Loading...
HomeMy WebLinkAboutSDP2010-00051Figure No. 2 color0. 1.03 �N 00 y' 70 } 1 0. f CONTROL POINT #4 HUB W/ TACK j f f f f I J'l A \S i c c w C V� BEACH AOVA \ ON O w y` b 1.00 \ �� t' 1� t I _ ids G yti ato of � 4} 3e' Q 3 0 O )O ' WIRE FENCI 615 T '' CONTROL POINT # _-1,WQ__W/ TACK POSITIOIk HUB 3 s i 1 } DECK TEMPORARY _ BENCHMARK 'B' SPIKE W TOP OF STUMP ELEVATION CONTROL POINT #2 HUB w/ TACK -3 HOMESITE TOPOGRAPHIC SURVEY PREPARED FOR: MR. SEIICHI ADACHI Graphic Scale 20' 0 to' 20' 40' 1 " = 20' BASIS OF BEARINGS: PARCEL "C" SOUTH LINE N88'29'35"W %-i I A � I B -1 AREA LEGAL SCRIPTION: PARCEL THE NOR QUARTER OF GOVERNMENT LOT 1, SECTION 3, TOWNSHIP 26 NOARTH RANGE/ WEST, WILLAME E MERIDIAN. I v ION A`HUB 2 POSITIO " HUB 1 / I HOUSE BALCONY AREA r r r rr 0 FD. STEEL FX POST ^, ROX/MATE PROPERTY LINE REBAR /CAP N 8 9'35" W 143.78' FD. STEEL A FOUND \& CAP R96 8 FOUND STEEL FOUND STEEL t POST POST a �k Reference-. Survey by Main -Line Surveying dated 7/28/08 (I.E. elev 75 - Black topo lines) and Clark Surveying dated 4/29/08 (LE elev 85 - Brown topo lines) There is a 10' difference in elevation between each survey. TEMPORARY BENCHMARK SPIKE IN TOP OF STUMP ELEVATION = 67.53' C 0 20 40 SCALE IN FEET oe- 5 SEI ADACHI SLIDE AREA TOPOGRAPHIC SURVEY ON TOANDOS PENINSULA JEFFERSON COUNTY, WASHINGTON JUNE 27TH TO JULY 6, 2008 P� 0d GEC Approximate location of slide scarp MAIN -LINE SURVEYING 303n — 81 ST. PLACE, SE, No. 6 ME' =R ISLAND, WA 98040 DATL: 7/28/08, 206 - 236 -6273 JOB No. 08010 S H 1 OF 1 BASIS OF BEARINGS: HAND COMPASS BEARING OF N 71 ' E FROM CONTROL POINT #2 TO CONTROL POINT #1 DATUM: MEAN LOWER LOW WATER (MLLW) BASED ON ELEVATION OF SEAWATER AT 11:15 AM C JUNE 20, 1,998 WHEN TIDE WAS AT 3. 1' PER TIDAL DATA FOR POINT WHITNEY CONTOUR INTERVAL = 2 FEET Legend B -1 Approximate location of exploration boring ELEVATION OF HIGH POINT IN DRIVEWAY _ = 171.0' A PORTION OF THE NORTH 114 OF GOVERNMENT LOT 1, SECTION 3, TOWNSHIP 26 NORTH, W.M., JEFFERSON COUNTY, WASHINGTON Q J� U CONTROL POINT LISTING CONTROL POINT #5 HUB W/ TACK \A CONTROL POINT #1 N 20095.33 _. POSITION HUB 3 N E 20069.50 40087.91 E 40148.82 CONTROL POINT #2 N 20030.23 TOM 'A' N E 19995.45 40141.07 E 39959 77 CONTROL POINT N4 N 20220.90 TBU 'B' N E 20047.18 40090.51 E 40021.00 CONTROL POINT #5 N 20107.32 REBAR & CAP 19628 N E 20000.00 40000.00 E 40484.56 POSITION HUB 1 N 20043,59 STEEL POST N E 19995.53 40060.30 E 40145.20 N 19992.79 nnnc ^zC -:: t O(lc EXISTING ORAINFIELO AREA GROUND ELEVATION = 157.3' LOG ITEM # Page_, _ofZ? 0 20 40 80 Feet rn N O N 0 0 0 0 rn 0 co 0 0 DI m U) c ca U CU a Q rn N 0 0 0 0 U a) 0 a) (D r