Loading...
HomeMy WebLinkAboutBLD2007-00616 111/ 41111, MLA07-00667 BUILDING PERMIT APPLICATION ReviewType:I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT#: BLD07-00616 Received Date: 12/26/2007 SITE ADDRESS: OSPREY LN BRINNON, 98320 OWNER: TOM R MC MONAGLE PHONE: 763-593-3940 4485 TERRACEVIEW LN N MINNEAPOLIS MN 554462130 PULALI POINT PARTNERS LARGE LO SUBDIVISION: Block: Lot: 1+ PARCEL NUMBER: 601185001 Section: 18 Township: 26 N Range: 01 W CONTRACTOR: SEAHOME SERVICES, INC PHONE: (360)765-3749 7425 THORNDYKE RD QUILCENE WA 98376 Contractor's License SEAHOSI077KS Expires 11/17/2007 REPRESENTATIVE: GREG BARRON PHONE: 360-765-3749 7425 THORNDYKE RD 360-765-4551 QUILCENE WA 98376 PROJECT DESCRIPTIOI NEW SFR W/A/G 500 GAL PROPANE TANK TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,121 VALUATION 460,000.00 ADD'L: HEAT TYPE: PRO CODE EDITION: 2006 HEAT BASE: 519 HEAT TYPE: OCCUPANCY: R-3 UNHEATED: 616 #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: SHORELINE: CONST TYPE: SETBACK: DECK: 326 BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: OTHER BEDROOMS: BATHROOMS: Exist: Exist: Prop: 3 Prop: 2 Total: 3 Total: 2 Routing Date: IR 10• ( ci Type Amount Paid By: Date: Receipt: Approved/Date Permit $3,009.75 CJZ 12/26/07 95530 APIDRVEED Plan Check $1,956.34 CJZ 12/26/07 95530 State Building Code $4.50 CJZ 12/26/07 95530 APRA 2008 Potable Water Application $58.00 CJZ 12/26/07 95530 Jefferson County Planning Total: $5,028.59 &Building Department II 410 , cO JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT ' t P4 621 Sheridan Street• Port Townsend •Washington 98368 DEC 2 6 2007 360/379-4450. 360/379-4451 Fax c www.co.jefferson.wa.us/commdevelopment SIN Master Permit Application MLA: 0 -LP k0 1 Project Description(include separate sheets as necessary): Aie..t/ Q.e.S ;Oo.•v Gt Tax Parcel Property a�Number: � O /8, d 0/ Size: oe, p.G s (acres/square feet) Site Address and/or ►'ections o Prope . Property Owner(s)of Reco •: ►. IA 0 a rr. L'Z Telephone: 7(.3 •- 5 9 3-"2A Lj/O Fax: email: Mailing Address: 4,4-/gs 7 642424ka. V 7"6.44.1 L-,v,J M { r1f1'APOL csi pi Ai S 5 Z/17‘ Applicant/Agent(if different from owner): G- a Prt2J2.p.J Telephone: 34c— 7 6 S-37 Yg Fax: b o-7.6 c— L/SS email: Mailing Address: A-• a a `L I v k -.-'e ( 'A 983 C What kind of Permit?(Check each box that applies ¢XCiuilding ❑Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit ❑Conditional Use[C(a),C(d),or C]** Ingle Family ❑Garage Attached/Detached ❑Discretionary"D"or Unnamed Use Classification Manufactured Home ❑ Modular ❑Special Use(Essential Public Facilities)** ❑ Commercial* ❑Boundary Line Adjustment ❑)hange of Use ❑Short Plat** Address ❑Road Approach ❑Binding Site Plan** ❑Home Business ❑Cottagelndustry ❑Long Plat** 51-Propane ❑Planned Rural Residential Development(PRRD)/Amendments** ❑Sign ❑Plat Vacation/Alteration'"* ❑Allowed"Yes"Use Consistency Analysis ❑Shoreline Master Program Exemption/Permit Revisions** ❑Stormwater Management ❑Shoreline Management Substantial Development** ❑Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance ❑Temporary Use ❑Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment ❑Forest Practices Act/Release of Six-Year Moratorium ❑Tree Vegetation Request *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate (3 f(1 O,J to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE C.:7' r 1 •t G Date: DEL 7s-��' By signing this application form,the owner/agent attest that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or y omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required r" -'r inspe. r ns. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the applicatio a e or s ants prior notice. Signature: / —.../v A Date: 2 C) 7 The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are/..mpliance the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable r=•• sibility f. .eying to and complying with the ESA. The Applicant has read this disclaimer nd sig and dates it below. Signature: , ' 1 Date: t 3 ?Z 0 7 G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc . r BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: Fax: SZ tq 4 S_e ly ; s r.,i c ( ) 76r37 Lis (7ao) 765"-'1c 1 MAILING ADDRESS: 7 Ve2S //LO r,✓d y le 2,j EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: 8i As1S2 017 It) NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: F me Type: Bathrooms: Shoreline: Type of Sewage Disposal: New Vf Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: __,_ Bank ❑ Community System ❑ Alteration/Remodel ❑ Concrete Total: Height:, *individual System ❑ Repair ❑ Masonry 0 SEP Permit# ,A ti-aas- ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: Setback: ❑ Private well ❑ Two Party Type of Heat Proposed:Total: —•— O O , ePublic (�(op(v) , Name ofSystem:NN Quf If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Pro•ane Tank a . . : . 1 • Installation 'ermit mark all items below that a, .1 : I Und d Tan - _,•_ve ground Tan Size of Propane Tank: 0 0 �__ Cook St• . I Woodstove i Fireplace Insert -o a - -" i Pellet Stove I Other Is this appliance being installed in a Manufactured/Mobile Home Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage Current Proposed For Office Use Only Amount Revision Main Floor Heated i .-• EH Bid App Review: 1 '�C ) 111 .5". X (0 2 2 na `Floor Heated Consistency Review: !f 3 Other Heated Base fee: . 61C)lq 115- Mezzanine : � -7 \5r�r51Oc€wet >'Q • 3S 1 Heated Basement 5 t9 35,��w. -4-- an Check fee: l a 5` -j1 Unheated Basement `j�r{l-•-�/ State Surcharge fee: t 61 6 •cta _ Other Unheated Pot Water Review fee: 01 3 Garage/Carport SUBTOTAL —56 ,1 (. Decks ( `� 911/Rd Approach fee: ,5a Other b ` TOTAL: $5 793 561 Receipt Number: 15530 f 4 Cash/Check Number 59 35 W i di i t ._. ESTIMATED COST(REQUIRED Date: Ala��f7 •Fair market v a labor and materials o on to finish i(IIIII01 o o DE0a'� 6 2007 ,.' l 1 ,y G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc CERTIFICATE OF OCCUPANCY Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 Carl Smith, Director/Building Official PERMIT #: BLD07-00616 SITE ADDRESS: 152 OSPREY LN Issue Date: 04/28/2008 BRINNON, 98320 Final Date: 4/25/2014 APPLICANT: TOM R MC MONAGLE PHONE: 763-593-3940 4485 TERRACEVIEW LN N MINNEAPOLIS MN 55446-2130 SUBDIVISION: PULALI POINT PARTNERS LARGE LO Block: Lot: 1 PARCEL NUMBER: 601185001 Section: 18 Township: 26 N Range: 01 W PROJECT DESCRIPTION: NEW SFR W/A/G 500 GAL F'ROPANE TANK THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2006 EDITION. OCCUPANCY GROUP: R-3 TYPE OF CONSTRUCTION: 5N SPRINKLER SYSTEM yes no THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 4/25/2014 \\tidemark\data\forms\F_BLD_Occupancy.rpt 4/25/2014 Jefferson County Building Digion Permit Num BLD07-00616 Applicant: MC MONAGLE BUILDING PERMIT INSPECTION APPROVALS kpplicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that clay's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks Erosion Control Foundation Footing �/ 4/11-11 1 UFF0 , ec_A ct Footing Drains Foundation Stem Wall Underground Plumbing 0'1.6 Straps(hold downs) D'"�—� S7S‘: CU (VA Ext. Shear Wall Nailing Rough-in Plumbing Framing � )%it' Blocking Airseal 3/0 Insulation:Walls , -G f Insulation: Floors Insulation:Ceiling ;:h'/'1 �j jiPs Int. Shear Wall Nailing L//1/4,I Wallboard Nailing Gas Line: Interior Gas Line: Exterior 2 /3/e I // Propane Tank Heat/Chimney Clearance Drywell/Alt Drainage Address Posted ) FINAL INSPECTION (AYi { FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • • CONDITIONS for Building Permit# :BLD07-00616 1.) NO WATER SEWER LINE CROSSING IS ALLOWED. 10' SEPARATION REQUIRED FROM THE WATER LINE TO ANY SEPTIC COMPONENT.. 2.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 3.) VOLUNTARY MEASURES OF COASTAL&AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 4.) MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 5.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 6.) A Geotechnical Report was submitted in conjunction with this application. The report addressed the stability of the geologic hazard area. A setback of 50 feet shall be measured perpendicularly from the top of the geologic hazard to the proposed single-family residence. 7.) PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT A WRITTEN LETTER FROM THE GEOLOGIST WHO PREPARED THE GEOTECHNICAL REPORT DATED JANUARY 4, 2008 STATING THAT THE STRUCTURE AND/OR FACILITIES HAVE BEEN CONSTRUCTED IN CONFORMANCE WITH THE REQUIREMENTS OF THE "GEOTECHNICAL REPORT." THE LETTER SHALL BE STAMPED BY THE LICENSED GEOLOGIST/ENGINEER. 8.) All construction activities shall not encroach upon the 50-foot buffer along the top of bank or into the 25-foot wetland buffer. This includes the storage or preparation of materials. 9.) A setback of 25 feet, measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, clearing, or other alteration of the wetland or its buffer is allowed. • • 10.) Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall contain the following statement: "Wetland & Buffer- Do Not Remove or Alter Existing Vegetation." 11.) A permanent physical separation along the upland boundary of the wetland buffer area shall be installed and permanently maintained. Such separation can include installing logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC Administrator. 12.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 13.) The applicant shall fully adhere to all conditions and requirements of the eagle habitat management plan that was prepared and approved for the Pulali Point Large Lot Subdivision. 14.) In the event that archaeological resources are encountered on the site in the course of development activities, the relevant lot owners and contractors shall immediately cease work and notify the Jefferson County Planning Department, the Washington Office of Archaeology and Historic Preservation, and the Skokomish Tribe. Work shall not be started again until the site has been examined by a professional archaeologist and appropriate measures are taken to avoid impacts to archaeological resources. 15.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 16.) A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 17.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 18.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an autormobile wrecking yard or junk (or salvage)yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage)yards. In no case, shall any such junk motor vehicles be stored in a critical area. 19.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 20.) Call Jefferson County Permit Center, Development Review Division for inspection of erosion control measures. (360) 379-4463 21.) Residential developers and individual builders shall be required to preserve shoreline vegetation and reduce the associated risk of erosion during construction and any future activity which may impact the stability of the shoreline. • 22.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 23.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 24.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 25.) The building height is not to exceed 35 feet. 26.) The limits of clearing will be marked in the field prior to beginning any ground disturbing activities. 27.) Construction access is limited to the existing and new driveway, as shown on the site plan approved April 22, 2008. 28.) Prior to beginning any ground-disturbing activities, a silt fence is to be installed along the erosion control line, as shown on the site plan that was approved on April 22, 2008. Jefferson County staff shall review the location of the site fence prior to beginning any earthwork or construction. Jefferson County staff shall be contacted at least three (3) days prior to beginning of any ground-disurbing activities (360-379-4450). 29.) All exposed and unworked soils shall be stabilized by using effective BMPs that protect the soil from the erosive forces of raindrop impact, flowing water, and wind. This could include, but is not limited to, temporary and permanent seeding, plastic covering, and dust control. 30.) From October 1 through April 30, no soils shall remain exposed and unworked for more than 2 days. From May 1 to September 30, no soils shall remain exposed and unworked for more than 7 days. This condition applies to all soils on site, whether at final grade or not. 31.) Soil stabilization measures should be appropriate for the time of year, site conditions, estimated duration of use, and potential water quality impacts that stabilization agents may have on downstream waters. 32.) All pollutants, including waste materials, that occur onsite shall be handled and disposed of in a manner that does not cause contamination of stormwater. 33.) Maintenance and repair of heavy equipment may result in discharge or spillage of pollutants (such as oil, hydraulic fluids, solvents) to the ground. Spill prevention measures, such as drip pans, shall be used to reduce the potential for pollutants to reach Jackson Cove. In the event of a spill, contaminated surfaces shall be cleaned immediately. 34.) All BMPs to control stormwater during construction shall be inspected, maintained, and repaired as needed to ensure that the they are functioning as intended. 35.) Setback from Osprey Lane right-of-way is no less than 20 ft., side setbacks are no less than 5 ft and rear setback is no less than 50 ft. (shoreline). If an environmentally sensitive area (ESA) is present, then the more restrictive setback shall apply. r- _ S�'111G3H;?�3 GNV' Nv td 2'JOC�'ld 1NSWa5'�8 0 fl r . 1 0��� n Qw m� f �� Val NONNIbe t co E a �Q MNMCI E 3- 5,� NQ k . o I l; oLLo . tl m o 2 . Z 2 t J Zy W �AU It° U ,„ ox / 20-4 / W 1. i 1! 9EfL ! y �a:0,4-1-,Z .YIF ha .1/1 Y.E }- ® 1 _ turn.- . • J ill UgC B 1 0 ED 1 i _ t kg � x rc g IW4.1.MNNM11118444.14N00.I z • . I.\\\* 1.171.1"1" s. p S ' i \\ O n m 01 \ n as 1, 1 bII .T i __,,,-. 4- [ fQ m 0 1nr1LP11,^� }.,_,...-,,, ________F___,,, ci �• \ 4241.71 no 9 .r wnlllrw rn ..1.--‘—1,.. ,o IAE ka - - - w • a -1I ® a Y,�- — o I o �'o��� = —Th Q ii• O:i Y � Qm Q ,_^r-r �— !-0' W df �.-- m 1p m w 't—� """""lN�,. .���a�; W ���,:1�...°n r `°wn noun , 1T �� F SS`0; am \ � fi ® — ug 0 i L ' , IL ----� � ` •, ,_ • • •W it rA \ _\T QZp1 '- _ • • 32 IIL 0 ; 1 s t? L ... 11;1.10 �MIM°N*P01,0MNMWnM1_ - I \ Ja \ t 0 • Q \ \ \ ------- - _-_-...__.__ J c 1 • CI / .O'A / .Y6 Z•.a .I.1 .61E I•A.__.' .U15•2 r �I m �p Q 0040004 m Y 3 m 3 3 yam. y~, y. 0. p, ," o • _1 l� d l� a LL C ` L W a U 4 1� C C C ,p .x s '� ,J. ,,i .r- § k 2 Z Z l C �. L Q Q 9 3 3 X f. >,. ya1 aq p w Q • Q �¢q -17 p` pi pp 0 pp 0. pL Cpp app 0L W VZ , Um m W g 2 Y 3 3 3 99 3 3 3 3 3 9 u W �1 ? W d W a "sa 30 & S % SSSSSSS oIII W Wa6 d � mo g EE J `, 7p�1 1Jz[} W i W L 5- P z W w W Qi m W p Z Y QW pU y W I! Q m LL W 0 T a x 3 x x x x ? 77 x Z x s Q m ; W 5 Q i Q J J x x X 3 x X Q Q LL'W &V 0 -1� e 8 e Q c i► a m m m m o o 0 E F p u u m m a. o- ¢ a Q ¢ ix 0C n 3 �+ a r` w u e s g a V' hill 'p ; 9 9 9 3 9 6 19 3 6 9 6 e . = m ,J„ w i Q A m 111 A In m A it in a1 m A in %� 6 J 3 yW- a WI d Q O Qp a p � r1 ` a = Vam '821y¢� m aasamcasaQ7e ® a gi'RKm p=)t Z - R• d , , m m m J m J m 0 • Q " 8 z ! .p r r ® Q ${ $� S�h� '� x $s pQ� p ;1 1 1 ) � ) ) ) i i i i a & W 2 LL g 2 4 4 4 ~ 1 O _O uu 'D 6 6 ® 6 9 .Y 0 9 i e 6 .0 a 4o z d § 4 r- u p m A in .0 A Y .0 0 J m c .11 p OC _ m - h - - Q W W r W !It'll jEEp^{� Yu� Z e• A — m - r i .• Z nxi 3 Q `W�7 — Q W A ^ Q� gqqp� 1 4 l i l i I t Q - W W Q h h — a. h -.I W tx I g r i i' U 2 Z 2 g q 3 J m m 0 m m m a m m m n tl a _ d QW Q o a ' OU tl u .-. A 3 m m Q J m W " N w OQ f� W f: 'ri v . J — -• Z ` T a W l3 p W LL m = - _'f Y J L 2 �Li h A r m .o m Y� Q '—^ f, LL,r r Nr1=1 aOOnd NItW v a e 1,.. . � oi '® . o I L3e8 vm NONNIble • °-HEZ � • do . a MNECISSb O U—, _fliLL °� <noou� F -- m m \ O g z r m n Q gl ww0 / / -- / A .0(( S m0 A m .0,, .0..0 X0 !pii J x I / . I A C) QA 3e- . .a-.6 a•bi .0-.► .0-.9 n• iff / I I `urt J-.► I .tA►•1 .aC 0..9 i .INE t-.6 --�ij )- I' ® .4 - V a J'UL�- .I Om Qa oI I ° fY lm .i w I 7.-a -- 3 ! m W' � 1 w I kilin ill 11 ) I' ' '� (IIIi OI 0 I oo ' r . i ° till A t U ...„ lei) I w a � � 0 ° ' oo ' \ ; I Z .o o b W --� z k. s. 4 \ " y \ Aga . •'�� 6S 7 • z �� < a I x —n1 a -• �y.! l IQ II '1 ° w. a_ ( = M1 } IaMry1a 9 w.. I ------, 7,.... ilt.1)„c„ . § ____f`li V I - - .. . LL s � _ _ Ea ^ ate m J 1. . I„I d;b4 i h MY YM1 T E3 ..• 11 \ 0 / \ I / .-Fj 617 2 nz i , iii LL1 > < a ICI I N. O T fa O4 w m C II1. II J� II \Ili • I��1'I A ><,,, t a O( j' : \ .0a O I "I n . ICI I 'S. \ CI !.L0014*PM} n tk.19!1.9. I t•'\ 1 III, {1 1 \ I () w I \ • V>o°�� .WE1-.9 / .WE 1-.9 / NC 6•.E / A,E 9-.9 -HE -.d � �E[1a A-I .►rt[-Xi .M i•A d,I-U m �t2/2 0,96 • • . • • • • • • i 0 TOPOGRAPHIC SURVEY FOR TOM MCMONAGLE of a Portion of Lot I of Pulali Point Partners Large Lot Subdivision, Volume 30 of Surveys,. Page 65, located in Section 18, Township 26 North, Range I West, W. M. Jefferson County, Washington PARCEL # 601185001 SIZE: 98972 SF LOCATE NEW DRINKING WATER SERVICE LINE AT LEAST 10' FROM EVERY COMPONENT OF NEW 4 EXISTING SEPTIC SYSTEM, INCLUDING RESERVE DRAINFIELD AREAS - U � 0 Q 0Lu 76.19 65.62 74.43 -- - --- ---- —---------- -- — N 90'00'00" E N 90'00'00" E N 90'00'CO" E GG M 20" �vP r LIMIT OF TOPOGRAPHICAL � SHEET EROSION SURVEY \ CONTROL DURII TEMPORARY BM GALVANIZED SPIKE `�s30" — — _ CONSTRUCTIONNG / I I I \ HOUSE 1 ! \ \ 6" UP NIN FACE OF ,0" DIAM FIR REV. 3 — — — — _ 32x32 1120 SF ELEV. „s.64 ROOF STORM WATER 4 �I — — — DECKS — L1 �'1 t5 I W� Jl PER CONDITIONED PUMP I W� USE OF 2005 SLUM FOR I CONTROL \ I III' \', 500 GAL. w—�W�W______�\1;1 STATE OF WASHINGTON PANEL I I I I I I 11 \\ \ PROPANE WATER TO PERFORATED STUB OUT FOR CONNECTION 411 4' SOLID DOUINSPOUT DRAIN TO 501_01, mN 5ET5AGK PERFORATED STUB OUT CONNECTION 1 FROM 70P OF BANK / 4114b GRAVITY SEWER PIPE AND L O T 1 GLEAN -OUT 1 1000 GALLON SEPTIC 1 I 4 OUTLET SCREEN 1 1000 GALLON PUMP 1 I CHAMBER 1 r0"0 CASING OVER 1 \ TRANSPORT PIPE WHERE. \ CROSSING DRIVEWAY a TOP OF BANK 1 1 \ 1 1 \ PROPERTY LINE 1 _ - FOLLOWS MEAN HIGH WATER LINE 1 _ OHUI"1 1 OHU1M / TOP OF BANK 82.04 N 90'00;00" E 64.98 — — —N 90'00'00" E- zit — — — — — — — — — — — — C3 Io EXIST IS" REV. 3 FLAGGED TREE 2'xl0' LEVEL TRENCH \ TO BE REMOVED W/ PERFORATED PIPE STRAW BALE SEE DETAIL THIS NORTHWESTERN TERRITORIES, INC. Engineers — Land Surveyors — Geologists e Construction Inspection — Materials Testing NTI 717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 452-8491 www.nti4u.com all, TANK ABOVE a 1 GROUND \ \1\g �\ o\,\, 1 I I I �II \ o 1 \ 115, I I I I 112� a I3118 I2 9 I 1 . TRAM' p 16' p1 g I I g" I i I I1 '11I I ` 1�T�1 I'I�gI"I III II�T0 ' Q 1 Q I N 20 — — 65.22 N 90'00'00" E 1221-411 50.14 71.39 N 90'00'00" E N 90'00'00" E / 3 CA w EXISTING GRAVEL " Ui Ul DRIVE _w W W—U U roil iI // k �Jw // Pp� /// G) 6110 AWWA-C-500 PVC SLEEVE �p I I I T J I\\ 1 I I I I I 1 \\ OVER 3"0 TRANSPORT PIPE L WHERE UNDER DRIVEWAY �y�Ilp'IIyI,�2,I 1 I a ,�, . ', 1 18\ \ _ �g D. �OR00� oe wAs �'d �S R �£gtH�Yn 9 0 &11 !�o�AAL LNG S EXPIRES 04/11/09 DATE: 20 549 01 _ CONNECT NEW 3"4, ACH 40 PVC SEWER _' 71 W TRANSPORT PIPE TO EXISTING 2110 PVC S V� 19pMANIFOLD ADJACENT TO 24"4, VALVE RISER. NEW GRAVEL DRIVE ■ 0 L .ri'IAI .M i�;r'•1MC1dMdU0Nt C / �51 BUFFER I SEPTIC SOIL TEST PITS PER SEP-S6-245 I i I WETLAND EDGE �3 PER AFN 423CJ53 0 C) vOL I SURVEYS \ 00 0 I PR! LARGE LOT i I SUBDIVISION � 1 C/) I � I r APPROVED SITE PLA[: / . — :2_ 2'U JEFFERSON C� _ DF"..OFC bIMUNIIY :. _ IMPLIED RESERVE AREA SIGNATURE PER 5EP56-24!i-CLEARED - L— EXISTING DRAINFIELD CERTIFIED BY RALF'H CENTER LINE THROUGH PERCH TREE 119.92 FT FROM 42" WILSON 4/27/2006 FROM DESIGN BY JANE:T DIAM FIR WELCH, SEPTIC SENSE SEP`36-245 EDGE OF CLEARING FIR TREE WITH DIAMETER XX INCHES DAHORIZONTAL DATUM -- ASSUMED VERTICAL DATUM -- MLLW — BASED ON TIDAL BM B-3 NOTES 1. UNLESS NOTED OTHERWISE, LINES SHOWN HEREON ARE BASED ON THE SURVEY RECORDED IN VOLUME 30 OF SURVEYS, PAGE 65, RECORDS OF ✓EFFERSON COUNTY. SEE SAID SURVEY FOR ADDITIONAL BOUNDARY INFORMATION. 2. EXISTING UTILITIES SHOWN HEREON ARE BASED ON ABOVE GROUND OBSERVATIONS AND SHOULD BE CONSIDERED APPROXIMATE AND POSSIBLY INCOMPLETE. J. FIELD WORK FOR THIS SURVEY WAS PERFORMED ON MAY 7, 2007 b A.e SURVEYOR'S CERTIFICATE l HEREBY CERTIFY THAT I AM A PROFESSIONAL LAND SURVEYOR LICENSED TO PRACTICE IN THE STATE OF WASHINGTON AND DECLARE rx v THAT THIS MAP CORRECTLY REPRESENTS A TOPOGRAPHIC SURVEY PERFORMED UNDER MY SUPERVISION, AND MEETS OR EXCEEDS 1111111WP" INDUSTRY STANDARDS FOR TOPOGRAPHIC SURVEYS OF ITS CLASS; PERFORMED AT THE REQUEST OF PETER BROWN IN DECEMBER, 2006. 0 Figure U PGffm lDed Stub -out Connection 0 20 40 THOMAS D. ROORDA PLS 36825 SCALE IN FEET 1—FOOT CONTOUR INTERVAL S I t E FLAN SCALE I" = 20'-0" NORTH 1401 Sixth Street Bellingham, LJA S8225 TEL 360.521.0115 FAX 360.521.0142 \891 REGISTEjt \II RC 1 J H G gory Rob 1 E OF.WA5�1iur.Tnu U #— A A w V q z ll Revisions Date 1 12-IS-01 2 2-11-05 3 4-14-OS Scale: I" - 20'-0" Date: 10-26 -0-1 Drawn: T5 Check: GR File: Frank -site A,,,l OF 8