Loading...
HomeMy WebLinkAboutBLD2014-00261 - MECHANICALr. •ILDING PERMIT APPLICATOI BLD14-00261 Review Type: Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT#: BLD14-00261 Received Date: 7/24/2014 SITE ADDRESS: 1003 PARKRIDGE DR PORT TOWNSEND, 98368 OWNER: KARL 0 MEYER TRUSTEE PHONE: 360-385-7753 KLM FAMILY TRUST PO BOX 1642 PORT TOWNSEND WA 98368-0129 9999 SUBDIVISION: Block: Lot: 53 PARCEL NUMBER: 999900153 Section: 28 Township: 30 N Range: 1\A CONTRACTOR: POWER TRIP ENERGY CORP PHONE: 360-643-3080 83 DENNY AVE PORT TOWNSEND WA 98368 Contractor's License POWERTE934QE Expires 11/5/2015 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOP ROOF MOUNTED GRID TIED PV(SOLAR ELECTRIC) TYPE OF WORK NON SQUARE FOOTAGE: TYPE OF IMP MEC MAIN: VALUATION ADD'L: HEAT TYPE: CODE EDITION: 2012 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: BEDROOMS: BATHROOMS: Exist: Exist: Prop: Prop: Total: Total: IRouting Date: Type Amount Paid By: Date: Receipt: Approved/Date Permit $228.00 SRE 07/22/14 151271 Total: $228.00 APPROVED JUL 24 2014 Jefferson County DCD \\tidemark\data\forms\F_BLD_App_Bid.rpt 7/24/2014 • 0 °a,yke. power Trip energy Corp PV Installation contact 83 Denny Ave Port Townsend, WA 98368 (360) 643-3080 www.powertripenergy.com lic # POWERTE964JN Consent to Act As Agent on Permit Application To whom it may concern, I Lizabeth Meyer_, grant Power Trip Energy Corp.Permission to act on my behalf for the purpose of acquiring a Solar Electric Permit from Jefferson County and grant Power Trip Energy permission to complete and sign the permit application on my behalf. jt- Signature: - ' - A Date: 7- J f V 1 I July 1,2014 Page 5 of 8 Lizabeth Meyer • • c.Sor, JEFFERSON tNTY ,e eDEPART T COMMUNITY DEVELOPMENT r pnt-i,Trp.vlserld,WA 3 / 3 "i TM w. o.eersan. ra.us •mnuni dvelopmen � rek 360,379,4450j Fax 360.3'19,4451/E,sa : did c e o Ava.ts EXPEDITED PERMITTING CHECKLIST FOR SOLAR PHOTOVOLTAIC SYSTEMS ***TO BE COMPLETED BY COUNTY STAFF *** Building Permit Required? El Yes 0 No Staff Initials Date Fee: ***TO BE COMPLETED BY THE APPLICANT*** 1. Project Information Project Applicant: Power Trip Energy,83 Denny Ave,Port Townsend,WA 98368,360-643-3080,john @powertripenergy.com Site Owner Name: KLM Family Trust,Karl O.Meyer&Lizabeth S.Meyer Trustees Project Address: 1003 Parkridge Dr,Port Townsend,WA 98368 PV System Description Roof mounted,Grid-tied PV 2. Determine if your project needs a building permit(check all that apply): Applicable Yes No Not App 1. Mounting equipment is engineered and designed for solar PV equipment. X 2. The solar PV system will comply with the National Electric Code(NEC) X including obtaining an electrical inspection through permit#2342627E. 3. To address uplift the solar modules will be mounted no higher than 18 inches X above the surface of the,roofing to which they are affixed. Note:" Questions 3-5 Apply to Rooftop Systems 4. Total dead load of panels,supports,mounting,raceways,and all other X appurtenances shall weigh no more than one of the following. If YES indicate which: Es Conventional solar modules(one layer of glass)or frameless solar modules(two layers of glass)that weigh three and one-half(3.5)pounds per square foot(PSF)or less on any roof. ❑ Frameless solar modules(two layers of glass),on sloped roofs of at least 3:12 but less than 5:12 pitch,that weigh no more than four and one-half(4.5) pounds PSF. 0 Frameless solar modules(two layers of glass),on sloped roofs of 5:12 pitch or greater,that weigh no more than five(5)pounds PSF. 5. Supports for the solar modules are installed to spread the dead load across as X many roof-framing members as needed to ensure that point loads do not exceed fifty(50)pounds at any location. 6. Attachment to the roof is specified by the mounting system manufacturer. X Note: Question;7 Applies to-Ground Mounted Systems X 7. Ground-mounted solar PV systems using racking components installed per the I I manufacturer's specifications. J If you an ered, li yes or N/A to all of the above questions,no separate building permit is required. . John S.Fleming,Power Trip Energy 7/21/2014 Date cant Signatu C 1 • • EXPEDITED PERMITTING CHECKLIST FOR RESIDENTIAL PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED -----TO BE COMPLETED BY CITY STAFF--__-_ Building Permit Required? ❑Yes ❑No Qualifies for Electrical OTC? ❑Yes ❑No Date: tick here to enter text. Staff initials Date:Click here to enter text. Staff initials TO -.E COMPLETED BY APPLICANT---- T------- project Information Project Applicant: Power Trip Energy Co,83 Denny Ave,Port Townsend,WA 98368 Site Owner Name: KLM Family Trust,Karl 0.&Lizabeth S.Meyer,Trustees Project Address: 1003 Parkridge Dr,Port Townsend,WA 98368 PV system description: Roof Mounted,Grid-tied PV(Solar Electric) •etermine if your project needs a building permit (check all that apply): Yes No 1. PV system is designed and proposed for a detached single family house. X ❑ 2. PV system is designed for rooftop of a house in general compliance with applicable codes. X 3. Mounting system is engineered and designed for PV. X ❑ 4. Rooftop is made from lightweight material such as shingles. X ❑ _ 5. PV system has been pre-approved by electrical permitting agency. X CI 6. To address uplift, panels are mounted no higher than 18"above the surface of the roofing to X ❑ which they are affixed.Except for flat roofs,no portion of the system may exceed the highest point of the roof. 7. Total dead load of panels,supports,mountings,raceways and all other appurtenances weigh no X ❑ more than one of the following. If YES,indicate which: X No more than three and one-half(3.5)pounds per square foot(PSF) El Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half(4.5)PSF ❑ Frameless panels on at least 5/12 pitch roof weighing no more than five(5.0)PSF 8. Supports for solar panels are installed to spread the dead load across as many roof-framing X p members as needed to ensure that at no point are loads in excess of fifty(50)pounds are created. 9. Attachment to the roof is specified by the mounting system manufacturer. X CI 10. Method and type of weatherproofing roof penetrations is provided X 11. Home is code compliant to setbacks and height,or code allows expansion of nonconformity for X solar panels. 12. Panels are mounted no higher than the roof ridge or apex of roof(applies only to pitched roofs) X Applicant Signature: Printed Name: John S.Fleming,Power Trip Energy Date:7/21/2014 .ct.if you answered yes to all o he above questions, no separate building permit is required. f Created by the Evergreen State Solar Partnership vi.0 • S Jefferson County "ctoitizityttipm*nl D4,1 '` w5 Step 3: Confirmation and Receipt Result: Payment Authorized Confirmation Number: 14482637 Your payment has been authorized successfully and paymentwill be processed. Jefferson County Departrnentof Community Development thanks you for your payment For questions about your account,please call 360-379-4452 Thank you for using our bill payment services. Please save or print a copy of this receiptfor record keeping purposes. My Bills $247.001 [Residential Applications paymentof$247.00 on Parcel Number 999900153 $247.001 Subtotal: Customer Information Convenience Fee: $7.50 Total Payment: $254.50 First Name: Power Trip Last Name: Energy Address Line 1: 83 DennyAve Address Line 2: City: Port Townsend' State: Washington Zip Code: 98368 Phone Number.3606433080 Email Address: john @powertripenergy.com Payment Information Card Number ********`*"1482 Expiration Date: "r* III *I 14 -lie( - i i...s ON c JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT i-, 621 Sheridan Street I Port Townsend,WA 98368 I Web:www.co.'efferson,wa.usicommuni development s'ilnio Tel:360,379.4450 I Fax:360,379.4451 I Email:dalAcojefferson.wa.us Building Permits&Inspections I Development Consistency Review I Long Range Planning I Watershed Stewardship Resource Center Master Permit Application MLA: Project Description(include separate sheets as necessary): Roof Mounted, Grid-tied PV(Solar Electric) Property Size: 4.97 acres Tax Parcel Number 999 900 153 (acres/square feet) Site Address and/or Directions to Property: 1003 Parkridge Dr, Port Townsend,WA 98368 Property Owner(s)of Record: KLM Family Trust,Karl 0.Meyer&Lizabeth S.Meyer Trustees Telephone:360-379-2816 Fax: email: km4garden@yahoo.com Mailing Address: P06 1642,Port Townsend,WA 08368 Applicant/Agent(if different from owner): 360-643-3080 Telephone: Fax: 360-539-1857 email: john@powertripenergy.00m Mailing Address: Power Trip Energy Co,83 Denny Aye,Port Townsend,WA 98368 What kind of Permit?(Check each box that applies 0 Lot or Road Segregation DBuilding 0 Critical Areas Stewardship Plan O Demolition Permit 0 Variance(Minor, Major or Reasonable Economic Use) 0 Single Family 0 Garage Attached/Detached 0 Conditional Use(C(a),C(d),or Cj** O Manufactured Home 0 Modular 0 Discretionary"D"or Unnamed Use Classification O Commercial* 0 Special Use(Essential Public Facilities)** O Change of Use El Boundary Line Adjustment O Address 0 Road Approach 0 Short Plat** 0 Home Business 0 Cottage Industry 0 Binding Site Plan*" 0 Propane 0 Long Plat** 0 Sign 0 Planned Rural Residential Development(PRRD)/Amendments" 0 Allowed"Yes"Use Consistency Analysis 0 Plat Vacation/Alteration"* 0 Stormwater Management 0 Shoreline Master Program Exemption/Permit Revisions** 0 Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Substantial Development** 0 Temporary Use 0 Shoreline Management Variance 0 Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment 0 Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment *May require a Pre—Application Conference 0 Tree Vegetation Request **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: Labor & Industries Electrical Permit DESIGNATION OF AGENT Please see attached I hereby designate to act as my agent in matters relating to this application for permit(s). 411, 7/21/2014 OWNER SIGNATURE 'Mk Date: 1 1111 /MMOMBEgagai.HOMIL ‘t By signing this application fo ,the owner/agent atte that the information provided herein,and in any attachments,is true and correct to the best of his,her or its knowledge. Any material falsehood or.W omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any req ired later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the applicati that n wants pri tics. A.... 7/21/2014 Signature: , Date: The action or actions plicant will undertake s a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a po. ial"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if yo are in compli.I.- 'th the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual A." and non-transferabl resporyli •r,.s-ring to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: Date: 07/24/2013 III III BUILDER STATEMENT The signer of thi statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be ass ing t - •- •, '01 y of the -neral Contractor for the proposed project. Signature: . Date: 7/21/2014 'NIL GENERAL CONT-• °TOR OR MANUFAC i•HOME INSTALLER: PHONE: FAx.}643-3080 (360 )539-1857 Power Trip Energy Co MAILING ADDRESS: 83 Denny Ave,Port Townsend,WA 98368 EMAIL john @powertripenergy.com CONTRACTOR'S LICENSE WAINS 063.472-00 NUMBER: POWERTE934QE NUMBER ARCHITECT/ENGINEER: N/A PHONE (360 )643-3080 FAx:(360 )539-1857 MAILING ADDRESS: '83 Denny Ave,Port Townsend,WA 98368 EMAIL john @powertripenergy.com Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: L New 0 Wood Existing: 0 Sewer G Addition ❑ Steel Proposed: Bank ❑ Community System • Alteration/Remodel ❑ Concrete Total: Height: L Individual System D Repair Re E. Masonry SEP Permit# CI p Bedrooms: Water Supply: Demolition ❑ Other: Existing: Setback: rj Private well G Two Party Type of Heat: Proposed: D Public yp Total: Name of System: If this is a Commercial Proiect you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank andlor Appliance Installation permit,mark all items below that apply: Underground Tank Above ground tank Size of Propane Tank: Heat Stove Cook Stove Woodstove Fireplace.nsert rehtO I evotS telleP i knaT retaW toH Is this appliance being installed in a Manufactured I Mobile Home? Yes / No property When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all ro erty lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area Square Footage I Current Proposed For Office Use Only Amount Revision Main Floor Heated EH Bld App Review. 2"°Floor Heated Consistency Review Other Heated • Base fee: Mezzanine Additional Section: Heated Basement Plan Check fee: Unheated Basement State Surcharge fee: Other Unheated Pot Water Review fee: Garage/Carport SUBTOTAL Decks 911/Rd Approach fee: Other TOTAL: Receipt Number: Cash/Check Number: ESTIMATED COST(REQUIRED) Date: •Fair market value of all labor and materials foundation to finish Initials: 07/24/2013 JEFFERSON C NTY_' bon NO. 151271 DATE TI a.)-/ ' 14 RECEIVED FROM YOVORY fir t p burecer DESCRIPTION BARS# AMOUNT CURRENCY Pj LD PJ E as j. (AD ) r, COIN GciC►\ 1 _4 .c-o 4 v is,,, n ring 4 c m �L I ° Td- ,E « l Ls utigdo V RECEIVED BY a` i,t) ; TOTAL 0"I4 ' DC) +TSB. r • • • Point& Pay - Create Order Page 1 of 1 • Thank you for your payment! This service has been provided by Jefferson County Dept of Community Development, WA and Point& Pay. We value your business. Please keep this receipt for future reference. You have made a payment to Jefferson County Dept of Community Development, WA . Jefferson County Department of Community Development thanks you for your payment. For questions about your account, please call 360-379-4452 Name: Power Trip Energy Address: 83 Denny Ave, Port Townsend WA, US, 98368 Contact: 3606433080 Comments: Payment ID: 14482637 Date: 07/21/14 05:44 PM Subtotal: $247.00 Fee: $7.50 Total: $254.50 Method: Credit or Debit Card(************1482) Item Purchased Transaction Description Account Amount Residential Applications Jefferson Co C D GOV 999900153 $247.00 Signature: Date: / / By signing this receipt you agree to the terms and conditions of this service. You will see one line item on your credit or debit card statement indicating the amount you paid and will be identified as Jefferson Co C D GOV. If you have any questions about the charges please call 1-888-891-6064. Print Receipt Close Window https://agent.pointandpay.net/pointandpay_counter/viewReceipt.do?method=viewPayment... 7/22/2014 • • 3 cj J 0 0 Parcel Details Page 1 of 2 • •,, ,,,, Jefferson '-_.-a '''1:''''''''''' , ,, : teas-04 .... 1' 1-1k-, o : Home '. County Info a artm nt :, Search Parcel Number: 999900153 SEARCH Parcel Number: 999900153 Printer Friendly Owner Mailing Address: KARL 0 MEYER TRUSTEE KLM FAMILY TRUST PO BOX 1642 PORT TOWNSEND WA98368-0129 Site Address: 1003 PARKRIDGE DR PORT TOWNSEND 98368 Section: 28 School District: Port Townsend (50) Qtr Section: NE1/4 Fire Dist:Chimacum (1) Township: 30N Tax Status: Taxable Range: 1W Tax Code: 0111 Planning area:Tri-Area (4) Sub Division: 9999 - WOODLAND HILLS #2 Assessor's Land Use Code: 1100 - Residential - Single Unit Property Description: WOODLAND HILLS #2 PHASE 2 LOT 53 SUB) TO EASE & REST OF RECORD Tax,A/V, Sales, Photos, and Permit Data Bldg Data Map Parcel Plats&Survey Septic Monitoring Info % `'- Jefferson (aunty HOME 1 COUNTY INFO 1 DEPARTMENTS 1 SEARCH Best viewed with Microsoft Internet Explorer 6.0 or later Windows- Mac http://www.co.jefferson.wa.us/assessors/parcel/parceldetail.asp?Parcel_NO=999900153 7/24/2014 POWER TRIP ENERGY CORP Page 1 of 2 • Cil) Washington State Department of Labor & Industries POWER TRIP ENERGY CORP Owner or tradesperson 83 Denny Ave COCHRANE,ANDREW P PORT TOWNSEND,WA 98368 360-643-3080 Principals JEFFERSON County COCHRANE, ANDREW P, PRESIDENT CARR, STEPHEN E, VICE PRESIDENT Doing business as POWER TRIP ENERGY CORP WA UBI No. Business type 602 349 562 Corporation License Verify the contractor's active registration/license/certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. POWERTE934QE Effective—expiration 11/05/2007—11/05/2015 Bond CBIC $12,000.00 Bond account no. SH5957 Received by 131 Effective date 11/05/2007 11/02/2007 Insurance GENERAL INS CO OF AMERICA $1,000,000.00 Policy no. 24CC21330840 Received by 1.8,1 Effective date 10/08/2013 11/02/2010 Expiration date 11/02/2014 Insurance history Savings https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602349562&LIC=POWERTE934QE&SAW= 5/21/2014 esON `bo JEFFERSON COU DEPARTMENT OF COMMUNITY DEVELOPMENT 7. Date: ?-'ZZTime Received: x230 et ED on Tue. Wed. Thur. Fri. Date: g'=L- BLD: ? L-f- p/\,(p 1 Contact Name: Owner: Contact Number: 360 6,4 'Q ' Address: I pp -1 I p -P--1DL,Z- Dr- 206 Notes: S c, Z Foundation Plumbing Framing Propane Tank Mechanical Setbacks Under-ground Framing Under ground Furance Footing Rough In Air Seal Above ground Gas Stemwall Hydronic Exterior shear Exterior lines Oil Straps Hot Water Htr Interior shear Interior lines Ducts Post Hole Ventilation Appliance Underfloor Gas/Wood stove Man-Homes Insulation Final Inspection Setbacks Floor Foundation Wall Address Posted Block&Tile Ceiling as ON c I MECHANICAL AND DEMOLITION PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD14-00261 Received Date 7/24/2014 SITE ADDRESS: 1003 PARKRIDGE DR Issue Date 7/24/2014 PORT TOWNSEND, 98368 APPLICANT: KARL 0 MEYER TRUSTEE PHONE: 360-385-7753 KLM FAMILY TRUST PO BOX 1642 PORT TOWNSEND WA 98368-0129 53 SUBDIVISION: 9999 Block: Lot: PARCEL NUMBER: 999900153 Section: 28 Township: 30N Range: 1W CONTRACTOR: POWER TRIP ENERGY CORP PHONE: 360-643-3080 83 DENNY AVE PORT TOWNSEND WA 98368 Contractor's License POWERTE934QE Expires 11/5/2015 OWNER, KARL 0 MEYER TRUSTEE PHONE: 360-385-7753 if different: KLM FAMILY TRUST PO BOX 1642 PORT TOWNSEND WA 98368-0129 PROJECT DESCRIPTION: ROOF MOUNTED GRID TIED PV(SOLAR ELECTRIC) Directions To Site: THIS PERMIT IS VALID FOR ONE YEAR AND IS NOT RENEWABLE. THE FINAL INSPECTION MUST BE SCHEDULED AND PASSED WITHIN THAT YEAR. THE EXPIRATION DATE IS 7/24/2015. REQUIRED INSPECTIONS: Installation per Manufacturer Specifications/CO2: Tank/Line/Appliance: Final Approval: , b BUILDING INSPECTION HOT-LINE 379-4455. REQUESTS MUST BE RECEIVED BY 3 PM THE DAY BEFORE THE INSPECTION IS NEEDED. Office Hours 9:00 a.m. -4:30 p.m. Monday-Thursday HOT LINE AVAILABLE 24 HOURS A DAY \\tidemark\data\forms\F_BLD_Permit_Propane.rpt 7/24/2014