HomeMy WebLinkAbout091514_ra01Department of Public Works O Regular Agenda: 10:00 AM Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director /County Engineer Agenda Date: September 15, 2014 Subject: Adopt the 2015 -2020 Six -Year Transportation Improvement Program Statement of Issue: Conduct a public hearing for the purpose of receiving public testimony concerning adoption of the 2015 -2020 Jefferson County Six -Year Transportation Improvement Program (TIP). Analysis / Strategic Goals / Pros it Cons: RCW 36.81.121 requires the annual adoption of a six -year transportation improvement program after holding a public hearing. The purpose of the law is to "assure that each county shall perpetually have available advanced plans looking to the future for not less than six years as a guide in carrying out a coordinated transportation program" (RCW 36.81.121(1)). Fiscal Impact / Cost - Benefit Analysis: The TIP relies heavily on the availability of outside grant and program funding from the State and federal government. Fiscal impact is evaluated through the annual budgeting process including adoption of an Annual Road Construction Program. Recommendation: After considering public testimony, approve by Resolution the proposed Six -Year Transportation Improvement Program. Return a signed copy of the Resolution to Public Works for further processing. Department Contact: Zoe Ann Lamp, AICP, Transportation Planner 385 -9162 Reviewed By: -� i -p iiii ount strator Date COUNTY OF JEFFERSON STATE OF WASHINGTON In the Matter of Adoption of the 2015 -2020 Six -Year Transportation Improvement Program RESOLUTION NO. WHEREAS, State law obligates the legislative authority of each county to adopt on an annual basis a six -year transportation improvement program, holding a public hearing prior to adoption, the purpose of which is to "assure that each county shall perpetually have available advanced plans looking to the future for not less than six years as a guide in carrying out a coordinated transportation program" (RCW 36.81.121(1)), and; WHEREAS, an analysis of the Road Fund was prepared covering the six -year program period using the County's best estimate of future revenues and expenditures in accordance with WAC 136 -15- 130 and, WHEREAS, the Board of County Commissioners, Jefferson County, State of Washington, has reviewed the transportation priority array and bridge condition report as prepared by the Department of Public Works, and has conducted a public hearing on the corresponding proposed six -year transportation improvement program; IT IS HEREBY RESOLVED that the Board of County Commissioners does approve and adopt the Six -Year Transportation Improvement Program for the years 2015 through 2020, inclusive. ADOPTED and signed this day of 2014. SEAL: ATTEST: Erin Lundgren Clerk of the Board JEFFERSON COUNTY BOARD OF COMMISSIONERS John Austin, Chair Phil Johnson, Member David Sullivan, Member Jefferson Count%, PUBLIC WORKS 2015 -2020 Six -Year Transportation Improvement Program Information Package Snow Creek Road culvert replacement, milepost 3.8, Andrews Creek, August 2014 JEFFERSON COUNTY PUBLIC WORKS 623 SHERIDAN STREET PORT TOWNSEND, WA 98368 PHONE: 360.385.9160 WW W.CO.JE F FE RSON.WA. U SIPU 13LI CWORKS 2015 -2020 Six -Year Transportation Improvement Program Information Packet Table of Contents Letter of Introduction from the Public Works Director ................................. ..............................1 Jefferson County Board of County Commissioners Noticeof Public Hearing ........................................................................ ..............................2 BridgeCondition Report ..................................................................................... ..............................3 2015 -2020 Six -Year Transportation Improvement (TIP) Program ProjectLocation Map ............................................................................ .............................15 ProjectList .............................................................................................. .............................16 Acronyms Used In the Project List ...................................................... .............................20 Budget and Funding Information 2015 — 2020 Six Year TIP By Project Category ................................... .............................21 Funding Breakdown Pie Charts ............................................................ .............................22 Six -Year County Road Fund Projections ............................................. .............................24 Jefferson County Department of Public Works 623 Sheridan St. Port Townsend, WA 98368 (360) 385 -9160 Monte Reinders, P.E. Public Wonls Director /County Engineer Welcome to the 2015 -2020 Six-Year Transportation Improvement Program (TIP) The Six-Year TIP is a "rolling" plan that is updated each year to provide direction to transportation improvements on Jefferson County's 399 -mile public road system. Development of the TIP is a process that identifies needs, prioritizes those needs, develops projects to meet the needs, and rolls some of those projects into a plan that should occur over the next six years. A range of different project types is included in the TIP. The TIP is strongly influenced by the availability of funding, and many of the projects listed do not as yet, have secured funding. As a result, some of the projects in the TIP may not be completed within six years; however, they must be included on the TIP to be eligible for funding. Historically, projects on Jefferson County's TIP have averaged about 70% funding from State and Federal sources. This means that by investing S I of Jefferson County's money in a project, an additional $2 or more can be brought into our community to put people to work to improve our infrastructure. Many non -local transportation revenue sources, however, only fund certain types of improvements on certain types of roads, and the result is that Federal and State priorities strongly influence what actually gets accomplished. This TIP reflects a project average of over 90% funding from State and Federal Sources, primarily due to decreasing availability of local dollars for capital improvements. Jefferson County is relatively rural and sparsely populated. Local transportation revenues are among the lowest in western Washington when measured in terms of dollars available per road mile. Timber harvest receipts historically played a key role in the County's transportation revenue stream. To offset revenue losses resulting from the decline in this industry, the federal government provided payments to Waal timber counties over the last two decades. To date, this program has not been reauthorized by Congress. This results in an immediate 20% loss of transportation revenue for our County. Additionally, the amount of non -local revenue that this money could be matched with will no longer be available. As a result, the Road Fund projections contained in this packet show that service levels and project work will need to be scaled back substantially. The Six-Year TIP, like any other capital improvement plan, is only a plan for what should be done provided adequate funding is available. It shows what funding must be sought and/or what revenue sources must be developed. Decisions about which projects actually get advanced are made through the annual County budgeting process. Since the Six-Year TIP is updated annually, it can be changed to reflect new needs, priorities, and changed budgetary conditions. I hope you find this document useful in understanding Jefferson County's Transportation Improvement Program. If you would like more information, feel free to contact the Jefferson County Public Works office, located at 623 Sheridan Street, at (360)385 -9160. Sincerely, Monte Reinders, P.E. Director /County Engineer NOTICE OF PUBLIC HEARING: PROPOSED SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM Notice is hereby given that a public hearing will be held by the Jefferson County Board of Commissioners on Monday, September 15, 2014, at 10:00 AM in the Commissioners' Chambers at the County Courthouse, 1820 Jefferson Street, Port Townsend, Washington, for the purpose of taking testimony concerning the adoption of the Jefferson County 2015 -2020 Six-Year Transportation Improvement Program. "Each county shall perpetually have available advanced plans looking to the future for not less than six years as a guide in carrying out a coordinated transportation program" (RCW 36.81.121(1)). Written public comments on the proposed Program will also be accepted any time up through the close of the public hearing, addressed to the BoCC at P. O. Box 1220, Port Townsend, WA 98368 or by email at jellboccQco.jefferson.wa.us. The proposed 2015 -2020 Program is available at the Commissioners' office at the County Courthouse, (360) 385 -9100, and on the County website: www.co.jefferson.wa.us. Jefferson County ensures full compliance with Title Vi of the Civil rights Act of 1964 by prohibiting discrimination against any person on the basis of race, color, national origin or sex in the provision of benefits & services resulting from its federally assisted programs & activities. The meeting site is accessible to persons with disabilities and accommodations for people with disabilities can be arranged with advance notice by calling (360) 385 -9100. kustin, Chair of Jefferson County Commissioners MEMORANDUM TO: Board of County Commissioners Jefferson County Department of Public Works 623 Sheridan St. Port Townsend, WA 98368 (360) 385 -9160 Monte Reinders, P.E. Public Works Director /County Engineer FROM: Monte Reinders, P.E., Public Works Director /County Engineer/11/ DATE: July 21. 2014 SUBJECT: Bridge Condition Report 2014 INTRODUCTION As required by WAC 136 -20 -060, each county engineer shall furnish the county legislative authority with a written resume of the findings of the bridge inspection effort. This resume shall be made available to said authority and shall he consulted during the preparation of the proposed six -year transportation program revision. The resume shall include the county engineer's recommendations as to replacement, repair or load restriction for each deficient bridge. The resolution of adoption of the six -year transportation program shall include assurances to the effect that the county engineer's report with respect to deficient bridges was available to said authority during the preparation of the program. BRIDGE INVENTORY Jefferson County Public Works owns a total of 32 bridges, two of which are permanently closed — see the attached Master Bridge List (Appendix A) for a listing of all county bridges. BRIDGE INSPECTIONS The National Bridge Inspection Standards (NBIS) and WAC 136 -20 -030 mandate that public agencies inspect and report on all bridges at least once every two years (routine inspection). Jefferson County staff performs all routine inspections. Special inspections are required for bridges that cannot be inspected adequately from the ground. For these bridges an Under -Bridge Bridge Condition Repon 2014 Page I of 3 Inspection Truck (UBIT) is required. Steel bridges with fracture critical members may also require special inspections with the UBIT and/or other special equipment. Jefferson County has two bridges which require the UBIT inspection and one bridge which requires both the UBIT and the fracture critical inspection (identified in the attached Master Bridge List). Jefferson County currently has a contract with the Washington State Department of Transportation ( WSDOT) to perform these inspections. Jefferson County Public Works has split up the bridge inspections so that East Jefferson County bridges are inspected in odd- numbered years and West Jefferson County bridges are inspected in even - numbered years. In conformance with that schedule, Jefferson County completed the biennial inspections for all East Jefferson County bridges in 2013. The inspection reports were submitted to WSDOT, which then verifies compliance with the NBIS and reports to the Federal Highway Administration (FHWA). DEFICIENT BRIDGES All bridges are assigned a sufficiency rating (SR), which is a calculated score based on numbers assigned to all of the bridge elements reviewed by the bridge inspector. The SR is a number from 0 to 100, with 100 being an entirely sufficient bridge, and 0 being an entirely insufficient or deficient bridge. For additional explanation of the sufficiency rating and other ratings see the attached WSDOT publication, Bridges and Structures - Ratings (Appendix B). The sufficiency rating is used to determine if a bridge is eligible for federal rehabilitation or replacement funding. Currently, none of the county's bridges have any major deficiencies, and none are eligible for rehabilitation or replacement. As described in previous Bridge Condition reports, Tower Creek Bridge is being monitored for potential scour problems associated with down- cutting of the streambed. The Tower Creek streambed experienced significant down - cutting in 2007 -2008 due to migration of the Hoh River and heavy flows in Tower Creek. However, based on regular monitoring, the streambed elevation has been relatively stable since 2008. Public Works will continue to monitor this situation. POSTED BRIDGES All bridges are required to have a "Load Rating" calculation. The Load Rating establishes how much weight the bridge can carry for several standard configurations of vehicle axle loads. If the load rating calculation shows that a bridge cannot safely carry the legal traffic loads then the bridge must posted with the appropriate load limits. Jefferson County currently does not have any bridges with load restrictions. The load rating values (in tons) are listed on the attached Master Bridge List (Appendix A). EMERGENCY REPAIRS AND INSPECTIONS There have not been any emergency repairs or inspections since the last Bridge Condition Report in 2013. Bridge Condition Report 2014 Page 2 of 3 MAINTENANCE ACTIVITIES Routine maintenance of the county's bridges is conducted by the road maintenance department. Typical routine maintenance consists of deck cleaning, brush clearing, and minor miscellaneous repairs. COMPLETED PROJECTS In 2010, Public Works applied for and received $2.97 million in federal funding to repaint the Queets Bridge, which spans the Queets River on Clearwater Road. The painting project was completed successfully in December 2013. It was 100% funded by the Federal Highway Administration. A new bridge was added to the system in 2013. At Alder Creek Tributary, Upper Hoh Road milepost 2.15, a 25 ft. span, pre-cast, reinforced concrete three -sided structure was constructed. This project corrected a fish - passage harrier, and replaced a deteriorated culvert. The project was funded with 86.5% funding from the Federal Highway Administration. CURRENT PROJECTS Current projects include the following: • A 60 ft. span precast, pres - stressed concrete slab bridge at Upper Hoh Road MP 4.38. The contract bid documents are complete. The project is scheduled to be advertised to bidders in January, 2016 and be constructed in summer 2016. This project is 100% funded by the Federal Highway Administration. • A 21 ft. span, pre-cast, reinforced concrete three -sided structure at Upper Hoh Road MP 6.95. The contract bid documents are complete. The project is scheduled to be advertised to bidders in January, 2016 and be constructed in summer 2016. This project is 100% funded by the Federal Highway Administration. • A 24 ft. span, pre-cast, reinforced concrete three -sided structure at West Uncas Rd MP 0.804. This project has received funding for the design phase, but not for construction. PROGRAMMED PROJECTS There are no programmed bridge projects at this time. RECOMMENDED PROJECTS There are no recommended bridge projects at this time. Bridge Condition Report 2014 Page 3 of 3 APPENDIX A Jefferson County Public Works Master Bridge List LAST UPDATED: 7/21/14 Total number of bridges in inventory: Total number of permanently closed bridges: Total number of active bridges: Total number of West Jefferson County bridges: Total number of East Jefferson County Bridges 32 30 IS active bridges I permanently closed bridge 12 active bridges I permanently closed bridge Jefferson County Public Works Master Bridge List Laat Undated: 7rz12n1/ m �» z i 0 W RIUD4E TYPE tJ ,EG F F < } E FZ Q uC SS R < C 41 a Y Supenwelan Sobsiruelun 7996700 ISE Hunts 634509 Hunt Rd. 0.15 27 Reinforced Cone. Cone. Abutment w/ 1971 NO NO NO NO NO 1.18 1.97 STD. 4/16113 88.92 Slab C.I.P. none. piles (42 TON) (70 TON) 8165100 16E Little 931507 Center Rd. 14.6 64 Reinforced Conc. Cone. Pile cep, 1955 NO NO NO NO NO 0.63 1.05 STD. 4/16/13 59.75 FO Quilmne Slab, Conc. Girder Prestress. Cone. (22 TON) (37 TON) River pit= 8464900 17E Yarr 931501 Cemer Rd. 3.44 25 Conc. Multiple Web Conc. Abutment w/ 1955 NO NO NO NO NO 0.39 0.66 STD. 428114 64.61 12 MONTH INSPECTION Girder Prestress. Conc. (14 TON) (23 TON) FREQUENCY les 8150600 2111 Old Little 327209 Brush Pleat 0.04 59 Concrete Arch ead 1916 NIA WA NIA N/A NIA NIA N/A WA 6/1/09 N/A PERMANENTLY CLOSED Quileene Rd. River 8320300 23E Linger 301309 Langer 0.42 81 Prestress. Conc. trnrnt w/ 1969 NO NO NO NO 0.89 1.49 STD. 4/16113 70.03 Longer Longer Rd. Bulb -T Girder umn over I IND (32 TON) (33 TON) e. piles 8381400 24E Rocky 250008 Dosewall ips 3.01 47 Prestress. Conc. utment w/ 1964 NO NO NO NO NO 0.72 1.20 (43 STD. 4/16/13 76.99 Brook Rd. Bulb -T Girder ead (25 TON) TON) 8229900 25E Meyers 503409 Belfrage 0.12 30 Timber Timber abutment, 1971 NO NO NO NO NO 21 TON 31 TON STD. 6127/13 63.58 R& Ifirriber piles 8488200 26E West Uncas 500209 West Uneas 1.89 61 Roof. Cane. Slab Conc. Abutment, 1964 NO NO NO NO NO 0.66 1.10 STD. 4/16/13 82.17 Rd. Conc. column over (23 TOM (39 TON) C.I.P. mac. pile 8136900 28E Leland 344009 Rice Lake 0.33 32 Prestress. Conc. Conc. Abutrneni, 1987 NO NO NO NO NO 1.59 2.66 STD. 4116/13 88.20 Creek Rd. Slab Conc. spread (57 TON) (95 TON) FO footing 866000029E Contractors 501409 Old 3.56 294 Timber Deck, Cone. Pile cap, steel 2000 NO NO NO NO NO 0.78 1.31 UBIT 712/12 86.41 UBIT EVERY 4 YEARS Creek Gardiner Timber Girders piles (28 TON) (47 TON) LAST OBIT 7/12/2012 Rd. Page 1 012 Jefferson County Public Works Master Bridge List East Jefferson County W yh z F Z Eo a enwce rvee E � < � �' o � °P• i �C � � m E a C P i iz G is < 0 1 0 � � iC • d w `� �o� a. '� Superstructure Substructure 8754000 )1 E Shine Creek 447608 South Point 0.25 70 Prestress. Cones Conc. Abutment w/. 2005 NO NO NO NO NO 1.45 1.76 STD. 4/16/13 97.58 Rd. Slab Cork. Pile (64 TON) (108 TON) 8737900 J2E Donovan 727508 E Quilcene 0.77 70 Prestress. Cone. Care. Abutment wl 2006 NO NO NO 1.25 1.62 STD. 4/16113 89.28 Creek Rd. Slab Conc. Pile (60 TON) (101 TON) 8751800 37E Old Tarbox 157509 Old Tarbox 0.88 42 Prestress. Cone. Conc. Abutment w/ 2003 NO NO INNOO NO 1.8 4 3.07 STD. 4116!13 89.98 Rd. Stab steel piles (66 TON) (111 TON) Page 2 or 2 Lest Undated: 71212014 Jefferson County Public Works Master Bridge List West Jefferson County 9 Fe z E ° 2 z 5o y�J BRIDG[1YPE � .Supelltructure .Substructure 8451600 01W Fletcher 911607 Quire th 8. 3.19 78 Prestress, Cone. Cone. Abutment w/ 1974 NO NO NO NO NO 0.98 1.64 STD. 5112/14 99.50 Creek Shore Rd. Bulb-T Girder C.I.P. coot. pile (35 TON) (58 TON) 8258500 02W Barlow 134309 Oil City Rd. 9.75 64 Prestress, Cone. Slab Cone. Abutmnn w/ 2005 NO NO NO NO NO 1.53 1.99 STD. 5/12114 63.53 C.I.P. Cone. Pile (69 TON) (115 TON) 8145800 03W Ardenon 134309 Oil City Rd. 4.44 81 Prest.. Cox. Cone. Abutmet w/ 1974 NO NO NO NO NO 0.91 1.52 STD. 5/12114 90.43 Creek Bulb- TGirda C.LP.xx. pile (32 TON) 54 TON) 8280100 04W Hell Roaring 914207 Upper Hoh 0.16 120 Prestress. Conc. Cone. Aburnent w/ 1982 NO NO NO NO NO 131 2.19 STD. 3113/14 91.88 Creek Rd- Gird" steel H pile (47 TOM (78 TON) 829880(1 05W Alder Credo 914207 Upper Hoh 2.07 67 Prearess, Cone. Co.. Abmmaa w/ 1972 NO NO NO NO NO 1.11 1.85 STD. 5/13114 99.59 Rd. Bulb-T Gird" C.I.P. xx. pile (40TON) (66TON) 8363600 06W Rock Creels 914207 Upper Hoh 6.49 83 Prestress. Cox. Conc. Abutment w/ 1973 NO NO NO NO NO 1.13 1.89 STD. 5/13114 92.80 Rd. Bult,4 Girder C.I.P. xrc. pile (40 TON) (67 TON) 8384000 07W Tower Creek 914207 Upper Hoh 7.5 71 Prestress. Cane. Conc. Abumem w/ 1973 NO NO NO NO NO 1.10 1.84 STD. 5/13/14 92.80 Rd. Bulb-T Girder C.I.P. xx. pile (39 TOM (66 TOM 8391000 08W Queeta Rive 107509 Clearwater 0.6 844 Steel Plate Grader, Cox. Pins, Cox. 1968 NO NO NO NO NO 1.07 1.79 UBrr 5112114 98.71 UBII EVERY 4 YEARS - Rd. C.I.P. core. dwk Abument w/ nest H (38 TOM (64 TOM LAST UBIt 7 110.2012 pile 8047800 09W Iffeniphill 146809 Dowam 2.3 31 Timber Deck. Tim bumet, 1977 NO NO NO NO NO 21 TON 31 TON STD. 5113114 60.39 Creek Creek Rd. Timber Girders tonber piles 7966600 IOW Duwans 1468119 Dowane 0.52 81 Pre"ress. Cox. Cone. Ahuuxnt w/ 1974 NO NO NO NO NO 1.10 11.84 STD. 5/13/14 93.79 Creek Creek Rd. Bulb-T Girder C.I.P. cox. pile (39 TOM (66 TON) Page ld2 Jefferson County Public Works Master Bridge List West Jefferson County Lag Undated: 7/21120/4 Page 2 of 2 i ° L e � � tlHIIX:l. I l Yl. F� F5� E tip H, UH z ° SupeMruclure Subrtructure 8475700 I1W Owl Creek 135109 Malik 1.29 69 Pmstmu. Cone Slab C.. Abetment W/ 1989 NO NO NO NO NO 1.36 2.27 STD. 5112/14 83.45 Creek Rd. Simi H piles (49 TON) (81 TOM FO 847380012W Maple Creek 135109 NOT [N 81 Prtaues. Cmc. Care. Abulnamt 1972 N/A WA WA NIA WA WA N/A N/A 628/05 IVA PEPMANIN YC.OSm SERV)CE BWb-T Girder $253600 13W Huns Creek 107509 Clearwsuer 2.66 67 Presumes. Core. Cone. Abuttrlalt, 1969 NO NO NO O 1.03 1.72 STD. 5112114 99.86 Rd BWbT Girder Core, cola core. (37 TON) (6) TON) footuig 8339400 27W Willoughby 914207 Upper lloh 3.52 60 Pmmuert. Core. Core. Pile cap W/ 1962 NO NO NO NO NO 0.82 1.37 STD. 5113/14 59.03 Creek Rd. 9u1bT Girder Presses. Came. Pit= (29 TOM (49 TOM 8659900 30W Cassel Creek 134309 Oil City Rd. 3.59 154 Steel Girder Core. Pik cap. sueel 2000 YES NO NO NO NO 1.19 2.00 uBFr 7/10112 72.52 Fri axe C66W Smem Inap - -- pitw (43 TON) (72 TON) FO ``SD 1-f '"'a""`^ "d uRrr m -m°ady 88299M 34W Pole Creek 914207 Upper Halt 8.3 37 Came. 3wlded Box Core. Spread 2010 NO NO NO NO NO 1.11 1.41 STD. 5/13/14 92.80 Rd Culy Footing (50 TOM (65 TON) 8845600 35W Dismtul Creek 914207 Upper Hoh 9.19 22 Core. 3 -Sided Box Core. Spread 2011 NO NO NO NO NO 1 1.3 STD. 5/13/14 91.00 Rd. Culvert Footing (36 TON) (46 TON) 8853500 36W Spruce Creek 914207 Upper Holt 9.7 22 Cane. 3 -sided Box Come, Spread 2012 NO NO INO NO 1.176 1.463 STD. 5/13/19 92.80 Rd. C.I x Footing (42 TOM (52 TON) 8863300 37 W Alder Creek 914207 Upper Hoh 2.15 23 Cone. 3 -ddd Box Cone. Spread 2013 NO NO NO NO I b() 1.29 SID. 5113/14 91.11 Tributary Rd. CUNW Footing (36 TON) (46 TON) Page 2 of 2 APPENDIX B 12 WSDOT - Bridges and Structures - Ratings A�i G// e.or�t.i«n sol�Trr.sportatien Bridge Ratings The safety of bridge structures in Washington State is ensured through a meticulous inspection system, incorporating state and local agency inspection contributions. The condition of all bridge decks, superstructures and substructures are rated based on these inspections. USDOT's Federal Highway Administration (FHWA) requires all state transportation agencies to report state, city, and county Structurally Deficient (SD) and Functionally Obsolete (FO) bridge ratings each year. These ratings are used to help determine federal bridge replacement and rehabilitation funding levels to the states. With the past collapse of the 1 -35W bridge in Minnesota much of the national discussion has focused on bridges being classified as structurally deficient and functionally obsolete. Unfortunately, these discussions have led to much confusion as to the actual meaning of the terms. Aside from tracking structurally deficient and functionally obsolete, WSDOT's Bridge Program emphasizes the importance of cost effective preservation programs, such as bridge replacement and rehabilitation, seismic retrofit, bridge painting, bridge deck rehabilitation, and bridge foundation scour mitigation. Structurally Deficient Structurally deficient means that a bridge requires repair or replacement of a certain component. This may include cracked or spalled concrete, the bridge deck, the support structure, or The Us 101 Simpson Avenue Bridge the entire bridge itself. If the condition is such that it no longer over the Hoquiam River is able to carry its intended traffic loads it may be weight restricted. Being structurally deficient does not imply that the bridge is in danger of collapse or unsafe to the traveling public. Page 1 of 2 The 38th Street Bridge in Tacoma WSDOT has 139 state owned bridges, including one large span culvert, that are classified as structurally deficient as of Jan. 2014. Contract work is in progress or complete on 15 bridges. Functionally Obsolete Functional obsolescence is assessed by comparing the existing configuration of each bridge to current standards and demands. A bridge can be categorized functionally obsolete a number of ways like having substandard lane widths, or narrow shoulders. Another example would be a bridge that doesn't have enough vertical clearance for large trucks to pass under, causing repeat hits and damage to the bridge. Sufficiency Rating The sufficiency rating formula is a method of evaluating a bridge's sufficiency to remain In service, based on a combination of several factors. The result of the formula is a percentage in which 100 percent represents an entirely The State Route 20 Deception Pass Bridge to Whidbey Island 13 http: / /www.wsdot.wa.gov/ Bridge /ReportingtBfidgeRatings.htrn 7/21/2014 WSDOT - Bridges and Structures - Ratings Page 2 of 2 sufficient bridge and zero percent represents an entirely Insufficient or deficient bridge. The sufficiency rating doesn't necessarily indicate a bridge's ability to carry traffic loads. It helps determine which bridges may need repair or replacement, not potential for collapse. Like all other states, Washington annually submits a report to the Federal Highway Administration (FHWA) containing all of the required Information for each of our bridges. FHWA uses this information to determine sufficiency ratings. Many factors are included in the ratings, a few examples include traffic volume, roadway width, structure type, roadway alignment, and the condition of the road deck and structure. A bridge's sufficiency rating affects its eligibility for federal funding for maintenance, rehabilitation, or replacement. For bridges to qualify for federal replacement funds, they must have a rating of 50 or below. To qualify for federal rehabilitation funding, a bridge must have a sufficiency rating of 80 or below. Good, Fair, and Poor Condition Good: A range from no problems to some minor deterioration of structural elements. View from under the SR 20 Deception Fair: All primary structural elements are sound but may have Pass Bridge deficiencies such as minor section loss, deterioration, cracking, spalhng, or scour Poor: Advanced deficiencies such as section loss, deterioration, cracking, spalling, scour, or seriously affected primary structural components. Bridges rated in poor condition may be posted with truck weight restrictions. As of June 2011, 5% of WSDOT bridges are in poor condition. Fracture Critical Fracture critical refers to a bridge component that might cause the entire bridge to collapse if that component failed. Copyright WSDOT tO 2014 14 http: / /www.wsdot.wa.gov[Bridge /Reporting /BridgeRatings.htm 7/21/2014 Jefferson County Transportation Improvement Program ' -- — _ _ w 2015 2020 f Admiralty _ L- - - -_ -- Inlet � ' 1 J - i - Townsend Port Bay 9 rCli, i a I .a = Its a Sequins - - -- ; ` � -- � � -• Discovery 31 w ald Ba y 21 — a. 30 � 1 1 20 33 _ v 19 32 12 J, 1 I / 24 30 ` Oak Bay `I 16 13 1 25 "i'- I_.1 22 I'I'IL441 +++ 27 f ii...YY������ t I & 1 + r 1C Puget OV S Sound �roC�e a o' y / / I '*rk Wsi.� ✓_ 18 Y b i 0 17 10 iVIMI i I v i ; ___________________ 2 7 -�'— B — tlo �cark A1+c��+• ; CY O4' 7 oa '!. 5 �Funding J r 1 (� Planned Ll v I BAj .= m.oembe.l«RM��a to .,ct numberein mrtalive summery. 3 4 rs ..e... 1 10 _ r 1 K1 _ — 75 CA AOerrry. JeRer•on County County No 16 D"FT SIX -YE TRANSPORTATION IMPROVEMENT PROGRAM 2016 -1626 Neanro Date xk 14 Aaophon Dale. Wn ✓10 Resolution No X, 14 y % d G 4 ww[cr mnnFwAnoY rw4e w. •wwv nr.gw -•rrM Srnw.r c•.[.r.•.q•[rrww�l [ a�err wrm].r rr can IMR. Rrwmarel L€ ye— FT !F C � 2 � � rxol[cr cw» w PRCAR• CYPEMdrlwE ecRldRE Fwp[p rgMMe »afar fj �[ i ['j 3 � FUNarlb •wIIY:[efORY•rRw F[P[•Aa vulYx rten rug6• orlell IT/Cf•I9 aocu FINW rota � C 8� i 3 C a Rw/ GPPr rurlr» / arxn nerc ca•rN rl1Ar wa11 w] ru«] MI• rM, )H] rGe. W1{ Wr• ♦Me »Jr• Mx rota r16]r• j �C _p w ulm Mr oaaz.w a�tlM -rut.] r.eigmrOrrwrae +�.Gnew+xe •nO rwOm..iq >]vW wxy auvwrewr N • ]} eee qIF Cw« TW a a3 M 1M MM/ TI,IY • 11.W 1• ISW 1 +♦f« • 0 0 YN GM! MAO • •«w MARS •«w it • • rr n o • • ]n W l vW {l Da.ene CM Rue VxnrwA M1wr. Mw.na[w. RC I•aacq MP 3mereuli er ..n }oy tl ={r O]x3Y b • •.« P2 MI Cx rW a G Y NI 1818 W [MO ] rr m x w N w N] 0 e 0 me e1M MA10 Cw lem ea«e »3,113 MJ13 wbe nw • bw mw '"J'. 0 a 0 • e m 0] z •nm Win.un beam fnw RwO Repv mn nylon s. iniyi. ex nr >oio �.. r�aPS+sW Iw » • «q [C mW cw«. raw a UL[ r w 1N] G m 31,fw S'e. »3 «• !».. Yx We la a lOw 1a MN We "em 0 •IF llp 11 •1 W 'Om m n m • e nww 111m. a s e o n w w 3 3FW0 uV•Iwro of �.]{ Wn•an «RO V. nanr ee«e•pau naux wn a .aMm ou2u rut f']l �ry om aM l.nCUyrq 6pawnvnlrqu « • O.r re. pw CaY rpw e G Y 0 e a 0 0 0 Ne W Ile.w ».w w ly mw e n • 1 ww m a 0 • • a 1 W m 1 wew .avy Rrlwn.yar Rplr our Fen0. allrnFR IYZM r' mmw k.a q4 m. Uwe�wn Ra .�eeeY wwYO wzlle uRR «.em web retlr=lw ]m x • «• PT v[. We tar r.r o[e r N> INI rYb 1 w a 1 w uw law a e 0 a e o l • • a l uw a • • • s l w ar • ww wlm• Ames n.wr.rar. xae R.0 FenY OrymrcMwM Art euawi.VSrrpna »nn. +w . nariargl e�grm 4Mq m, na.W'.rn e..w.wnlwx M••n .uellma ra Ra cR err... row•{+ w 11 • w P.r rA. MY M3 rr o at[ N e e o a e e Ne ww THw a »1w m THw • • s m • • a+ r Peso wm Year.'. R«IYnF•wr aryw«rYM wrrewcl..e..ge..r. o-.awarry rM1rol P�.rr4M.gMrmJ.�Ya1 euMM1MeiC wlFp mlwn Mwamr, rMga CNPM ia. ={r]w IN n • W P.r r.E pe awl TWl F Oe• N. • • 0 • ] e M P»C 1. • I.rSre 1 1 IMm w e • • 1 w • 1 • • • • ei • ww w•.b YwPrernellen'. Nr lYnFrea arymRR. wLM A+.Rw.r.w ugn.gn otla.mrw rRaro� Prtar.n4migbnleavnlMm.rilWNwJ wugeiMl uVe rM RE fjl Rewe rdtl =fl im nw n • MW R.r •E ww Cwl. rWl e •w r 0 0 rNl Vtlw • • o Mx rW w «. • rl rl w«I a • e w+ • rf • e • • w F m. .1. w•,•rwv VpryrlM eul'M/rrybMMFW rrnwq 1pllcwera auge.4.ceu Rrgern �FrARILM�q If �l+l nY6e luMiq Yn innaevuc0.n RrtValen Pgstl PnaaMO e wuWn rn +emem of rrywR let.' =fr]ru 11 • »A R.t R.E bM aar raY o paC Y» «.w w 1•.M 1 w le «Ow Yx 0 0 0 Mr 0 0 0 e e «.w w nw reW l • • • w w 10 maw MP 0,3 U1.w+e] rereuer e.y q..e- Rr...z )R ngci RwMer *in.[Wn tenants re w••a mm eeyM.urc'•w SrMb Ywe.ne.q.tle G.wM.i - r s3• m �•1ryYWIM01.1 a r • ax r.r.c. w R.e Rx awl tar a r er1• YI• w Lln 1we w sM HF. l VN w alY w .,r M« 4W YN GR 1 .w laAr lj«In l.]W l • l W m m IN a • • • a 1 m qr Tweean WMbotl WJVI RU T..Il Yrvmr✓nCM ✓9 CM1mprm qo« n]r l »3R b • e.W I.i M fwl, TaY e a0• Yb lAr • t W IS]w lylw • • • yN •»A «I.m r••r ]II.eN • «a]lt IS.m W» «a311 l»tx • • tl » Well 0 e e 0 11 bn eoa.ua owxvxol+ V Agency: Cw* County No 16 DRAFT SIX NEAR TRANSPORTATION IMPROVEMENT PROGRAM 2015-2020 Neenrp DOW '.xx W14 Abophon Den: Wxxlte ReeWWion No xx le ra }j `r UPPL G rnaecl roExnrrcinox . wv ar�a� ma. ckpmmrq.iw EmY p�oeN�rr F ...... Wen erq 1. Cwl lrrul MwrMUnl i : C ij L rRUecrcwnwoauw•• maNTUtl•umxs ruxrco wro»cn axLr ' 1ile. i 6 rurol•em/ee xraY•row pEee Fpin• • orYER IOCRI roru •y� �3 wr e•r/r 11•rwr• CO�InN rE1R1 F alt rWe Ale nAR[ rn n1m, a roru a'.. '4r N'` � 1r N n r WIFyy CenWelren Rir�ipnmYUw �mmro-v�ew ap0'vwreenm ena »eaYprYn NOrE „eIKKA R[b ke sYY lisle Vr Yr�x]u'El a • ei vE Rd Car , I. 1 »,i f4o »Aw I YO 4Ne 4N0 aAA 4i Llf KIM am am e • • vw Y am KM N to M1e {eN10 MP P.Y aRN M wraYewkrwol -fR »E w.e1 VMYrRY lvYy pgwlberrpror r,rrreus am Ym pWeelrun LMgI PVY IoW- NCIBN !1 • e.» /.T r! iaW 0 4n0 0 4® 4A• jam 0 AORM a be np Mew e 0 EW ULIW • • • e e us w1 rcurrry rm. • YYwYU pem. con'q.b Yawl e.N r.T r e. Rr» Curti OC! r e IA.•w 0 1A. tae.lN 1 0 a e e 11�4 w 0 w— Sam 0 e e m.m 1 e 0 e 0 m » oa.eE[pw arwrOY10MP.ak w.. simor�E•rr.eYYa.m uo+P mR 11 L Mm r,T RM rr e om e • e tlw v • e L e e m w W N Oor •e.r Rlf...rMegrWrbi•L . rbr.n Pwep w Paarq b muAUa drmPa Pvmur yY.r.YmrWw,ro o.�.wr a•r rYaurr?m ».le • 1.N N r. e. LA cw. rr L rna rlmwev I I,ep 14oar 10An l4m 0 0 0 e e e a vo • • • a non N n NNO oUP w.x erYrilml •r•Y. •Nmr.•wm wYr cM1O rOrr iexM1 mraeer aar Ear .m.. yrs Y.O nrrWE arWpP Fw.VM YSOIa rwralmw N • ea r,T r.e Rnr CaxE rr [ e a o o rrN v.NO NAN w.am e e e » ".me Mo e • • e e ww v » "Pew., M rw.r LN err.»rNa mAaler Orrr uexEwr erm +a.+m.lP RaamrmwYnewu rrr wra wnw�alrwv ..rwre +awLl amo r r IN r.T.e re Lw Cwt Ir 0 x w lao nM0 Iraw nMe n.w n4o e e w v.MO • "COUP M. • Wel o • IN m i.w.w e e n nw sam w • 1 w n »4bYEru Nm (elYw TL Mpnwe MRI WreLMamiNl-IrrmaalCSmMren) mrryr♦n RUn Emunw qe ro M4vrGanlr lrYwr rranaw al r Lv /.! Rr» cww. rr e OLC u1e O ».NO 1W.Oa IN 1 0 0 • 0 0 e a n w • Is. Imo e e e o e I w I w N A NIN M4tlY110llN brm bYgwoill 01Y•rerreb IEwlrLrapOrYn ar0 lmmwy Ra nprorw tlgrYY vK•[Y bmw wmPy mwwru Yrrn rwl n r La• 1T re ry» carts, TWO 1 0 v IMNe a. PWPU a,•m aAY M. nY w YLN a. We. eRem N0.1p M. w I Na am No t INO mp m, e 1 tie 0 w m 1 w e A » n w low a l w N No ••IN Nr l.m r ur a» ...P Wmouo1.1- 111—mereP 1.1 T1.n ]H prulYCl PermmnlpueervMa. ore.ey T.e purPaub w.rrra nb YUa.wre erw mp orarwe.Ory era l•M1R' cm le r li r[. le» CmM tar 0 M >.na Mw M.MO low 0 0 0 xw x4w w w e a e Mw UP, w N H wA P. III.. w.uw.e Retl CUIrM Rpbaumm.YV O.eW gape yuwew muY ouaM rYrllr oawelY W. ca'rYl FWrawpe pgpcl MlrrNwrn 011, Saimaa C 11— Mel•aeoeCreW 11 r IW qT Y!. MY C.. &i. 111E o w 0 0 0 HO,w W e o ww Mo 0 ww e • e NO ON IMIUp0 . 05r2YA1e m Agency. Jefferson County County No. 16 DRAFT SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2015 -2020 Reanq Dew WW14 Adoption Del.: E .04 Resolution No xX -1a r3� ry a EE CpMwb^EXiw Em Yp xumur D. rWN.....m. e Mu.lrXan m wwv me iWl con I�MI anam,wnt II 3 t p( FR }, _ iii t 5! Pxmen coo. ix mttw lEPlMdilllll.CX[d14E Fllxp[a PPO]lci. dXv E iG yy [iEi iUXww]eWXCE1wOpWETKK1 {EOEMLFUMPE BTAIE RIXa! REVENUE. NNW TOL]J. y( a: I CNP / 1NI WiY oltw STATE CWT \Y rlNw M 1 YM, Y[M] • Yall me ]NO �y GF N E s i C a] aiq.w.t .]]Nr NY a. ]. w NV o w cXm.c.m W imm-1 nya.mw mrw mu.i.,..uwaquq.mY Wk .b,p Ln.m.wm nep nom Cau�cn unblMwq, Wq I.PI�P]0 WC ]I r ai r.[. you CWe Tgtl m T Rrr# » n.Y ew ]W.N• m.m ST'. C. wAle w.m Y VNe ETM mm lal] 00a ]Y.w lw. W . • t W 1 w0 . • ]w Y• ]ww • a 1 wA Y as wrq,,., FwYw Ylmm, CrW oor w.m llKn..r. e.r- E.a,.�••rx�t �.t,n�m,n wp...otsw •aoo]r.W r.sd o.wM a.1 MIw.n ON G.,b,w N[N•s.lmm nw. qN =fssl Ne. al r s w r.[. ww CWL T.Nt a v o E e a E o IICG+NIA W,w w.w Wr MM . Yw • • o • e MGS.n.,tlwnMbinrABq 0006, 001 0., Y,s Gq bvq n.aYYE Yr. M•,XW Arxw] AOI COT.wgwW M.J prow. B.tNh�Otl tyq,r rbW •9.Y,m fw.t .won,m .wn]EO am w P y r.E 1e1. CWL rout 0 N 0 0 a a 0 a IICO 1Mw tY.w Y4E10 MAN w.w e W • Ww w • • e e . wW s ,n.u,W XroX.W m oor Y.q n..n.�l.gs.MN.t• cXa�q. . ry o.=.u.on n , of ' S p��vc�InB.d . W W To.WWW .y tl X.q] , .m b wewlr�] f ++. w, 01.N r v It cN.Y .t TW v .Ke MOOD a .Mw .a4., 4Ow .OT • w We w.w • .1YA,w a W'l'. . a new E a . • . • rn.o0 w fl .wo WPZW w.0 vWM.W fil..,l..rWW,W- Nwru..E X.p.v c4w1NX..K CMLwq. W{Y.NW eJM ragXE.+e1ap0 11 P WY If r!. LsN. i.bl a Y ellw w,w • RW .Ew w.w E ellllll W.w . WAtl .]O,W 0 Ww0 0 0 • • e e 1111U10 W W.W w i %w V1M MC.WY•C,IwI•YI.aYk -IY e.N gwlp gq,vgw n,Y O.r.IM�YeISw W.q T 4pW0 0]0 tl r W1 rE WN Cww T. i aCE wYX IwVw 0 Nw E . EM{M a WAN m mm m 0 . 0 • • e • M m m w w w wtw w+.Ne fiM1rllrCCWnINy.swwl Xgvo ssu.iunw lu'�..Nwpdi.arrry gPf,WM r WY If l.w four iW 11 e Y I1.M +E "c" 1 NlN µM• ]eAN A • • . m= • • • • + w WA Y iY Nen�a,sW PK,mne NWnpX La.Wq P ,I V 'mve W—k w0w —I� Kin�in mr�KKbrr�. mmv cl.m«�nPrn+gfy qugv/DS I. r tAI r[. YW CWL TWI --392 • at[ N TM 13.Ne WA w Y,w• •[w 0 • • 0 • • a e 1] N Mw mm • • E • w wA l+'yw (�C...L..mi.x »I.dMaC.I,hrw.Um Mp,w�„n4 RammS[nrc�poiM moWrp rouoa. uMry el r W r. .Y r x N.W 0 w.w w.W w.w e a • w a w • a w e w E • • wA v cgm.swn m,p q X] c..,,ai P.nna.gn.n imPp..m. Xon..an.�o.m+ama.�,ra +.n..n „n a,m cnm,u.m xnvim X.ICU,ai o.n urf tr]c.n ]t r u ra ww foul. TWt e x w[P Yw a ]s.YO Yp qW e o . M.r 1Y.W 0 1w.W tww +ww 0 w . 0 n000 e R twW • • 1 W WA » 1-1. ci..Y Na. ft, Fw„cn,... s.w.w m�.mmnna wmrvwewenvuw., aonrxrey lA,ry 6co11 I,.'Ibfuu, Cgrrgn RY Nu.N11500 N r 4Y r.1 . M Nqt T.I.I OC! V m# w a.W +1.Y0 +W. nlW .rP# .l ..]w .NW A .Y err# .1. Y,]N E.NW Ww ew I I 1 NE OY e 0 w,W .It YO 0 0 IYw Ww 0 •11w Wt upOnYO 5Q(ll LG Agency: Jefferson County County NO, 16 DRAFT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2015 -20x0 Heenng Dms:xxW14 MopWn Dew: xMW14 Reso4lbn No.xx -11 Lan.,.wo. M2] XU 1 7m. i I1.w.ml al , wl x.p,wl e..2111 "...1 eeft.wl e•n,wl ef., ewwl i G i g d rxaen mexnnun °M 0 exwa LOS x,.mw, -en•w xwwW Ceginnine.^4Ew x,uW.1 o .nn..i sn.e..m. .P,WW.xanlyG E. 0..crlgbn olWM .nC ieW Cw111M :_■ '� YxawCi GWIE a MUM• (V(xalW(ELN(Wll rux•(O rsoxcn awr G G rOIOIe EPMC(IwgIW1pX feP(xu fuxoe r oTl(X M(YEMKE lMU fa1GE 1arK yy i i3 B y dd [[ wr �'^I 1NIwi• I rwrrr OINNI mre uarn rx•p r(MI al( YIARE an V(Me an r(Alle ale V(Me Ulf Y(M• m m a1La]0 j t� w E • ■ ■� w. a. fN•IY14. VYLlY YgN.p,L1Y vWWw Pn..x w.mw�wm.ni.m wwr wx.n nplemne. e�ny. u,.u`f .p,Im.. n..ww�rN Y,reW atlls m . igpga ap r w• rE. wW C. Iwl 0 x IIw 1 e.w • Uo IE aO e o o p.p0 p.0•D a.ON a ea e • • pw p aw ( • MW ( ( mm w. a •u,gMtleln,w.11on L4ry l,G.n1 fanlny uWy yopo bapuvnnn re.q�.w .ycx wunh,w•. nw =poo 000 a r W I( LewL I.YI 0 OLE M far IM 0 la 1Y�w, 1 pp 0 0 NN • I •iw W w w • • • • E e ww e ( w a v( F. Cowl IoW 0 • 0 0 • 0 0 0 0 0 o • • a o e E o • e o Lan.,.wo. M2] XU 1 7m. i I1.w.ml al , wl x.p,wl e..2111 "...1 eeft.wl e•n,wl ef., ewwl TRANSPORTATION IMPROVEMENT PROGRAM 2015 -2020 The following is a guide to codes and acronyms used in the TIP project spreadsheet for Jefferson County. PROJECT PHASE P.E. = Preliminary Engineering; RMI= Right -of -Way; Const. = Construction FEDERAL FUND CODES (applicable to Jefferson County) ER Emergency Relief FEMA Federal Emergency Management Agency STP -S Surface Transportation Program- Safety HSIP Highway Safety Improvement Program PLHD Public Lands Highways Discretionary Program STP -R Surface Transportation Program - Regional TAP Transportation Alternatives Program WAFH Washington Forest Highways Program STATE FUND CODES (applicable to Jefferson County) ALEA Aquatic Lands Enhancement Account EMD Emergency Management Department NOVA Non - Highway and Off -Road Vehicle Activities Program PBP Pedestrian and Bicycle Program PIF Public Infrastructure Fund PSAR Puget Sound Acquisition and Restoration Fund RAP Rural Arterial Program RCO Recreation & Conservation Office SRTS Safe Routes to School Program WWRP Washington Wildlife Recreation Program PBSP Pedestrian and Bicycle Safety Program ENVIRONMENTAL TYPE CE Categorically Exempt DCE Documented Categorically Exempt EA Environmental Assessment EIS Environmental Impact Statement 20 DRAFT - 2015 -2020 SIX -YEAR TIP BY PROJECT CATEGORY Prior. R Project Description Emergency REYairs & Mitigation Fund Status Local State Federal Total 2 DOWANS CREEK ROAD PERMANENT REPAIR S $97,205 $91,098 $564,91 $753,213 3 QUINAULT SOUTH SHORE ROAD REPAIR S $ 32,228 5 - $ 1,130,797 $1,163,025 4 IDOSEWALLIPS ROAD PERMANENT SLIDE REPAIR I S $ 13,2001 $ 118,800 1 $ $132, Category Subtotal $142,633 $209,898 $1,695,707 $2,048,238 Road & Intersection Improvements Fund Status Local State Federal Total 1 CENTER RD OVERLAY - PHASE 5 5 $865,000 $926,740 $ $926,74 9 UPPER HOH ROAD /OLYMPIC NAT. PARK FLAP PROJECT S $45,000 $ - $ $45,000 10 PARADISE BAY ROAD, PHASE 2 S $124,916 $1,124,259 $ $1,249,175 17 WEST SPRUCE& EAST ALDER 5TREETS- SURFACE UPGRADE S $50,000 S . $ - $50,000 18 PARADISE BAY ROAD - PHASE 3 P $100,000 $900,000 $ $1,000,000 20 SOUTH DISCOVERY ROAD REALIGNMENT P $255,000 $1,935,000 $ - $2,190,000 21 SOUTH DISCOVERY ROAD PAVEMENT PRESERVATION P $38,000 $342,000 $ $380,000 23 CHIMACUM ROAD IMPROVEMENT P $135,000 $ S865,000 $1,000,00 Category Subtotal $747,916 $5,227,999 $865,000 $6,840.915 Culvert & Bridge Reolacement/Reoair Fund Status Local State Federal Total 5 ACCESS PRESERVATION: HOH RAIN FOREST MP- PE ONLY 5 $ - $ - 515,000 $15,000 6 ACCESS PRESERVATION: HOH RAIN FOREST MP 3.338 S $ - $ $723,628 $723,628 7 ACCESS PRESERVATION: MOH RAIN FOREST MP 4.38 S $ - $ $1,022,095 $1,022,095 8 ACCESS PRESERVATION: HOH RAIN FOREST MP 6.95 5 $ - $ $983,661 $983,661 15 DONKEY CREEK CULVERT - CLEARWATER ROAD S $62,000 $0 $ - $62,000 22 W. UNCAS ROAD CULVERT REPLACEMENT -MP 0.804 P $ $598, $ - $598, 27 WEST VALLEY ROAD CULVERT REPLACEMENT- NAYLOR CREEK P $ $500, $ $500, 28 SNOW CREEK ROAD CULVERT REPLACEMENT -MP 0.84 P $ - $ - SSW, $500, 29 CENTER ROAD CULVERT REPLACEMENT -MP 1.358 P $100 - 1 $ $100, Category Subtotal $162,000 $1,098,904 $3,244,384 $4,505,288 Non - Motorized Transoortatlon Fund Status Loral State Federal Total 11 RICK TOLLEFSON TRAIL- PHASE 1 (CHIMACUM VALLEY) 5 S $313,174 $652,437 $965,611 12 RICK TOLLEFSON TRAIL- BALLFIELD CONNECTION 5 $85, $ - $ $85,000 13 SAFE ROUTES TO SCHOOL - SR 19 & WEST VALLEY ROAD 5 $ $285, $ $285, 14 QUILCENE COMPLETE STREETS S $ $822,239 $ - $822,239 16 ODT SOUTH DISCOVERY BAY SEGMENTS A &5PLANNING 5 $1,524 $13,553 $ $15,077 19 RICK TOLLEFSON TRAIL- PHASE 2(CONNECTIONS) P $25,000 $125,000 $ $150, 24 ODT SOUTH DISCOVERY BAY - SEGMENT A, PHASE 1 P $55,000 $S00,000 $ - $555, 2S DDT SOUTH DISCOVERY SAY - SEGMENT A, PHASE 2 P $140,000 $750,000 $ $890,000 26 SALMON CREEK CROSSING HIGHWAY 20 P $ $775, $ $775,000 30 TAP NON - MOTORIZED PLANNING MULTIPLE LOCATIONS P $13,095 SD $83,905 $97, 31 CEDAR AVENUE NON - MOTORIZED & INTERSECTION IMPROVE P $ - $550, $ - $550,DDC 32 CHIMACUM GRANGE TO HJ CARROLL PARK - PEDESTRIAN IMP P $ $175, $ $175, 33 ODT- MILO CURRY ROAD TO FOUR CORNERS P 1 $92,500 $ - 1 $519,000 $611,5 Category Subtotal $412,119 $4,308,966 $1,255,342 $5,976,427 Planning & Countywide Programs Fund Status Local State Federal Total 34 1COUNTYWIDE VARIOUS IMPROVEMENTS 1 P 1 $60,000 $ - 1 $ - 1 $60,000 35 RUN -0FF -ROAD & INTERSECTION SAFETY PROJECT P $ - $ $600, $600,000 Category Subtotal $60,000 $ - $600,000 S660,000 Updated: 08 /2512014 21 Graphs Based on DRAFT 2015 -2020 TIP 2015 - 2020 Six -Year Transportation Program Expenditure Breakdown Amounts by Project Category Non - Motorized Transportation Culvert & Bridge $5,976,427 Replacement /Repair 29.8% $4,505,288 22.5% Planning & Countywide Programs $660,000 3.3% Road & Intersection Emergency Repairs Improvements & Mitigation $6,840,915 - $2,048,238 34.2% 10.2% 2015 - 2020 Six -Year Transportation Program Funding Breakdown Percentages by Revenue Source Federal $7,660,433 38.2% Local $1,524,668 7.6% State $10,845,767 54.1% 22 Graphs Based on DRAFT 2015 -2020 TIP 2015 - 2020 TIP Funding: Secured vs. Planned Secured $9,298,464 46.4% Planned $10,732,404 53.6% % Average Annual Road Fund Revenue Used on Capital Projects Road Levy & MVFT Revenue for Operating Costs $4,905,775 95.1% Road Levy & MVFT for Capital Projects $254,111 4.9% Average Annual Road Fund Revenue = $5,159,886 23 A 2015 -2020 Six -Year County Road Fund Projections Updated. OflIWW14 ACTUAL ACTUAL ACTUAL I ACTUAL ACTUAL I PROJ PROJ PROJ PROD PROJ PI-1 PROJ TOTAL DESCRIPTION k¢r. 202 2010 2011 2012 2013 201/ 2015 2016 2017 2016 2018 2020 20168020 PROPERTY TAXES: 0.5% 3.571,012 3A21A03 3,730.681 3.907 614 4,065A78' 4,144.108 4,164.919 4.227A06 4,290201 4.354343 4.410.444 4.485,516 PROPERTY TAX:& 1 %(1.747) 1.0% 41,261 42362 42.891 43,329 62,877 44,614 _2.5.941.420 767,869 0.5% 0 BANKED CAPACITY (722) 0 216390 210,000; 0 0 0 0 0 0 0' 0 0 c � C TIMBER TAX FEDERAL FORESTJS444a6 N9rM6MO0Y) 1.016 90355 1$02,130 78710 1,162.618 1711603 1,OM.480 /68,188. 433491 708301 40WO 202,282 428.761 100,000. _ 0 101.000 0 _102,0.10 _ 0 103,030 0 144.000 0 - 106,101 _0 019.102_ 0 1.0% _ a1,401 DI ONR TIMBER SALES 75.596 125.072 280.042 132,132 50.825 140,844 75.000 75.750 78,508 77,273 78.045 78828 80% X FUEL TAX _ 1298.117 1.335293 1.333.164 _ 1.343.512 _ 1,980291 1.352057 1.357.342 I 1.367.342 1,357,342 1.357.342 _1.357.342 1.357.342 8,144,052 0.a% `6 O CAPP FUNDS PERMITS 6 FEES 150240 83,057 152,905 15,920 152.908 29,925. 188,060 38.426 196,9_38 140.858 206,984 121,774 210190 122,992 290,000 124222 200,DDO 125.464 200,000 12IL719 200 ODD 127,908 200000 129,285 1.210,190 158447 1.0% 2.0% OTHER MISC REVENUE _ (8.817) 120204 _ 19.44 19328 _ $.%1 6.908 15000 _15.300 15.608 15,918 _ 18,238 18.561 94.822 REIMBUSIBLE SERVICES 85.520 10.775 4.500 17.020 1.323 1.297 0 0 r 0 0 0 0 0 TOTAL OPERATING REVENUES: 5,441,071 6,915,777 6.061.863 8834,200 5,798103 8.345883 5359,044 5,400234 6,26,346 1AM1971 5406,274 6,661,012 44,834,484 ExlraorelnarY PropIl Rwenw4 1645) Fa0eral 271,987 601,034 988.243 539,986 7NI53 0 0 0 0 0 0 0 0 0 E Y Swe, Olner 20,190 0 171.714 0 12.487 0 _ 5,978 0 111 0 99244 78000 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0: Ex1neNlnary Rov"ua Su01oul: 934,227 MAN 1334,710 616,34{ 698.72 174246 8 0 0 0 0 8 0 Y 0 o. Rapular Prol ct Rwanwa (595) Feoerai SIa1e Omer Salim 171361 0 79,190 776,919 0 tow 165071 0 - 1 440,813 1 208.480 0 3,070,348 (16.383) 0 1923.055 381.954 98.62 1.570 689 , 3.O6t 878 _ i 0 9308744 _ 1_126.980 0 _ 225,150 2,019,060_ 0 1.369600 500.250 1 0 439,250 2,21_2.000 0 - 450,000 1.902_000 0 - 0 7,860,433 10,813.787 0 e U Capital Projed(TIM R9661M Ou040rk 1(345340 $5348 134.777 676, 303 3, 404. 406 2,441.034 4.632,567 4.711.733 X740,834 1Aa.850 7301.250 2.362,900 18.934,200 TOTAL CAPITAL PROJECT REVENUES: JAMP2 1,"W1 1,M,437 1224,269 X341 5704 4,832,681 4,731,131 2205004 1,869,660 2351,204 2,362,000 18,606,200 TOTAL ALL ROADS REVENUES 7,177.641 7AM34 /344251 6,856,489 8375734 529,613 9.992.0]1 10,139."1 7,7",149 7,406,947 8256.524 6.020,012 51,556,644 OPERATING EXPENDITURES REIMBURSIBLE SERVICES (519) 61.616 9A91 1.004 14.218 LWM 674 0 0 0 0 0 0 0 REGULAR MAINTENANCE(542) 20% 3.700,507 6,W3,109 3.796.476 3,994.493 4370,833 4.299.451 4556,559 4. "7 690 4.740.844 4,835,457 4,932,166 5,030,09 26,743.325 _ GENERAL ADMINISTRATION (543) 2.0% 694.695 632216 910.758 1.0134278 1,004. "5 961.667 874.380 691.863 900.705 927,800 946,457 965,388 5,515.2S TRANSPORTATION OPERATIONS (544) 2(1% 722.932 582,352 01 505,873 500.534 49 7.692 509.877 520075 530.418 541,066 551.907 562. 945 3218,368 INTERFUND TRANSFERS D a 0 0 M3 0 0 0 0 0 0 0 0 {I TOTAL OPERATING EXPENDITURES: 5,187,859 6.417,168 6,316,676 6,678.662 6,671,624 6,769,4" 6,948818 6,059,632 6,180,625 8,3 ", "l 6.438630 6,669.141 37,475,306 CAPITAL EXPENDITURES 0 LOAN REPAYMENTS (Pnkp I mtmg) 8.5% 38. "7 37,895 98.442 35,789 34337 33.8" 32,842 32,021 31.220 30."0 29.879 28,937 185.139 333 EXTRAORDINARY EXPENDITURES 15,t5) 828.536 1,113246 561.216 654.371 193.625 0 0 0 0 0 0 0 >a W REGULAR CONSTRUCTION (505) _ _ _587,157_ 1,514.477 813,156 769.467 1.031.348 3.995.019 2.134.477 5343.211 4,758,257 2.331.900 3.077,500 2.970.OW 2.550000 20030886 CAPITAL FACILITY COSTS (ROADS) 0 0 83.123 141451 53569 314,052 0 0 D 0 0 0 0 CAPITAL EQUIPMENT PURCHASES 56,507 8.148 0 0 0 8.534 0 0 0 0 0 0 0 TOTAL CAPITAL EXPENDITURES: 2,197,088 1,486,061 2,012,680 1,771,808 4,747,696 2,584,372 5,376,053 4,790,276 2,363,120 21D7, "0 2.098579 2,678937 20216,007 LOCal runEmp used 6 cape"pmpram. 910,715 377 754 821243 547539 866903 109.592 743.486 58.545 94.320 238.090 345429 226.937 1.709,807 Percent qmm Nn0e6, 59% 75% 59% 69% 82% "% 89% 99% 56% 2% a6% 91% 92% TOTAL EXPENDITURES 7,104, "T 6,401333 7,329,666 7,160,470 10,126,320 0,"X634 11,314,069 10, "9,910 11,M3, 0416 8,412,181 0,430,209 0,139.070 67.21,393 BEGINNING FUND BALANCE _4.996,08 4.740.x2 4.910.25] _4,9_24.902 �_ 4.332990 3684.466 3701 473 2376.675 10%.706 866.910 0394851 (1313.1762 p U REVENUES LESS EXPENDITURES ENDING FUND BALANCE _(207.5 ") 4,789,402 121,855 4310267 (85.265) 4,824,22 (492,002) 4,332,990 (648.524) 561%434 1 7.W7 3,701,473 (1324798) 2,376,675 (709969) 1.666.706 (799.7%) 066,010 11006.395) (139,4861 (1,173.9861 (1.113,171) 0,118,0651 12.x1,23) 25.0% CASH RESERVE GOAL (25%) 1288.965 1.354292 1,328 NO 1,3 94,BBB 1.394.406 1639.871 1085,244 1514.908 1,545.206 1,576.110 1,07.633 1,539 .785 2015 -2020 Six -Year County Road Fund Projections $6,000,000 $5,000,000 $4,000,000 ENDING FUND BALANCE $3,000,000 CASH RESERVE GOAL (25 %) $2,000,000 $1,000,000 $0 - $1,000,000 42,000,000 - $3,000,000 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020