Loading...
HomeMy WebLinkAbout052714_ca04Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director /County Engineele� z , Agenda Date: May 27, 2014 Subject: Local Agency Agreement Supplement No. 2 with the Washington State Dept. of Transportation ( WSDOT), Access Preservation: Upper Hoh Road MP 3.338, Olympic National Park, CR1896, Federal Aid Project No. PLH- A160(001) Statement of Issue: The attached Local Agency Agreement Supplement with WSDOT is necessary in order to proceed with construction of the Access Preservation: Upper Hoh Road MP 3.338 Culvert Replacement. Analysis /Strategic Goals /Pro's Et Con's: Jefferson County has been awarded Federal funding through the Public Lands Highways Discretionary (PLHD) Program. The proposed culvert replacement project at Upper Hoh Road MP 3.338 is necessary to maintain reliable access for resident, business and Olympic National Park visitor use. This supplement is for construction and construction engineering for the culvert replacement. The culvert will be replaced by pipe ramming a 48 -inch diameter steel casing through the road fill adjacent to the existing culvert. Work will also include slip lining the steel casing with a corrugated metal pipe to add roughness, and plugging the old culvert. Fiscal Impact /Cost Benefit Analysis: This supplement will add $733,565 to the construction funding, for the construction contract and construction engineering. This will be funded at 100% by the Federal Highway Administration. Recommendation: The Board is requested to sign the three originals of the Local Agency Agreement Supplement, and return to Public Works. Department Contact: Mark Thurston, P.E., Project Manager, 385 -9160. R iewed B�,� lflhilip M'pr� , CauDWAdministrator Date AdW Washington State wo DepartmeM of Transportation Local Agency Agreement Supplement Agency Supplement Number Jefferson County 2 Federal Aid Project Number Agreement Number CFDA No. 20.205 PLH -A160 001 LA -7591 (Catalog of Federal Domestic Assistance The Local Agency requests to supplement the agreement entered into and executed on September 23, 2011 All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows: Project Description Name Access Preservation: Hoh Rainforest, Olympic National Park MP 3.338 Length 0_40 Termini Upper Hoh Road MP 3.2 -3.6 Description of Work ❑ No Change Culvert Replacement at Upper Hoh Rd. MP 3.338 including safety upgrades as necessary. Prior $690,799 obligated for PE at 3 sites under one project. Reason for Supplement This supplement is for the construction contract and construction engineering, to be performed by agency staff and consultants. Does this change require additional Right of Way or Easements? ❑ Yes ® No Advertisement Date: January 21, 2015 T f Wk Type o or Estimate of Funding (1) Previous A reementlSu 1. (2) Supplement (3) Estimated Total Pro ect Funds (4) Estimated Agency Funds (5) Estimated Federal Funds PE a.Agency 680.799.00 680.799.00 1 680,799.00 100 % b. Other c. Other Federal Aid d. State Participation I 0,000.001 10 000.00 10,000.00 Ratio for PE e. Total PE Cost Estimate (a +b +c +d) 690,799.001 1 690,799.00 690,799.00 Right of Way f. Agency % g. Other Federal Aid h. Other ZiCo.Pro Participation Ratio for RW i. State j. Total RAN Cost Estimate (f +g +h +i) David Ivarez Chief Ci Al DPA Construction k. Contract 650,827.00 650 827.00 650,827.00 I. Other m. Other 100 % Federal Aid n. Other Participation o. Agency 72 738.00 72 738.00 72,738.00 Ratio for CN , State 10 000.00 10 000.00 10,000.00 . Total CN Cost Estimate k+l+m+nw 733,565.0 1 733,565.001 733 565.00 r. Total Project Cost Estimate e The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official By Title DOT Forrn 140 -041 EF Revised 0312014 Washington State Department of Transportation ° Director of Local Programs Date Executed