Loading...
HomeMy WebLinkAboutBLD2014-00183 "'BUILDING PERMIT APPLIC•ION BRLD1e 00183 1 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT#: BLD14-00183 Received Date: 5/29/2014 SITE ADDRESS: 250 SUNSET BLVD PORT TOWNSEND, 98368 OWNER: WILLIAM H WOODSON PHONE: 360-554-0414 250 SUNSET BLVD PORT TOWNSEND WA 98368-8912 CAPE GEORGE COLONY DIV 2 SUBDIVISION: Block: 3 Lot: 8 PARCEL NUMBER: 938100308 Section: 12 Township: 30 N Range: 02 W CONTRACTOR: POWER TRIP ENERGY CORP PHONE: 360-643-3080 83 DENNY AVE PORT TOWNSEND WA 98368 Contractor's License POWERTE934QE Expires 11/5/2015 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOP ROOF MOUNTED GRID TIED PV(SOLAR ELECTRIC) TYPE OF WORK NON SQUARE FOOTAGE: TYPE OF IMP MEC MAIN: VALUATION ADD'L: HEAT TYPE: CODE EDITION: 2012 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: BEDROOMS: BATHROOMS: Exist: Exist: Prop: Prop: Total: Total: Routing Date: Type Amount Paid By: Date: Receipt: Approved/Date Permit $228.00 JLA 05/28/14 148716 APPROVED Total: , $228.00 MAY 2 9 2014 Jefferson County DCD \14irlcmorlArlo4o\forme\G RI!l Li nn Rlrl rni F/70/7l11A .41D1 14 - 183 - • „oN co gitlie--iA JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street I Port Townsend,WA 98368 I Web:www.co.iefferson,wa.ustoommunitydevelopment ' riNG' Tel:360.379.4450 I Fax:360.379,4451 I Email:dcd0.0,iefferson.wa,us Building Permits&Inspections I Development Consistency Review!Lang Range Planning I Watershed Stewardship Resource Center Master Permit Application MLA: Project Description(include separate sheets as necessary): Roof mounted, Grid-tied PV (Solar Electric) Tax Parcel Number: 938 101 308 Property Size: 17100 sf (acres/square feet) Site Address and/or Directions to Property: 250 Sunset Blvd, Port Townsend,WA 9836B Property Owner(s)of Record: William H.Woodson Telephone: 360-554-0414 Fax: email: williamhwoodsonQyahoo.com Mailing Address: 250 Sunset Blvd,Port Townsend,WA 98368 Applicant/Agent(if different from owner): edio.3,elt 1?-41 0.041 cot-D, , . Telephone:360-643-3080 Fax: 360-539-1857 email:johnipowertripenergy.com Mailing Address: Power Trip Energy Corp,83 Denny Ave.,Port Townsend,WA 98368 What kind of Permit?(Check each box that applies 0 Lot or Road Segregation 0Building 0 Critical Areas Stewardship Plan O Demolition Permit 0 Variance(Minor,Major or Reasonable Economic Use) 0 Single Family 0 Garage Attached/Detached 0 Conditional Use[C(a),C(d),or CI** O Manufactured Home 0 Modular 0 Discretionary"D"or Unnamed Use Classification O Commercial* 0 Special Use(Essential Public Facilities)-- 0 Change of Use 0 Boundary Line Adjustment O Address 0 Road Approach 0 Short Plat** 0 Home Business 0 Cottage Industry 0 Binding Site Plan-- O Propane 0 Long Plat** 0 Sign 0 Planned Rural Residential Development(PRRD)/Amendments** 0 Allowed"Yes"Use Consistency Analysis 0 Plat Vacation/Alteration-- O Stormwater Management 0 Shoreline Master Program Exemption/Permit Revisions** 0 Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Substantial Development** 0 Temporary Use 0 Shoreline Management Variance 0 Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment 0 Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment *May require a Pre-Application Conference 0 Tree Vegetation Request **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: Labor & Industries Electrical Permit ac , DESIGNATION OF AGENT please see atthed I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: . By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or Its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections. Staff's access and right of entry will be assumed unless the applicant informs the County in writing at the time of the a licationgt. ,-or she wants prior notice. , Signature: *la `$ eirt140•M-7 Date: 5fre/7-40f The action or a tions Applicant wil 4 dertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could le:• o a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even f you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transf rabl Sty for haring to and complying with the ESA. The Applicant has read this disci imer and signs and dates it below. Signature: *--- rr.$..Ju a- re.tf uNgury Date: 9 2,13P-Pet 07/24/2013 • 0 BUILDER STATEMENT The signer o this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be umi •. e -. •a nsibili of the General Contractor for the proposed project. Signature: ''�a 11i. `(Am* '17:41" NO `(` Date: /.,!' Z Q��' t A ! GENERAL CONTRACTOR OR M A'"FACTURED HOME INSTALLER: PHONE: FAX: Power Trip Energy Corp (360 )643-3080 (360 )539-1857 MAILING ADDRESS: 83 Denny Ave, Port Townsend,WA 98368 EMAIL: john @powertripenergy.com CONTRACTOR'S LICENSE WAINS 063-472-00 NUMBER: POWERTE934QE NUMBER ARCHITECT/ENGINEER: Pik PHONE (360 ) 643-3080 FAX:(360 )539-1857 MAILING ADDRESS: 83 Denny Ave,Port Townsend,WA 98368 EMAIL john©powertripenergy.com Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: ni New 0 Wood Existing: D Sewer ri Addition G Steel Proposed: Bank 0 Community System U Alteration/Remodel 0 Concrete Total: Height: U Individual System Repair Masonry SEP Permit# U Demolition U Other: Bedrooms: Water Supply: Existing: Setback: i:, Private well U Two Party Type of Heat: Proposed: C' Public Total: Name of System: If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: Underground Tank Above ground tank Size of Propane Tank: Heat Stove Cook Stove Woodstove Fireplace.nsert rehtO I evotS telleP I knaT retaW toH I Is this appliance being installed in a Manufactured)Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage Current Proposed For Office Use Only Amount Revision Main Floor Heated EH Bld App Review: 2htl Floor Heated Consistency Review: a , oCG Other Heated Base fee: Mezzanine Additional Section: Heated Basement Plan Check fee: Unheated Basement State Surcharge fee: Other Unheated Pot Water Review fee: Garage/Carport SUBTOTAL (9,4-4 00, Decks 911/Rd Approach fee: Other TOTAL: $a(..1 i•cc Receipt Number: l 9 ec I 10 Cash/Check Number 139 a yaa c ESTIMATED COST(REQUIRED) Date: .Fair market value of all labor and materials foundation to finish r-'6--c'5/Zeo L Initials: 07/24/2013 1 I • • Power Trip Energy Corp PV Installation contract 83 Denny Ave Port Townsend, WA 98368 (360) 643-3080 www,powertripenergy.corn lic # POWERTE964JN Consent to Act As Agent on Permit Application To whom it may concern, I William Woodson ..grant Power Trip Energy Corp. Permission to act on my behalf for the purpose of acquiring a Solar Electric Permit from Jefferson County and grant Power Trip Energy permission to complete and sign the permit application on my behalf. Signature: 1;---r ,.et :"1.!. Date: e 749/1( May 23,2014 Page 5 of 9 Bill Woodson ill III JEFFERSON COUNTY erDEPARTMENT OF COMMUNITY DEVELOPMENT 40 621 Sheridan Street/Pori,'Townsend,WA 96363/Web: www.codeffersorkwa.usicommunitvdevelooment Ts+ 360.379A450/Fax: 360379.4451/Email: dcd@c• lefferson.waAiS it• + lsill Nuec0 EXPEDITED PERMITTING CHECKLIST FOR SOLAR PHOTOVOLTAIC SYSTEMS ***TO BE COMPLETED BY COUNTY STAFF*** Building Permit Required? CI Yes 1:: No Staff Initials Date Fee: ***TO BE COMPLETED BY THE APPLICANT*** 1. Project information Project Applicant: Power Trip Energy,83 Denny Ave,Port Townsend,WA 98368,360-643-3080,john@powertripenergy.com Site Owner Name: William H.Woodson Project Address: 250 Sunset Blvd,Port Townsend,WA 98368 PV System Description: Roof mounted,Grid-tied PV 2. Determine if your project needs a building permit(check all that apply): Yes No Not Applicable 1. Mounting equipment is engineered and designed for solar PV equipment. X 2. The solar PV system will comply with the National Electric Code(NEC) X including obtaining an electrical inspection. 3. To address uplift the solar modules will be mounted no higher than 18 inches X above the surface of the roofing to which they are affixed. Note: Questions 3-5 Apply to Rooftop Systems 4. Total dead load of panels,supports,mounting,raceways,and all other X appurtenances shall weigh no more than one of the following. If YES indicate which: :4: Conventional solar modules(one layer of glass)or frameless solar modules(two layers of glass)that weigh three and one-half(3.5)pounds per square foot(PSF)or less on any roof. 0 Frameless solar modules(two layers of glass),on sloped roofs of at least 3:12 but less than 5:12 pitch,that weigh no more than four and one-half(4.5) pounds PSF. Frameless solar modules(two layers of glass),on sloped roofs of 5:12 pitch or greater,that weigh no more than five(5)pounds PSF. 5. Supports for the solar modules are installed to spread the dead load across as X many roof-framing members as needed to ensure that point loads do not exceed fifty(50)pounds at any location. 6. Attachment to the roof is specified by the mounting system manufacturer. X Note: Question 7 Applies to Ground Mounted Systems 7. Ground-mounted solar PV systems using racking components installed per the X manufacturer's specifications. If you answered yes or N/A to all of the above questions,no separate building permit is required. Applica t Signature el.--114 614oz-cry t P . /21/24 if D te — — • • EXPEDITED PERMITTING CHECKLIST FOR RESIDENTIAL PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED ___ --TO BE COMPLETED BY CITY STAFF Building Permit Required? ❑Yes 0No Qualifies for Electrical OTC? ❑Yes 0 N Staff Initials Dater-Click here to enter text Staff Initials Date:Clfck here to enter text -------�TO BE COMPLETED BY APPLICANT-«----- Oroject Information Project Applicant: Power Trip Energy Corp,83 Denny Ave, Port Townsend,WA 98368,360-643-3080 Site Owner Name: William H.Woodson Project Address: 250 Sunset Blvd, Port Townsend,WA 98368 PV system description: Roof mounted,Grid-tied PV •etermine if your project needs a building permit (check all that apply): Yes No 1. PV system is designed and proposed for a detached single family house. X ❑ 2. PV system is designed for rooftop of a house in general compliance with applicable codes. X ❑ 3. Mounting system is engineered and designed for PV. X ❑ 4. Rooftop is made from lightweight material such as shingles. X ❑ 5. PV system has been pre-approved by electrical permitting agency. X ❑ 6. To address uplift, panels are mounted no higher than 18" above the surface of the roofing to X ❑ which they are affixed. Except for flat roofs,no portion of the system may exceed the highest point of the roof. 7. Total dead load of panels,supports,mountings,raceways and all other appurtenances weigh no X ❑ more than one of the following. If YES,indicate which: X No more than three and one-half(3.5)pounds per square foot(PSF) ❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half(4.5)PSF ❑ Frameless panels on at least 5/12 pitch roof weighing no more than five(5.0)PSF 8. Supports for solar panels are installed to spread the dead load across as many roof-framing X ❑ members as needed to ensure that at no point are loads in excess of fifty(50) pounds are created. 9. Attachment to the roof is specified by the mounting system manufacturer. X ❑ 10. Method and type of weatherproofing roof penetrations is provided X ❑ 11. Home is code compliant to setbacks and height,or code allows expansion of nonconformity for X ❑ solar panels. 12. Panels are mounted no higher than the roof ridge or apex of roof(applies only to pitched roofs) X ❑ Co men s: Clt k h ter tact. J'�7y /�f t rr.top GIJ y If you answered yes to I of the above questions,no separate building permit is required. Created by the Evergreen State Solar Partnership v1.0 POWER TRIP ENERGY CORP • • Page 1 of 2 0 Washington State Department of Labor & industries POWER TRIP ENERGY CORP Owner or tradesperson 83 Denny Ave COCHRANE,ANDREW P PORT TOWNSEND, WA 98368 360-643-3080 Principals JEFFERSON County COCHRANE, ANDREW P, PRESIDENT CARR, STEPHEN E, VICE PRESIDENT Doing business as POWER TRIP ENERGY CORP WA UBI No. Business type 602 349 562 Corporation License Verify the contractor's active registration/license/certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. POWERTE934QE Effective—expiration 11/05/2007—11/05/2015 Bond CBIC $12,000.00 Bond account no. SH5957 Received by L&I Effective date 11/05/2007 11/02/2007 Insurance GENERAL INS CO OF AMERICA $1,000,000.00 Policy no. 24CC21330840 Received by L&I Effective date 10/08/2013 11/02/2010 Expiration date 11/02/2014 Insurance history Savings https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602349562&LIC=POWERTE934QE&SAW= 5/21/2014 5/28/14 • Jefferson Co Dept of Comm Dev WA-Online Pa• Jefferson County fc`'rW s%w„ AN „i4 ae. Step 1:Seler.€Payttte06 Step 2;RevPew apd Suhmft Step 3 .,ont€rrnaP rE em,d. Step 3: Confirmation and Receipt Result: Payment Authorized Confirmation Number: 13923022 Your payment has been authorized successfully and payment will be processed. Jefferson County Department of Comm unity Development thanks you for your payment.For questions about your account,please call 360-379-4452 Thank you for using our bill payment services. Please saw or print a copy of this receipt for record keeping purposes. My Bills Descriptor ,mount Due Residential Applications payment of$247.00 on Parcel Number 938101308 $247.00 Subtotal: $247.00 Customer Information Convenience Fee: $7.50 First Name: Power Trip Total Payment: $254.50 Last Name: Energy Corp Address Line 1: 83 Denny Ave Address Line 2: City: Port Townsend State: Washington Zip Code: 98368 Phone Number: 3606433080 Email Address: john @powertripenergy.com Payment Information Card Number: 8600 E)piration Date: **f** https://client.pointandpay.net/web/JeffersonCoDeptofCommDelWA 1/1 i • Sally Ellis From: j flem [john @powertripenergy.com] Sent: Wednesday, May 28, 2014 3:33 PM To: Mary Blain; Sally Ellis Subject: Solar permit application for William Woodson, 250 Sunset Blvd Attachments: Woodson Jefferson Co Dept of Comm Dev WA-Online Payments.pdf; Woodson Jefferson County Solar Permit Application.pdf Good Day Mary & Sally: Please find attached a permit application for a roof mounted, grid-tied PV (solar electric) system for William Woodson at 250 Sunset Blvd, Port Townsend. I have pre-paid the application fee of$228 plus $19 scanning fee and the on line service charge. When it the permit is approved, could you please email us back a copy? Many thanks! Sincerely, John S. Fleming PE Solar Engineer Power ri r Coro 83 Denny Ave. Port Townsend, WA 98368 360-643-3080 office 360-452-8500 cell john(a�powertripenergy.com email 1 • MECHANICAL AND DEMOLITION PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD14-00183 Received Date 5/29/2014 SITE ADDRESS: 250 SUNSET BLVD Issue Date 5/29/2014 PORT TOWNSEND, 98368 APPLICANT: WILLIAM H WOODSON PHONE: 360-554-0414 250 SUNSET BLVD PORT TOWNSEND WA 98368-8912 8 SUBDIVISION: CAPE GEORGE COLONY DIV 2 Block: 3 Lot: PARCEL NUMBER: 938100308 Section: 12 Township: 30N Range: 02W CONTRACTOR: POWER TRIP ENERGY CORP PHONE: 360-643-3080 83 DENNY AVE PORT TOWNSEND WA 98368 Contractor's License POWERTE934QE Expires 11/5/2015 OWNER, WILLIAM H WOODSON PHONE: 360-554-0414 if different: 250 SUNSET BLVD PORT TOWNSEND WA 98368-8912 PROJECT DESCRIPTION: ROOF MOUNTED GRID TIED PV (SOLAR ELECTRIC) Directions To Site: THIS PERMIT IS VALID FOR ONE YEAR AND IS NOT RENEWABLE. THE FINAL INSPECTION MUST BE SCHEDULED AND PASSED WITHIN THAT YEAR. THE EXPIRATION DATE IS 5/29/2015. REQUIRED INSPECTIONS: Installation per Manufacturer Specifications/CO2: Tank/Line/Appliance: Final Approval ' 7)I(1I BUILDING INSPECTION HOT-LINE 379-4455. REQUESTS MUST BE RECEIVED BY 3 PM THE DAY BEFORE THE INSPECTION IS NEEDED. Office Hours 9:00 a.m. -4:30 p.m. Monday-Thursday HOT LINE AVAILABLE 24 HOURS A DAY \\tidemark\data\forms\F BLD Permit Propane.rpt 5/29/2014 ^fir ‘6"*.,�{ JEFFERSON COUNTY I'tortr.4 DEPARTMENT OF COMMUNITY DEVELOPMENT -rs9i NG,° Date: —05-Time Received: ,Jef f/pm Mon. Tue. . Thur. Fri. Date: 7 619 BLD: /X J -/.3 Contact Name: Owner: Contact Number: 360 b`-f9 708(0 Address: 2,;-Q Se.9itr jJ L.0 206 Notes: _,OC../kVL- Foundation Plumbing Framing Propane Tank Mechanical Setbacks Under-ground Framing Under ground Furance Footing Rough In Air Seal Above ground Gas Stemwall Hydronic Exterior shear Exterior lines Oil Straps Hot Water Htr Interior shear Interior lines Ducts Post Hole Ventilation Appliance Underfloor Gas/Wood stove Man-Homes Insulation Final Inspection Setbacks Floor Foundation Wall Address Posted Block&Tile Ceiling JEFFERSON COUNS [�C..(� Iv148 716 DATE 5/ " r-,/ 1 RECEIVED FROM �13Ultr 4 DESCRIPTION BARS# AMOUNT CURRENCY P4_1) Izl�l.](.� as V C� . ,. _ COIN S GO CC; C KS 13c ai � ,�;`, � 0 ......c) ,I,� �P m r p 33 O RECEIVED BY S ��""v TOTAL 0)41- ` 0 0 11110