Loading...
HomeMy WebLinkAbout060914_ca03Department of Public Works O Consent Agenda Page 1 of 2 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director /County EngineeW/, Agenda Date: June 9, 2014 Subject: Supplemental Consultant Agreement #3 with Integrity Structural Engineering, PLLC Queets Bridge Painting, CR1881 Co. Rd. No. 107508, M. P. 0.60 to M. P. 0.76 BHOS- 16WA(001) Statement of Issue: The issue is requesting execution of the Supplemental Consultant Agreement #3 with Integrity Structural Engineering, PLLC of Seattle, WA. for providing continuing construction engineering support services for the Queets Bridge Painting, CR1881 project. Analysis /Strategic Goals /Pro's l3 Con's: This project consists of repainting the steel bridge girders and bracing members of the Queets Bridge. The work includes minor girder web bracing, abrasive blasting, treatment of pack rust, containment of wastes, and repainting with a primer and top coat paint system. Additional construction engineering support services are necessary due to an extended project close out phase. This supplemental agreement will provide additional construction engineering support services by Integrity Structural Engineering, PLLC, through the end of the construction phase. The additional required engineering support work for this project consists of Engineer of Record and technical Paint Expert services. Fiscal Impact /Cost Benefit Analysis: The maximum amount payable for consultant services under this Supplemental Consultant Agreement #3 is $0.00. These consultant services will be eligible for reimbursement from the Federal Highway Administration BHOS funding at the rate of 100 %. The Date of Completion will be extended to December 31, 2014. Department of Public Works O Consent Agenda Page 2 of 2 Recommendation: The Board is asked to execute the three (3) originals of the Supplemental Consultant Agreement #3 with Integrity Structural Engineering, PLLC, and return two (2) signed originals to Public Works (attn. John Wayand). Department Contact: John Wayand, Project Manager, 385 -9377 By. r ip Mo County A inistrator Date The Local Agency of Jefferson County, Washington desires to supplement the agreement entered into with IntegritV Structural Engineering, PPLC and executed on April 8, 2013 and identified as Agreement No. Queets 2013 -2. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 11, SCOPE OF WORK, is hereby amended to read: No Chance. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 3 1 2014 III Section V, PAYMENT, shall be amended as follows: Original Agreement: $185,143.68 (April 8, 2013) Supplemental Agreement #l: $146,817.65 (October 28, 2013) Supplemental Agreement #2: $12,901.62 (February 10, 2014) Supplemental AKreement 43: $0.00 (Reauested) New Agreement Maximum Amount Payable: $344,862.95 as set forth in the attached Exhibit A, and by this reference made a pan of this supplement. Page 1 of 3 Organization and Address Supplemental Agreement Number 3 Integrity Structural Engineering, PLLC 124 Interlake Ave., N. Seattle, WA. 98103 Agreement Number 06 -547 -1379 Queets 2013 -2 Project Number Execution Date Completion Date CR1881 December 31, 2014 Project Title Maximum Amount Payable Queets Bridge Painting, Bridge No. 8W $344,862.95 Clearwater Road M.P. 0.60 to M.P. 0.76 Description of Work Provide additional construction engineering support services for the project close out phase of the Queers Bridge Painting project. The Local Agency of Jefferson County, Washington desires to supplement the agreement entered into with IntegritV Structural Engineering, PPLC and executed on April 8, 2013 and identified as Agreement No. Queets 2013 -2. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 11, SCOPE OF WORK, is hereby amended to read: No Chance. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 3 1 2014 III Section V, PAYMENT, shall be amended as follows: Original Agreement: $185,143.68 (April 8, 2013) Supplemental Agreement #l: $146,817.65 (October 28, 2013) Supplemental Agreement #2: $12,901.62 (February 10, 2014) Supplemental AKreement 43: $0.00 (Reauested) New Agreement Maximum Amount Payable: $344,862.95 as set forth in the attached Exhibit A, and by this reference made a pan of this supplement. Page 1 of 3 If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. Integrity Structural Engineering, PLLC Consultant � , -71 Consultant's Signature s /z9 / /I- Date COUNTY OF JEFFERSON BOARD OF COMMISSIONERS John Austin, Chair Phil Johnson, Member David W. Sullivan, Member pproved as toArm only: t 10�4 W4--� David Alvarez CoDate Deputy Prosecutin Attorney // Y Mon &-R inders, P.E. Date Public Works Director /County Engineer Page 2 of 3 Exhibit "A" Summary of Payments Page 3 of 3 Basic Supplemental Supplemental Supplemental Total Agreement #1 #2 #3 Direct Salary $160,589.29 $127,526.77 $11,181.70 $0.00 $299,297.76 Cost Direct Non- $24,554.39 $19,290.88 $1,719.92 $0.00 $45,565.19 Salary Costs Total $185,143.68 $146,817.65 $12,901.62 $0.00 $344,862.95 Page 3 of 3