HomeMy WebLinkAboutBLD2014-00338 - MECHANICAL UILDING PERMIT APPLIC N BLD14-003 8
Review Type:
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT#: BLD14-00338 Received Date: 9/18/2014
SITE ADDRESS: 723 MIDDLEPOINT RD
PORT TOWNSEND, 98368
OWNER: MICHELLE OLIVER PHONE: 360-379-6387
723 MIDDLEPOINT RD
PORT TOWNSEND WA 98368-9088
SUBDIVISION: Block: Lot:
PARCEL NUMBER: 001052026 Section: 5 Township: 30 N Range: 1■1
CONTRACTOR: POWER TRIP ENERGY CORP PHONE: 360-643-3080
83 DENNY AVE
PORT TOWNSEND WA 98368
Contractor's License POWERTE934QE Expires 11/5/2015
REPRESENTATIVE: JOHN FLEMING PHONE: 360-643-3080
83 DENNY AVE
PORT TOWNSEND WA 98368
PROJECT DESCRIPTION NEW ROOF MOUNTED, GRID TIED PV (PHOTOVOLTAIC- SOLAR
ENECTRIC) SYSTEM
TYPE OF WORK NON SQUARE FOOTAGE:
TYPE OF IMP MEC
VALUATION MAIN:
CODE EDITION: 2012 ADD'L: HEAT TYPE:
OCCUPANCY: HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
OTHER:
CONST TYPE: GARAGE: SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL:
WATER SYSTEM:
BEDROOMS: BATHROOMS:
Exist: Exist:
Prop: Prop:
Total: Total:
Routing Date:
Type Amount Paid By: Date: Receipt: 74 •=*•; `
Permit $228.00 SRE 09/18/14 151533
Total: $228.00 SEP 1 8 2034
Jefferson County DCD
\\tidemark\data\forms\F_BLD_App_Bld.rpt 9/18/2014
SON )11
JEFORSON Cou-Nn'
r£
'6`1./1 621 Sheridan Street§Port Townsend.WA 983681 Web: IAN.co efferson. �a.usicar:munitydeve'cpment
Nc Tel:360.379,4450 -ax:360.379.4451 9 Email:ded(?cc.jefferson.wa,us
Building Permits&Inspections I Development Consistency Review 6 Long Range Planning I Watershed Stewardship Resource Center
Master Permit Application MLA:
Project Description(include separate sheets as necessary):
Roof Mounted, Grid-tied PV(Photovoltaic-Solar Electric)System
Tax Parcel Number. 001 052 026 Property Size: 5.11 acres (acres/square feet)
Site Address and/or Directions to Property:723 Middlepoint Rd, Port Townsend,WA 98368
Property Owner(s)of Record: Michelle Oliver
Telephone: 360 379-6387 Fax: email: micholiver @mac.com
Mailing Address: 723 Middlepoint Rd,Port Townsend,WA 98368
Applicant/Agent(if different from owner):
Telephone:360-643-3080 Fax: 360-539-1857 email: john @powertripenergy.com
Mailing Address: Power Trip Energy Co,83 Denny Ave,Port Townsend,WA 98368
What kind of Permit?(Check each box that applies ❑Lot or Road Segregation
❑Building ❑Critical Areas Stewardship Plan
❑ Demolition Permit ❑Variance(Minor, Major or Reasonable Economic Use)
❑Single Family 0 Garage Attached/Detached ❑Conditional Use[C(a), C(d),or C]**
❑ Manufactured Home 0 Modular 0 Discretionary"0"or Unnamed Use Classification
❑ Commercial* ❑Special Use(Essential Public Facilities)**
❑ Change of Use ❑Boundary Line Adjustment
❑ Address 0 Road Approach ❑Short Plat**
❑Home Business 0 Cottage industry ❑Binding Site Plan**
❑Propane ❑Long Plat**
❑Sign ❑Planned Rural Residential Development(PRRD)/Amendments**
❑Allowed"Yes"Use Consistency Analysis ❑Plat Vacation/Alteration**
❑Stormwater Management ❑Shoreline Master Program Exemption/Permit Revisions**
❑Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Substantial Development**
❑Temporary Use ❑Shoreline Management Variance
❑Wireless Telecommunication* ❑Comprehensive Plan/UDC/Land Use District Map Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium ❑Jefferson County Shoreline Master Program Amendment
*May require a Pre—Application Conference ❑Tree Vegetation Request
**Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal,if known:
L&l Electrical permit
Please See Attached DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATUR - rev>ett- EM y c®. Date: 9/17/2014
Nit
By signing this application form,the owne !-nt attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or its knowledge. Any material fal- ood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
i further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the
time of the ap licatio trshe w is prior notice.
Signature: p e'-114 "'E 4 ' Ct. Date: 9/17/2014
The action or a ions Applicant will rdertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lea o a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)ev-ttt if you are in com•liance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-tranierable o is'•ty for adhering to and complying witn the ESA. Tne Applicant has read this disclaimer and signs and dates it below.
Signature:` 'tP '` `t Date: 9/17/2014
07/24/2013
• •
xau38aam na am1-o Do3Umow dooa aloo-vt^>t
tJlmo a avOS Ad Gail.tuts/Ua1MLw.Jod "twat:.1 -
"...is"`R•v asmP .WsP,o3.W.aaE4£tNOO W OuAgds71J O'ttetrbt
919IJ111S 4402 OW O3O.MAld and A005 2X941522'O1d35:5OO2125 00 0014 ,'
A
oo OS oesus ,Rnot AMtw Pna j aasiPyroossp
■
WX1 a 1—d—le
it
y ads
A. r.4CJr A.t Y W .uk.,,l—'te a
Oa
_L.c Lg.,-a-:'t
''!4'j a.11_nxaa -- - 'J.rj 1Y1h
Vii 110Z191.l1. ;...cI
® I
4 yAl caw+ /1119ism 1 p ry
•Jjo is 4 )1vT
0 41S — Jo},11a ,rn) sw�pafqu
-Id}ud a '................................*Pond.
JI paura I diek
oq� ip
XV 3NO0 #tozf#zoo zsocoa-rvrtu-1eruj-dsw u al
,P-'s auC 3N00 #KtZI#Z!► #1.0DI F# #t°Z19t1Y O£L0 snoauslla ll-dsq M 1
i - our 3NUU #IOZi#Z/P 3'tOZt#Z7# 14(2/914t, 6500- Sveppng imnd-ds1M 1 '
P vir 3NUU MD9I$L zsa 3,,,,,awaiyyals;M 2f150 X110
Vir 3NO #MOZ1914 600V,midaV1W,ad 6 i.gMe9
VIC 3NOCI - 1,10ZJ91/i #14219141 Lt017 Oatas u0011 Aopeiio oo N
Y1r #tOZfntfl LO07 pai 9111 3asso
:alo,ti auou-aiap of pautmsay cam lalq0 tom woo utaty tuglauasaa ' I W?OQ.';
-' aZOOO-C la-rd J6) 1'^tvV
j 1 QA1St!ldlJi l id
leiauao Palew ] ld,A,T O d3/1l5 YL ssa,ppy
11VigtfP>l2iHOaeN
T.
I O i. ° d 5n4e35 sz -P1G1N- :quad 6uiptins
.....O WM NO b!S a»PO PPV r'tA +rolo
Id 9 Pr X cll P
SA 205 >a1 WU 'w40 tN IS]
.,..tprb opt --po a -41,.‘1 fY)
\n ' - 1\4-(s �
nW ° 1--1 "1Cj
1,r\ sQe t\a( - F(..ctat
III •
BUILDER STATEMENT
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be suming the r®syensibilit�'of the General Contractor for the proposed project.
Signature:` '', tow Tap Eo &41 CDate: 9/17/2014
GENERAL CONTRACTOR OR MA FACTURED HOME INSTALLER: PHONE: FAX:
Power Trip Energy co. (360 )643-3080 (360 ) 539-1857
MAILING ADDRESS: 83 Denny Ave., Port Townsend,WA 98368 EMAIL: john @powertripenergy.com
CONTRACTOR'S LICENSE WAINS 063-472-00
NUMBER: POWERTE934QE NUMBER
ARCHITECT/ENGINEER: PHONE (360 )643-3080 FAX:(360 ) 539-1857
MAILING ADDRESS: 83 Denny Ave.,,Port Townsend,WA 98368 EMAIL john @powertripenergy.com
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
• New ❑ Wood Existing: ❑ Sewer
❑ Addition iE Steel Proposed: Bank ❑ Community System
l Alteration/Remodel ❑ Concrete Total: Height: ❑ Individual System
U Repair 2 Masonry SEP Permit#
❑ Demolition 7_, Bedrooms:Other: Water Supply:
Existing: Setback: ❑ Private well ❑ Two Party
Type of Heat: Proposed: ❑ Public
Total: Name of System:
If this is a Commercial Proiecf you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
Underground Tank Above ground tank Size of Propane Tank:
Heat Stove Cook Stove Woodstove Fireplace.nsert rehtO I evotS telieP I knaT retaW toH
Is this appliance being installed in a Manufactured 1 Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage Current Proposed For Office Use Only Amount Revision
Main Floor Heated EH Bid App Review
2°Floor Heated Consistency Review
Other Heated Base fee:
Mezzanine Additional Section: , °C)
1 Cl Heated Basement Plan Check fee:
Unheated Basement State Surcharge fee:
Other Unheated Pot Water Review fee:
Garage/Carport SUBTOTAL
8,14 (3 O
Decks 911/Rd Approach fee:
Other TOTAL $ CY-)
Receipt Number: ' ' J 3 3
Cash/Check Number:
ESTIMATED COST(REQUIRED) Date: a/ 1 Wt L-I
.Fair market value of all labor and materials foundation to finish
Initials: C
07/24/2013
• •
:::.;2
.‘,,,, _, 4"--",-' X,--,.-4,0 00:!.0 7 -f,:, C Q",1'- ,;-. ,-,, : 0.ok,v11. ,_,-
, ':. « . } 1 w co e'f erson.wa.usicommunityo vela rnent
eft\CS
EXPEDITED PERMITTING CHECKLIST FOR SOLAR PHOTOVOLTAIC SYSTEMS
***TO BE COMPLETED BY COUNTY STAFF ***
Building Permit Required? 0 Yes I I No Staff Initials Date
Fee:
***TO BE COMPLETED BY THE APPLICANT***
1. Project Information
Project Applicant:
Power Trip Energy,83 Denny Ave,Port Townsend,WA 98368,360-643-3080,john @powertripenergy.com
Site Owner Name:
Michelle Oliver
Project Address:
723 Middlepoint Rd, Port Townsend,WA 98368
PV System Description:
Roof mounted,Grid-tied PV
2. Determine if your project needs a building permit(check all that apply):
•
Yes No Not Applicable
1. Mounting equipment is engineered and designed for solar PV equipment. X
2. The solar PV system will comply with the National Electric Code(NEC) X
including obtaining an electrical inspection.
3. To address uplift the solar modules will be mounted no higher than 18 inches X
above the surface of the roofing to which they are affixed.
Note: Questions 3-5 Apply to Rooftop Systems
4. Total dead load of panels,supports,mounting,raceways,and all other X
appurtenances shall weigh no more than one of the following. If YES indicate
which:
® Conventional solar modules(one layer of glass)or frameless solar
modules(two layers of glass)that weigh three and one-half(3.5)pounds per
square foot(PSF)or less on any roof.
Fl Frameless solar modules(two layers of glass),on sloped roofs of at least
3:12 but less than 5:12 pitch,that weigh no more than four and one-half(4.5)
pounds PSF.
0 Frameless solar modules(two layers of glass),on sloped roofs of 5:12
pitch or greater,that weigh no more than five(5)pounds PSF.
5. Supports for the solar modules are installed to spread the dead load across as X
many roof-framing members as needed to ensure that point loads do not
exceed fifty(50)pounds at any location.
6. Attachment to the roof is specified by the mounting system manufacturer. X
Note: Question 7 Applies to Ground Mounted Systems
7. Ground-mounted solar PV systems using racking components installed per the X
manufacturer's specifications.
If you answered yes or N/A to all of the above questions,no separate building permit is required.
1-------0---
P
Applica Signature Date
• •
EXPEDITED PERMITTING CHECKLIST FOR RESIDENTIAL PHOTOVOLTAIC SYSTEMS:
ROOFTOP MOUNTED
-----TO BE COMPLETED Y CITY STAFF-®__.A_
Building Permit Required? ❑Yes ❑No uahfies for Electrical OTC? ❑Yes 0 N
Staff initials Date:lick here to enter text: Staff Initials Date_C lick here to enter text,
-_____mTO BE COMPLETED BY APPLICANT-------
Groject Information
Project Applicant: Power Trip Energy Co,83 Denny Ave, Port Townsend,WA 98368
Site Owner Name: Michelle Oliver
Project Address: 723 Middlepoint Rd, Port Townsend,WA 98368
PV system description: Roof Mounted,Grid-tied PV(Solar Electric)
etermine if your project needs a building permit (check all that apply):
Yes No
1. PV system is designed and proposed for a detached single family house. X ❑
2. PV system is designed for rooftop of a house in general compliance with applicable codes. X ❑
3. Mounting system is engineered and designed for PV. X ❑
4. Rooftop is made from lightweight material such as shingles. X ❑
5. PV system has been pre-approved by electrical permitting agency. X ❑
6. To address uplift, panels are mounted no higher than 18" above the surface of the roofing to X ❑
which they are affixed. Except for flat roofs, no portion of the system may exceed the highest
point of the roof.
7. Total dead load of panels,supports,mountings, raceways and all other appurtenances weigh no X ❑
more than one of the following. If YES,indicate which:
X No more than three and one-half(3.5)pounds per square foot(PSF)
❑ Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half(4.5)PSF
❑ Frameless panels on at least 5/12 pitch roof weighing no more than five(5.0)PSF
8. Supports for solar panels are installed to spread the dead load across as many roof-framing X ❑
members as needed to ensure that at no point are loads in excess of fifty(50)pounds are
created.
9. Attachment to the roof is specified by the mounting system manufacturer. X ❑
10. Method and type of weatherproofing roof penetrations is provided X ❑
11. Home is code compliant to setbacks and height,or code allows expansion of nonconformity for X ❑
solar panels.
12. Panels are mounted no higher than the roof ridge or apex of roof(applies only to pitched roofs) X ❑
Applicant Signature Printed Name: John S.Fleming,Power Trip Energy Date:7/21/2014
:. If you answered yes to a I of the above questions, no separate building permit is required.
Created by the Evergreen State Solar Partnership v1.0 1
•
Power Trip Erma Corp PV Installation contract
83 Denny Ave
Port Townsend, WA 98368
(360) 643-3080
www.powertripEnergy.com
tic # POWERTE964JN
Consent to Act As Agent on Permit Application
To whom it may concern,
I John Di Maggio and Michelle Oliver , grant Power Trip Energy Corp. Permission to act on
my behalf for the purpose of acquiring a Solar Electric Permit from Jefferson County and grant
Power Trip Energy permission to complete and sign the permit application on my behalf.
5ignaturE: - P,\( - Date: 112./Pi
Signature: D ate: -1/1-/i/
June 30,2014 Page 5 of 8 John DiMaggio
•
9/17/2014 Jefferson Co Dept of Comm Dev WA-Online Payrn--
,70 ,
jeffetsbn County
ci..3r-monitv Deve,tmirif-Ar4eot -
Step 3: Confirmation and Receipt
-kk c,cc
Result: Payment Authorized
Confirmation Number: 15136439
Your payment has been authorized successfully and payment wit be processed.
Jefferson County Department of Community Development thanks you for your payment For questions about your account,please call 360-379-4452 Thank you for using
our btl payment services.
Please save or print a copy of this receipt for record keeping purposes.
My Bills
'Residential Applications payment of$247.00 on Parcel Number 001052026 $247.00
Subtotal: $247.00
Customer Information Convenience Fee: $7.50
First Name: Power Total Payment: $254.50
Last Name: Trip Energy Co
Address Line 1: 83 Denny Ave
Address Line 2:
City: Port Townsend
State: Washington
Zip Code: 98368
Phone Number 3606433080
Ernst Address:Address: john@powertripenergy.com
Payment Information
Card Number *'**********8600
Expiration Date: -*/**
V i!Akt L PePA-ur E
https://client.pointandpay.net/web/JeffersonCoDeptofCommDevWA 1/1
Point& Pay - Create Order Page 1 of 1
• •
Thank you for your payment!
This service has been provided by Jefferson County Dept of Community Development, WA and
Point & Pay. We value your business. Please keep this receipt for future reference.
You have made a payment to Jefferson County Dept of Community Development, WA . Jefferson
County Department of Community Development thanks you for your payment. For questions about
your account, please call 360-379-4452
Name: Power Trip Energy Co
Address: 83 Denny Ave, Port Townsend WA, US, 98368
Contact: 3606433080
Comments:
Payment ID: 15136439
Date: 09/17/14 07:01 PM
Subtotal: $247.00
Fee: $7.50
Total: $254.50
Method: Credit or Debit Card(************8600)
Item Purchased Transaction Description Account Amount
Residential Applications Jefferson Co C D GOV 001052026 $247.00
Signature: Date:
By signing this receipt you agree to the terms and conditions of this service.
You will see one line item on your credit or debit card statement indicating the amount you paid and will be
identified as Jefferson Co C D GOV. If you have any questions about the charges please call 1-888-891-6064.
Print Receipt Close Window
https://agent.poinfandpay.net/pointandpay_counter/viewReceipt.do?method=viewPayment... 9/18/2014
JEFFERSON COUNTY bc.n NO. 151 533
DATE Cli 18/1 L1
RECEIVED FROM 4 /-i' I En a j ��/ CO
DESCRIPTION " BARSN AMOUNT
CURRENCY �L'J 6ASL (T�•t7(D
e COIN ���n 1/� I C, •C'0
',et t ( -0c2--02L2 .
ti
r
Cn
t „ Uni of 6,iri -f1'c� PV o
IeGfY( L str m
is a
o
s
RECEIVED BY v ' E TOTAL c:2 4 uv
--0 JtFrttbUN UOUN I Y
gsf__o?
c„......
DEPARTME ' OF COMMUNITY DEVELO•ENT
Date: tOeu Time Received: g am/pm Mon. Tue. Wed. Thur. Fri.-
Date: 0-2
BLD: Contact Name:
Owner: V L 0- .r ontact Number: 360 �„_ r L 5
Ad dress: "'"[ 2— V c 'p Rd_j 206
Notes: e7aCA_..
Foundation Plumbing Framing Propane Tank Mechanical
Setbacks Under-ground Framing Under ground Furance
Footing Rough In Air Seal Above ground Gas
Stemwall Hydronic Exterior shear Exterior lines Oil
Straps Hot Water Htr Interior shear Interior lines Ducts
Post Hole Ventilation Appliance
Underfloor Gas/Wood stove
ix.
Man-Homes Insulation
Final Inspection
Setbacks Floor
Foundation Wall Address Posted
Block&Tile Ceiling
Jefferson County Building Division Permit Number: BLD14-00338
Applicant: OLIVER
BUILDING PERMIT INSPECTION APPROVALS Applicable Code: 2012 International Building Codes
To schedule inspections, call (360)379-4455 no later than 3:00PM the day before the inspection is needed.
Requests received after 3:00 PM will not be scheduled for the next day's inspections.
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Miscellaneous
FINAL FINAL Building
A final inspection will not be scheduled until all of the
following are completed and signed off by the applicable
Department:
• Building Permit Conditions are met
• Septic Permit Final/Complete for any building
containing plumbing
• Land Use Conditions met and signed off
• Public Works Permit Final(where applicable)
FINAL INSPECTION In 2,t 1c�
l
FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT#: BLD14-00338 Received Date: 9/18/2014
SITE ADDRESS: 723 MIDDLEPOINT RD Issue Date 9/18/2014
PORT TOWNSEND, 98368 Expiration Date 9/18/2015
OWNER: MICHELLE OLIVER PHONE: 360-379-6387
723 MIDDLEPOINT RD
PORT TOWNSEND WA 98368-9088
SUBDIVISION: Block: Lot:
PARCEL NUMBER: 001052026 Section: 5 Township: 30 N Range: 1V'
CONTRACTOR: POWER TRIP ENERGY CORP PHONE: 360-643-3080
83 DENNY AVE
PORT TOWNSEND WA 98368
Contractor's License POW ERTE934QE Expires 11/5/2015
PROJECT DESCRIPTION: NEW ROOF MOUNTED, GRID TIED PV(PHOTOVOLTAIC- SOLAR
ENECTRIC) SYSTEM
TYPE OF WORK NON SQUARE FOOTAGE:
TYPE OF IMP MEC MAIN:
VALUATION ADD'L: HEAT TYPE:
CODE EDITION: 2012 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: GARAGE: SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL:
WATER SYSTEM: Type Amount Paid By: Date: Receipt:
BEDROOMS: BATHROOMS: Permit $228.00 SRE 09/18/14 151533
Exist: Exist: Total: $228.00
Prop: Prop:
Total: Total:
Directions to Site:
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455.
Request must be received by 3pm the day before the inspection is needed.
Office Hours 9:00 am -4:30 pm MONDAY- THURSDAY
HOT LINE AVAILABLE 24 HOURS A DAY