Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2002-00477
THIS BUILDING IS NOT FINALED . PERMIT WAS CANCELLED PRIOR TO RECEIVING ALL INSPECTIONS AND HAS NOT BEEN ISSUED A CERTIFICATE OF OCCUPANCY. UILDING PERMIT APPLICAN MR�W-00440 Type: Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT#: BLD02-00477 Received Date: 8/21/2002 SITE ADDRESS: 302 RIPLEY CREEK RD QUILCENE, 98376 OWNER: CHARLES E GREENERT III PHONE: (360)765-4020 DONNA S GREENERT PO BOX 337 QUILCENE WA 98376-0337 SUBDIVISION: Block: Lot: T 11 PARCEL NUMBER: 802353004 Section: 35 Township: 28 N Range: 02 W CONTRACTOR: T6 N &CO 'TRY POST& FRAME PHONE: 800-824-9552 1652 Y •9 SUITE B CU-)�, A // LYNNW'4OD 98037-3161 3Y" Co actors e TOW NCPF099LT Expires 6/30/2003 REPRESENTATIVE: IM GUI, PHONE: (425)743-1555 TO' = OUNTRY 16521 • B L y u ooa, (AAA 42u37-31101 PROJECT DESCRIPT1014 POLE BUILDING TYPE OF WORK GAR SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: VALUATION 23,626.00 ADD'L: HEAT TYPE: UH CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: 1,260 SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: Prop: Seismic Streams Total: Total: Flood Way Floodplain Routing Date: F&W Landslide F/01. 1 02- Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: Approved/Date Permit $377.25 MAM 08/21/02 49510 Plan Check $245.21 MAM 08/21/02 49510 APPROVED State Building Code $4.50 MAM 08/21/02 49510 Total: $626.96 SEP - 52002 Jefferson County Planning &Building Department oN oo d JEFFERSON III • V4 ' DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street• Port Townsend •Washington 98368 360/379-4450 . 360/379-4451 Fax o www.co.jefferson.wa.us/commdevelopment �3IN Master Permit Application MLA: Project Description(include separate sheets as necessary): Po\t. u.'t\d>; \' ��� o-Z 1)i Tax Parcel Property Number: Size: (acres/square feet) Site Address and/or Directions to Property: Z IA C."14 1.-V1 V---0L' Gl`Ctc L \..XA L% ( 1'o Property Owper(s)of Record: Ch1 \25 E 0e-4_ i�nnc� `� (re tv- Telephone: (✓La r11u5-L\OZ_O Fax: email: . Mailing Address: Q■:ACtr2 u. kit 'N*° Applicant/Agent(if different from owner): Telephone: Fax: email:_ Mailing Address: What kind of Permit?(Check each box that applies) ❑ Building ❑Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit ❑Conditional Use[C(a),C(d),or C]** ❑Single Family ❑ Discretionary"D"or Unnamed Use Classification o Garage Attached/Detached ❑ Special Use(Essential Public Facilities)** ❑Manufactured Home ❑ Boundary Line Adjustment ❑ Modular ❑ Short Plat" 0 Commercial* ❑ Binding Site Plan** ❑Change of Use ❑ Long Plat** o Address ❑ Road Approach ❑ Planned Rural Residential Development(PRRD)/Amendments** ❑Propane ❑ Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management ❑Shoreline Management Substantial Development** ❑Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance 0 Temporary Use ❑Comprehensive Plan/UDC/Land Use District Map Amendment o Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium *May require a Pre Application Conference **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business hours. Signature: Date: The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: Date: G:\PemritCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc • OWNER BUILDER STATEMENT • The signer of this statement does hereby that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be -a •the of the General Contractor for the proposed t Signature:.` n^ Date: ( ' 1 fl� GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX ( ) ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: ❑ New ❑ Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: Bank ❑ Community System ❑ •Alteration/Remodel 0 Concrete Total: Height: ❑ Individual System 0 Repair 0 Masonry SEP Permit# ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: Setback: ❑ Private well o Two Party Type of Heat: Proposed: ❑ Public Total: Name of System: If this is a Commercial Protect you must answer the followinsr: Number of Parking Spaces: Current: Proposed; Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ❑ Underground Tank ❑ Above ground Tank Size of Propane Tank: ❑ Heat Stove ❑ Cook Stove ❑ Woodstove ❑ Fireplace Insert ❑ Hot Water Tank ❑ Pellet Stove ❑ Other Is this appliance beino installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to Install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all properly lines,bufldfngs and septic e'------components, including the reserve area. Square Footage For Office Use Only ti Fd Current Proposedp� : Main Floor Consistency Rev t: f 5 � � 2"u Floor s Base fee , � A 3f 0 Floor Additional,Section: ` ` k ,.,;',:r.',',:,.,',' 4..,. Mezzanine: 'plan Check fee: Heated Basement a �k , ate Surds Unheated Basement Pot Waterey� _ ` , h Syr`, 'r�' Other Unheated 9i1/lid r '22,-'---,-, � o , -N- , -' - v Garage/Carport TOTAL; Decks !x; J7eceIpt;Number Other Cash/Check Number+ ESTIMATED COST(REQUIRED) Date: ` a 'h• 5 S z{ *Fair market value of all labor and materials foundation to finish initials: G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc ■ -- - --- •. Suite B•18521 Highway 99•Lynnwood,WA 98037-3199 Please Check After Doing Site Plan: 7§eptic and drainfield of size Draw North An ow in Circle To &Country Everett: (426)258-4171 Puyallup: (253)840-9552 (Property dimensions ❑ ewer lines ❑Elevation of property POST FRAME B ILDINGS Ad:ioistrative Headquarters: (425)743.1555 I�Exlsting buildings etbacks of proposed&existing buildings ❑Bodies of water Iiil • - — FP (425)742.4379 Toll Free: 1-800.824.9552 / -_reposed building p1ciain road with name ❑Floorplan ar PER A • LT Contractor's Lie.N.TOWNCPF099LT ❑Easementsccess to proposed building ❑Slopes&Contours(5'increments) Query:Our Future Depends On It Job Name: -&Z-C-/4✓ tr Job Site Address: 3'd 2 )Zi PZ±3-• elirif,c- "4 �C7 2 _ 7 �3 r 6 ems/ Legal Description: dgeJ Tax Account 0: /+-c��ar- PCi 2. 0 z• iU4.-t1J e,iss,'d2' - -1)i 4/ /ZsD .. r' %�'Ti„1 ,2‘a `', ,,,. (1) �.C�./�l�GD G/C 1 �.,,` VI —fir ?v f v-.e.,4- /` s-..r"./- or r /� .1�0,-.✓G- --- i/ / a ..J /Q .4r. l ,- .c:CV ��5 r Z‘ir ., .�✓G,Z?' A U r 4-{ 1- 0,..c.12.e S _ // I•f , I ) • i 1 I I APPROVED !, SITE PLAN sf�J. .-4. o AUG 2 8 2002 • • JEFFER 0 41�'�l TY ` • DEPT.OF COMM i IT 1a —; • ENT s? - GNATURE: 1 ■ ,. N • NO Z�, r� 9r4 , P t v-uv P: �" i •4111,11Pk.... 41110 4 N) - / f e 1` I / � PRA• . tea, t �_ • H , (kcce 5 ; �. 'is Rl I �)›-r, i � r c); ., OP' -----.. rs....) ., C,CD ii 1 14) 11 CS � � I �n \ alit]i a 1 . I:1 ii.,i c ''j DO NOT SIGN COMPLETE SITE PLANI Customer has verified and approved the location of the building,orientation of the building to the North,and verifies that all White-Customer Copy White-Office Copy Yellow-Accounting Pink-Production t !Ig rntc,�-el — SPAN z L > III� �-,, (40' MAX.) F �cYi -i- -- POST SPACING POST SPACING POST SPACING ' 471 \1� > --I v o= mZ ��m (14' MAX.) (14' MAX.) (14' MAX.) \ Z I 9z D II I ° ° z III 7 A ii N 9A C y I �Or• Itq I 7 x� 9) > d 1:15 8 .A-WoZ _ GRID SYSTEM PER SECTION Y APilA D ~ > .fi _ POST SPACING X n w �yb •� l�;iJI ry _ _ ir i �0 7.�. C Q x • x _I� � f Z _ - R _8Y 0 H RS i� YC _ _ _I� _ git 2p mg I? I li I T� 35 411)0o.��� � _ _ _� - = I= _ _ • v)P' P. t 1 1 I \ t- 8 xa; A Ag 5TEtt.52Rs. i 2 ill ?-; i;: Itt 24$' kOsi f' 4 " 8 �> oy �. - i /4 N N n , Iv ` \ a 1< _ il;ie. ;i;� 1 8 c,o 2 -._..o FCy�� F 8 :am D epr, - r 8 + a 11 Tm 1" z m 1}i >> NNm p1 C 12' SZ m� X? Z N{C;A�y N 11 g 1 1!. girl : i3 . R53 ! XT'-q4 %g ag m.8 9.-p P A zpy 9 t A 8 Off\ 1 � O/�\/� z I+ N N _ ,:r:: = ::,L,J J.): : F-1, -:_. I tip 40 ta / 1CI4 @ f'V ` N A f>'19 9n . NC Bar- 1 _ t� /� ° 2� 5A D 8R ii PNN - Pfri � it A _� w Z /I z [F:_-_—:::::_. \ 1 in-q i xl T " c '�` °� J UN - r o d2 1 ,::!i _ V�1p� �GF N 9!:§ , go ;�/l' �� Gam` T---ij �O Corn '.� --- �,� 1 /J�/\�/j���/�\ PS • I �`r//� �, )%*4%iii �o U 03 M j A I A EAVE HEIGHT _— -� 5 . EAVE HEIGHT ..r Y? /�I <16' NA%.) (r/� 111"' <l6' HaXJ �, L m m 0\ 03 TOWN & COUNTRY BASICS *nw JRR ENGINEERING, INC. • OWNER: TOWN do COUNTRY PERMABILT PLANS & 18521 HIGHWAY 99, SUITE B ELEVATIONS LYNNWOOD, WA 98037 • (425) 743-1555 eeb SCAtz: NOT TO SCALE i u R t1j 00-388 DATE: 06/05/2001 =1 ENGINEER:JRR Engineering, Inc. T,o,, DRAM: AMR 18609 76th Ave. W., Ste. 8. Lynnwood, WA 98037 (425) 897-5108 FAX 697-4506 00-38 CHECKED: RKR No. DATE REMSION _ APP.() FltE NAME CRIDELEV.DWC DATE PREPARED:JUNE 03, 2001 6/Tee,ve+e74-, Z0'd "d101 —'[^d J l Y'1r\ Inn giro 11•1 • i. or Jefferson County De nest of Community Development ' '.}'60v cc".. 621 Sheridan Street,Port Townsend WA 98368(360 379-4450 . o- set F @- �rn0` App c©it © .• Fit• Project A, don: Z- .. ` Building Type' - Project T 1P �r� 1 Type: Presses Type: r'. CD yti�'s Vet JWoed ❑Single Family - t u O 'stage Attach etacht:tl '¢ -; ©Additiot: ❑Steel ❑Modular " �� o O iltmation/Remade ❑Concrete ❑Commercial ='F . ° ['Repair O Mtuto OiViulti-family/#of Units ___r � a ❑Demolition ❑Other,�'•ag',r rea, °Industrial — CI Other: . Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one fa Rxisting . Bxisttn,5 ClSewe r ComauaityS eo u C7hkeai`!ty ['Oil Proposed: '' Proposed; r. tidividualSystem ❑Woodstove ❑Propane Torsi: 1, Total: J� );f not sewer,fill out the followitigt ❑Heat Pump /► onventionat E I Alternative 0 Other__/v/�t•J _-Permit# SEP r. mate well L7'1 v, Water Supply: Two Party Well Public.Name of water system: _ _ 1 Square Footage: For Office the Only 0 Main Floor Consistency Review 39O y1. 200 Floor Base Fee 3 7 7. 2 3131 Floor _ Plan Check fee ati.,5L • (At • Htd Basement State Surcharge fee •-T' SO Uohtd Basement , Subtotal _._..�...__r._�, t - qt.. Garage Carport . 12 Co C) 4 Pot Water Review fee :::73". /,_ nll/Rd:lpproach fee ' ' . tier b13. R� � Ctxllmarcial TOTAL Q Industrial Receipt#* q,193./ 0 Orhrs • Cash/Chock# /• 0 Total''' radon: 4 2.3 } Le 2-G. '- Initials �'O /v Or Due fir Z t Estimated Cost-. • . . '`'{ `�• • i If within 200' of the Shoreline, �� - i ', ; l I Distance to Bank or Ordinary High Water Mark ft.Bank Height �• ' t; ,;F•.. liv slims the application form.the epplitOAd.+wner eIc>:ts That rho t •mouton pruvnIcd herein u taus tend tomtit to the bier of nctn krmwacdpa Any matatt thchuud.00r am . .•!'• .: : • . itm .amn of it'mime(feu malt br the applicant/wterner wish taepeer m this applimtiun tnteka MO mull in this pctmit ihnil t Atlil met mat. I hitcher not*iii Aare.indunnur:ttnl heal hamlas Icffction cow aping all liatsiluiu,Itlikilentrut court curia.orayKehthlts ntcomur's Tees and taproom winch may in any way matt . ' . wens JafTarene t inxuy a a nettle of or in eutraryucnet j.f the pre g of Ns permit 1 Whey mots(II prtn tit ncc d nail( i MT'm leUa:eu Cu r and its employers.tnyeestrnotnu or mina feu the purpose of applieouo 'review and any rggytted litter tnapacnnna. .1eeinte and eight ati Crtrr lit th apt►rlicant Ix-opt-cry+x yr It be&quested and andd Well(duon %OAF l ttihttes hours. Signature: y.. Date: 2 4, (4'2__ . OVER ► 11:110\IIL\l'I.Nr:NI11\ ' w()Nl.ut:\FONMIti\lll.DpLemta\pplie:uum 11.K.,01 Z0iE0'd T69T Z1'1. Set' ANl11.1M1 '2 KI ZSIbb6LE09E era.0b:80 Z09Z/L0%89 T9/L0 39dd a3a 00 .dd3P ______:.. • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD02-00477 Received Date 08/21/2002 SITE ADDRESS: 302 RIPLEY CREEK RD Issue Date 09/5/2002 QUILCENE, 98376 APPLICANT: CHARLES E GREENERT III PHONE: (360)765-4020 DONNA S GREENERT PO BOX 337 QUILCENE WA 98376-0337 SUBDIVISION: Block: Lot: T 11 PARCEL NUMBER: 802353004 Section: 35 Township: 28 N Range: 02 W CONTRACTOR: TOWN&COU POST& FRAME PHONE: 800-824-9552 16521 SUITE HWY t ne LY► f •OD WA 98037-3161 ��� ontractor's License: TOWNCPF099LT Expires: 06/30/2003 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION POLE BUILDING REQUIRED INSPECTIONS: ( ] SETBACKS / Footings: [ ] Foundation: [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: [ ] Framing/Plumbing: [ ] Propane Tank/Lines: [ ] Insulation: [ ] Sheetrock: [ ] Septic System Final Approval: [ ] Zoning Final Approval: [ ] Final/Occupancy Approval: HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY -SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY 09/06/2002 Conditions Associated With. 9:26:00AM Case #: BLD02-00477 1 of 2 FINDINGS 1.) 7,202 F-Confirmed ESAs None NOT MET 08/28/2002 KMR The application was reviewed by the Jefferson County Department of Community Development staff on 8/28/02 for the potential presence of Environmentally Sensitive Areas(ESAs)under the provisions of the Unified Development Code(UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection,the following ESAs were confirmed to be present on the subject property:Landslide Hazard Area,Erosion Hazard and Susceptible Aquifer Recharge Area 2.) 7,204 F-Aquifer Recharge Area None NOT MET 08/28/2002 KMR Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 3.) 7,205 F-Susc.Aquifer Recharge Area None NOT MET 08/28/2002 KMR Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 5.) 7,208 F-Geohazard Area None NOT MET 08/28/2002 KMR Geologically Hazardous Areas in Jefferson County are characterized by slope,soil type,geologic material,and groundwater that may combine to create problems with slope stability,erosion,and water quality during and after construction or during natural events such as earthquakes or severe rainstorms. 11.) 7,751 F-Site Plan Changes None NOT MET 08/28/2002 KMR The site plan as submitted with the building application on 8/21/02 has been reviewed for consistency under the UDC,and has been approved by Jefferson County Department of Community Development. Any modifications,changes,and/or additions to the stamped,approved site plan dated 8/28/02 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 12.) 7,752 F-Approval for Only None NOT MET 08/28/2002 KMR This approval is for a accessory building only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. CONDITIONS 4.) 2,216 Aquifer Recharge Conditions(SFR) None NOT MET 08/28/2002 KMR Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However,during construction the project shall follow the Best Management Practices(BMPs)and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin(see attached). 6.) 2,201 Landslide Vegetative Buffer None NOT MET 08/28/2002 KMR A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area. 7.) 2,203 Slide Buffer-Native Vegetation None NOT MET 08/28/2002 KMR Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction,the Unified Development Code(UDC)Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator. 8.) 2,204 Identify Landslide Hazard Buffer None NOT MET 08/28/2002 KMR Prior to and during approved construction activities,the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer-Do not Remove or Alter Existing Vegetation." 9.) 2,205 Do Not Disturb Buffer None NOT MET 08/28/2002 KMR All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials. 10.) 2,206 Permanent Landslide Boundary None NOT MET 08/28/2002 KMR 09/06/2002 • Conditions Associated With', 9:26:00AM 2 of 2 Case #: BLDO2-00477 The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder of the subject property through installing logs,trees,a hedge row,or any other prominent physical marking approved by the UDC Administrator. 13.) 75 Bld lot coverage None NOT MET 08/28/2002 KMR Maximum lot coverage is not to exceed 25%. Lot coverage is defined by the amount of impervious surface which includes roof tops,driveways,concrete,etc. 14.) 70 Bld building height None NOT MET 08/28/2002 KMR The building height is not to exceed 35 feet. 15.) 66 Bld Setbacks None NOT MET 08/28/2002 KMR Ripley Creek Road is classified as a private road and thus requires a minimum 20-foot setback. The side and rear lot lines require a minimum 5-foot setback. Setbacks are taken from the lot lines and measured perpendicularly from the lot line to proposed development. UDC Administrator Date