Loading...
HomeMy WebLinkAboutBLD2012-00295 ILDING PERMIT APPLICA Reew 00211 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT#: BLD12-00295 Received Date: 9/26/2012 SITE ADDRESS: 41 N PALMER DR PORT TOWNSEND, 98368 OWNER: JUDITH SPECHT PHONE: 360-379-0297 C/O JED/ALLEGRA BOTHELL 933 TAFT ST PORT TOWNSEND WA 983685400 CRESTHAVEN SUBDIVISION SUBDIVISION: Block: Lot: 5 PARCEL NUMBER: 946100005 Section: 12 Township: 30 N Range: 02 W CONTRACTOR: BLUE HERON CONSTRUCTION CO PHONE: 360-643-3511 PETE DUFFY PO BOX 718 PORT TOWNSEND WA 98368 Contractor's License BLUEHCC109D8 Expires 8/19/2014 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOP NEW SFR TO REPLACE FIRE DAMAGED RESIDENCE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 2,318 VALUATION 241,000.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2009 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: 11050 BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 2 Prop: 3 Total: 2 Total: 3 Routing Date: —� Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,783.35 LYK 09/26/12 135236 APPROVE° Plan Check $1,159.18 LYK 09/26/12 135236 State Building Code $4.50 LYK 09/26/12 135236 1 2..PI Z Total: $2,947.03 jotte;w3n County PIann n &Building Department \\4 ir7cmorlArl a#o\fnrmc\F RI 11 Ann Rlrl rn# 0/7RM111') • • CERTIFICATE OF OCCUPANCY Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 Carl Smith, Director/Building Official PERMIT#: BLD12-00295 APPLICANT: JUDITH SPECHT PHONE: 360-379-0297 C/O JED/ALLEGRA BOTHELL 933 TAFT ST PORT TOWNSEND WA 983685400 SITE ADDRESS: 41 N PALMER DR Issue Date: 12/6/2012 PORT TOWNSEND, 98368 Final Date: 8/14/2014 SUBDIVISION: 9461 Block: Lot: 5 PARCEL NUMBER: 946100005 Section: 12 Township: 30 N Range: 2W PROJECT DESCRIPTION: NEW SFR TO REPLACE FIRE DAMAGED RESIDENCE in conjunction with a shoreline exemption permit (SDP12-00053) THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2009 EDITION. OCCUPANCY GROUP: R-3 TYPE OF CONSTRUCTION: N SPRINKLER SYSTEM yes no THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 8/14/2014 \\tidemark\data\forms\F_BLD_Occupancy.rpt 8/19/2014 ■ A'- • } 44�gOT7 G� O Fl COPY w r a 16WING'° JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT ALTERNATE BRACED WALL PANEL. (ABP 1800#AND 3000#) IRC R602.10.6.1 2'8"minimum I I 1 IMO#. ABP 3000#ABP Minimum 2'8" panel width Minimum 2'8" panel width Maximuml0'0" height Maximuml0'0" height 3/8"APA rated sheathing 3/8"APA rated sheathing both one side sides. Secure with 8d nails Secure with 8d nails Edge: 6" o.c. Edge: 4" o.c. Field: 12" o.c. Field: 12" o.c. 1800# uplift capacity tie down 3000# uplift capacity tie down devices at each end, installed devices at each end, installed in accordance with the manu- in accordance with the manu- facturer specifications. facturer specifications. 2 anchor bolts at panel C®mac.l the 133.1;1d r,,,i itni rt at quarter points (360) : "' , „ 3 anchor bolts at or Y-,.' T,i one-fifth points (3 total) (1)#4 reinforcement bar at the top and bottom (1) #4 reinforcement bar at the top and bottom All alternate braced panels shall be supported directly on a foundation which is continuous across the entire length of the braced wall line. The foundation shall be reinforced with not less than one #4 bar top and bottom. USE 1800# UPLIFT CAPACITY TIE DOWNS ON SINGLE STORY OR SECOND STORY OF A TWO STORY STRUCTURE. USE 3000# UPLIFT CAPACITY TIE DOWNS ON THE FIRST STORY OF A TWO STORY STRUCTURE, SHEATH BOTH SIDES OF PANEL . ��5ON r' El Ilt 4 2.,Sx1N o o JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT • STANDARD 4'O" BXTER OR ' '-, t" ; _1NBRACEDit (BWP or IBWP) IRC R602.10.3 Exterior if ') Method 3 of IRC (for other approved methods Typical Method 5 R602.10.3 see R602.10.3) Minimum 4'0"panel width when 1/2" Minimum 4'0"panel with gypsum board installed on 2 sides of the Maximum 10'0 height braced wall panel. (See Table Re02.10.5 below for additional Minimum 8`0"panel width when 1/2" • allowances) gypsum board is placed on one face of the braced wall panel. 5/16"APA rated sheathing 16"o.c.framing;or Secure with 6d drywall nails 7"o.c. 3/8"APA rated sheathing 24"o.c.framing. (See Secure with 6d common nails R702.3.5) Align vertical joints over studs.Horizontal 6"o.c.at edges,12"o.c.in the field,&6"o.c. joints shall occur over,and be fastened to, at gable end walls. 1 1/2"blocking.(R602.10.7) Align vertical joints over studs. 1 1/2"blocking at horizontal joints. 1 1/2"blocking at horizontal joints. contact ii-e P. ,i_``°_° ).; ° .-J-1-m-1,, at Support IBWP as specified in IRC Extend sheathing to foundation sill plate. (36�) - 37C--' -' ` ' - R602.10.9 Exterior braced wall lines shall have a braced or revs := i " �` o Braced wall connections R602.10.8:Interior braced wall lines shall be fastened to floor wall panel located at each end of the wall line, and roof framing in accordance to Table Exception:When a BWP begins no more R602.3(1)and to required foundations in than 8'0"from the end one of the following is accordance with Section R602.11.1 (see allowed: foundation details). In addition floor joists 1) Amin.24"wide panel is applied to each parallel to the top plate shall be toe-nailed to the top plate with at least 8d nails spaced side of the bldg.corner and the(2)24" a maximum of 6"o.c. Top plate laps shall wide panels at the corner shall be be face-nailed with at least(8)16d nails on attached in accordance with figure R602.10.5,or each side of the splice. re Where joists are perpendicular to the 2) The end of each braced wall panel closest braced wall lines above or below,blocking to the corner shall have an 1800#capacity shall be provided under and in line with the tie down device fastened to the stud at the * < < ,f w braced wall panels. Where joists are edge of the braced wall panel closest to ;''r ;CJ -'."-�`�+�;t':_ w r�° ."' ' ;-';x��,,' .T1?`r ;'''' _l 4-.1.--:;'','_- . : parallel to braced wall lines above or below,•the corner and to the foundation or ,.y!: ,`? `;.; :;�- ., ' a rim joist or other parallel framing member framing below. The tie down device g shall be provided at the wall to permit shall be installed in accordance with fastening per Table R602.3(1). manufacturer specifications. When noted on building plans install an 1800#, uplift capacity,tie down device. See exterior BWP exception#2.above Spacing between braced wall lines in each story shall not exceed 25-ft on center in both the longitudinal and transverse di- rections. Exception: In one-and 2-story building two adjacent braced wall lines shall not exceed 35-ft. on center in order to accommodate an area not exceeding 900 sq.ft. in each dwelling unit. Spacing between all other braced wall lines shall not exceed 25-ft. (R602.10.11.1) -P w N It O .O co V o. -P,. W N ., it - -I - > > 3 > > > n < m v, m m m 0 F m r- r- r D m Z � 0 r_On 9r u n o < ° n Z ,zi D = > T n z 9 -O z ,,-, nn m^ nn m I C 0O OO n > m D n Q HZ 3 y m 3n o 0 o '- > - � I' D -ZI 0 3 Z y a O n z _ _ __ __ t D v m Z o m n p 3 o p D O o O D N D 0 _ I I + r = I --------- ------------1_ , i D O m y D 0 - p 2 - m vm 1 m n m Z n r O R m 3 L I Z m _it' . y r^ m .� -P 3 D — ------------I--- 1 0 x D I z __ > ,, „, E 0 n O , O p O z D O m0 {I------------rH-- - -- --- mr,p._____,_________I_________1_,, O O X D g a 7-,-,- O O < Z I ink ]-- ---'----�— '-- --IT1 F) O D m D m (n Z n m = 0 r,, Z m 0 '---------- '---- N'---- I I vm, m r- O6 F S D D a O o O I I L X —1---- r-- —..■m m n1 m m P D X D m O Z P - - --I w p ,�^„ a 3 o p o z „, D Z n --------- ----------- O Z - 2 m - C Z , CC �n1 I --_— ill — -- — m G Z m G D G o ,, - y In m D < —-- ------------- m O Z p In m, N — ----------- ------- /l "---- Qn N w = m X O P 0 Z m------ -------------1 ---- ---_—I—� „^ m p, Z m = I m Z X O m I v+ y ------------- n N n o' o fJ D o I I 1 I m H p m p r m Z 0 m n g 0- - o I -{ m ------'-- ---------_I--1 _ rl N 'n V� 3 N u I -1-...J. C D m D a y o �; a I BEARING FOR IWBP I I I O m I 3 m r m ' < - I I p dam^ z v C > o ---------1 ----'----- I RFAR ac, EaLuvva2_ _I Z = 0 n ,7, r m z 0 n m � m Z \ z �--—• I Z m —I— --1 m = 3 I ----- 4 -------- _ —{—I � 'G C �D › m p N` P i1 '...� it i 'a 3 a 3 '�---'----- l.. .._i. I -, -. Q. r'► w• CD CO • te N vm p _ _ __ _ _F— -- — -- --1— — — -- F— --�—�o a I 3 -a o tip O r 7C1 D I -- -- -- -1 1 _ I C▪ ) Sc O ---------- O O S o rn I L p, o> v► o m -- -- -- —I-------------1--'-- -- -- —I --1— *O y. p c 3 n — -- —— — --1 = y3o - -- - r — " 5 _ ps � 0 o n �-------- I -----------!— I I O ° 7' m 1_ I— n rt MII ---'-------mow-----------r---------------r_--- I- fI ---'-------]—n-----------'I_ ------------------r z ------'---I 1iiiiiiiiii r o _ __ _--' ---------- m I I '----------a----'---------I------------- -----I_ f I m I L- - - I - --------- L--------- L ---------- _ -_[ Z -- - -- --I-- - n o` II_ -- -- - 1 � —� -- -- -- -�1 -n n m 0 - 7_7____i____ — v A o rn If 11 - BEARING FOR IWBP ,-,s fl o 11 UUU I — -- -- —_i___,, m -0 1 N C -9= z L'— ... ter: -- 5 - o I --n cr • 0 z O O IV CI I I . Q 7p r GI �F -- _— —_ _F 0 0 Cr:, �r — - -- -- — � =- - — a � �} - -- -- -I D 1 I ° m O - 0 -- -- -- —I— -- �, - --,-- - W —,------------L_-; z _ c +------------I---- — I O g3 � � —L----------- 1 ,. I i--..■-- -■. ■..■H--■■■■■■_..u. ______ _ \_______H____________, D . , L /VA �.' ! ,,',., m In> 1111 mri1 r v -y nini ,bOJC`n rnp p-I`I C-C-1��r- Ym O nn mbb9t'TI X ° D b m tin� m/ t m C ` � ‘ \ o ''�' X< N N 70 In p O � T r\ 0 co mZ nn b6 -I\ -z OCi 1 pp�m bZO6 -I��o -I> I- Z p m Z � S�ro co a A V ` • C o O xb In ne y \ / r m Or I'77 Ln :m LN- °�� SI,"3 s '''' m !'"I O r b,X O S o ° DC a 3 m / ga' ri^ �Op r o O m O O O O O /(12;.1 -, -, T D O 0 0 0 oo r- N /D ro N L_ o.m o O dddd C ao? --I ICI m /1 f6 <o•° Dart \ , c 2 0 v, .� _ 36'-0„ n�.� 0 rn nSL" 1 3 T W1� p T cz , ao° ''D W1 �I i ;H"V�/SP zo li -i tlj- t I IIII z-___ _. ......m. IIII co' ■7-1 . 411 ,g-E b:, --6-47: d m N om o a_o n -c ,IL:01 _ C - , .� - 1 1 -<n0 t� 9Ii D6 n m N 26 D14 1 +3 w IL r: p 0 1 w, ;7 ice= III-''' ro 7-C I� o I 'u _ 6 J >k I D I mv-I, _-- O Ca w a p ^ 137i o O D N c , g?ad o -2-: OT �\ 0 _ �, x F m'c cn D o 0.(� 0q O NTERIOR BRACED WALL PANES i ,,,. D i o- rig 0 'h CU rt m i d ° ao° o N o p r , / D07 I o or Q W -. Q - .. N o 3 i - INTERIOR BRACED WALL PANEL t N �,a th 0 H v ill a p C 1 = Q rt D w 3.2. 1,--,5, W J1if— a -- — �fil . a / s v i a 0.1 el x 1 3 I N -o O� �+ xp �(Q LI 1❑u IIII P� o` �\ �II ti 1 o. a C N N p K H a- V hill I / - O -- w N N� P I ZS OiilI Do 3 MECH. STOR. o a al VI �° ors. �.1, o �, �: ��; ---- _—_—_—_ 1 SIG - I III I '-6" 5,g„ 3•_7• os 1 STO . E02 — ,„ ° SOR tBRAcEALI lt N�V�u- ,a C .t O guiti CT f,p CU Qf7 D12 �� c I . W li o_zTO, INTERIOR BRACED WALL PA -i�� = _C ZpIo o ro om r °m Oa pAn,n r.a0 ta/ ° fII! �fq a ° _ A 0 CA V p -n v c n ZDpn�D�ZOOrDmrnC O _n `"' ,IIf n3 my a� OSm�nn Cmcny�r i pj O (n°Z°CC1=r Aar^Z�p c'i n m h I a° op �nmin�ZmDv,2mD �O «-r nlN Sti�l,; 0 R. 0 0 c �- O3-' o m� Z�nn°_nv,zr aZZ o , , -O V1 0 -r p n ��� ^ DDpaOn °�= °y n° D N m O CD rn m (l " r a-I O a m Z m Z rD v..aC'7" I�r� (n (] °,o w o T 3 ro °mDm`^3 n n Ac�a-C� w (D Q D o fn O `m m m�r..ZCJ N Z - C T co p)-'\ ���� z m° r N _° Z .�Z u N r,, n �h O 0 N Yu rim C I m 13 - + Z m ,C'""1 = o.o n Q C 0 �I o v ° z o ,„„ i 7 - , p' o I. (D O ^ < w C_ O<m ' c• i�c p N o \ °n 0_ OZ o - 1i ;Z S In m Z ., = f QD i__ \mO ` w-I o C�� Z = „.1 %o 1 n 11&::. I I v �Mill Z-r.' 11"11111 vI'I"”' $ n.,, ' ' r_ice—=.� N � D09 YI y p I I �7G _ ' WO3 9 3'0 x66 s AWIi - OD (D W jj L W03 W04 1 Cn ca� 0 0 ----1 O IV O -I=...., 2 O 36 .0„ z=8„ = W— T �p fll O Al V 7 n T .p 5-'.d 2'O I!ilhI mlln1i Sheaall panel inspections o u-,-<^l o d ,P,-"51'o' ?o.v J=a\°^2� � � n _w O cn m Braced panels, Alternate Braced Panels -z^ o N _ -ro n ro o= a�ro ^ _,E`^ N rt N N n d O N rr-0 d W d O fIl ao.�o3 ona,- >t, n+3-,-z,vo -3 vo'r`°o=�o° � �a�a oo�op'°i�o �„ and Interior Braced Wall Panels are to 401)',1-87O a -,5, ° _ rod._.a _ o z be inspected and approved prior to =a r rt ro° rt°._. v J"°^ "_"ro a d rov,�,Yc a =v 3;on_. ,,,a,,°4 ,,,, P---+io`o cover. �o ILEi . py �3� Q�z='Dro „�ro�°'oaro o°'^tea°' n 1)a - ro o�V .+o N5 ort °'c �IiFIiIIILilit p i•O 11111 1 11111 FU I ID 8 O N O N P iiiiiiii!iiiiiIiiii ii lit liii! W RO O N O P U O P U U D, U U pOo • • • • • co co co co D, co co co co co `~ • • • • O • O O O O o O O O O O O O O O O O O O •. X d Q , T T T T T T T T T n m � c � �+ x x x x x x x x x x x °i 2".: 2 n n v 2 n! F a 3 a s d a a a n a a !!° = °1 < > > > 2 2 2 2 2 sX .'0r o`", a a a o"', N a N m • • • • • • • a . a ro ro m m a m a ro 7• U N T r- �- S S S S S S S S S 7- S �- r �^ N - d In d d d d d d d a d 3. rD d a p an d ro ro rro ro rro m m m rro o S a s a n n a a n a a n p p „ p p p p p p c 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p p p o 0 „c!' 0 „03 0 0 • o 0 a o 0 0 < e. F F _ F F F :E. o o 0 .1 „:0 0 0 0 0 0 0 0 00 Type F m • o m m com IIIIIco co Oo co Oo Co co Oo Co Co Oo Ca N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .. HEADER O iii IIIiiiiiiiiiiiii g 0 • o 0 0 0 0 0 0 , 0 I 0 0 0 0 0 o - Area b 0 0 0 0 0 w 0 0 0 O s) H �' o N 3 3 0"0 D (D p V = (D - �n < a y _o • _ I n `t% D� a9 n icII11 (D _w 0 o S O y` -R ° I o O■ cD ;;_ n 3. O -im a `° N _ zO i� m v�< Zn' HG rt U °p TO rm--X CS--I '� A- - D O r0 0 yc rr=n0 -ri vii 0 =C 0,co Z p ZC nOnp y pnp r m p r r p CD T o• A D x I g; O N l W 0 E • p< N '-'• (D co Z 2 to ' CD O n y 1 0 -'-r (D 3 p 0) 1 -, a CD .. O Q -+, N . 7 ill ^J i-S r Q-o N W a rr N — Ni N N cil O p v N o y l o ...:7'-"N„, D p m ti r S r 4 n rr'r b O r- 5 0 N' - < W - .1 9 o 11 ?-0 CD `n. ;O * i R 6 D - . Qrnca 0 it r, '' a n CD , r ---o o 1 , 0 l/1 I m I q - 0 N N jy "'t I S 6 _ II - _ _ __- - -- - -- <0 z,: I CJ rnj- 9 • _011111211. 1 s __ LO \ 8'-'I ik" 'V: t/ 6" N xi 9 1 i0 3/4" N N D O - fU (p N (D O Vii G) 7 S N 3 c �. CZ p�Xm *1*zOXlr� �"'i" D� rn I E Cr a �:-s 5� Op` 1 D pO- b pH x4, {D_O� . 3 ,., NX _7--=v D- N I n cQ n n Dr riZ�O rr- `I ym�v, , ,�b ��Xn C 2, Xco v C �pvz>XN m O v v Zr nim -I' :ZZ ,p O o - p . n r�o g2 m� O-{v,m '� Z to (D (D (D P m2toT 2- p- < �< rD1Z0°' <n •� 0 po b y nn O � � 2p � n� m� q0 y bx b ' O 0 �-n p��=c, D Z O * < ' n x �co0 -1, +?•-, m o C -nm �Zv to pm"1 < c n _ z co�p •<.'no .Z r z17 .bO CY .._Jn° ?0- �� r'T �_° z° Tr-�D< O 0. N D n S7 m5 N N ,b , th p o r0 -< Z o rD �� Zmp �Om<O-Im N (D o =1 mn 'P.d Z` Po, i v C0 ZDm , 5. �- Dp �Om<o2> - (D CD 2 v V pn *P v,�.> Obb Q N 5 !'OOH p.-,�v,, O 'a z N v r N T2-IZ1- n o (D cp n< m n -1 _a O a- �O v n CO ry mp �p OZOn n 'mH D�mO _ a p0 mn 2Z�TCn� m Q Q "'• pDC C „� 7 OX� Z74 T n -I Oo O Z < �hiZa0O vp �n Znn pZp �^�T Z �� Dln m = O C v :mn! :� DNZ� r.rr w 7\-cOm Z -I �. O =n L J T<O F0Zx O Z"n� ° a O °o� ^c�mN On ti a Dc D� HS? N O =o 5�n� ^O 5• m r� Op ^� rO� =Z-=IOpw 0 Qo N�� `^ m Onrn o a W j X . 0, Z Q N p N O-� p co v Q 0) m Z N S X D (D cD no ' 0 (D v -, Iki m _ N E. 0 o O m w 7 v D 3 Q 5•`G n N Fr y rn �" 7 y 3. 91 cD ✓r (D ————I 5. 3 N 3 -T1 (7). = 11111,1111(Y. Ef CL ._, C N, CD 111111111111111 I \ o I m Z N CO I r-0 ' 2> n I m n _ o -i r- I _ Z 1111111111111 n I - - . . . . \ 1 \ •0 ,1 IIIIIII 72c,III f)is 4- \ 1 \ \ — _., \,, _\_ ___ — , n _ ., t / ' C-1 Cp GIID07/ IP P157 >7 17119799199111 \ , \\ , \\\ti _ _ i \\ 1,,-----'N\ it \ \ \ \ m m I ' J / ,? / 1111111111111111 ■., i ,I / \ \,,, 1,1 } 11 / /// .! 11111111111111111 x. --- . \ 1 4,'--- , ,\ 11111111111 n m i\\\ '5 \-\I 5 1 ‘ N.\.\\\),\ 0 , .- 11111111111 1 \ \ \ \ \ ) onnpunnpozonm ° 1?"x"?' 'F ' '',° T7' Z' \ 3 ' ro = \ 0 7 _‘ ZrTi-?) ,v, (-) -C1 > > -o .7..,_ 14" \\\ \ n nrTi 17:' m ,_--, _B. cp r- -c, > N 0 \ -r '-' c) 0 r- -0 0 - , 0 0 < t, r- < r- > ..„ Y' -‹ li - m -‹ - "rj t, > 0 > Lr■ 0 cm > m Cl m 2 m 5 F- - .-1 v., \\ ,...---- ---..... \ tx) 61 , (g •m rn -0 o > )< i z ts-j'irf - ---- \ / 5' 17 (n a . .> * > w, r-i Pi >7 rn 0 I;17 / .6', \ \ Ts o \ di L (i) 3 iOrn n 3 c CD 7:3 CT \ m — /) f! r+ , ,_ m -0 ,„ m - •• , r-r, \ r- m ucc , oz > r.-<- m 8 0, ----- j ,, / \ N.::, a. 0 --, -0 -- x'-' 0 \ 0 0 0 7 2 "ii so -I 0 oh 0 v, 0 0 -F, x 1.\ _______-/ / 3 0- i., -I- _ _ i 71 z '-- -n c o'c' L: mZ _ - - - a, > o > 2 42 5 ,,, .',' , -a o I 1— -r1 -° Z , ril -% — c ma , r- ---i ' ) u P.; z ..i. m or c i 0 0 t-n H / e cs< > (:) ,-, • " ovloo x 0 ,..sm -h E- < -n Cs _,71 -n . . X //// 0.• M ti) _re- 5 1 m /, a ;1 _><, 1 /1 c - w 53 a c E 2 o ti, / 0 > 0 c cn CD s_ c" z / o ;" 2 ° 0. .6 S V-,.-; ii)" (fin) (.-3 u m ci) < cn n 0 -.F. . I-... E.- a) 0 -..., — a) 4:... ET F.) CI • --, -a• 0 < X 0. aj -1° 0) 0 (3 Q. T. 1 co 6// • ,_,.icci oi ti ag=f,1 Z cn 0- n -h a Zt. _i ,R- — LI 0 m m 0_ 3. .-. a, 3 -.. 0 4 3 (,) ca c cii767. > - cn (1) m r- , D-,c) B ;1 ' al --, 5 • (0 u) n m ,Q / I g ,. (1) _,- cD c ov cs 0 co 0 U3 :3 L.-) 'a j To. 0 (i) / Q. - 0 -, Z 7 X so ki-1-F. 0 a) 0 H ,,C:2 -1=' " r, N., ..$. -h ea m , * ___ l 0 4,.. 5. 3.3 ,T,_ =..0 * 0 ED 51) co * ID a; CM rIlz "D 7:3 = Cl) zi; CO -0 U) (D 3 a) D < tl) - r-rD a -• m 1— C ID -- 0 M ->=1 CA (I) . —= =, 0 CU Z n m =. 0) H St) -(0 0 0 5.,,, p.,.—E * n i a Ci Z VI *0 3• -a-c „ m , al n P n 5 `..i. ra: . . Fd a*, i/D:.0-51 ..< -I fl) 0- 0 _,_ 7Z-T (D Ea CU (1 0 ■-•• ,<• (D X `.--, Z — = (1) cT) (75 s< 0 •+, -0 rD $1) ,:._, (1Q lo -.- ,_ _ mmm- 2 c 0 -0 0 0 0- t.r..J ''' d° Ci P 5. ri cm ' 3 v, tz, * 43 u) o w 0 , 0 , = a (.,, -4, o (n 0- 1 - --2--1 0 ;-') a' o 0 0 fa e — _) CID e! P.) ''' 000 o (-13 o ______ _____-2 0,•_. 0 Pr aul -0 cn Cr. 1 ,= r:..).. -6' 5 = .--)- * m H -0 I--i ; -61 2 — 1:1 a) 0. 6 aTW c' m M c) m " * a) co co co i) -=cr;:q „. r+ i';') =.Cr)- 7 r•„) / .:' o 0 o 0 - -41 \ n.) A-. 7C -? C 3-) = :1". cn 0) .....' II / a) K) o -Ps[1.:,4 ,....., P 5' cic-,, eD ‹.. II 0 _b `-' cn M "-------- m n CI) FILE COPY 1- m > o z m IIIIIIIIIIIIIIIIIIIIIIIMIMIIIIIIIIIIIIIIIIIIIIIIIIMIMM■N■■---___ 17'-0' 12'-0" II \ y i \ \ \ i 11 ilw/ I H I . ��� \. 1 \ \ \ (01 I ��� /, / 1 I I , II I lull , . III , , 1, , , \ os ___. iIi/ 1n:I' -�-I _ fll ® j 2-- -- —�. .E 111111 0,m - • • *' 17'-0" / II - -r. M 1 I a__ I • I i i 3 1 0 I 10 II i ii V1 I ' ar ii, p w C a = 1 i— —•n m - r ,-m o Os J \\'\‘‘',ss\ , rn m - i _z 0 ti z nril '' O 3 14 \ Zj A,.. / ^..5� Z_,, f:_„, 1 _ .'//..7' i.il � ir 2o ip9 o ��% % I \ ✓ dp. i r ir____1 / -' ■t ra \ I /4/ -.a CC co (D W]7 L ' v; G / 07-' C N n On 0 I �' o � ,) m n = Arno m .-m _ ) �: 0 ;< m a r o cn 3] m E (5' m b > r 0 FILECOP'1 r O n z n z m J 0 • J ® p C ®W W gl C t.-- W w zi .5 a E S c ZOC m +- m " m` 30 0 n 0 <0 _C- Za O u) co O L� >a E m crl OCR W W w 1 l bow c c A > > i ' , p ril i0 � _. O�CZ O O V (� mava WO a n. ' � � A , ..,::. a E c o Wm c .. m ni O U :n 1016E `> 'aa w 0 c CI Q 45 re% v U ° ° t> mpa r141011) liill Clill BUILDING PERMIT • EXPIRATION NOTICE Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD12-00295 SITE ADDRESS: 41 N PALMER DR Date Issued: 12/6/2012 PORT TOWNSEND,WA 98368 Date Expires: 12/6/2013 APPLICANT: JUDITH SPECHT C/O JED/ALLEGRA BOTHELL 933 TAFT ST PORT TOWNSEND WA 983685400 SUBDIVISION: CRESTHAVEN SUBDIVISION BLOCK: LOTS: 5 PARCEL: 946100005 Section: 12 Township: 30N Range: 02 W According to our records, YOUR BUILDING PERMIT HAS NOT PASSED A FINAL INSPECTION AND WILL EXPIRE ON 12/6/2013. To keep your building permit active you must pay a $228 renewal fee. This will keep your permit active for one year after the date of expiration. If renewal fee is not paid by time of expiration, no more inspections can be performed until received. Please contact our office if you have any questions. Sincerely, Permit Technician data\forms\F_BLD_Permit_Exp_Ntc.rpt • . -. ., - • ■ -.:-,2-‘.'...;:.::-.: . . • . -.:::-.:-,:::P,.=.-':- - - --- 7.,A :tsi.f:4.4p1,vre ___-TIT-1-;.1, . iv.-A,v,Td.,. ..a. ";.- ., c . Date 1—13_ time received il 35- am /0 Mon Tues. Wed: Thur. -Pd. BUD: 1 L. —2-ci 5" . Date: OWNER: . . Contact Name:. . . ADDRESS: '4 ( N PAtAnAer' Contact Number.360 (04 3 -35 7( 1 _ 206 4 . t Notes: - . • . Foundation Plumbing -Framing Propane Tank Mechanical - . Setbacks Under-ground Framing Under ground Furnace Footing Rough in Air seal Above ground Gas Stemwall _ Hydronic Exterior shear ._X,.. Exterior lines Oil Straps Interior shear Interior lines . Ducts f Post Hole Ventilation Appliance Underfloor --K Gas/wood stove Man-Homes Setbacks Insulation Final Inspection >) Foundation . .-A, Block&Tie floor wall ceiling Address Post'ed �4 JEFFERSON COUNTY. • DEPARTMENT OF COMMUNITY DEVELOPMENT 7 Date: 7130 Time Received: 3 a / i Mon. Tue. Wed. AO Fri. Date: ''7/3/ BLD: 1,, A95 Contact Name: / Owner: Contact Number: 360 (,y3 37y/ Address: '9/ v Pet,/h,,.e,, 206 Notes: Foundation Plumbing Framing Propane Tank Mechanical Setbacks Under-ground Framing Under ground Furance Footing Rough In Air Seal Above ground Gas Stemwall Hydronic Exterior shear Exterior lines Oil Straps Hot Water Htr Interior shear Interior lines Ducts Post Hole Ventilation Appliance Underfloor Gas/Wood stove Man-Homes Insulation Final Inspection Setbacks Floor Foundation Wall Address Posted Block&Tile Ceiling $ON CM �¢ C''4 JEFFERSON COUNTY 4: DEPARTMENT O COMMUNITY DEVELOPME Date: Time Received: ' ( Z3 am/pm Mon. Tue. Wed. Thur. Fr' _____ Date: ( -3 I BLD: I Z '2Q 5' Contact Name: Owner: Contact Number: 360 ( q3 3.51/ Address: 4) F{ PAA-0,.c4.- 206 Notes: is Foundation Plumbing Framing Propane Tank Mechanical Setbacks Under-ground Framing Under ground Furance Footing Rough In Air Seal Above ground Gas Stemwall Hydronic Exterior shear Exterior lines Oil Straps Hot Water Htr Interior shear Interior lines Ducts Post Hole Ventilation Appliance Underfloor Gas/Wood stove Man-Homes Insulation Final Inspection Setbacks Floor Foundation Wall Address Posted Block&Tile Ceiling • • Q4,4;t' ooh. JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 2 2 Date: / _2°Time Received: / 6 I art0 Mon. 40 Wed. Thur. Fri. Date: /—20/ BLD: f Z 2 Q S' Contact Name: Owner: Contact Number: 360 331 Address: L / Ai PA loWiCie 206 Notes: Foundation Plumbing Framing Propane Tank Mechanical Setbacks Under-ground Framing Under ground Furance Footing Rough In Air Seal Above ground Gas Stemwall Hydronic Exterior shear Exterior lines Oil Straps Hot Water Htr Interior shear Interior lines Ducts Post Hole Ventilation Appliance Underfloor Gas/Wood stove Man-Homes Insulation Final Inspection Setbacks Floor Foundation Wall Address Posted Block&Tile Ceiling i • i, ,��� ! 4Q4g0N coo JEFFERSON COUNTY 4, DEPARTMENT OF COMMUNITY DEVELOPMENT gO o gN Date: t.—r'Time Received: WO /pm Mon. Tue. Wed. la. Fri. Date: 12.- BLD: (2 Z q 5 11 -2A i`a Contact Name: Owner: Contact Number: 360 t (o Li 3 33'f/ Address: 1411i2k, JJ Pa imeir 206 111 Notes: 1 Foundation Plumbing Framing Propane Tank Mechanical Setbacks Under-ground Framing X Under ground Furance Footing Rough In Air Seal Above ground Gas Stemwall Hydronic Exterior shear Exterior lines Oil Straps Hot Water Htr Interior shear Interior lines Ducts Post Hole Ventilation Appliance Underfloor Gas/Wood stove Man-Homes Insulation /j Final Inspecti.� A, Setbacks Floor Foundation Wall Address Posted Block&Tile Ceiling s 220 o O p a = E. j ♦ l pHWM a O O D O � � (Q L -� � s� ' O _m --m > >a N F, m rI m -� Zm < (I) rn m > Oo' 0 S Z O 0 2° ._4 Ln Om a �,o vC, Co > O .D <. , O c W .:o'. � �z < rD O - m N s". ci w1' V 66 S OT„ n 0 •„�--►n rrl t� • m m .� h `O til a 1 ►- -rei c." r o ig'1 col N P°P 00 sz � �. � % IIilif ` • 0 VI to l./1 VI to to r ' -1-1 7 1 7 1 -1 1 7 1 7 1 m w >iueq jo doh o I O i a*1 m� ` , E'low ��eg3as 6uipl!ofl X 3— — — N. PALMER ..-_-..._....._-. / _ 50 ` rn 2�13 O mO O 0 _- existing 36'x 68'fire damaged building „�-,4'8 I • I o ? iO o-Sz NSFC. I N M6 kx)-r•pRf1 \ at Clz /" \ (1) cF 0 1 i 1 ' W It • 1 o� ; j: ° v 94 x, a � \ .o_ 1 s o $ g 3 ' oe g x ,•P CD an 'O —I- 1 -- / \ C, 5' n -. ._existing Abu K -� t o di 1 Q 1 n o r v — lo ., a 7 A-rT CAA eA4r-■ -g �\ /I . 9 • I -73 —1 L. ""'" w \ . w LJ *A; r C — — ro w / F O # m m �r ro m x x ro Po rt . r 7 -Ti ri N c IT , s aci 0 can L O i iL U C) > .ter 4 O r`,:-= . m • i, i ■telialulow.— ; \ W -1 . 220'-0„ 1 • vi co � ` + N -•rn-• C ` N ;o7- 0 N CI) � m 0 N 7W- I ■ • • n 07 B m Judith Specht Residence z P Rick Erickson Design LLC 0 o -+ 41 N Palmer Dr. 3422 Copper St. m � �• m m Port Townsend, Wa Port Townsend, Wa 0 Z 9461 00005 360.643.1617 m • 0 . Driveway shall meet the requirements of the permitting agency It is recommended that the entrance be crowned so that runoff drains off the pad . }sA s 064 i* i mm• 'I �� tee d sN .d 0 ,. % % CFA �. a6 : 5 . Install driveway culvert if there ki, � \ is a roadside ditch present f , n 4,-8"quarry soalls ,N_ $s" t Geotextile a �, 12"min.thickness Provide full width of ingress/egress area Figure 4.1.1 —Stabilized Construction Entrance Approved as Ecology has approved products as able to meet the requirements of BMP Equivalent C105. The products did not pass through the Technology Assessment Protocol—Ecology(TAPE)process. Local jurisdictions may choose not to accept this product approved as equivalent, or may require additional testing prior to consideration for local use. The products are available for review on Ecology's website at http://www.ecy.wa.govi programs/wgtstormwater/newtech/equival ent.html Volume II—Construction Stormwater Pollution Prevention -August 2012 4-9 • • BMP C105: Stabilized Construction Entrance / Exit Purpose Stabilized Construction entrances are established to reduce the amount of sediment transported onto paved roads by vehicles or equipment. This is done by constructing a stabilized pad of quarry spalls at entrances and exits for construction sites. Conditions of Use Construction entrances shall be stabilized wherever traffic will be entering or leaving a construction site if paved roads or other paved areas are within 1,000 feet of the site. For residential construction provide stabilized construction entrances for each residence,rather than only at the main subdivision entrance. Stabilized surfaces shall be of sufficient length/width to provide vehicle access/parking,based on lot size/configuration. On large commercial,highway, and road projects, the designer should include enough extra materials in the contract to allow for additional stabilized entrances not shown in the initial Construction SWPPP. It is difficult to determine exactly where access to these projects will take place; additional materials will enable the contractor to install them where needed. Design and See Figure 4.1.1 for details.Note: the 100' minimum length of the Installation entrance shall be reduced to the maximum practicable size when the size Specifications or configuration of the site does not allow the full length(100'). Construct stabilized construction entrances with a 12-inch thick pad of fl- inch to 8-inch quarry spalls, a 4-inch course of asphalt treated base (ATB), or use existing pavement. Do not use crushed concrete, cement, or calcium chloride for construction entrance stabilization because these products raise pH levels in stormwater and concrete discharge to surface waters of the State is prohibited. A separation geotextile shall be placed under the spalls to prevent fine sediment from pumping up into the rock pad. The geotextile shall meet the following standards: Grab Tensile Strength(ASTM D4751) 200 psi min. Grab Tensile Elongation (ASTM 30%max. D4632) Mullen Burst Strength(ASTM 400 psi min. D3786-80a) AOS (ASTM D4751) 20-45 (U.S. standard sieve size) • Consider early installation of the first lift of asphalt in areas that will paved; this can be used as a stabilized entrance. Also consider the installation of excess concrete as a stabilized entrance. During large concrete pours, excess concrete is often available for this purpose. Volume II—Construction Stormwater Pollution Prevention -August 2012 4-7 -IIII 0 • 4' . house I fr : I Roof downspout 114111 serves up to :::::!1 700 sf. Of roof imm ii:::::::: '''';"'iiiiiii...... 50' min. II Iiiiiiiiiiiiiiil Vegetated flow path 11::::::1 4:Hi:I cSplash '111,1 block _____4bil 1::......: A-----.7.---- — - 1, -- Downspout extension NTS r Splash / block Figure 3.1.7-Typical Downspout Splashblock Dispersion V( time III–Hydrologic Analysis and Flow Control BMPs–August 2012 3-16 • I Design Criteria for Splashblocks A typical downspout splashblock is shown in Figure 3.1.7. In general, if the ground is sloped away from the foundation and there is adequate vegetation and area for effective dispersion, splashblocks will adequately disperse storm runoff. If the ground is fairly level, if the structure includes a basement, or if foundation drains are proposed, splashblocks with downspout extensions may be a better choice because the discharge point is moved away from the foundation. Downspout extensions can include piping to a splashblock/discharge point a considerable distance from the downspout, as long as the runoff can travel through a well-vegetated area as described below. The following apply to the use of splashblocks: 1. Maintain a vegetated flowpath of at least 50 feet between the discharge point and any property line, structure, slope steeper than 15%, stream, wetland, lake, or other impervious surface. Sensitive area buffers may count toward flowpath lengths. 2. A maximum of 700 square feet of roof area may drain to each splashblock. 3. For purposes of maintaining adequate separation of flows discharged from adjacent dispersion devices,the vegetated flowpath segment for the splashblock must not overlap with other flowpath segments, except those associated with sheet flow from a non-native pervious surface. 4. Place a splashblock or a pad of crushed rock (2 feet wide by 3 feet long by 6 inches deep) at each downspout discharge point. 5. No erosion or flooding of downstream properties may result. 6. Have a geotechnical engineer or a licensed geologist,hydrogeologist, or engineering geologist evaluate runoff discharged towards landslide hazard areas. Do not place Splashblocks on or above slopes greater than 15%or above erosion hazard areas without evaluation by a professional engineer with geotechnical expertise or a licensed geologist,hydrogeologist, or engineering geologist, and approval by the Local Plan Approval Authority. 7. For sites with septic systems,the discharge point must be downslope of the primary and reserve drainfield areas. This requirement may be waived if site topography clearly prohibits flows from intersecting the drainfield or where site conditions (soil permeability, distance between systems, etc) indicate that this is unnecessary. Volume III—Hydrologic Analysis and Flow Control BMPs—August 2012 3-15 IF, IL ON c. 49- 06, JEFFERSCOMUNTY -‘ 1... DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street• Port Townsend •Washington 98368 A peAtI*,:' A,.. 360/379-4450 • 360/379-4451 Fax *---,407 www.cojefferson.wa.us/commdevelopment 441/ING I. Master Permit Application MLA: Project Description(include separate sheets as necessaN): NEW CONSTRUCTION ON EXISTING FOUNDATION Tax Parcel 946100005 Property 2.040 /89000SF Number Size: (acres/square feet) Site Address and/or Directions to Property ,T.APE,SE:C.!RciE RoAD rc,i;1-.7.. ._01\1`,..- EN f,V,I',1(..:--, Iziii3i--.1 ON N PA1 Vi'-'R DC-I 41 NC'. THE =_.EP: Property Owner(s) af Record: Fax : JUDI I H SF'LCH I 1-7-\\ 4cEo Telephone: yii.a.--7\ 360.379----UZH ! ispechtuoiympu Mailing Address: 41 N. PALMER DR. Port Townsend, wiiiJi Applicant/Agent(if different from owner): 1 n SFP 26 2012 i Telephone: Fax L _.,1 email: Mailing Address: JEFFER3ON COUNTY What kind of Permit?(Check each box that applies DEPT.OF COMMUNITY DEVELOPMENT 0Building 0 Variance(Minor, Major or Reasoname Economic Use) O Demolition Permit 0 Conditional Use[C(a),C(d),or C] 0 Single Family 0 Garage Attach-. Detached 0 Discretionary"D"or Unnamed Use Classification O Manufactured Home 0 Modular 0 Special Use(Essential Public Facilities) O Commercial* El Boundary Line Adjustment O Change of Use 0 Short Plat** O Address 0 Road Approach 0 Binding Site Plan** O Home Business 0 Cottagelndustry 0 Long Plat** 0 Propane El Planned Rural Residential Development(PRRD)/Amendments** 0 Sign El Plat Vacation/Alteration 0 Allowed"Yes"Use Consistency Analysis El Shoreline Master Program Exemption/Permit Revisions" 0 Stormwater Management 0 Shoreline Management Substantial Development** O Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Variance 0 Temporary Use 0 Comprehensive Plan/UDC/Land Use District Map Amendment El Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment 0 Forest Practices Act/Release of Six-Year Moratorium 0 Tree Vegetaion Request *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal,if known: DESIGNATION OF AGENT I hereby designate pi vii.,..6 to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Z...e.: )11----e-76.-e_. 4,14(.42— 91-1 Date: c74-a-cs- / .---- By signing this applicati form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabakies,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections. Staff's access and right of entry will be assumed unless the applicant informs the County in writing at the time of the appli..Lion that he or she wants •nor notice. , Signature: .,- Date: 91—.?--- 7 .---- s---el, . .., ...., 4.1.• '..4 .,... . . The action or p.ions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered sla-cies and could lead to a potential"take of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can Me a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-tran fern. - responsibility for adheri . to and complyin.with the ESA. The Applicant has read this disclaimer and signs and dates it below. — . / Signature: ..., ,..--— _ -1,............ •-41 ......41-... ....,4_-.... Date: 9...— 2- .c --1" Jr --- C:\Documents and Settings\carol\Local Settings\Temporary Internet Files\OLK86\Master Permit Application 12-19-2006.doc i /- ' • BUILDER STATEMENT • The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: BLUE HERON CONSTRUCTION ( )643.3511 ( ) MAILING ADDRESS: Randy Welle<ranwel3@aol.com> EMAIL: Randy Welle<ranwel3@aol.com> CONTRACTOR'S LICENSE WAINS NUMBER: BLUEHCC109D8 NtER ARCHITECT/ENGINEER: RICK ERICKSON DESIGN LLC PHONE ( )643.1617 Fax:( ) MAILING ADDRESS: 3422 COPPER ST. EMAIL ERICKSON@MAC.COM Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: ❑ New ❑ Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: 2.b Bank ❑ Community System $ Alteration/Remodel ❑ Concrete Total: L.b Height 8 Individual System ❑ Repair ❑ Masonry 8 Demolition ❑ Other. D � U 11 \t - -�� •;•Existing: «. r. ..,.•: 1 ❑ Two Party t Proposed: L 8 Publi) I H IC Total: 2 i'l l Name •• • •m: ! L' SEP 2 6 2012 If this is a Commercial Project you must answer the following: j Number of Parking Spaces: Current Proposed: NumINFIFEXIditjr" ng pace Number of occupants(includes owners,tenants,employees,etc) Current DEPT OF COMM WENT IBC Occupancy IBC Type of construction: Will you have Food Service? Yes No If this is a Propane Tank and/or Appliance Installation permit,mark all Items below that apply: ['Underground Tank []Above ground Tank Size of Propane Tank: ❑Heat Stove ❑Cook Stove ❑Woodstove ❑ Fireplace Insert ❑Hot Water Tank ❑Pellet Stove El Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage Current Proposed f ofQ�f Only .- 1 . . =; evi r Main Floor Heated 2318 - EH Bid App Review Floor Heated w:Consistency Review: -- Other Heated Base fee: t �'j�'7Sj G Mezzanine Heated Basement Plan Check fee: t 5n tg• Unheated Basement State Surcharge fee: "� 4 - Other Unheated Pot Water Review fee: Garage/Carport SUBTOTALA Sll l■-� Decks 911/Rd Approach fee: EXtsn mci Other TOTAL: $3,---163.O Receipt Number: 132A Cash/Check Number: O ESTIMATED COST(REQUIRED) Date: n J�j Z .Fair market value of all labor and materials foundation to finish `� • 31,, ,:ro Initials: C:\Documents and Settings\caral\Local Settings\Temporary Internet Files\OLK86\Master Permit Application 12-19-2006.doc D -I )E )E -+) 0) Cl, -I -+, x -I -I CD 0) -- -- 0) -0 CO CO X a n r+ X 0) 0 -s v 0) 0 - -0 -3 -3 O 0) C Cl CD 0) C) CD S CO CC -- CD CC CD CD -0 CD r+ O CD - O 7C rn -3 E -3 -- C n O o xx CC O -` CD C3 O Cl, - O O 03 O - Cl) CO CO - - rn C) n O O o N O O O C co O Cfl O r+ - O) co co n C n r+ -o I- n c) o w c o C m o = CD 70 CA O v 3 C)) CO n -i m o -I H -D CO = Cl) -I C_ -I r m -I -I Cn -I n 73 -I a m x rn 7C - = CL m C-3 O TI v -I I- 3> 3> 3 X - co m C . m C W I- o Z 37 -0 -I c CO rn O CO CO I- rn 3] a v CO Z o -0 0) rn -I r- n o - X H no 73 Z M = o a -I -I CO o ✓ c) -I zo co = a c Iv v M 73 m I- X CO CW m D 3> CO m v O 7o 0_ CO co H N -I X CA -1 C � X 3] O X H -- -I i--I RD Cl) - = Z I-I 3> C1 CO rn C ) n I- CO O CJ) o CO I- o -. 0) CO Z -I E c) I- .M c o V m rn 0 Xi co n I o c Cn o_ CO - CD CD 0 O -• O O -I -I M, - 3 -0 -0 r'-'. GI = 0 Z M n n o CT a --A CA = O' = 1 $ I CO CO I-I O r+ CO v 0 m I-I C 0 n D N Z m r+ Cl no 3 r- --• CO - o. O m 7C O - CFI - CD fi m �. N •• •- r- ry O I- 11 O I-I O TI Z o- m o CO c CO I-I • • - - 'O i '° m G 0 3 0 0 0 0 0 0 , y000o or=on VI VI N VI I— rt! r0 ro to "r 0 0 - a s nI,m o ' : 0 D 3 d rt 36'-o" �6 0 -c 13'-2 1 z" 6'n" o` 3'-0" 9'-11 1 z" m na . 0 -. W1 18.0 l ro 1 , 0 20 _48"WSP +8„WSP J 48' WSP ICI i t ■IN�I <s P. -- "' , ,o, = a 2O < N�. G Co •0 00 X �' G�r p X w Wn °'o w „F .� - ° Mow.--_ '� N V:rte__.. i V1 to to to i o - _�_ - -1'1 11 11 11 6 -o 7' av o •- - • :1:711 D15 D14 -�i iD p I 2'6• 2'6' 3= �... N I p Z N 1 p =.� v N m� " p > Z O "' 1 -- 1 O 0 p n I rD 4 1 6 ONO D mN I'm o -7-, we w1 p c om Vl A v'•O y < lA I ���' n ! _ \ av I I o 3'0' 4, p INTERIOR BRACED WALL PANEL - NN - ' 'O19 007 N LA ,, m �/� 1 NTERIOR BRACED WALL t____ I. .. ,„,, __ I°J w 4 ---- tn E01 ' D 72 -— a III 4 41 :::,,,, �o o* 110. O J :18 ii __ 1 Ij ------------------ I ....4 „ , �I AI „..C 0,, ., O v 4 0a x w o o. N m o b m p o° ° y 0. O,MECH. STR. 11 —�- ill g; :VS o 0 0 ... i e� STOR.TI� 1111111 , , , ,T, ,v,. 5 Iv I WSP 7 �J, n I �.I G E02 I 1 Np 503 I� '8 WJP °- 6 ''lIA �V � -I � 1111111 _, ���I' �_�'� � 1 v I IDJI"ERIOR BRACED WALL LINF. G // h': l 0 i I O ri I I D12 �I I' Ill 7 o, INTERIOR ooh BRACEDWALLPA1 L o ,, Cw_Z1 �rO�OO D� 0 0 oh g�. D o oc= Z p m Z O m D rn m C rn „,a O n N 0' nv,,--__ a2aZ�r-r. m � .._. ��On "' ��a 0=m3n= '„C„yCr^„Dv-p mm I p• n„3 �' �+� mZ CGI,_ 7m Omc f0 NI�J= �- nZ�� p-I. p. 0 ^'m�` - y �rt `a LA-I_ my"'ZmzZ O ,_, cno O �o zZ 6nq_nv,zr-.-i>oC„ O w -� O ,,Om On ,�`-z- D p me O O U m o D D m Z m Z rD C cT) `m 3 ,h 7,--10.-1 mDm":rn n n ),-c. -t, m rn e 11111[16♦+✓ m m, D '� Q_m.Z Z t5'r., I O= _,�� z o n n °° I� CD 1 I I IF wos I o _ w IT �x ��;,__Yr _ _i •0, o klor �7 11 m z a v, _ III� m0 7C oo w I .2,.. O m Z 1 OD I a t7 Z D N• _ L� _.111111111111.1111111111 Dos I1 _I=-- ,I=. h Contractors or Tradespeople Prier Friendly Page • Page 1 of 2 General/Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name BLUE HERON CONSTRUCTION CO UBI No. 600583456 Phone 3603854335 Status Active Address Po Box 718 License No. BLUEHCC109D8 Suite/Apt. License Type Construction Contractor City Port Townsend Effective Date 3/28/1990 State WA Expiration Date 8/19/2014 Zip 98368 Suspend Date County Jefferson Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Expiration Status Date Date BONYUG1006LN BONYUN & Construction Carpentry/Framing Ceramic/Plastic/Metal 6/15/2000 6/15/2001 Archived GRAY INC Contractor Tile BONYUN a Construction Ceramic/Plastic/Metal BONYUGCO24MA GRAY CERAMIC Contractor Tile Carpentry/Framing 7/1/1998 6/15/2000 Archived TLE INST SHOULT*093D6 SHOULBERG, Construction General Unused 3/26/1991 3/1/1994 Archived TED Contractor BLUE HERON Construction BLUEHCC151MW CONSTRUCTION Contractor General Unused 7/16/1985 7/10/1990 Archived CO INC TIRCO**052N3 T I R CORP Construction General Unused 8/23/1995 8/15/2010 Expired Contractor Business Owner Information Name Role Effective Date Expiration Date DUFFY, PETER J Secretary 09/22/2003 MILHOLLAND, DOUGLAS Treasurer 09/22/2003 WELLE, RANDY Vice President 08/15/2006 BOUGHTON, JONATHAN President 08/15/2006 08/23/2012 STORY, MICHAEL Vice President 09/22/2003 08/23/2012 WELLE, RANDY A President 09/22/2003 08/15/2006 BOUGHTON, JOHNATHAN Vice President 09/22/2003 08/15/2006 WELLE, RANDY 01/01/1980 09/22/2003 MILHOLLAND, DOUR 01/01/1980 09/22/2003 BOUGHTON, JOHNATHAN 01/01/1980 09/22/2003 LALISH, GREGORY G 01/01/1980 09/22/2003 PINE, LIONEL J 01/01/1980 09/22/2003 LICHTY, JOHN 01/01/1980 09/22/2003 GREENE, JOSH 01/01/1980 09/22/2003 DORN, MALCOLM 01/01/1980 01/01/1980 https://fortress.wa.gov/lni/bbip/Print.aspx 9/26/2012 contractors or Tradespeople Prir Friendly Page Page 2 of 2 IMICHEL, WILLIAM I 101/01/1980 101/01/1980 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amour 6 CBIC SG8601 08/15/2006 Until Cancelled $12,000.0 5 RLI INS CO RSB741329 08/11/2001 Until Cancelled 09/16/2007 $12,000.0 Assignment of Savings Information Savings Assignment of Savings Account Number Effective Date Release Date Assignment Type Impaired Date Amount Re 2 0641013164 6/28/1993 Until Bond $6,000.00 7/ Released 1 1354535609 7/10/1985 Until Bond $6,000.00 Released Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Receivt Contractors 20 Bonding& C11SG8601 08/15/2012 08/15/2013 $1,000,000.0006/29/ Insuranc Contractors 19 Bonding& C11SG8601 08/15/2011 08/15/2012 $1,000,000.0007/08/ Insuranc 18 CBIC C11SG8601 08/15/2010 08/15/2011 $1,000,000.0007/15/ 17 CBIC C11SG8601 08/15/2009 08/15/2010 $1,000,000.0008/11/ 16 CBIC C11SG8601 08/15/2008 08/25/2009 $1,000,000.0007/02/ 15 CBIC C11SG8601 08/15/2006 08/15/2008 $1,000,000.0007/02/ Summons/Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions/Citations Information No records found for the previous 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 9/26/2012 Jefferson County Building Division Permit Numb BLDI2-00295 Applicant: SPECHT BUILDING PERMIT INSPECTION APPROVALS Applicable Code: 2009 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that days inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection 1 Inspection Item Date Approval Signature Notes Setbacks t 2.12" Z P - Minimum setback from North Palmer Drive right-of way shall be 20 feet. Mininum side yard setbacks shall be 5 feet. Minimum setback from Ordinary High Water Mark(OHWM)shall be 127 feet 11 inches as per submitted site plan. (Residence is being built within the same footprint as previous SFR that burnt down). Erosion Control SEE CONDITION 2 Foundation Footing f Footing Drains Foundation Stem Wall Underground Plumbing Under Floor Framing 1_,1_i3 49,_ Straps(hold downs) �1. ,1.i3 �. Ext.Shear Wall Nailing ��p�i'l, Rough-in Plumbing ( v Framing 11(ial1 �_• �? (,�i Lei Airseal l (11!2) �f'�,� Insulation:Walls Insulation:Floors bl /Insulation:Ceiling �) Int.Shear Wall Nailing 14 f/Is Wallboard Nailing .4q//3 Gas Line: Interior `2 `/l 7 % Gas Line: Exterior Propane Tank 1 2-� t r6 Heat/Chimney Clearance Drywell/Alt Drainage SEE CONDITION 1 FOR SPLASHBLOCKS Address Posted FINAL INSPECTION 713\1tl y.. FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD12-00295 Received Date: 9/26/2012 SITE ADDRESS: 41 N PALMER DR Issue Date 12/6/2012 PORT TOWNSEND, 98368 Expiration Date 12/6/2013 OWNER: JUDITH SPECHT PHONE: 360-379-0297 C/O JED/ALLEGRA BOTHELL 933 TAFT ST PORT TOWNSEND WA 983685400 CRESTHAVEN SUBDIVISION SUBDIVISION: Block: Lot: 5 PARCEL NUMBER: 946100005 Section: 12 Township: 30 N Range: 02 W CONTRACTOR: BLUE HERON CONSTRUCTION CO PHONE: 360-643-3511 PETE DUFFY PO BOX 718 PORT TOWNSEND WA 98368 Contractor's License BLUEHCCI09D8 Expires 8/19/2014 PROJECT DESCRIPTION: NEW SFR TO REPLACE FIRE DAMAGED RESIDENCE in conjunction with a shoreline exemption permit(SDP12-00053) TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 2,318 VALUATION 241,000.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2009 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: SHORELINE: CONST TYPE: DECK: SETBACK: 128 BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: 11050 Type Amount Paid By: Date: Receipt: BEDROOMS: BATHROOMS: Permit $1,783.35 LYK 09/26/12 135236 Exist: 0 Exist: 0 Plan Check $1,159.18 LYK 09/26/12 135236 Prop: 2 Prop: 3 State Building Code $4.50 LYK 09/26/12 135236 Total: 2 Total: 3 Total: $2,947.03 Directions to Site: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. Request must be received by 7 am the day the inspection is needed. Office Hours 9:00 am -4:30 pm MONDAY- THURSDAY HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY-SEE ATTATCHED • • CONDITIONS for Building Permit# :BLD12-00295 1.) DESIGN CRITERIA FOR SPLASHBLOCKS: AVEGETATED FLOWPATH OF AT LEAST 50 FEET SHOULD BE MAINTAINED BETWEEN THE DISCHARGE POINT AND ANY PROPERTY LINE, STRUCTURE, STEEP SLOPE, STREAM, WETLAND, LAKE, OR OTHER IMPERVIOUS SURFACE. SENSITIVE AREA BUFFERS MAY COUNT TOWARD FLOWPATH LENGTHS. A MAXIMUM OF 700 SQUARE FEET OF ROOF AREA MAY DRAIN TO EACH SPLASHBLOCK. A SPLASHBLOCK OR A PAD OF CRUSHED ROCK(2 FEET WIDE BY 3 FEET LONG BY 6 INCHES DEEP) SHOULD BE PLACED AT EACH DOWNSPOUT DISCHARGE POINT. NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT. FOR SITES WITH SEPTIC SYSTEMS, THE DISCHARGE POINT MUST BE DOWNSLOPE OF THE PRIMARY AND RESERVE DRAINFILED AREAS. 2.) CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE. QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER MANUAL). ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON STIE. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE PERMANENTLY STABILIZED. 3.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 4.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 5.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices(BMPs)and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 6.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements#1 through#12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. • 7.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 8.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk(or salvage)yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk(or salvage)yards. In no case, shall any such junk motor vehicles be stored in a critical area. 9.) A minimum of two(2)on-site parking spaces shall be provided for the single family residence. 10.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 11.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 12.) Minimum setback from North Palmer Drive right-of way shall be 20 feet. Mininum side yard setbacks shall be 5 feet. Minimum setback from Ordinary High Water Mark(OHWM) shall be 127 feet 11 inches as per submitted site plan. (Residence is being built within the same footprint as previous SFR that burnt down). 13.) The building height is not to exceed 35 feet. 14.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 15.) Residential developers and individual builders shall be required to preserve shoreline vegetation and reduce the associated risk of erosion during construction and any future activity which may impact the stability of the shoreline. \\firlemark\rlata\fnrmc\F RI 11 Permit Rlrin rnf 12/R/9(112