Loading...
HomeMy WebLinkAbout102014_ca04Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director /County Engine r Agenda Date: October 20, 2014 Subject: Change Order No. 1, Snow Creek Rd. MP 3.78 Culvert Replacement, FHWA Agreement No. DTFH70-1 1 -E-00039, County Project No. CR1899 Statement of Issue: Change Order No. 1 with Seton Construction for the Snow Creek Road MP 3.78 Culvert Replacement, County Project No. CR1899. Analysis /Strategic Goals /Pro's Et Con's: This contract is for construction of a new, 24 ft. span, Precast Reinforced Concrete Three -Sided Structure at Snow Creek Road milepost 3.78. Change Order No. 1 is necessary in order to make minor additions and deletions from the bid items Clearing and Grubbing, Permanent Signing, and Seeding Fertilizing and Mulching. Fiscal Impact /Cost Benefit Analysis: This change order will increase the original contract amount by $687.50, from $219,178.38 to $219,865.88. This project is funded at 100% by the Federal Highway Administration. Recommendation: Public Works recommends that the Board execute all three originals of Change Order No. 1 with Seton Construction and return two (2) originals to Public Works for further processing. Department Contact: Mark Thurston, P.E., Project Manager, 385 -9160. Reviewed By: Philip Morle County Admin4trafor Date IY � jay IPA JEFFERSON COUNTY Sheet 1 of 1 DEPARTMENT OF PUBLIC WORKS Change 1 Date: 9/11/2014 CHANGE ORDER Order No. Ordered by County Engineer under terms of FX Section 1 - 04. 4 of the Standard Specifications CR1899 Contract No. ❑X Change proposed by Contractor To: Seton Construction Endorsed by: S G b t.�� w, S. Discovery Road Port Townsend, WA 98368 Port Contractor Firm Name Project Title Snow Creek Rd. MP 3.78 nature Date cwonA Title Consent given by Surety: (when required) Culvert Replacement By: Attorney -in -fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: The Contract documents are modified as follows: 1) The bid item 'Permanent Signing' is deleted in the amount of $1,500.00. 2) A new item, 'Permanent Sign Base' is added to the Contract. This work shall consist of furnishing and installing cast -in -place, concrete sign bases in accordance with Section 8 -21 of the Standard Specifications, and WSDOT Standard Plan G- 24.50 -02, Type ST-4 Sign Support. The Agency will furnish the "Lower Sign Post Support' and the Contractor will install the "Lower Sign Post Support" in the concrete base. The Agency will furnish and install all remaining components, including the sign posts, signs and hardware. Payment for'Permanent Sign Base' will be made in accordance with Section 1 -04.1 for the following item: "Permanent Sign Base ", per each. The agreed upon price per each for "Permanent Sign Base" is $350.00. There are an estimated two permanent sign bases to be installed for a total increase in the contract amount of $700.00. 3) It was mutually agreed between the Contractor and the Agency that additional clearing, beyond the scope of the original proposal, is required in order for the crane to off -load and install the Three -sided structure components. The total amount for the additional clearing shall be: Boom Truck and Man Basket 3.50 hr @ $150.00 /hr = $525.00 Laborer W Saw 2.00 hr @ $75.00 /hr = $150.00 TOTAL $675.00 The amount of $675.00 shall be added to the Lump Sum amount for Clearing and Grubbing. I 4) The Agency decided to increase the area for'Seeding, Fertilizing, and Mulching' from the plan quantity of 560 sf to an estimated 5,000 s.f.. The Lump Sum amount for'Seeding, Fertilizing, and Mulching' shall be increased from the original proposal amount of $2,062.50 to $2,875.00, for a net increase of $812.50. it The estimated total change in the contract amount for this change order is as follows: - ($1,500.00) + $700.00 + $675.00 + $812.50 = $687.50 Q to Co. Prosec David Alvarez, Chief tvil All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the t pe of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $219,178.38 $219,178.38 $687.50 $219,865.88 ORIGINAL CONTRACT CURRENT CONTRACT CONTRACT TIME NEW CONTRACT TIME (days) TIME (days) CHANGE (Add /Del) TIME (days) 45 45 0 45 APPROVAL RECOMMENDED APPROVAL RECOMMEN 7%%at,� C 9 - 2!0 -/4 - 2�-, Project Manager Date County Engineer Date APPRO AL OMMENDED APPROVED �' ❑ 14 Engineenn6 Services Manager Date Chair, Jefferson County Commissioners Date IY � jay IPA