BUILDING PERMIT APPLIC ION MRAO-00pe367
Review Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT#: BLD04-00412 Received Date: 6/22/2004
SITE ADDRESS: 397 N JACOB MILLER RD
PORT TOWNSEND, 98368
OWNER: JAMES C LYONS PHONE: (360)385-4903
RT 3 BOX 74
PORT TOWNSEND WA 98368
SUBDIVISION: J LYONS SHORT PLAT Block: Lot: 3
PARCEL NUMBER: 001051020 Section: 5 Township: 30 N Range: 01 W
CONTRACTOR: OWNER/BUILDER PHONE:
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOI ADDITION TO RESIDENCE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP ADD MAIN: 970
VALUATION 63,322.00 ADD'L: HEAT TYPE: PRO
CODE EDITION: 1997 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: y Exist: Z Wetland Erosion
Prop: 0 Prop: I Seismic Streams
Total: 1i Total: '3 Flood Way Floodplain
Routing Date: / 1 n F&W Landslide
6/75/C C.. , 1 Shoreline Aquifer
111 11 I V Forest: Commercial Rural
Type Amount Paid By: Date: Receipt: E
Permit $741.75 RAC 06/22/04 64548 �-�+�-+
Plan Check $482.14 RAC 06/22/04 64548 AUG 1 604
State Building Code $4.50 RAC 06/22/04 64548
Total: $1,228.39 Jefferson County Planning
/� "° & Building Department
1..��lz✓rq ‘
Or no �,?i`'` ..
'soN CQ
r1. a
Building T e
fi 1 App
�of Community Development
s7N b ;l: iY1 SeMd
_ O' '� TQ i id
�0W0A� 375-11450
\t w 2004 ect Type: Frame Type:
E mingle Family L \U M 2 2 ❑ N4w mood
❑ Garage Attached/Detachedtion ❑ Steel
❑ Modular :p!:filtration/Remodel ❑ Concrete
❑ Commercial t 1 " tepair ❑ Masonry
❑ Multi-family/#of Units -`_ ', ❑ Demolition ❑ Other:
❑ Industrial
❑ Other.
Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: Existing ❑ Sewer ❑ Community System ❑ Electricity ❑ Oil
Proposed: Proposed: ❑ Individual System ❑ Woodstove ❑ Propane
Total: Total:
If not sewer,fill out the following: ❑ Heat Pump
❑ Conventional ❑ Altemativ ❑ Other
Permit# SEP $I--$9
Water Supply:
❑ Private well ❑ Two Party Well❑ Public:Name of water system:
Square Footage: ` ce U For Office Use Only
Main Floor 97 C P 63 3,211• GV Consistency Review 48.• 00
2ND Floor Base fee 1Lt -1S-
3rd Floor Plan Check fee 02 • %T
Htd Basement State Surcharge fee 4•SO
Unhtd Basement Subtotal )Z1 C. t
Garage/Carport Pot Water Review fee
Decks 911/Rd Approach fee eh
Commercial TOTAL 1216-31
Industrial Receipt# in 4•S-44?
Other Cash/Check# '2408,3
Initials
Date O 4-'
Estimated Cost: 13 11)1 00
If within 200'of the Shoreline,
Distance to Bank or Ordinary High Water Mark ft.Bank Height ft.
By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any
omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections.
Access and right of entry to the applicant's property or structure sh. Ail requested and shall occur during regular business hours.
Signature: 1114., - Date: Co 1 a'�`
0 OVER ■
G:\PermitCenter\FORMS\BLDG FORMS\BLDPermit Application.doc 01/08/2004
BUILDING PERMIT
• ,
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT#: BLD04-00412 Received Date 06/22/2004
SITE ADDRESS: 397 N JACOB MILLER RD Issue Date 08/16/2004
PORT TOWNSEND, 98368
APPLICANT: JAMES C LYONS PHONE: (360)385-4903
397 N JACOB MILLER RD
PORT TOWNSEND WA 98368
SUBDIVISION: J LYONS SHORT PLAT Block: Lot: 3
PARCEL NUMBER: 001051020 Section: 5 Township: 30 N Range: 01 W
CONTRACTOR: OWNER/BUILDER PHONE:
PROJECT DESCRIPTION: ADDITION TO RESIDENCE
REQUIRED INSPECTIO�V�•
[ ] SETBACKS: 1v A
[ ] UFFER: N/A
[ ] Footing: OK /441,04
[ ] Foundation: OK L,046/1,1;6,01 /94 /
[ ] Stormwater FINAL Ap val:
[ ] Underground Plumbing. 9- twv
[ ] Underground Insulatio :
[ ] Shear Wall :
[ ] Framing:
1 Plumbing:
[ ] Propane Tank/Lines:
[ ] Insulation:
[ 1 Sheetrock: _
1 Septic Sytem Final Approval:
Road Approach Final Approval:
[ ] Zoning Final Approval:
1 Final/Occupancy Approval:
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY-SEE REVERSE
SPECIAL CONDITIONS FOR ISE t BLD04-00412 •
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on June 28, 2004 for the potential presence of Environmentally
Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC).
After an initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
Susceptible Aquifer Recharge Areas.
2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological
formations that allow percolation of the surface water into the soils and the underlying
zone of saturation. Aquifers are geologic formations that contain sufficient saturated
permeable material to yield significant quantities of water to wells and springs. Aquifers
serve as the source of drinking water within most of the rural portions of Jefferson County.
3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions
that promote rapid infiltration of recharge waters to groundwater aquifers.
4.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
5.) The applicant is proposing to create or add 1570 square feet of impervious surface and
1570 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson
County Unified Development Code requires that your proposal shall adhere to Best
Management Practices (BMPs).
6.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i).
7.) The site plan as submitted with the building permit application on June 22, 2004 has been
reviewed for consistency under the UDC, and has been approved by Jefferson County
Department of Community Development. Any modifications, changes, and/or additions to
the stamped, approved site plan dated June 28, 2004 shall be resubmitted for review and
approval by Jefferson County Department of Community Development.
8.) This approval is for an addition to residence only. Any future permits on this site are
subject to review for consistency with applicable codes and ordinances and does not
preclude review and conditions which may be placed on future permits.
9.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
10.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk(or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
11.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
12.) The building height is not to exceed 35 feet.
13.) Minimum setback from the platted right-of-way is 20 ft. Minimum side and rear setbacks
are 5 ft.
14.) This parcel has been designated as Rural Residential 1:5 under the Jefferson County
Comprehensive Plan Land Use Map effective August 28, 1998.
15.) A septic permit(SEP81-00089)was finaled on October 20, 1981 for a system of 1000
gallons per day.
16.) N Jacob Miller Rd is a local access road (C625519). The road approach is existing and
an address of 397 N Jacob Miller Rd has been assigned to the parcel.
17.) This parcel was created through the J Lyons Short Plat under AFN 277878, filed of record
April 2, 1989 in Volume 2 of Short Plat, at page 3 with Jefferson County Auditor's office.
18.) The project shall comply with Construction Stormwater Pollution Preventio1SWPP)
Elements#1 through#12 of the Department of Ecology's Stormwater Management
Manual for Western Washington to control stormwater, erosion and sediment during
construction. BMPs shall address permanent measures to stabilize soil exposed during
construction, and in the design and operation of stormwater and drainage control systems.
19.) A Declaration of Easement was recorded on the face of plat. A strip of land 30 ft wide