Loading...
HomeMy WebLinkAboutSeptember 25 Staff ReportJefferson County WA September 9, 2014 SWAC Solid Waste Staff Report  Tonnage/Revenue Solid waste tonnage for 2014 through August is down 167 tons (1.3%) compared to the same period in 2013; solid waste total customer transactions are down 4.6%. Recycling held steady at 4,050 tons/yr for the 12-months through July but is up 12% for the first 7 months of 2014 compared to 2013 due to different shipping schedules. The low tonnage for August is due to greater than normal stockpiling of material.  Coordinated Prevention Grant – Offset Cycle 2013 – 2015 Two HHW collection events are scheduled, Quilcene on October 18 and Port Ludlow on April 18, 2015.  Operations Staff is working on: 1. Routine equipment/facilities annual maintenance for winter. 2. Planning with Skookum for recycle baler replacement. 3. Security camera installation – Quilcene. 4. Revisions to the Solid Waste website. 5. Updating Solid Waste and MRW Operations & Maintenance Plans. 6. Recommendations for revisions to the 2008 SWMP.  Capital Projects - 2014 Completed projects include: 1. The potable water line extension to the Quilcene dropbox site (August). 2. Replacing the supports, load cells and wiring for the inbound weigh-scale at the Transfer Station (August). 3. Surplus and sale at auction of the recycle sorting conveyor system (August). Current projects include: 1. Replacing the main arm (boom) and grapple on the Grizzly waste compactor. 2. New catchbasin & concrete repair, baler building. 3. Planning for upgrades to oil/antifreeze collection sites. 4. Planning for recycle loading dock reconstruction.  SWAC Membership We welcome new member Hank Fly representing District #1. We have openings, and will be advertising, for members from Districts #2 and #3.