Loading...
HomeMy WebLinkAbout049 14(C W STATE OF WASHINGTON COUNTY OF JEFFERSON 11[� In thr atter of: x Creating a County project x RESOLUTION NO. 49 -14 designated as: Rick Tollefson Memorial x Trail - Ball Field Connection x County Project Number 1805951956 x x IT IS HEREBY RESOLVED that Old Hadlock Road, County Road No. 527109 , from M.P. 0.58 to M.P. 0.82 , be improved as follows: To improve pedestrian and non - motorized traffic operations, the intersection of Old Hadlock, Pomwell and Chimacum Road will be reconfigured. Old Hadlock Road will be realigned to a 90 degree intersection with Chimacum Road. A widened gravel shoulder along the west side of Chimacum Road will be built and a pedestrian crossing will be installed across Chimacum Road leading to the Bob Bates Ball Fields. IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purpose shown: PURPOSE LOCAL FUNDS STATE & FEDERAL FUNDS TOTAL PROJECT FUNDING Engineering $ 15,000 $ 0 $ 15,000 Right of Wa $ 10,000 $ 0 $ 10,000 Construction $ 60,000 $ 0 $ 60,000 TOTAL $ 85,000 $ 0 $ 85,000 This project is included in the officially adopted annual road program as Item No. X The project is hereby made a part of the officially adopted annual road program in accordance with R.C.W. 36.81.130. IT IS FURTHER RESOLVED that: The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq. X The construction is to be accomplished by County forces in accordance with R.C.W. 36.77.065 and W.A.C. 136.18. PASSED AND ADOPTED THIS =I' DAY OF OV M�r Z/ f � yT. C •' V ^�' . 4 SEAL: a Y4 ATTEST: ?Gt?' Carolyn Avejj Deputy Clerk of the Board JEFFERSON COUNTY BOARD OF COMMISSIONERS John ustin, Chair Phil Johnson, Member David Sullivan, Member c O U N C O U _0 v LL Q cu f6 m G � O v c O fun 4- v 0 U Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders P.E., Public Works Director /County Engineer Agenda Date: November 17, 2014 Subject: Resolution to Create a County Project known as; Rick Tollefson Memorial Trail - Batt Field Connection County Road No. 527109 Statement of Issue: Create a county project known as the Rick Tollefson Memorial Trail - Ball Field Connection and add the project to the 2014 Annual Road Construction Program. Analysis /Strategic Goals /Pro's ft Con's: There will be increased pedestrian and non - motorized traffic on Old Hadlock Road as a result of the Rick Tollefson Memorial Trail. Therefore, to improve pedestrian and non - motorized traffic operations, the intersection of Old Hadlock, Pomwell and Chimacum Road will be reconfigured. Old Hadlock Road will be realigned to a 90 degree intersection with Chimacum Road. A widened gravel shoulder along the west side of Chimacum Road will be built and a pedestrian crossing will be installed across Chimacum Road leading to the Bob Bates Batt Fields. The Rick Tollefson Memorail Trail -Ball Field Connection project was included in the proposed 2015 Annual Road Construction Program and in the adopted 2015 -2020 Six - Year Transportation Improvement Program. Fiscal Impact /Cost Benefit Analysis: The total estimated cost for the project is $85,000 and will be funded through the County Road Fund. Recommendation: Public Works recommends the Board adopt this resolution and add the project to the 2014 Annual Road Construction Program thereby creating a county project known as the Rick Tollefson Memorial Trail - Batt Field Connection. Department Contact: Matt Klontz, P.E., Project Manager, 385 -9160. Reviewed By: Philip Morl , County Administrator Date