execute a Rural Arterial Program (RAP) project agreement for the Dosewallips Slide Repair, MP 1.60 - 1.70 projects. Analysis /Strategic Goals /Pro's Et Con's: On March 6, 2014 a landslide occurred at MP 1.67 on the Dosewallips Road damaging the roadway and depositing a large volume of mud and debris in the yards of local residents. The emergency repair consisted of debris removal, construction of an access road, placement of large rip rap buttressing the toe of the slope, embankment repair, placement of top soil, erosion control fabric installation, and hydro - seeding. The cost of the emergency repair was $126,000. On April 24, 2014 Jefferson County received funding from the County Road Administration Board (CRAB) in the amount of $257,400 to reimburse the County for the emergency repair made in March and to fund a permanent repair project. The permanent repair project will address subsurface water through the installation of catch basins, under drains and extruded asphalt curb to direct water away from the slide site. Work will also include guardrail and pavement overlay. The cost estimate for this work is $160,000. Fiscal Impact /Cost Benefit Analysis: The total estimated cost for the emergency repair and the permanent repair is $286,000. CRAB funding, in the amount of $257,400, will provide for 90% of the total project cost. This funding requires at 10% match contribution, in the amount of $28,600, from the County. The County match will be funded using the County Roads Fund. Department of Public Works O Consent Agenda Page 2 of 2 Recommendation: Public Works recommends that the Board execute all three (3) originals of the Contract and return the 3 originals to Public Works. Department Contact: Matt Klontz, P.E., Project Manager, 385 -9160. Reviewed By: s�6 /� Date STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM PROJECT AGREEMENT FOR CONSTRUCTION PROPOSAL Submitting County: Jefferson Project Number: 1614 -01 Date Approved: 04 /24/2014 AUTHORIZED RATA FUNDS: $257,400 Road Road Name(s) BMP(s) EMP(s) Segment # 25000 Dosewallips Road 2014 Slide Repair 1.600 1.750 1 The State of Washington County Road Administration Board (CRABoard) and Jefferson County mutually agree as follows: (1) The funds hereby authorized are for completion of the proposed project as defined by chapter 36.79 RCW Roads and bridges — rural arterial program. (2) The County is in compliance with the provisions of chapter 136 -150 WAC regarding eligibility for Rural Arterial Trust Account (RATA) funds. If the County is found not to be in compliance with these provisions, such non compliance may be cause for the CRABoard to withdraw or deny the Certificate of Good Practice of the County and require pay back of any RATA funds that have been paid to the County for this project. (3) If the project is reconstruction, the County shall gain approval from WSDOT (chapter 43.32 RCW) for all deviations from the design standards listed in the Local Agency Guidelines prior to construction. (4) If the project is 3R (resurfacing restoration and rehabilitation), the County shall document its design considerations for the proposed improvements in keeping with 3R standards as listed in the Local Agency Guidelines. (5) The project shall be constructed in accordance with the information furnished to the CRABoard, and the plans and specifications prepared by the county engineer. (6) Phased construction methodology is permitted upon notification by the County Engineer of the phasing plan as authorized under WAC 136 -170 -030. Failure by the county to notify the CRABoard of phasing plan at least 15 days prior to commencement of construction may result in withdrawal of funding by the CRABoard and county forfeiture of all RATA funds expended. (7) The County shall notify the CRABoard when a contract has been awarded and /or when construction has started, and when the project has been completed. (8) The County shall reimburse the RATA in the event a project post audit reveals improper expenditure of RATA funds. (9) Costs of the project which exceed the amount of RATA funds authorized by the CRABoard, set forth above, and the required matching funds and other funds represented by the county to be committed to the project, shall be paid by the County as necessary to complete the project as submitted to the CRABoard. RAP Project Number: 1614 -01 Page 1 of 2 (10) Matching funds and other funds represented to be committed to the project shall be available as necessary to implement the projected development of the project as set forth in the construction proposal prospectus. (11) The CRABoard hereby agrees to reimburse the county from RATA funds allocated, and not otherwise, for its reimbursable costs not to exceed the amount above specified. (12) The CRABoard will reimburse counties on the basis of monthly progress payment vouchers received and approved on individual projects in the order in which they are received in the CRABoard office, and subject to the availability of RATA funds apportioned to the region. Such obligation to reimburse RATA funds extends only to project costs incurred after the date of project approval by the CRABoard. (13) Either the CRABoard or the County may request changes to the provisions contained in this agreement. Such changes shall be mutually agreed upon and incorporated by written amendment to this agreement. No variation or alteration of the terms of this agreement shall be valid unless made in writing and signed by authorized representatives of the CRABoard or the County hereto. (14) During the term of this agreement and for a period not less than six (6) years from the date of final payment by the CRABoard, the records and accounts pertaining to this agreement are to be kept available for inspection and audit and copies of all records, accounts, documents, or other data pertaining to the agreement will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until said litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the six year retention period. IN CONSIDERATION of the allocation by the CRABoard RATA funds to the project in the amount set out above, the County hereby agrees that as condition precedent to payment of any RATA funds allocated at any time to the above referenced project, it accepts and will comply with the terns of this agreement, including the terms and conditions set forth in Chapter 49, Laws of 1983, 1 st Ex. Sess. (chapter 36.79 RCW); the applicable rules of Title 136 WAC and all representations made to the CRABoard upon which the fund allocation was based; all of which are familiar to and within the knowledge of the county and are incorporated herein and made a part of this agreement, although not attached. This agreement supersedes all prior agreements issued using the project number listed above and shall be valid and binding only if it is signed and returned to the CRABoard office within 45 days of its mailing by the CRABoard. COUNTY ROAD ADMINISTRATION BOARD: Jefferson go Date: ma Date: RAP Project Number: 1614 -01 Page 2 of 2 A pro d to form o ly Sl1'glly etferaon Co. Prosecutor' ice David Alvarez, Chief Ci ' DPA