HomeMy WebLinkAboutZON2008-00003 UDC CONSISTENCY REVIEW
Project Planner:
Master#MLA08-00008 Review Type Project Description
ZON08-00003 Line in Line out changes to the Jefferson County Comprehensive
Plan
Applicant: JEFFERSON COUNTY DCD Site Address:
621 SHERIDAN
PORT TOWNSEND WA 98368 WA,
?oic-r U '.1 ew 1 /J tom- / ` .-u c 1
Project Location: L., A . OJ W &/1i
Parcel Number: COUNTY S-T-R: -- Total Acreage:
Legal Description Land Use:
Flood District: A Fire District: 74 1 I- Planning Area: I ,2.-O
Flood Map(FIRM)Pane o: /V Q. District: G cemotg:
COMP PLAN DESIGNATION: /'� EUC. f 02r4-1._ S
COMMUNITY PLAN: 4-• UGA: `5- 8 E i° MPR:
WATER SUPPLY UTILITY: Service Area RJ !7 PUD:
[ ]O.,kPlot plan states "property line"
[ ] ssessor's Map(Property lines on submitted plot plan must match the property lines as identified on the Assessor's 1/4 map)
[ ]
AAA
Legal Access to Property YES NO
[ ]/U/AParcel Tags or Scanned Documents YES NO
[ ] ESA's: Special Reports Nearby YESNO 4CA / .J( 1? /03 / 0Q
[ ] Designated Ag
[ ] Shoreline Designation: YES NO l'a I v.4-C tJAA G =.AG ?Der- 7L -1L 6A-Y
[ ] Orsh. -line Slope Stability: YES NO
tream .{ ' YES NO 7
-'ee an. • YESNO
Rare Plants:YES NO
Seismic: YESNO
Landslide: YESNO
crilta-i"--- YESNO
Erosion: YESNO
w er Rechar. 0,-44 0
SIPG: none At Risk High Risk Coastal
Stormwater site plan submitted: Yes No
[ Forest Lands: YE l
Adjoining Forest L.0 a s: Commercial/ Rural/ Inholding
[ tormwater:New Impervious Surface Land Disturbing Activity ESA's
Stormwater Req's: Min Req#2 Min Req#1 thru#5 Min Req#1 thru#10 Engineering
[ ]/1 otice Provisions/Disclosure: Airport, YES NO MRL YES NO Forest Lands YES NO
[ 4 andscaping Required: Yes No -
[ 4 'arking Spaces Required NO 2 Other
[ / ! it uilding Height: 35' UBC Standard
[ !/.Impervious Surface coverage percentage:
/ ' Resource Lands&Public: 10% Rural Residential: 25% Rural Industrial: Per UDC Sec 6.7
Rural Commercial: 60% Area of Building Coverage:60%in Rural Industrial Lands only
[ Totaling(s) Size:
•■∎t F CC:5,000 SF NC:7,500?"GC: 10,000 SF All others:subject to septic&water constraints/None specified
[ ] ,!:.etbac s: Front: Left Side: Right Side: Rear:
Shoreline Setback:
LSHA Setback:
[ ] Road Classification:
Road Approach:EXISTING NOT REQ'D RAP
[ [ SEPA Required:YEs EXEMPT
[ d lood Certificate:
[ ]#-Existing Case(s) & Condition(s):
Violations: Yes No
[ ]'1A- Recorded Date of Subdivision: AFN Over 5yrs=UDC
Plat Conditions: <5yrs=Plat Conditions on plat or Old Ordinance
Lots/Require Declaration of Restrictive Covenant YES NO, submitted: YES NO
[ Site Visit conducted YESNO
[ Require Final Zoning Approval YES NO
[ ] ADMIN: Setbacks entered in Permit Plan case N/A YES
iiii
New Parcel Tags entered in Permit Plan N/A YES
Special Reports Scanned N/A YES
No parcel tags found for parcel
Associated CASES status issued finaled description •
COUNTY
CPA99-00018 F 9/27/1999 Adoption of action Plan Principles,Goals and Strategies as an
addition to the existing Policy UPT 8.1
CPA99-00019 F 9/27/1999 To delete the Chimacum Commercial Crossroads from LNP 5.5
Neighborhood/Visitor Crossroads and add it to LNP 5.6
General Commercial Crossroads
CPA99-00020 F 9/27/1999 The amendment proposes changes to rural commercial land use
goals and policies
CPA99-00021 F 9/21/1999 The Economic Development Council has submitted
recommended changes to the Economic Development Element
formulated by the Business Recruitment and Retention
Committee of the EDC.
CPA99-00022 F 9/27/1999 The amendment proposes (1)Definition of"Rural Jefferson
County" and that the Western Jefferson County examptions
contained in the home-based business and cottage industry apply
to this area. (2) A policy designed to apply only to the West
End,LNP 7.1.8 under Small-scale Recreational and Tourist
Related Uses apply to"Rural Jefferson County',and suggests a
policy allowing light industrial uses conditionally in rural
commercial districts located in"Rural Jefferson County".
CPA99-00023 F 9/27/1999 To delete policies EPP 3.1 and EPP 3.3 having to do with an
Airport Overlay Zone and a Noise Overlay Zone Ordinance.
ENV00-00004 F 9/22/2000 The proposal is for the processing and approval of a
revision/update to the Jefferson County Onsite Sewage Code
8.15. The purpose of the revision/update is to address the
requirements of WAC 246-272,to incorporate policies,where
appropriate,to improve administrative procedures and
requirements for enforcement,appeals and certification of
installers,pumpers and operation and maintenance
professionals. The revision improves the connections between
permitting onsite sewage systems and review under other State
and Local codes. The revision requires ongoing education for
professionals certified under this code and upgrades the bonding
and insurance requirements. The State Code addresses technical
specification for the permitting of onsite sewage system. The
Local Code primarily addresses administrative procedures and a
few technical requirements such as the requirement for risers to
grade for access to septic tanks for monitoring and maintenance.
An economic impact statement was completed by the State
Department of Health prior to adoption of the revised WAC
246-272 in 1994.
ENV00-00005 F 7/19/2000 7/19/2000 A Comprehensive Solid Waste Management Plan(CSWMP),
which is a twenty-year plan for the unincorporated and
incorporated areas of Jefferson County.This CSWMP discusses
all aspects of solid waste management within the County and
incorporated areas, including waste reduction,recycling,
composting,energy recovery,collection,transfer, inport/export,
waste disposal,and regulation and administration.
ENV95-00002 F Proposed revisions to Jefferson County Subdivision Ordinance
No. 04-0526-92. The ordinance currently affects the regulation
of the subdivision and development of lands within
unincorporated Jefferson County, including,but not limited to,
type,scale, location and timing of development;the scope of the
ordinance;administrative authority and responsibility;short
subdivisions; long subdivisions;large lot subdivisions;mobile
home park divisions;recreational vehicle park divisions;
commercial/industrial park divisions;condominium divisions;
camper club divisions;boundary line adjustments;appeals;
variances;vacations;alterations; legal provisions; and
application procedures and process. The proposed revisions
clarify,correct,and amend references to appendices,county
departments,and responsible officials. It expands and clarifies
both the scope of the ordinance and its applicability as regard to
parcels in common ownership separated by a public
right-of-way,and exemptions as regard to boundary line
adjustments,planned unit developments,and divisions of
non-platted parcels which occur or have occurred as a result of
securing public rights-of-way by a government agency;and the
proposed revisions propose clarifications to calculation of days.
Procedural amendments relating to the provision of
pre-application review fees are proposed to sections regarding
Short Subdivisions, Long Subdivisions and Large Lot
Subdivision,Mobile Home Park Divisions,Recreational
Vehicle Park Divisions,Commercial/Industrial Park Divisions,
and Condominium Divisions;the determination of what
constitutes a"substantially complete application",and"vesting"
are addressed;and revisions to insure consistency in the
provision of public notice are included. Provisions for Open
Space and the time period of dedication have been amended. A
Boundary Line Adjustment section is added which expands and
clarifies the definition,process and procedures for boundary line
adjustments. The Jefferson County Camper Club Ordinance
No. 3-80 is repealed and replaced by the Camper Club section
of this ordinance;this new section is substantially similar in
process,procedure, and requirements to Ordinance No. 3-80. In
addition,a section covering the appeals process has been added;
Appendix E "Large Lot Subdivision Private Roadway Design
Standards" and Appendix G "Documents Relating to the Design,
Construction,and Placement of:Roads,Bridges,Drainage
Ways,and Signs"have been deleted; and,Appendices A("Short
Plat Application Checklist"),B("Final Short Plat Checklist"),
C("Preliminary Long Plat Checklist"),and D("Final Long Plat
Checklist")have been expanded and corrected.
ENV95-00006 F 12/31/1995 Proposed revisions to the Jefferson County Flood Plain
Management Ordinance.
ENV96-00002 F 8/22/1996 to amend the Shoreline Management Master Program, Section
5.60 Docks,Piers,&Floats, in particular to amend Performance
Standard 13 which increases the limitation on length of private,
non-commercial docks and piers from 60 feet to 125 feet
maximum for single use with additional length incentives for
joint use. Policies and performance standards have been added
to restrict such construction where navigation and environmental
constraints exist. In order to reduce prolifieration of structures
on the shoreline,joint use provisions are proposed for new
waterfront subdivisions. The proposal provides language
amendments that add clarification and consistancy with the
Shoreline Manaement Act.
ENV97-00004 F 12/1/1997 12/1/1997 to amend the Shoreline Management Master Program to allow
the Jefferson County Hearings Examiner to conduct public
hearings for decisions under the Shoreline Management Master
Program and to incorporate changes based on revised WAC
173-27 and RCW 90.58 including definitions,changed WAC
numbers,timelines,additional wording for exemptions,and
several new exemptions with criteria as codified under state law
related to site exploration activities prerequisite to an
application for a substantial development permit;removing or
controlling aquatic noxious weeds according to chapter 43.21C
RCW;watershed restoration projects;hazardous substance
remedial actions;and projects to improve fish or wildlife habitat
or fish passage.
ENV99-00005 P Amendment to the Jefferson County Comprenhensive Plan per
order of GHB Decision..
MLA01-00085
ZONO1-00007 F 2/1/2002 Proposed text amendment to the Unified Development Code
•
(UDC). The proposed amendment would change language in
the UDC to allow on-site septic systems to be installed prior to
application for a building permit if the proponent has gone
through a Site Plan Approval Advance Determination(SPAAD)
process pursuant to section 8.7 of the UDC(see attached Exhibit
B for line in/line out text changes).
MLA01-00183
ZON01-00020 F 5/15/2001 Code interpretation of Unified Development Code Section
4.24.7
MLA01-00214
ZON01-00028 F 2/1/2002 To rationalize the setback requirements between different uses
as per the UDC.
MLA01-00215
ZON01-00029 F 2/1/2002 Comp Plan Amendment to allow family housing, ie mobile
home parks,apartments,and multiplexes, in all commercially
designated districts.
MLA01-00216
ZON01-00030 F 2/1/2002 Comp Plan Amendment to designate Chimacum as a General
Crossroads for all commercial properties in Chimacum.
MLA01-00217
ZON01-00031 F 2/1/2002 Proposed text amendment to the Comprehensive Plan(CP)and
Unified Development Code(UDC)to enable the siting of
additional Master Planned Resorts(MPRs)in Jefferson County
through an application review process. According to the text of
the CP,Port Ludlow is Jefferson County's only MPR. The CP is
proposed to be modified such that Port Ludlow is acknowledged
as the only existing MPR in the County,but that additional
MPR's could be approved through a process outlined in the
UDC. This proposed process is defined in the attached UDC
text amendment.
MLA01-00221
ZON01-00032 F 2/1/2002 Proposed text amendment to the Comprehensive Plan and
Unified Development Code(UDC)regarding total building size
and building height in the Rural Industrial districts. This
amendment would eliminate the 20,000 square foot building cap
referenced at LNP 8.5.2 in the Comprehensive Plan related to
the Glen Cove LI/C district and update text in UDC Section
4.26 to be consistent with this change. "Total Building Size" in
the UDC Table 6-1 would be amended to read "Building
Envelope Size"and a definition provided. "Area of Impervious
Surface Coverage"would be amended to read "Area of Building
Coverage" and a definition provided. Resource Based
Industrial,Light Industrial,and Light Industrial/Commercial in
Table 6-1 would be amended to read"None Specified"for the
building envelope size and to read"Uniform Building Code
(UBC)Standard" for building height. Comprehensive Plan
Policy LNP 8.5.2(c)relating to the one time expansion of
nonconforming uses in Glen Cove would also be eliminated(see
attached application materials including the line in/line out text).
MLA01-00225
ZON01-00033 F 2/1/2002 Proposed text amendment to chapter three of the Jefferson
County Comprehensive Plan for purposes of clarification
regarding Land Use Policy(LNP)5.1. This amendment would
add language to LNP 5.4.1,LNP 5.5.1,and LNP 5.6.1 would be
amended to reference LNP 5.2 rather than LNP 5.1 (see
attached application materials including line in/line out text).
MLA01-00233
ZON01-00038 F 2/1/2002 Text Amendment to the Comprehensive Plan clarifying
designations of forest lands where adjacent to existing small
lots. The amendment is proposed to further widely held values
for minimizing conflicts between adjacent land uses as put forth
in the Comprehensive Plan while designating appropriate
locateions for conservation of natural resource lands.
MLA02-00076
ZONO2-00060 F 1/31/2003 Comprehensive Plan Land Use Map re-designation for
approximately 8 acres known as the East View Industrial Plat
from Rural Residential 1:5 top Rural Light Industrial
MLA02-00077
ZONO2-00059 F 4/22/2002 Part I(housekeeping)-Proposed text amendments to the •
Unified Development Code(UDC)to comply with the first of
six actions listed in Final Decision and Order No 01-2-0015 of
the Western Washington Growth Management Hearings Board.
The subject of the amendments is the level of protection in the
UDC for areas vulnerable to seawater intrusion and the
categorization of same.
MLA02-00227
ZONO2-00044 C Comprehensive Plan/UDC Amendment-proposed new
definition for the term"Built Environment" as defined in the
Comprehensive Plan Glossary.
MLA02-00228
ZONO2-00045 C Comprehensive Plan/UDC Amendment-proposed language to
phase out by March 3,2003 the ability to apply for rezone
applications on the basis of a"Map Error" as defined in the
Comprehensive Plan and Unified Development Code.
MLA02-00229
ZONO2-00046 C Comprehensive Plan/UDC Amendment-Proposal for creation
of a new land use category to be established within 500 feet of
Rural Village Center boundaries including the waiving of land
use fees for non-profit and self-help organizations to encourage
affordable housing.
MLA02-00232
ZONO2-00047 F 2/12/2003 Comprehensive Plan/UDC Amendment-Proposing
re-definition of the criteria for Forest Land designation and/or
the adoption of a"Forest Lands Buffer Overlay District"to
create a residential transition zone between Forest Lands and
adjacent high density pre-platted lots.
MLA02-00234
ZONO2-00048 F 1/31/2003 Compressive Plan/UDC Amendment-Update Comprehensive
Plan language in Chapter 6(Open Space,Parks and Recreation,
and Historic Preservation)to reflect consideration of updated
2002 Parks,Recreation&Open Space Plan.
MLA02-00238
ZONO2-00050 F 1/31/2003 Update Comprehensive Plan language in Chapter 6(Open
Space,parks and Recreation, and Historic Preservation)and
Chapter 10(Transportation)to reflect consideration of the
Jefferson County Non-motorized Transportation Plan.
MLA02-00239
ZONO2-00051 F 1/31/2003 Update Comprehensive Plan language in Chapter 2
(Implementation)based on recent Growth Management Act
amendments related to statutory timelines and eliminate Plan
reference to out-dated application deadlines.
MLA02-00240
ZONO2-00052 C The proposal is to adopt policy language in Chapter 3 (Land
Use and Rural)of the Comprehensive Plan related to the
establishment of a process for designating a bank of no more
than two master planned locations for major industrial activity
outside urban growth areas consistent with newly enacted state
legislation(House Bill 2498)
MLA02-00241
ZONO2-00053 F 1/31/2003 The proposal is to revisit the boundary established for the Glen
Cove Industrial Area Interim Light Industrial/Commercial Zone
consistent with Comprehensive Plan Land Use Policy 1.4 and
the Washington State Growth Management Act.
MLA02-00242
ZONO2-00054 F 1/31/2003 The proposal is to adopt a Provisional Urban Growth Area
(UGA)boundary in the Tri-Area and include that boundary on
the Jefferson County Land Use map. This amendment is a
component of the Tri-Area/Glen Cove Special Study and the
designation of a Provisional UGA represents the area in which
final capital facilities and UGA planning will be conducted.
Current rural standards will continue to apply in the Provisional
UGA until all statutory requirements related to the establishment
of an Urban Growth Area have been met. In the event that all
statutory requirements related to full UGA designation can be
met prior to the conclusion of the 2002 amendment cycle,this
amendment will include the designation of the Tri-Area as a
UGA consistent with the Growth Management Act(RCW
36.70A)
MLA02-00243
ZONO2-00055 F 1/31/2003 The proposal is to revisit the rural commercial boundary •
established for the Chimacum Neighborhood/Visitor Crossroad
Interim, Commercial Zone consistent with Comprehensive Plan
Land Use Policy 1.4 and the Washington State Growth
Management Act.
MLA02-00244
ZONO2-00056 F 1/31/2003 The proposal is to revisit the rural commercial boundary
established for the Discovery Bay Neighborhood/Visitor
Crossroad Interim Commercial Zone consistent with
Comprehensive Plan Land Use Policy 1.4 and the Washington
State Growth Management Act.
MLA02-00245
ZONO2-00057 F 1/31/2003 The proposal is to revisit the rural commercial boundary
established for the Four Corners Neighborhood/Visitor
Crossroad Interim Commercial Zone consistent with
Comprehensive Plan Land Use Policy 1.4 and the Washington
State Growth Management Act.
MLA02-00246
ZONO2-00058 F 12/9/2002 Proposal to review the Brinnon Sub-area Plan through the
annual Comprehensive Plan amendment cycle.
MLA02-00314
ZONO2-00076 F 7/23/2002 Part II(regulations)-Proposed text amendments to the Unified
Development Code(UDC)to comply with the first of six
actions listed in Final Decision and Order No 01-2-0015 of the
Western Washington Growth Management Hearings Board.
The subject of the amendments is the level of protection in the
UDC for areas vulnerable to seawater intrusion and the
categorization of same.
MLA02-00329
ZONO2-00072 F 1/31/2003 The proposal is to amend the Unified Development Code
(UDC)in conjunction with the establishment of a revised Glen
Cove boundary(See File Number MLA02-00241). The Glen
Cove boundary revision will occur as a Comprehensive Plan
amendment.
MLA02-00485
ZONO2-00092 F 4/28/2003 Proposed text amendments to the Unified Development Code
(UDC)per an agreement with the Washington Environmental
Council(WEC)in relation to a petition by WEC to the Western
Washington Growth Management Hearing Board. The WEC
petition concerned protections as established in the UDC for
environmentally sensitive areas, in particular Wetlands and Fish
and Wildlife Habitat Areas.
MLA03-00003
ZONO3-00004 F 5/1/2003 The proposal is to amend the Unified Development Code
(UDC)based on a Settlement Agreement between the Port of
Port Townsend and Jefferson County dated July 24,2002 and
related to Growth Management Hearings Board Case No
1-2-0016.
MLA03-00209
ZONO3-00034 F 12/8/2003 BOCC adopted Ordinance No.05-0428-03 on April 28,2003,
amending the UDC with regard to the regulation of existing and
ongoing agriculture, among other topics. The Comprehensive
Plan amendment application is part of"Step Two" of 2003
Agricultural Lands planning. Using grant funds from
Washington State,DCD will coordinate a public outreach
process to ascertain interest in the "Agricultural Lands of Local
Significance"program cited in the Comprehensive Plan.
Working with the Planning Commission,DCD will develop a
Comprehensive Plan and/or UDC of various Agricultural Lands
designations,reconsideration of UDC regulations as applied to
Agricultural Lands(uses allowed per Table 3-1 in particular),
and other unfinished Agricultural Lands planning tasks as
described in the Comprehensive Plan. The package will be
refined during the months of May and June and reviewed in
public process with the Planning Commission and BOCC.
MLA03-00210
ZONO3-00035 F 6/9/2003 The UDC was adopted in December 2000 and became effective
as Jefferson County's set of development regulations to
implement the Comprehensive Plan on January 16,2001.
Adoption of the UDC was appealed by the Shine Community
Action Council and the Olympic Environmental Council with
regard to groundwater protection and seawater intrusion. The
Western Washington Growth Management Hearing Board
(WWGMHB)issued a Compliance Order(No. 01-2-0015)on
December 5,2002,which included direction to adopt seawater
intrusion policy as a Growth Management Act(GMA)action.
The Board of County Commissioners(BOCC)directed staff to
establish a placeholder Comprehensive Plan amendment
application for the 2003 amendment cycle. The proposal will be
developed and refined in the coming months in combination
with MLA03-00202,a seawater intrusion protection proposal
developed by the Planning Commission and currently under
review by that body.
MLA03-00244
ZONO3-00032 F 12/13/2004 Proposed Comprehensive Plan Amendment. The Applicants are
requesting that Jefferson County to amend Essential Public
Facilities Policy EPP3.1,3.10,Chapter Strategy B and to delete
Essential Public Facilities Policy EPP3.3
MLA03-00446
ZONO3-00050 C Code Interpretation-UDC Section 8.6
MLA04-00028
ZON04-00007 F 12/13/2004 This amendment is proposed to meet the statutory requirements
of RCW 36.70A.130,the Growth Management Act(GMA)
provision related to ensuring that the Comprehensive Plan and
development regulations comply with the requirements of the
GMA.
MLA04-00029
ZON04-00008 F 8/9/2004 This amendment is proposed to complete work related to the
December 2002 designation of the Tri-area urban growth area
(UGA). This is a placeholder application to adopt urban level
of service standards and finish required capital facilities
planning(with emphasis on sewer)including fiscal analysis of
affordability of those needed services.
MLA06-00078
ZON06-00009 C Suggested Comp Plan Amendment. Propose to move density
changes within a zone from the comp plan to the UDC. This
will result in more prompt decisions and relieve the staff and PC
of having to meet the annual CP cycle.
MLA06-00084
ZON06-00013 P Suggested Comp Plan Amendment.
MLA06-00086
ZON06-00015 C Suggested Comp Plan Amendment
MLA06-00211
ZON06-00023 P Suggested Comp Plan Ammendment-Port Ludlow Drainage
District UDC Drainage Revisions
MLA07-00265
ZON07-00039 P Urban Growth Area for Irondale Hadlock Area
MLA07-00408
ENV07-00001 F 10/5/2007 10/5/2007 Jefferson County On-Site Sewage System Management Plan
MLA08-00008
ZON08-00003 P Line in Line out changes to the Jefferson County
Comprehensive Plan
Page 1 of 1
Joel Peterson
From: Stacie Hoskins
Sent: Friday, April 10, 2009 11:45 AM
To: Joel Peterson
Subject: Tidemark& UGA
Hi Joel,
What do you want to do with MLA08-00008? Is it still needed for any reason? It's still pending in Tidemark, and it
looks like you created a new one (MLA09-00024)for the compliance project.
Line in Line out changes to the Jefferson County Comprehensive Plan for UGA '°
pd compliance A 71
_�'yVILA09-00024 WWGMHB Compliance Port Hadlock UGA; Jefferson County DCD ,
Thanks,
Stacie
f`
r
v
k\j, Oc.)
O
CP
4/14/2009