HomeMy WebLinkAbout081814_ca04Department of Public Works O Consent Agenda Page 1 of 2 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director /County Engineer'o Agenda Date: August 18, 2014 Subject: Rural Arterial Program (RAP) final prospectus for South Discovery Road MP 3.20 to MP 4.56 Statement of Issue: The Rural Arterial Program (RAP) is a competitive grant program managed by the County Road Administration Board (CRAB). In order to be included in the RAP priority array, this prospectus must be submitted to CRAB via an online database and signed hard copies sent by September 2. Analysis /Strategic Goals /Pros Et Cons: The segment of South Discovery Road between MP 3.20 and MP 4.56 has poor structure and surface condition. The purpose of the project is to preserve the structure, improve safety and ride quality. The project will include repair and pavement resurfacing maintaining the current width. This segment rates well as a 2R (Resurface and Restore) for RAP funding. Fiscal Impact /Cost Benefit Analysis: Our local funds available for road construction are limited. The Rural Arterial Program is one outside source available to counties. If projects are selected, RAP funds cover 90% of the project cost and the local match is 10 %. This is a competitive program within the RAP Northwest Region and no funds are guaranteed for any county. Preliminary planning estimates indicate the total cost of the project is $500,000. If selected, RAP could fund $450,000. County match from the local road fund would be $50,000. This RAP project is included in the draft Six -Year Transportation Improvement Program (TIP) for 2015 -2020. Department of Public Works O Consent Agenda Page 2 of 2 Recommendation: Authorize the chair to sign the Rural Arterial Program Prospectus. Return to Public Works for further processing. Contact: Zoe Ann Lamp, AICP, Transportation Planner, 385 -9162 Reviewed By: Philip Mo ,County Ate' rator Date STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM FINAL PROSPECTUS Biennium: 2015 - 2017 Region: NW County: Jefferson IDENTIFICATION State Legislative District: 24 Six -Year T.I.P. Priority No: 21 Total Points: 96.41 Road Number(s) I Road Name(s) I FFC(s) I TRC(s) I BMP(s) I EMP(s) 60150 South Discovery Road Pavement Preservation 1 08 99 3.200 4.560 DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Ratina Worksheets Roadway Structural Section, or Bridge Condition: ❑ Deviation Anticipated? Phis segment has poor structure and surface condition. The project will include dig -out repair and ) avement resurfacing maintaining the current 22'— 24' width. iorizontal Alignment: ❑ Deviation Anticipated? lo changes in horizontal alignment are planned. Vertical Alignment: ❑ Deviation Anticipated? lo changes in vertical alignment are planned. Width: ❑ Deviation Anticipated? Fhe project will maintain the current 22' -24' width. Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.: ❑ Deviation Anticipated? Six trees have been identified as roadside obstructions and will be removed. ESTIMATED FUNDING AND TIMING Estimated Year Phase Est Total Cost RATA Amount Start End Design /Prelim. Engr. $50,000 $45,000 Jan -16 Mar -18 Right of Way Construction $450,000 $405,000 Jun -18 Jul -18 TOTAL $500,000 $450,000 SPECIAL CONSIDERATIONS THAT MAY AFFECT PROJECT SCHEDULE: ❑Wetlands ❑NMFS ❑R.O.W. ❑Shorelines ❑USFWS ❑BIA ❑HPA ❑RR ❑USACE ❑WDFW ❑Cultrual (Hist. Arch. Paleo.) ❑Tied (Other agency work) ❑Other PROJECT TYPE Project Type: 2R - Resurface and Restore LOCAL PROJECT APPROVAL RAP Project Prospectus prepared under the supervision of: Vic. Map and typical cross sections attached? WI RAP Project Prospectus submitted to CRAB with the approval of: / Signature - County Engineer f Date Signature of Chair of the Board of County Commissioners or County Executive / Date Page 1 of 1 South Discovery Road M.P. 3.20 to M.P. 4.56