Loading...
HomeMy WebLinkAboutBLD2010-00368 UDC CONSISTENCY REVIEW Project Ph I I - Master#MLA10-00385 Review Type Project Description BLD10-00368 I STAND ALONE EMERGENCY STORMWATER REPAIR Primary: JOAB EADES Site Address: • EDEN EADES LOUISA ST 21 BALSA WAY WA, PORT TOWNSEND WA 98368-8730 v 3gs 70'0 Project Location: Parcel number 948 603 201, Eisenbeis Bay View, Blk 32,Parcel A, located off Louisa Street Parcel Number: 948603201 S-T-R: 16-30N-01W Total Acreag( Legal Description EISENBEIS BAY VIEW BLK 32 PARCEL A BND TGTH Land Use: 9100 THRU BLA#107144 SURVEY V31 PG4 ADJ QTA Flood District: Fire District: 1 Planning Area: 2 Flood Map(FIRM)Panel No: School 50 Zoning: COMP PLAN DESIGNATION: VA2 COMMUNITY PLAN: UGA: UGA Trans MPR: WATER SUPPLY UTILITY: Service Area PUD: [ ] Plot plan states"property line" [ ] Assessor's Map(Property lines on submitted plot plan must match the property lines as identified on the Assessor's 1/4 map) [ ] Legal Access to Prope NO [ ] Parcel Tags or Scanned . uments YES NO _ [ ] ESA's: Special Repots Nearby YES NO [ ] Designated Ag Y )� [ ] Shoreline Designation: YES 0 [ ] Shoreline Slope Stability: YES NO Stream Type:YES NO Fish&Wildlife:YES NO Wetlands: YES NO Rare Plants:YES NO Seismic: YES NO Landslide: YES ► • Flood: YES filt Erosion: YES Aquifer Recharge Area:YES NO SIPZ: none At Risk High Risk Coastal CMZ: none High Risk oderate Risk Disconnected CMZ Stormwater si e plan subitted: Ye No �[�] Forest Lands: YES �/ Adjoining Forest Lands: Commercial/ Rural/ Inholding [ ] Stormwater: New Impervious Surface_ _Land Disturbing Activity_ ESA's Stormwater Req's: Min Req#2 Min Re. #1 thru#5 Min Req#1 thru#10 Engineering cpNotice Provisions/Disclosure: Airport YES in RI, YES No Forest Lands YES MN Landscaping Required:Yes 1, „[/] Parking Spaces Required I• 2 Other r Building Height: 35' UBC Standard yr- Impervious Surface coverage percentage: Resource Lands&Public: 10% Rural esidential: 25% Rural Industrial: Per UDC Sec 6.7 Rural Commercial: 60% Area of Building Coverage:60%in Rural Industrial Lands only [7Y- Total Building(s)Size: RVC:20,000 SF CC:5,000 SF NC:7,500 SF GC:10,000 SF All others:subject to septic&water constraints/None specified [ ] Setbacks: Front: Left Side: Right Side: Rear: Shoreline Setback: LSHA Setback: [ ] Road Classification: Road Approach: D RAP SEPA Required: � EXEMPT Flood Certificate: t) -1;9___ Existing Case(s) &Condition(s): VViolations: Yes • o C7c---- Recorded Date of_ _:2 .:.. ..: O ..3( O4 AFN x'(,55 /6 ( Over 5yrs=UDC Plat Conditions: <5yrs=Plat Conditions on plat or Old Ordinance [ ] Lots/Require Declaration of Restrictive Covenant YES NO, submitted: YES NO UGA No Protest Agreement YES NO, submitted: YES NO [ ] ' conducted YES NO [ ] Require Final Zonin_ - . . : . YES NO [ ] ADMIN: Setbacks entered in Permit Plan case , ' ES New Parcel Tags entered in Permit Plan N/A YES Special Reports Scanned N/A YES Title Notes Updated Parcel tags found for parcel 948603201 1.) Custom Warning F TO IMPLEMENT THE INTENT OF LNG 19.0 OF THE 6/28/06 COMPREHENSIVE PLAN TO PROTECT THE FOREST CORRIDOR AND TREE CANOPY IN THE GLEN COVE AREA,THE SETBACK FROM THE RIGHT-OF-WAY OF SR 20 SHALL BE 50 FEET ON EACH SIDE OF THE HIGHWAY (COMPRISED OF A 30-FOOT BUFFER AND A 20-FOOT SETBACK FROM THE BUFFER), FOR NEW DEVELOPMENT, FROM THE NTERSECTION OF OLD FORT TOWNSEND ROAD AND SR 20 TO THE INCORPORATED BOUNDARY OF THE CITY OF PORT TOWNSEND. Associated CASES status issued fine led description 948603201 MLA10-00385 BLD10-00368 P STAND ALONE EMERGENCY STORMWATER REPAIR SEP06-00329 A 10/30/2006 DEVELOPMENT REVIEW TIME SHEET Date T e Comments bti 'n I 1 b'ZO 0 f ks VCk-. -zo-t �� Qom. l0 - 10 rrti� E,�, r Jefferson County Department of Public Works 623 Sheridan St. Port Townsend, WA 98368 • )' `�` (360) 385-9160 Frank Gifford, Public Works Director Monte Reinders, P.E., County Engineer March 28,2012 Mr. James Eades MAR 2 2012 2911 Sherman Street Port Townsend, WA 98368 .. Re: MLA10-00385 Stormwater Permit to retrofit Balsa Way drainage Public Works Department fees Dear Mr. Eades: This follows up on my letters dated August 12, and November 30,2011 and my phone messages on February 13 and March 21,2012. Public Works reviewed the storm drainage plan for your project in October 2010. You will recall that Public Works responded expeditiously to assist you to correct a serious drainage problem that was threatening residences and septic drainfields. While construction was in progress, revisions to the drainage system were proposed. Revised plans have not been submitted to Public Works. The project engineer needs to submit revised plans to Public Works. Depending on the revisions that were made,the plans may also need to be reviewed by the Environmental Health Department to ensure that the septic permit for Parcel F remains valid.After construction has been completed,the project engineer needs to submit a letter to Public Works certifying that construction conforms to the revised plans. In order to meet the requirements of the Jefferson County Unified Development Code and ensure that the drainage facilities are maintained,Jefferson County requires project proponents to enter into a Stormwater Management Facility Maintenance Agreement with the County. Public Works sent you a copy of its Model Agreement with the suggestion that you review it with your attorney, share it with the other parcel owners,and revise it as appropriate. The Agreement should refer to recorded easements that authorize the construction and maintenance of the facilities and identify the parties that will be responsible for maintenance. Prior to final signoff on your project by Jefferson County, the Agreement needs to be reviewed by Public Works and filed with the County Auditor. Until these actions have been completed, you and the other affected property owners will not have assurance that the drainage problem that instigated this project has been solved. Attached is an updated bill for Public Work's fees for the project. Please remit the amount due. Please contact me if you have any questions or if I can be of assistance. erely, Jam s W. Pe. on Pro'-ct Manaer ttachment c: Michelle Farfan,Department of Community Development Randy Marx, Environmental Health Department Ryan Barnard, 155 Louisa Street,Port Townsend,WA 98368 Michael and Nancy Rody, 159 Louisa Street,Port Townsend,WA 98368 John Partch, PE, 4 Seasons Engineering „ ..- 4SEASONS - 23 • Fax(360) 452-3047 , iii, 1-€11„ fo , E NG'NEERING INC 619 S. Chase Street 30 Port Angeles, WA 98362 January 21, 2013 James W. Pearson Jefferson County Department of Public Works 623 Sheridan St. Port Townsend WA 98368 Subject: MLA 10-003876 Storm Water Permit for Balsa Way retrofit Dear Mr. Pearson, On January 16th, 2013, 4 Seasons Engineering, Inc. performed a final observation on the storm drainage retrofit for Balsa Way. The work included installation of storm drainage pipes and an infiltration basin. The work was done by the project owner Jim Eades. The project is now ready for final approval. Based upon our observation,the constructed stormwater system is substantially consistent with the design drawings. Enclosed is a copy of the as-built drawing for your records. 1 Signed, g,.PET °_ '—� j+_ 11% AS�r :T L�1G7�a..e. `\rj iL r- O� J L ! Jay S. Petersen P t f ' '0,2I,.r Uet ' . t►o LllU in.......i.. 3 2013 Civil Engineer sr v. ?V'. ���Nt:R�o�t cou�TY kS�1n1YALt ON F PUBLIC WORKS DEPT 1.) cc. Jobe Eades / enc. U 1, / . (34 tv K1 14 oi \\ --'g 1(T; cz,0 z A) 0 8 I I rn,Q 1.. (/) 't,43(,) 0 7=.(4 .."---- 0 .4 C) N ..4: 31 ;1 ' I ' :r. x) ).. • -i 0 HZ:""11 I''' P., 240 0 r- . ii ';.., 0 1) *t 1 ...-0-ri x1-4,:xl --"" -4, . .4 0 0 1-1 i ais, •i 0 '9 il -,,,, 1" 2a 0 : ' 4 cp-,-, ,, 1.rn ....- (/) * --4 co - ), P . 0 r- ,-- . , ,..)),- (,) .-...? ef-z rri ' i RI II v 'ci . ) ca 4• :0 N-1 1.1. ). 8 / V...or / i\--- ,A J._ n (,) 8. .... 11. (,)z z c,z-, , -,... 4 7,...„ /...?,.. .4, • , , , z.....,0 , ,i „,,,p, 8 o. ,z,0 -r, 10:7,1 - ..c...--)o() ) (61 i .... li / ___-frt'-f.)°`' f 1 + 13(/) ft :s 11111r44, ... (t) z,, Avii,. )•4 , ..,.. ,. PALI co r- alp/ Tr `411 0 1 n' IL Aiiii 131 so ‘1)\‘‘ ‘1,-- ,-1 r•";) ' '. ‘.41. :4\i‘SH,,,, ' ,:6 4.444.‘6111......,.. (j)..., . ic -:21 All,:iiiiolli'er:418111:: I L.`•W.'AP"111...- I NW r:(r) r Z \\\\\i\41 1111110111 6 C-1) fi --1 t — 4 4k,.. #* -1-11ki . 4 or4111.14(p) merd z .t..: t 111111i1111111 1■4#4.. 442''- **if! "0140 i r., U + Ei ". . '3 .PA_ al .--414,716,4c 8 >2- . >, c) . "111111111m 1 A) 1 jcv oct rntigi.::::iiiii-T`"-- cr) • r- x) 0 co 4■.: o ?,2 1,... \*,100)fillilik 0 1,0;:eali:‘,41114.4 --i 0 I f Z' 4 C) • . 1 .---1 -,:.;i 1 6 po T 4 46 .11 El '12 II 1 .. cn '4 228 fp4' -.< ('S r■1 , >< "0 :,! n1 a e I 1 I.I: .-1 0 -0 ‘ , ' A) _ el • (1", , lb t Ell • /9.0 1 I:::7 _ Z rri 0 rn r- (1) • C\. "C .%. 0 111111Ficilall ,fr N° .A.k1' % q / ril ,., tt, --I V ° : , ■1‘ ... \.. 4i‘ . 8 1111F11111111 \ , ../..., . 0 , ' - .1.\ 1.i 0 ft -••••- litriki **4 :. \''. \ ■ xli&'26.1&**4 Ct) 1 III 1 I Ifrilli I liZ:11 ll: \ .., iv- ).. \ \ sp....,s7,...., •44,1, ti ,:-.1 . :,D 0 0 , ..., rn 0 r.i .-ri Z ni( .• ■I R. fr \ '‘'446 I § \ 41 0 r wi 1 INF rib ii i 1 \ .t. 1 (1) (1 I P1 .. — i- i ■\ \ , --t") -1 ...„,--4 ›: ni o , C ..': i 11111 1, I-1 --ij il 4, 4 • i 1 1 1 i 1/1 1110/111 I 111&: (/ Itt I F:- 0 (1) 0 Z t I ibili4 : 0-I 14 °I 'it, 8 -„, 1,1 0- ■It 8 1111111A111111d 1 1 fir IA litkl ..,---- ----V" _-mii h ow 1111111111111 I 1 I 111117‘ \ - \`6. o e_ liril 1 1 (1----$ 4 m e 1 t M 1 illifillith \ •• e 0 ,rli tiik 0 MI 4 2 I I I fit 0 =0 1 111111 I 111114,4 N .0 -- •-di ,._ its A o 0 i ■ 4° ' "'eV Nifekith 41001e 8 ig a I 1 I • vp' ; • . , 1---j--; PUNCHUST NOV. 2011 45- e-r/H-v/3 .7 REVD: OFTOBER 21. 2010 NSTORM ji. NW;i,DNR WArl N IMPROVEMENT PLAN RANGE DATE: OCTOBER 2010 JAMES AND MARSHA EADES sAE:TIEoNIM2P1, PORTION OF ZAMPERIN SHORT PLAT, LESS R/WsP PARCEL NO. 001212008, JEFFERSON COUNTY, WA .> 4 1W, LESS 'SEA S 0 N S SCALE: NOTED DRAWN BY: JEP ENGINEERING, INC.(360)452-3023 CHECKED: JSP 619 S. Chase St Port Angeles. WA 98362 SHEET: 0 i _ 0 — A\ *"\-\\. c A . &L) cr,vN ,sSo 1\ CA" a r"l& eJ C(9144 t\tetz_ik. •t3t • • NNip p - 7\',..F0(■" ‘ •-esu■-st—k' ... 5 r rc-- / / . i•' / ''-* ,r,--:---- I> ?O O 6 6 r \- K go/ f'_g Z ay Or z 08 xi 01 r- (n151 1 1111111 11 n LJOtrt l• uyS( Ell i ; L- --- a 121' 8 I ' , Op iir. __.., / •--1 i IIIIIIII ' r , • /---- \ + y m jt r / 4*ir - 11111iiiiiiii zis.r__ _,, ,,„-i- , i ..ii \ \ .. . ',..1" . IINIiIi1. r v N -3k.,1„-t,-, 7,--:::: v ,,_� �; � � ,‘: ' ••'. ' sA, '% (.__(,u,t///, 4:46-.,,,,..:v::/fio .44;14rdzkt :•/,',;;.', V'••----- .„,,*:ai 6..‘, ..,741,.1 A .T. 1131.011111,1111 -0 730)..... ! iy/ i5,,, , .04,■ 6,---,0,- list.,..,,,Aw ,,;,,,,, ;.„3 , /, ,,, ,,..A,'• 411111" -!,0 -2- -/ ' ,.,-0 _,,,, zo f� unn' Ilt, u- V 11E04101111filaM11111 \ T i i i 2 7"--)'\IZI'.°3 cH .- N4.5 \ ��o \$ '„`.1111111111111 �git { o o oy t. 1111111111111 C 1111111114111111101 m o VI c o a uEllik . \ , 1. _- IiIIP1IIIII N 1 1\ n 1 '11111111111111111 kt4.-All 00 Ilk''' Z 0 a 5 A. • \ 1 � - REVD: OCTOBER 21,2010 STORM DRAINAGE IMPROVEMENT PLAN DATE OCTOBER 2010 JAMES AND MARSHA EADES 4SEASONS SCALE: NOTED NYa NW Y,,NW Y. SECTION 21, TOWNSHIP 30N,RANGE 1W,LESS DRAWN BY: £P PORTION OF ZAMPERIN SHORT PLAT,LESS R/W ENGINEERING, INC.(360)452-3o23 CHECKED: JSP PARCEL NO. 001212008,JEFFERSON COUNTY, WA 619 S.Chose St.Port Angeles, WA 98362 SHEET: 2 e` „. xmcCO a s "° ( '_ obi g, 1 e m2 z°n° QA2 $1 R' ice- +�+a.. _ f)1,,,"-. z- r" ',,,,,/ 11,111■,1 tour / \§ ME= 02°0� x'g V' j $ • 1 ti z Z U 7 �� i{ I II/ .� I `s�tel r � .co a ism 1 Nir , �, r� .. w la �'� { �� 2 i wrr/ _ mar top I "W v2 !t-4( aa / ro.Q t f .\--q 2 ) : Ill i �-: ii ...tz xim,020 AL_ ""r ,La lL 71 ,.„. ii o ; m t MAW bM � , g a 8o # o O a t ELIZABETH STREET � 1 •y. 41:- a Zt'Qm � n _\: �,‘• \ wJ� __/ — I-_____ -,\ 7\ ,\' \\\ \ \ a) 6 4 i ■ .1.7......IP 1 / e s.l. Se�3 mono°.; us 2 a o_ 3 � n a G i I c° 0 v4 q� %3.nc� oK:"..—.R.-se p$ a � co f � . o ° o°po 3' R$ y p r ° �°g$IeaezaEnne z3;. R,".4 ° 111 I rn °M S—. oe 1 Mo°9 Ore �000go°-, $3�'�°� �3o°3O ,� .' N .� g°°; o„�a ° Boa s°o°C°2$o°°o .l ASS ci.. ...., i y C f, ?3,�0°° s.8 (4,2§1_ d �V� o w S. w - o p aa. M'1 yy u gzo g ao$g Q na d .. '1 S .o S° 3 o°o2oI w _'a ° _. °ow to g >yiLo1m>>oIR3 d83 s A li°.__y _ ao �� aonlOOVn Inc o VA� War 01 " 3 O•w..'gmcgagEO°�o,r avn 8 1 rrl IPIfPIIIJII O a $ ♦ V Gas* 4 2. �a\� ��► ° r d rfl REVD: OCTOBER 21,2010 STORM DRAINAGE IMPROVEMENT PLAN DATE OCTOBER 2010 JAMES AND MARSHA EADES 4SEASONS SCALE NOTED DRAWN BY: JEP N Yz,NW Y,,NW Y.SECTION 21, TOWNSHIP 30N,RANGE 1W,LESS PORTION OF ZAMPERIN SHORT PLAT,LESS R/W ENGINEERING, WC.(360)452-3023 CHECKED: JSP PARCEL N0. 001212008,JEFFERSON COUNTY, WA 619 S Chase St,Port Angeles,WA 98362 SHEET: 1 Page 1 of 2 Michelle Farfan From: Randy Marx Sent: Monday, October 24, 2011 10:43 AM To: Jay Petersen PE Cc: Nathan Cleaver; Jim Eades; Michelle Farfan; Jim Pearson Subject: RE: Hope Roofing, Eades Stormwater Repair. BLD10-368 Hi Jay When I first reviewed your plan I took your location of the storm drain and transposed it onto the various septic system as-built drawings. One version of this showed a storm drain to be up against a septic drainfield. Jim Eades came into my office shortly after that and explained how the "greenbelt" factored into the two drawings and that there shouldn't be any setback issues with this portion of the storm drain. When I noticed the construction had started I did make a courtesy stop by the project to see how things really laid out. The trench that was excavated is not up against the drainfield and appeared to be in the 30' range. I did not take any measurements as I did not take the time to locate the reserve drainfield, however, I confirmed the storm drain is not up against the septic system as I originally feared. It is my understanding that Nathan Cleaver is aware of this situation. In the end any open ditch that is down slope from a primary or reserve drainfield must be 30' away. Existing reserve drainfield areas can be moved by Nathan if necessary, this may or may not require an application from our office. Our office can't sign off on this project until the above is confirmed. Respectfully R Nta.kx Always Working For a Safer& Healthier Jefferson County 360 385 9444 ><((((2> ><t{t ><((((2> ><((((22> ><<{{ ><((((°> ><((((22> >< ((((2> ((((a> ! <i ����I` ° : ((�� , Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALI'TY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient (s) and may contain confidential and privileged information, Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Jay Petersen PE [mailto:fourse @olypen.com] Sent: Monday, October 24, 2011 8:31 AM To: Randy Marx Subject: Hope Roofing, Eades Stormwater Repair. Dear Randy, 10/24/2011 Page 2 of 2 On Friday, October 21, 2011, I reviewed the progress on the stormwater conveyance system and infiltration pond being constructed by the Eades. The plan is to route storm water runoff away from some existing residences and drain fields. Our plans indicate using 12 pipe at the end of Eisenbeis Avenue. The Eades indicated that you have reviewed the infiltration ditch constructed and have approved the setback from the drainfield and reserve areas for the two lots at the end of the road. Please confirm that the installed infiltration trench meets the required setback. If the setback is not sufficient, then the pipe will need to be installed, per the approved design. Regards, Jay S. Petersen PE Civil Engineer 4 Seasons Engineering, Inc. 619 South Chase Street Port Angeles WA 98362 360-452-3023 10/24/2011 ��� 4/ #\ oa . m g �w o>og° II n o y 0 N ? � � sS I -'11k 2� VlA 240 �� �:. s m �6 • s8 0 7* ,• -?1'a m V o-1 . rri 1 n i-a. , N A al in": III m m. R'' $ I —y+ pIts goo : . r' $ o �� � - '1/4 ,. .iiiiinii y ,: rt . 0 s.„s`\ AEI i yl •z �A, 234 „-, IINiIII1III, y 232 -,� v �� fir'%,, ���„ fr 4). ILANIkikilliiki .7,,,,,, ,p7j,xi w la g Ell C r ^0 _ g bL, .• ,.• . y X111 111 a ,f oo0 1��� ���� �o , �� ,� ® ° '�� Alta St c”" 11 11101111 ; y ?z° Z �� '1 ti o0 \ }'"'`sue aZ �'*� . ,// /iv/ , erillA 25," ,„ c: tv t 111E1111N4E- ,, .4 1 z ,,, NI, /14 iv m E�I�'+,, V '` `7 �I \ m m V I n -n . . • N �, \ Ir� /I %..... k. . ,,,„ o \ ;r i 1Yi Z g g v anti Vr f \ . i REVD: OCTOBER 21.2010 STORM DRAINAGE IMPROVEMENT PLAN DATE OCTOBER 2010 JAMES AND MARSHA EADES SCALE NOTED N h,NWY4,NW Y4 SECTION 21, TOWNSHIP JON,RANGE 1W,LESS 4SEASONS DRAWN BY ..EP PORTION OF ZAMPERIN SHORT PLAT,LESS R/W ENGINEERING, INC.(360)452-3023 CHECKED: LISP PARCEL NO.001212008,JEFFERSON COUNTY, WA 619 S Chase St.Port Angeles WA 98362 SHEEP 2 l 133HS Z9P98 YM 110I1)6W_Pod 7___S 090410 S 819 - VM :uNnoo NOSd34d3P'9OOZLS100'0N 7302Nd ' :03)133140 ' 090_VN/ `JN2/33N/JN3 Mid SS37 1V7d IdONS NId3dwvz 40 NOUMOd d3r :AEI Iona cA/OC7V3 r SS37 Ml 3ONd21'NOI'dIHSNM01 '1Z N01103S ii(MN'ki{MN¶1 N t73LON 37WJS a.r�Y a7 V a7 S30V3 VHS21VP1 ONV S3VVVP o�0a a3eauoo 3LV0 NV7d 1N3W3A021dWI 3OVNIV21O Wd101S oioa'�a essa.00 :court F , o v M S^ v Z ° �� Q L .t , -_\ ,gym a� y Sli gli 61i o8 A ++i '� F C�naogo wad �� ,� 1, E C4C6 Vi . DI ooa�o.00 3mp�� I e 1 �.r2m v$ id* C+ V 47 auni"3pZ o�'o°o a°�° '�"o c o Qr •47.4.. p 4' p �rp.adtm ko=u« -v .""g-0.„0,.._. ...8 O .ti „ � M!1o1r act,-3p_.O E v°ws.!ra � vg$maoo .. ;.:1-0:13!EOU-0_c art `t`� o..°,1cmi gg oc, N ;3Enidvwet�5. 1111 ce I t Q � g.'coocI a°°°°aaEQa�a�o�o J O O cQi 0°v0) �a toc0000vo°mgs� \� w 00 h o ern °d t.. 43 a�c2°Oo illp Q W mil � ° ° a�°�Eo II:8.R $a"oou"E U m l Z ._ ,„-.1e, Qe ...3..so,a '��z t E`a,m : a U p 6 ° $ m aaop1 Pv ooy c� SZ N..cN e�im U..o�u C&WON E $�iam NM u) III API NA" 1 •r �r O C' PI:i --- ho � a (r arm_ _ ---� Nx_ M1 C Wy 7t t 1332/15 H13GVZI73 k ��� a�x v ►, z 1p `6l r< 4 I. '' oZMZ EQ " ,_=r; oapr� Ug x- )+) 3 .ov �1 CSCCC °1 l7 Aille 1 ...92 ;, *, A td . =FM k' '' 1 I x I' 1 ; I�I r,. I� uv N d co •,:c Pi A '-)a.rn .av �� i� axi `S{( L Q Q LLI CD IX Al& r .'e - ri'411 %N. o LL o ca al= 4z co ; Oc(Z 4t1 1 Ig � 1t gg it iv t I3 � ',111 A. pI 2ZW =mural ,,AN L ..., ....,`� �eF7.,$, -t t'�F .. �: �� 7a `• p W 1 I W Q? i. y✓ �U�W2�� ', OQ� Page 1 of 6 Michelle Farfan cfr Lt4 0-- From: Jim Pearson Sent: Monday, June 13, 2011 11:50 AM To: Randy Marx; Michelle Farfan Subject: RE: BLD10-368, Eades Stormwater Repair Thanks, Randy. Michelle, the project engineer 4 Seasons Engineering needs to review and revise the plans to include the additional storm drain and any catch basins before the work is done. The revisions should be reviewed by EHD and PWD. There also needs to be a Stormwater Maintenance Agreement. DCD and EHD should not give final sign off until this has been done. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax From: Randy Marx Sent: Monday, June 13, 2011 11:32 AM To: Jim Pearson Subject: FW: BLD10-368, Eades Stormwater Repair Hi Jim Below is where I am at with my septic system issues and this approved stormwater plan. The pictures are from 6/1/11. tZr amd..y. ?yt x Always Working For a Safer& Healthier Jefferson County 360 385 9444 ><( ><((((`> ><(((C> > {, ><(y(c, . ((((" ><(((r> >� (("� ((((0> ><6(r>. '-- ><((r"-- > <( ( . -r t ".... C� Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient (s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Randy Marx Sent: Monday, June 13, 2011 10:21 AM 6/15/2011 , - Page 2 of 6 • To: 'Jim Eades' Subject: RE: BLD10-368, Eades Stormwater Repair Yes. He said he will be in this week. This should address lot"F" issues. For lot"H" I plan to send you a letter that states that the currently approved stormwater plan if installed will cause a violation to the septic permit that serves the residence at .... Your plan to tight line to avoid this outcome will require an addendum and revised drawings by your engineer to be submitted and approved by DCD. JZa t.dy. Witzetx Always Working For a Safer& Healthier Jefferson County 360 385 9444 ><((((( > ><{{{S> >•<((((°> ><(((r> ><;{{^> <ow> ><(((r> ><(((r' > /(/((C ><i{i > >< �>><((r> .><({{ ><{t> ><({i"> ><1{1">' . > (1((0> <((((c —. . ><(((( > >``(W> ><(((r'' ><t{{ ><((((( Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALITY NOTICE. This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Jim Eades [mailto:jimeades @rocketmail.com] Sent: Saturday, June 11, 2011 6:55 AM To: Randy Marx Subject: Re: BLD10-368, Eades Stormwater Repair Just checking , Did Nathan contact you ? From: Randy Marx<rmarx @co.jefferson.wa.us> To: Jim Eades <jimeades @rocketmail.com> Sent:Wednesday, June 1, 2011 12:50 PM Subject: RE: BLD10-368, Eades Stormwater Repair Great, So then both will be resolved by June 10th, correct? Zasi.dy. Ilia we Always Working For a Safer & Healthier Jefferson County 360 385 9444 <(((( -' ><{ ><(((( > ><(((( ><{{{ > <(q(0> ><((g >c((((°>• ><qw5 ><((r(` _(((C > >< {.. >...(:(C;> Online Septic Permits Web Link 6/15/2011 Page 3 of 6 Environmental Health Web Site Link CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,is for the sole use of the intended recipient(s)and may contain confidential and privileged information. Any unauthorized review,use,disclosure,or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Jim Eades[mailto:jimeades @rocketmail.com] Sent:Wednesday, June 01, 2011 4:59 AM To: Randy Marx Subject: Re: BLD10-368, Eades Stormwater Repair In our meeting you gave 2 options , re-designate or hard pipe .There was no room to re-locate without impacting back deck , so we will use hard pipe. And I will have Nathan call you about Parcel F , that plan is correct ,there is a 30 foot set back. Jim From: Randy Marx <rmarx @co.jefferson.wa.us> To: Jim Eades <jimeades @rocketmail.com> Sent:Wed, May 25, 2011 4:07:18 PM Subject: RE: BLD10-368, Eades Stormwater Repair Hi Jim My notes from our meeting indicate the following: Parcel H. you were going to contact Nathan and apply to re-designate (re-locate) the reserve drainfield to be 30 or more feet away from the storm drainage that runs along the east property line. Parcel F You were going to have Nathan confirm that the 30' green belt is completely on parcel F AND that there is another 30' to the HWY 20 ROW, you were going to have Nathan come in a clarify these items on his as-built for parcel F. Since it took me 10 days to respond to you I will push out 10 days past my May 31st deadline accordingly (June 10th) ass.dv. Niaizx Always Working For a Safer & Healthier Jefferson County 360 385 9444 >< (((( > ><I{{"> ><(((('> ><(((( > >< { •> - "((((°> (('Or> ><(((( > C. a.. •. ><, ,.,,. >l "> ><WC>• ><((((° ><(1(( • ><:-;((((°> >< {{°> ><(((( Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,is for the sole use of the intended recipient(s)and may contain confidential and privileged information. Any unauthorized review.use,disclosure,or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Jim Eades[mailto:jimeades @rocketmail.com] Sent: Sunday, May 15, 2011 4:18 PM To: Randy Marx Subject: Re: BLD10-368, Eades Stormwater Repair 6/15/2011 Page 4 of 6 • Rain rain rain we started then stopped because of all the rain. In our meeting you said nothing about a application , only that as drawn it wouldn't work.So Nathan , Cleaver Septic design has verified boundry lines are correct for lot "F" and the set backs are as I stated.The line between lots G& F will be in a tight line pipe which was your other concern , which will meet your desired setback. From: Randy Marx<rmarx @co.jefferson.wa.us> To:jimeades @rocketmail.com Sent: Fri, May 6, 2011 3:34:50 PM Subject: BLD10-368, Eades Stormwater Repair Hi Jim The issues we talked about on our 11/8/10 meeting have not been resolved. I need to move forward on this in the next couple weeks. If I don't receive the necessary applications for the affected parcels I will need to place these permits into a violation status and notify the property owners. Please submit the necessary applications by May 31st to avoid placing these septic permits into a violation status. ?ar:tatxx Always Working For a Safer & Healthier Jefferson County 360 385 9444 ><a(r> ><(((r> > ><(((r> ><((((`> ><(( C> O / </( ( . ><(((( >< ><WC> ><u(-) <(U("> Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,is for the sole use of the intended recipient(s)and may contain confidential and privileged information. Any unauthorized review,use,disclosure,or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Randy Marx Sent: Wednesday, November 03, 2010 11:11 AM To:jimeades @rocketmail.com Subject: FW: BLD10-368, Eades Stormwater Repair Hi Jim Thanks for talking with me today about the issues your recently approved stormwater permit will create for the septic systems serving lots "H" & "F". I can meet with you this week including Friday to go over it, email me a time. Below is the email I sent out just after my review on Monday. i2arsi.diF Mahar 6/15/2011 Page5of6 Always Working For a Safer & Healthier Jefferson County 360 385 9444 ><(((( > ><{{{ ><0(c> -><(((C> ><{{{•,> - �:(r(('5 :-<(((( - ><(((( . ▪ •)--, ( (( > ><{f{"> ><0f"> >.:-'• ><u{^>' ><((((°> ><q(((i> ><(W°;:> ><WC ><M"> ><(((('5 Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALITY NOTICE: This e-mail message,including any attachments.is for the sole use of the intended recipient(s)and may contain confidential and privileged information. Any unauthorized review,use.disclosure,or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Randy Marx Sent: Monday, November 01, 2010 4:37 PM To: Michelle Farfan Cc: 'partch_fourse @olypen.com'; Jim Pearson Subject: RE:BLD10-368, Eades Stormwater Repair Health received this for review on 10/29/10 last Friday afternoon. After an expedited review I noticed some setback issues with the proposed stormwater system and existing septic systems. If the stormwater system is installed as show on the revised plot plan drawn 10/21/10 two existing in use septic systems will become invalid and require additional permitting to correct issues this stormwater system will cause. Specifically the issues are: • Existing primary and reserve drainfields are not shown accurately. • Any down slope drainage ditches or drainage swales must be located 30 feet below a primary or reserve drainfield area. • Can not install a stormdrain tight line through a primary and reserve area. A septic system designer needs to be contacted to address these and other possible issue that this project may create. Further review by health will require a review fee. Za szuCv_ 71ta tFc.0 Always Working For a Safer & Healthier Jefferson County 360 385 9444 ><(((( .> ><{{{.,> ><q(( ><O > ,<f{ ><((r> ::W ><W • •><(((( , > {l > ><WC1=°•. .><;({,.). ><{ <t,;,> ><:w",.• . ><U(('5 ><aff(:)> ,- ><((((°>. ><(((( . ><(((('5 ><{{{ ><((((°> 6/15/2011 • Page 6 of 6 Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,is for the sole use of the intended recipient(s)and may contain confidential and privileged information. Any unauthorized review,use,disclosure,or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message 6/15/2011 'iC fQ JEFFERSON COUNTY PUBLIC HEALTH qs,Y S� 615 Sheridan Street • Port Townsend •Washington • 98368 y,h� www.jeffersoncountypublichealth.org JAMES EADES June 20th, 2011 2911 SHERMAN ST PORT TOWNSEND WA 98368-5900 Re: Health Department issues with your Stormwater plan permitted under BLD10-368 Dear Mr. Eades: Nathan Cleaver came in to our office to help clarify the discrepancies between his septic system as-built drawing serving lot"F" and the approved stormwater plan by 4 Seasons Engineering. Comparing these two drawings with the final survey of the boundary line adjustment(AFN515101) we determined that the septic system is indeed located 30' from the east property line as shown by Nathan. This 30' accounts for the HWY 20 corridor buffer as shown on the survey. This 30' is a part of lot"F." Nathan shows this as "Greenbelt." The approved stormwater plan by 4 Seasons Engineering does not show that lot"F" includes the 30' buffer. This puts the storm drain 30' from the true east property line and therefore up against the septic system. Installation of the storm drain in this location will invalidate the septic system that serves the residence on lot"F." I recently visited the property and believe this not your intension, as I noticed that you have a temporary drainage system installed along what appears to be the true east property line (along the HWY 20 buffer.) Your engineered stormwater plan needs to be revised. Lot"H" also has issues as you know. The approved stormwater plan shows an open drainage swale between lots "H"&"G." This open drainage needs to be 30' below the reserve drainfield of lot"H." Installation of an open drainage in this location will invalidate the septic permit that serves the residence on lot"H." Your solution was to tight line this section reducing the setback to 10.' This is acceptable however;the approved plan needs to be revised to reflect this. I am copying this letter to the effected property owners should this stormwater system be installed as designed. Respectfully /aA/t Randy Marx Cc: Michele Fafan,DCD, Jim Pearson, Public Works Michael &Nancy Rody, Lot F John&Kim Gordon, Lot H Nathan Cleaver COMMUNITY HEALTH ENVIRONMENTAL HEALTH PUBLIC HEALTH DEVELOPMENTAL DISABILITIES WATER QUALITY MAIN: (360)385-9400 ALWAYS WORKING FOR A SAFER AND MAIN: (360)385-9444 FAX: (360)385-9401 HEALTHIER COMMUNITY FAX: (360)379-4487 t (1)(1) CO d�� 4 . 1171111 O �Z 03 zit r�II v &&.' ��\��� ....."7717,�� ��,`,a:&\�����yN� ..��`-�∎,�\��ww- \�---4,10.. �1��N�����n • '<z3 ° m v n z O c��\ice- �., \ !!!�lp�� ����• ������.�_ �u. ��o�..\ 02° O� Z8 250 s O `•4 R ■ I �\ Mk,3111M PI g4I Ii� �r g ' g J i $ �`O 1 O8 ��,l ,,l -, CI 0 0 . 1 , Mmi '\ �' U )< \. 4 8 I 1 \I, o 1r: , • ,sao ill $IJI 1 N1 p t» I I .. gi X ,,,/� T I, il ;...:is 'itON 002> IIIIMIL 1I' m 'z = C 4 t k ELIZABETH STREET•3 z-4 O4 °1 D g 4Ii- CA 70�' it 4 l .r ii c) Z 6 k .` co ni z-+O y lik ..\....; 40 I' \ 44„42 — —I i r .p { -` r)4. iiii. ...,._,,,,, . PRI mu, (N(�tn3NQrn �a0) a -+c) 8G,Qr.v3-` (n .. °a xo0 aomama v°, ° m o p e a Iyz rt� O j_�� C c<E p 0 0 ni rt3 tj tD 0 ° -i° 0 3 ° .°fO � p �Q � W tD > > ,°, Q ?Q O n° 1 y -a.--&aa`< Z"°-� M J O n Cr (n r O r O �„nti0 ° U01 'O' �C 'O^a� OaC 07j0 �� m _ ° a I rn -1 co ca.° 0 a0 rtan "3-0 C O rtrtQ t3 " Z m '":OtD0t) 0O?Q.R--0 rt' > > v-m rt N N � �O Q y * 0 C n +tD 0 tQ O V a O. rt Q I) :--0 41 SR S a 0 y n �c1D ?N0cct, 0yOnO0.7 • a0n S M,a - '•• 01 0 m 10 °ga° s•t° ° rt2° mmm e"- D * .....°) c Q rtQ n.4.° C CTOt° .-'•10 3 0 N O SC)aQ ��� QrtOtQ y 7 co p + 0� N ((, '-0•Q• a to -, S r) cD aO Z'Sj N y 0 9, rt�a Q --10?� as -1 co 030QO0r°•O830•n0 -. ay ''h Iii y 0 3'j n O cc) ((b 3 j Q�_ QD Y y la p 3(Q Q -3 p� O.cx; .0•, k) Q CO 7 M . O~ 0 0 0 C 'S•M f<D tQ Q t/f "� O• -O w a0 j 0•� O� 0 0 N O0 ScQ) 0 N O-P 3 -^ 3 a-b) N0 a rt rt 0 Ili N N 0 Q-0 ° 0-09 0 1 O ,.w0Nrt,,.. OZ•cn3" Qy0 C 0 -Q 0 y 0 0 • -h0 rt'Q� C/3 �- Q O 0 < . , Q Qas. 3 Oyu°i00 ° Q: 0 O yn _rt a N `-� `C O a 0 0 0 Nt° 0 0 n Q' O ^�, .49 �p° , 0 p C--, Z Q cn° (A a ,' rrl STORM DRAINAGE IMPROVEMENT PLAN DATE: OCTOBER 2010 JAMES AND MARSHA EADES SEA SONS SCALE: NOTED N Y2, NW Y4, NW Y4 SECTION 21, TOWNSHIP 30N, RANGE 1W, LESS DRAWN BY JEP PORTION OF ZAMPERIN SHORT PLAT, LESS R/W ENGINEERING, INC.(360)452-3023 CHECKED: JSP PARCEL NO. 001212008, JEFFERSON COUNTY, WA 619 S. Chose St. Port Angeles, WA 98362 SHEET: 1 t , `r r F( e -< \ rO�ZoDo� _mD:2:1:z ' :3:63r!v / N\ N N f2 \o g ' 2�cD n o a N "1 F r �v a Z$Z 0 2S ( Z z— W Dn O V rT a II4 Z Z �y0 (n m' p r*l &i , sit v _ a a / ,)8 4(11117\ N-'''' , * . _ v•,.. N 8 [ 1p • / .�IILilhlI a VI*11i4j,i, .:.At440110 OF Z 1 l! , 11 -1-iill - k, I : - 3-,, 11 1 -Al 01) , . - ‘,- , .IfilliIM flillitill 0 ct , v o i,3� PI 0 ci AI 0 0 V P ': �' • + mo ° . . . ,9 GA II' IIi1Jii!!IIII * x i O I• I PI r_ \ O rri -• OD O Q H- z, • O ® NZ a@ \ \ p Pik rrirri naa°Z \ y'o \ t "0 m I ) \ \ CO o _ c \ ‘. _ f T II///Ii///p \n o sr pi , -?' 'il'" .'' —;,t '7'4 Ill 1 tl ... S N N N# 1 o `�� C'` , STORM DRAINAGE IMPROVEMENT PLAN DATE: OCTOBER 2010 JAMES AND MARSHA EADES SCALE: NOTED N Y2, NW Y4, NW Y4 SECTION 21, TOWNSHIP 30N, RANGE 1W, LESS 4SEASONS DRAWN BY: JEP PORTION OF ZAMPERIN SHORT PLAT, LESS R/W ENGINEERING, INC.(360)452-3023 CHECKED: JSP PARCEL NO. 001212008, JEFFERSON COUNTY, WA 619 £ Chose St. Port Angeles, WA 98362 SHEET 2 ilr11"""%•**11141444\44., Y� y{ 4 0. �qp \rip t1Y F'r j 4 Iry 1 N /\� I. '0 k m .r-` $m v \ �m> N, '" r-\ \ \ \/ c � O Z -� \Z\ k/>'<//r % i� \ z o y j o b., r- c o \ kfiA ' •> •• —i A3 r. (s4 \:;•\' I r n), ; Liaani , MN 10 13 G)03 I.. , n / • Z (n Z1 . \ 6: 1\ 4„0N) : N r o � \, \ i t. � \\� A, � y // v i 'Z -0 < 1 ° (1) ' / \ :/ :\ \ ; —IC C) ...1 (/)ti o c-T1 r— o ..- \\ m t„--k 0D O ca 17 Z nio-I A3 < � � n � _mD -cZi r- Z./\ —I )1. A)E OW= � NN N c. ° � N !; ox = Z ;om ' P z r- te) O ` F - C n rm ni mva nlO yZ o 0 v C OO T31,31 f y 7 `, m a ” D D 1 O oo N) • I 1N A x_u - .....a.\. �COs' °s • + 4 , MIN DIA. as I PIPE ZONE 1 9 ,4 c 0 i v ci Aa 82A NA 0 NE m pny zto"I (n i 'iii z0 i!i!///!/ --I XI 1 \ Z i00 >i o Al // / z /�.!� ��4�\. c D / : o/ ! / <n i .,* Ki Z i O /%/A� O y r- - \0 4\�j C C O m N. I ./oGQ, m =a n1\ \ \ r*r O' I. \%�/\ �j O rl.$a i N.,ci, I'fit'' _ ■ -I).0O C��CER1 • Abm� pr-sa Ar-g n�v ... , ,e-) Q STORM DRAINAGE IMPROVEMENT PLAN DATE: OCTOBER 2010 JAMES AND MARSHA EADES SEA SONS SCALE: NOTED N lz NW Y4, NW Y4 SECTION 21, TOWNSHIP 30N, RANGE 1W, LESS DRAWN BY: JEP PORTION OF ZAMPERIN SHORT PLAT, LESS R/W ENGINEERING, INC.(360)452-3023 CHECKED: JSP PARCEL NO. 001212008, JEFFERSON COUNTY, WA 619 S Chase St. Port Angeles, WA 98362 SHEET 3 ,` ` ■ . � . 0.'y�:e � . 1 f k % 101 7 �ƒ Z \ » ® . \4: & �. ): % I1/4 Page 1 of 2 Michelle Farfan 11 1 -- From: Jim Pearson Sent: Friday, January 21, 2011 8:34 AM To: Michelle Farfan; Randy Marx Cc: Stacie Hoskins Subject: RE: BLD10-368, Eades emergency stormwater repair Public Works does not plan to inspect the work. We have recommended that the project engineer will certify that the system has been installed as per the project plan. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax From: Michelle Farfan Sent:Thursday, January 20, 2011 10:41 AM To: Randy Marx Cc: Stacie Hoskins; Jim Pearson Subject: RE: BLD10-368, Eades emergency stormwater repair The stormwater permit was issued on October 26, 2010 and has not been finaled. Jim, have you conducted any site visits? Randy, I'll make sure that it doesn't get finaled until EH has signed off on it. Michelle Farfan Associate Planner,FHM Lead Dept. of Community Development 621 Sheridan Port Townsend WA 98368 mfarfan @cojefferson.wa.us 360-379/457 360-3791473(fax) All voice messages and e-malls received by Jefferson County may be subject to Public Disclosure under Chapter g2.56'RGW Please note that DCD hours changed as of December 1,2008. Our office is open to the public 9:00 am-4:30 Pm Monday to Thursday and closed on Fridays. From: Randy Marx Sent: Thursday, January 20, 2011 9:49 AM To: Michelle Farfan Cc: Stacie Hoskins; Jim Pearson 1/21/2011 ' Page 2 of 2 Subject: BLD10-368, Eades emergency stormwater repair Hi Michelle. I spoke w/Joab Eades on 11/3/10 about the negative impact the proposed stormwater system will have on two septic systems serving two separate residences. I also met w/Jim Eades on 11/8/10. I have not heard anything since. I want to make sure that this permit does not receive final approval until the affected septic systems have been addressed. Can you tell me what the current status is of this stormwater repair? RasccLy. l tarlcx Always Working For a Safer& Healthier Jefferson County 360 385 9444 "><t((( > {{{ <((r> > ((qc).> ><1«"> ;>'( j'a> ><W`> •><;,t l t\ ><> ><. ' ><fir> ><>><>><((1(u' .><{{{"> ><{({ > ><{({"> ><:;. ><>" ><{{{">. >•.!(W e> e> ><(`((f>. • ><Or>. ><((((°> - <Or, ><Or> Online Septic Permits Web Link Environmental Health Web Site Link. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient{s} and may contain confidential and privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message 1/21/2011 Page 1 of 2 Michelle Farfan From: Michelle Farfan Sent: Monday, November 01, 2010 5:19 PM To: Al Scalf; Stacie Hoskins Subject: FW: BLD10-368, Eades Stormwater Repair Just an FYI on Randy's comments. The stormwater permit has been issued with conditions from PWD. Because this was an engineered stormwater plan, and due to the residence being flooded out 2 times, I requested Jim Pearson to review the engineered stormwater plan. Jim worked out some concerns he had with DOT and 4Seasons Engineering. Once I received his comments I proceeded with approval. I didn't even think to include EH in the review. I sent my apologies to Randy,hence his late comments below. Michelle Farfan Associate Planner,YHM Lead Dept.of Community Development 621 Sheridan Port Townsend WA, 98368 mfarfan @cojefferson.wa.us 360-379-4457 360-3791473(fax) All voice messages and e-mails received by Jefferson CountY maY be subject to Public Disclosure under Chapter 42.56 RCW. Please note that Oct) hours changed as of December 1,2o08. Our office is open to the public 9:0o am-4:3o pm Monday to Thursday and closed on Fridays. From: Randy Marx Sent: Monday, November 01, 2010 4:37 PM To: Michelle Farfan Cc: 'partch_fourse @olypen.com'; Jim Pearson Subject: RE:BLD10-368, Eades Stormwater Repair Health received this for review on 10/29/10 last Friday afternoon. After an expedited review I noticed some setback issues with the proposed stormwater system and existing septic systems. If the stormwater system is installed as show on the revised plot plan drawn 10/21/10 two existing in use septic systems will become invalid and require additional permitting Ito correct issues this stormwater system will cause. Specifically the issues are: • Existing primary and reserve drainfields are not shown accurately. • Any down slope drainage ditches or drainage swales must be located 30 feet below a primary or reserve drainfield area. • Can not install a stormdrain tight line through a primary and reserve area. A septic system designer needs to be contacted to address these and other possible issue that this project may create. Further review by health will require a review fee. 11/1/2010 • Page 2 of 2 Always Working For a Safer& Healthier Jefferson County 360 385 9444 ><((r> ><{{{"> ><((((c ><((((O> ><;{{-› ><((((°> ><((((°> ><(((( > •><((((`> ><((((° . .><;{{"> ><{{{":. ><{{{"> : ..> »c.. ><{{">. ><(((("> ><(((r)>• , ><((((°>• ><(((( . ><(((("> ><{{{ ><(((( > Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient(s)and may contain confidential and privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Jim Pearson Sent: Friday, October 29, 2010 12:20 PM To: Michelle Farfan Cc: Randy Marx; Susan Porto; partch_fourse @olypen.com Subject: MLA10-00385 Eades Stormwater Repair Michelle, This follows up on my conversation with Susan Porto, Jefferson County Environmental Health Department (JCEHD). The Storm Drainage Improvement Plan for the project depicts runoff from the parcel to the south being directed into a reconstructed rock lined swale between Parcel G (Ryan Barnard)and H (Jay Gordon). This swale flows to an enclosed storm drainage system on Balsa Way that conveys the runoff around Parcel F (Nancy Rody)to an infiltration basin on Parcel A(Eades). The Plan should be reviewed by JCEHD to ensure that the swale conforms to the required setbacks from the on- site septic systems on Parcels G and H. The Plan could be revised to replace the rock lined swale with an enclosed storm drainage system if required by the on-site septic system regulations. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax 11/1/2010 Page 1 of 2 Michelle Farfan From: Michelle Farfan Sent: Monday, November 01, 2010 12:08 PM To: Randy Marx Cc: Susan Porto Subject: RE: MLA10-00385 Eades Stormwater Repair Al wanted this to be expedited and since it was stormwater, it didn't cross my mind to send it to you. I apologize. I had sent the engineered stormwater plan to Jim Pearson who also consulted with the engineer and DOT. I see that Jim sent an email to you and Susan with attached site plans. Is that sufficient for you to review? I have the engineered stormwater report if you want that. The permit has been issued subject to PWD conditions. Let me know if you have comments/conditions and I can revise the permit. Michelle Farfan Associate Planner,FHM Lead Dept.of Community Development 622 Sheridan Port Townsend WA 98368 mfarfan @co.efferson.wa.us 360-379-9957 360-379-9973(fax) All voice messages and e-mails received by Jefferson County maY be subject to Public Disclosure under Chapter 92.56 ROT Please note that DCD hours changed as of December 2,2008. Our office is open to the public 9:0o am-9:30 pm Monday to Thursday and closed on Fridays. From: Randy Marx Sent: Friday, October 29, 2010 3:30 PM To: Michelle Farfan Subject: Re: MLA10-00385 Eades Stormwater Repair Wow, all these lots have installed septics. So am I going to get this for review or is DCD by-passing us? /Zcuu[ 71ta...x Always Working For a Safer& Healthier Jefferson County 360 385 9444 ><((((°> ><{{r> ><((((°> ><((((°> ><{{{ ><((((> ><(((r> ><((((`> .> ( (`> ><(((( > 11/1/2010 Page 2 of 2 (((("> >C Oir>• ><((r>. ><WC>• ><W> ><;{( ><((r> Online Septic Permits Web Link Environmental Health Web Site Link CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message From: Jim Pearson Sent: Friday, October 29, 2010 12:20 PM To: Michelle Farfan Cc: Randy Marx; Susan Porto; partch_fourse @olypen.com Subject: MLA10-00385 Eades Stormwater Repair Michelle, This follows up on my conversation with Susan Porto, Jefferson County Environmental Health Department (JCEHD). The Storm Drainage Improvement Plan for the project depicts runoff from the parcel to the south being directed into a reconstructed rock lined swale between Parcel G (Ryan Barnard)and H (Jay Gordon). This swale flows to an enclosed storm drainage system on Balsa Way that conveys the runoff around Parcel F (Nancy Rody)to an infiltration basin on Parcel A(Eades). The Plan should be reviewed by JCEHD to ensure that the swale conforms to the required setbacks from the on- site septic systems on Parcels G and H. The Plan could be revised to replace the rock lined swale with an enclosed storm drainage system if required by the on-site septic system regulations. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax 11/1/2010 Page 1 of 1 Michelle Farfan From: Jim Pearson Sent: Friday, October 29, 2010 12:20 PM To: Michelle Farfan Cc: Randy Marx; Susan Porto; partch_fourse @olypen.com Subject: MLA10-00385 Eades Stormwater Repair Attachments: Eades Drainage-Plan 101022.pdf Michelle, This follows up on my conversation with Susan Porto, Jefferson County Environmental Health Department(JCEHD). The Storm Drainage Improvement Plan for the project depicts runoff from the parcel to the south being directed into a reconstructed rock lined swale between Parcel G (Ryan Barnard) and H (Jay Gordon). This swale flows to an enclosed storm drainage system on Balsa Way that conveys the runoff around Parcel F (Nancy Rody)to an infiltration basin on Parcel A(Eades). The Plan should be reviewed by JCEHD to ensure that the swale conforms to the required setbacks from the on-site septic systems on Parcels G and H. The Plan could be revised to replace the rock lined swale with an enclosed storm drainage system if required by the on-site septic system regulations. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax 11/1/2010 =mcn os (z-, -D "3§2t , -:, - IIES m z1 t m P o Ys:z % N,1t,yo „.a *tip ����\ ��.1'.... v ~.`��.°„�i, .zr '`-n—w y`�.`� -< 0 m na" .'�.a�;w*,: 4` 6 .1`-.o3syw3� �v'. F?fir" ..Li+ `Lfi.`,, �`�. ''1�'V" "`\a.V14.\"�A� .AR1. �,, II 0 n pp oue -.� — A 1.r r tl (. �lril. r.� - Q Ill ,, 17.4 Mill o �y i `ag Q s r a $ a $ 1 + ?rnzz r .,. Al), a, ' -si --,0 - *) -c) --, ,. F U ^c`i Y1 � \ .. -A n < tsar, rrr r>wA co a I w mraim, r G � Ac 1 ali \,. .t , olp: n 1 .0. rill '2 "A, z gg�i'6^ W x; j'a s~i ma' .114 3` 4` �C y 741 a� a ELIZABETH STREET Alq ti�om t a. CO R 0 jo F 2". a .,L.--- iro in, ~ ° 3 ar�g<n k •� � 7r III, a >zyo c'1 ti• :' ' ��� _ x•••_.... ... ---------- ___ r,______ .,,, . ..„:„.., ,.. \,,,-- _ t �\y _ \ „N c____„, .4,,....‘,,..:.\\I 1____ ...., „ , ,,, of °awn8.3nut,10'48"c1 �P'2N,5."� z � %"e aoia8a a ,� n 1 on a m� '"3 3 o sr�;, n9•o m o D8n�•°t -8 2 I 00 n 3�wQ'o°� �$" °�vQnpo_ Q 8°ago o m D 00 4888 on.%A° 5%6' o O y t O O (- n° 4w 3'ac-8.", a, A'°8 cry r- s O 7) 3.Q°o^ipa 3rn8°>>Q o•_2P,° mil I m - n '10.$m„a_caxaa^ yyao.'" -P Oa a T.'°«STP—ag c�c 8 T4°riioz NP 0 _ na�am§84m°�•B.rB•� °.oa 8p sv� 1 `� Cn C 0 C71 CD XI IIIIUIVJU1P; ,n$,A 8,ga8�° gq8�i w�jPc`d q " m a 9,2 2-7.8""g 7 p o 4 °y S", 83oo"ma$82°° . 8Q"4,. 2 Ihr■ Hll9fluItH iN L'I 8.o. " v a$° c ,°o 05 a.a"°" 9'r oC ° $\111 r %E. US w 4 REVD: OCTOBER 21.2010 STORM DRAINAGE IMPROVEMENT PLAN DATE: OCTOBER 2010 JAMES AND MARSHA EADES 4SEA0Np� SCALE: N07E0 N Yz NW Y,,NW Ys SECTION 21, TOWNSHIP 30N,RANGE 1W,LESS ' DRAWN BY: dEP PORTION OF ZAMPERIN SHORT PLAT,LESS R/W ENGINEERING, IN 360)452-30 23 CHECKED: JSP PARCEL NO.001212008,JEFFERSON COUNTY, WA 619 S.Chose St.Port Angeles WA 98362 SHEET: 1 �..„„.■ i '�✓ t di, f--\_ A A _._ 2 _I//'v O C ! 4. , o r =o9-1 yA0 A a ,/ O ?2(1):"- o C 0. Z y m� m D P% x8R r—i /l 8 – mgi a t 4-jr- .--',/ .. ",,, __,/ . 0. II/ it - 0' N- ' '''\ 101111111 IF!''yfri,«e'l \ : .N1,_--;:, , _ 1m1!ri11e . .`,,,,1 ...IUII1IIi % �• . 1 /40:-,.‘,_...-/ >�X ��1 a" �y� ,1� +-� ‘ 4` IIilAi o i 1 r \g m 2X ' p2 _}„,,, ,,k''',„:%,_ � ii r > 2;1 Apo - co . Q 22$ X °^' 'r�� ti ‘ •y 0 P r. d m , _ A r •oD D -00' mz oat Z s A.�^�� titi 8la q k, 8 �2r>- ,• \ O -1\ 10, D 1 1 I . n ,111 \ .._.f ea \ ,s 5 I 1 1■i \ '' . '"".:: \--1,8ZZ Zli..r‘ O , y II \ ILJ l tr`I I I \\ � W 1/Y i��r�- t '1,/ r{f�,�ll � / �f. °off lip 1 ', lJiiliii ill . ,0/ „/;/(' R Vzt y �l'iil'i,l,{- a o �► 1( I \ N 1iili1 ir \Vy ( 1 I 11i 1 \; •Iv 70:7 I 'Ii1f11tliir i,� \\ a I / tt ` \ lt{r'13" 111, ice..- �l / % jii, A-\ / /,----v �.r \\ {fir t 1 l i i i 1 V ',,,,, , \ 1,(1, 1111111 • `/ C \ lift{l {11111{. 1 ii'{ ,; r, \\ 27 S N li ', i, ti A \ t,li iii, \ g ` \^ '``iil\1111 ..N. REVD: OCTOBER 21,2010 STORM DRAINAGE IMPROVEMENT PLAN DATE: OCTOBER 2010 JAMES AND MARSHA EADES 4 EASONS SCALE: NOTED N Y2,NW Y4,NW Y4 SECTION 21, TOWNSHIP 30N,RANGE 1W,LESS DRAWN BY: JEP PORTION OF ZAMPERIN SHORT PLAT,LESS R/W EN INEERING, INC.(360)452-3023 CHECKED: JSP PARCEL NO. 001212008,JEFFERSON COUNTY, WA 619 S.Chose St.Port Angeles, WA 98362 SHEET: 2 aP VNI.mu 13 O ti A t'3 Ap°N a 'c' .5' o 8 .°'rV;r4 ; 0 —/>, r am% 1.5 MIN \►ri m2°morn rrl lt lif:•, } 7\ TOT //:, !. -, ; �;J� T- O , A N/ A. ma r�,i� ` c zJ,, N�—,/,//' \gg r-anti�/ ,., cn f\j\\�% CRP M n z y f/ i/ /// //+r" \ ~ C C) 0x-. A� C N/�\\\ mN0> O % - DA °ma aQ A._A5,2V1 --° o A1-� ,,, ? D N om „ 0y00 m -I a � -, g € wf am°� el o 2008 rn u g! ' ga ,a NO P I V ... p lg 111 1Ag tg VII 41! ��y =g 1I r\\rr2rr\ � �a �1 4,/,.`` g p �7 m g4,/,x,' %$ s_ k. 1 z z `i'il``ii\`Iry NN, Rm '1 4'''\rr\,r\• V S y `ni Z 3'MIN.!-r5. k ,si‘ i`2MIN 8. (n STORA r Elf `/r�� S r r,r.\tiiririk m S o �frriiry`irr\\�r�\ F-'-': g ''gzfp���wr\\; a �= r\i9\iO,,i06Q9\ _ Z (/) /DJ'rr\/\ir1\,44% pp r•1 -C i >\\f ir/i Nip X43 r/ • ■;;;10�i„gam z riri4�ii. tIP ii Pi!, REVD: OCTOBER 21,2010 STORM DRAINAGE IMPROVEMENT PLAN DATE: OCTOBER 2010 JAMES AND MARSHA EADES EAS NS SCALE: NOTED N Y2,NW Y,,NW Y,SECTION 21, TOWNSHIP 30N,RANGE 1 W,LESS ' DRAWN BY: £P I PORTION OF ZAMPERIN SHORT PLAT,LESS R/W ENGINEERING, IN .060452-3023 CHECKED: JSP PARCEL NO. 001212008,JEFFERSON COUNTY, WA 619 S.Chase St.Port Angeles. WA 98362 SHEET: 3 Page 1 of 1 Michelle Farfan From: Michelle Farfan Sent: Monday, November 01, 2010 11:39 AM To: 'Mike Schuh'; Dave Lewis Subject: PDF of BOCC Agenda Reqeust Attachments: Bocc AR 2010 CPA 11 1 2010.tif I apologize if I have already sent this. Just wanted to make sure you had it for your records. Michelle 11/1/2010 JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT UNIFIED DEVELOPMENT CODE TYPE I LAND USE PERMIT APPLICANT: JOAB EADES EDEN EADES 21 BALSA WAY PORT TOWNSEND WA 98368-8730 DATE ISSUED: I 0(c (.0 if0 DATE EXPIRES: (0/.2(0 !�( MLA NUMBER:MLA10-00385 PROJECT PLANNER:Michelle Farfan PROJECT DESCRIPTION: STAND ALONE EMERGENCY STORMWATER REPAIR PROJECT LOCATION: Parcel number 948 603 201, Eisenbeis Bay View, BIk 32, Parcel A, located off Louisa Street CONDITIONS: 1.) The applicant shall implement the Stormwater Management Improvement Plan as revised by 4 Seasons Engineering on October 22, 2010. The work shall be conducted under the direction of licensed engineer. 2.) After work has been completed, the applicants shall submit a letter to Pubic Works from the project engineer certifying that the stormwater management facilities have been constructed as per the revised Stormwater Plan. 3.) In order to meet the requirements of the Jefferson County Unified Development code and the Washington Department of Ecology Stormwater Management Manual for Western Washington Minimum Requirement#10 Operation and Maintenance and to ensure that the approved stormwater management facilities are appropriately maintained for the life of the project, Jefferson County requires the applicant to enter into a Stormwater Management Facility Maintenance Agreement with the County. Public Works will send a copy of the Agreement that has been signed by the Public Works Director to the applicant. Prior to final project approval, the applicant shall sign the Agreement before a notary and file it with the Jefferson County Auditor. 4.) The proponent shall pay all costs related to Public Works review of the Stormwater Improvement Plan, any site inspections, communications, and preparation of the stormwater Management Facility Maintenance Agreement. In accordance with the Jefferson County Pubic Works Department Fee Schedule, the Department's fee is currently$65 per hour. 5.) The applicants engineer shall provide an operations and maintenance manual that is consistent with the Stormwater Management Manual, Minimum Requirement#10 Operations and Maintenance to the applicant and Public Works. 6.) The proposal will require the applicant to obtain easements to construct the drainage conveyance system across the following parcels in Eisenbeis Bay View Addition: a. Block 40, Parcel H, APN 948-604-004, John & Kim Gordon; b. Block 39, Parcel G, APN 948-603-901, Ryan Barnard; and c. Block 32, Parcel F, APN 948-603-207, Michael & Nancy Rody. The proposal would also require the applicant to obtain an easement to construct the drainage conveyance and infiltration system across following parcel in Eisenbeis Bay View Addition: Block 32, Parcel A, APN 948-603-201, Joab& Eden Eades. The applicant will need to document the easements to Public Works prior to preparation of the Stormwater Management Facility Maintenance Agreement. FINDINGS: 1.) The Administrator finds that this application complies with applicable provisions of the Unified Development Code,all other applicable ordinances and regulations,and is consistent with the Jefferson County Comprehensive Plan and Land Use map. 2.) The proposal is intended to retrofit an existing drainage system by collecting runoff from the adjoining property to the south (Assessor's Parcel Number 001-212-008)that periodically inundates properties on Balsa Way and conveying it by means of Swale and 12 inch diameter storm drainage pipe to an infiltration facility located on an adjoining lot to the north (Assessor's Parcel Number 948-603-201). 3.) This drainage problem was the subject of an Action Request to Public Works Initiated by Nancy Rody, 159 Louisa Street(Balsa Way on June 10, 2010. Public Works determined that the problem was not attributable to runoff from public roads or from the Eade's development on Louisa Street and Balsa Way. 4.) The Jefferson County Unified Development Code, Section 18.30.070 Stormwater Management Standards adopts the standards and minimum requirements of the Washington Department of Ecology Stormwater Management Manual for Western Washington. 5.) The applicants have submitted a Stormwater Improvement Plan for the proposal prepared by 4 Seasons Engineering (October 14, 2010). The Plan states that the improvements have been designed in accordance with the Stormwater Management Manual. Public Works reviewed the Plan and discussed it with 4 Seasons which clarified and revised aspects if the Plan in an email and attachment to Public Works dated October 22, 2010. 6.) A natural drainage channel on the adjoining property to the south has been impounded by a 7 foot high earthen dam that was constructed by the applicants in 2006. The structure has an 8 inch outlet pipe with a 2 inch orifice cap. This structure was not permitted by Jefferson County or a State agency. The Stormwater Plan states that it does not comply with the State requirements for height or construction materials or methods. The Plan recommends either the structure be removed or its height be reduced to 4 feet and the orifice cap on the outlet pipe be removed. It also recommends that if the structure is kept in place, it should be inspected by a geotechnical engineer. The Stormwater Plan calculations and recommended design of the conveyance and infiltration facilities assume that the height of the structure will be reduced and the orifice cap will be removed. The disposition of this structure is not the responsibility of Public Works. This memo does not review or authorize its construction or modification. APPEALS: Pursuant to r- + 70C,the applicant or any aggrieved party may appeal this final decision to Jefferson County Superior Court within twenty-o - ( fcalen•:r days of the •ate of issuance of this land use decision. For more information related to judical appeals see JCC 18.40. 0. '_ _• go -/ UD -Mlar MLA10-00385 2 of 2 1 t 1 T it Stormwater System Improvement Plan Hydrologic and Hydraulic Analysis For James and Marsha Eades Balsa Way, Port Townsend, Washington Client: James and Marsha Eades 2911 Sherman Street Port Townsend, WA 98368 Date: October 14, 2010 Location: Balsa Way Port Townsend, WA Prepared By: 4 Seasons Engineering, Inc. 619 South Chase Street Port Angeles, WA 98362 (360) 452-3023 >O.,N PARTC&` e ��s.PETE '�i ivri.fr/ Afr iktsSTI;1*tcS 8iP ON F� ?� St*-f FsS/ONA� NG • Y 4 Summary: Stormwater improvements to the street and residential lots at the east end of Balsa Way are proposed to ease intermittent flooding of newly constructed homes. During periods of late winter heavy rains,considerable stormwater passes through the yards of the newly constructed homes. Balsa Way and the associated residences were constructed beginning in 2006 in a previously platted,but undeveloped area. To improve the conveyance of stormwater around the homes,a new rock lined drainage swale, 12" culvert,and catch basins are proposed. The outflow of the new conveyance system will direct the stormwater to a shallow infiltration depression on the lot to the north. Our assessment of the existing conditions included review of topography,drainage patterns, soils, ground cover,and existing development using aerial photography,lidar topographic mapping, and on site observations,including soil test pits. The analysis and design of the stormwater improvements was done in accordance with the latest version of the Stormwater Management Manual for Western Washington. Drainage Basin Description: The proposed project is in the Glen Cove area south of Port Townsend, in Sections 16 and 21, Township 30 North,Range 1 West. The residential area at the end of Balsa Way is a moderately sloping area west of Highway 20, accessed from Louisa Street. The residential area was platted many years ago,but only recently developed by the Eades. The Eades family also owns the undeveloped property to the south, as well as a number of remaining undeveloped lots in the area. Average annual rainfall at this site is approximately 25 inches per year. The ground elevation at this location is approximately 250 feet above sea level. A natural drainage channel from the south previously dispersed overland onto the gently sloping area at the end of Balsa Way. The drainage is a small,forested valley on the edge of a gently sloping plateau. An earthen dam was constructed across the natural drainage channel in 2006. The earthen dam is about 7 feet high and topped with crushed roofing tiles. An 8 inch outlet pipe with a 2 inch diameter orifice drains the impounded area to the natural drainage below. The plateau to the south is undulating,very gently sloping and extends approximately 1/2 a mile before reaching the natural drainage divide. The plateau contains a mixture of forested and lightly developed rural properties just west of Highway 20. Undeveloped areas of the basin are forested with second growth fir,cedar, and alder,with grass,salal,and native ground cover. Many small depressions exist with signs of seasonal ponding and vegetation tolerant of hydric soil conditions. A small area of light industrial properties also drains into the natural drainage with a 24 inch concrete culvert across Highway 20. Soils of the plateau area,and the natural drainage channel are mapped mostly as Clallam gravelly sandy loam,according to the Soil Survey of Jefferson County. The Clallam soils 2 , typically consist of 20 to 40 inches of well drained soils over a slowly permeable cemented layer. Permeability would typically be moderate to the glacial till layer,but very slow through it, causing a shallow seasonal water table during the rainy season. A portion of the area, including the natural drainage is mapped as Hoypus gravelly loamy sand,but soil test pits confirmed the presence of compact till layers similar to Clallam soils. Soil test pits were dug in the area of the natural drainage channel just south of the Balsa Way neighborhood. The soils contained layers of sandy gravel over compact glacial till at a depth of about 5 feet. Below Balsa Way,the drainage naturally dispersed out onto a lower plateau of gently sloping sandy soils,where it appears to have naturally infiltrated. Overflow from the area would naturally have flowed toward a shallow ditch along the west side of Highway 20. The existing ditch does not have a well defined bed,indicating that the majority of runoff from the area naturally infiltrates into the sandy soils. The Soil Survey indicates that the area contains Dick loamy sand,which is typically very deep and somewhat excessively drained sand formed in glacial outwash. Permeability of these types of soils is typically rapid and the hazard of water erosion is slight to moderate. Soil test pits confirmed the presence of deep, sandy soils in the area. Two test pits were dug, confirming the presence medium fine sand down to depths of over 7 feet. Proposed Improvements: Intermittent flooding of the properties at the east end of Balsa Way in the past few winters, illustrated the need for a storm drainage system. The natural drainage channel has been altered by the grading and home construction. The roadway ditch along Balsa Way ends at the last ririxrcaxrav ixrith nit a enlvprt to heln maintain the natural drainage. Y � Stormwater controls could include preserving portions of the site, such as the natural drainage channel as native vegetation,and incorporating smaller stormwater retention areas throughout the development. Earthen dams over 6 feet high require a geotechnical design,are required to be keyed into the native ground,and compacted to proper specifications. The existing dam appears to be constructed of lightly compacted native earth and discarded roofing tiles without an adequate spillway. In the event of an overtopping storm,the earthen dam could fail and send a large surge of water down towards the residences below. We recommend that at a minimum,the orifice cap on the outlet pipe be removed and the vertical riser cut down to 4 feet above the pond bottom to restore the free flow of the natural drainage. Removal of the earthen dam or lowering the top to a maximum of 4 feet should also be considered. If kept in place,the earthen dam should be inspected by a geotechnical engineering expert to verify whether the construction is adequate for existing or future use as a stormwater impoundment. Hydrologic Modeling: The Western Washington Hydrology Model was used to model stormwater runoff and size the stormwater control measures. The predevelopment condition was analyzed based on soil and surface types from soil survey maps,aerial photography,and field verification. The computer model used a single basin with the attributes of the existing conditions with outflow to an infiltration swale area of wooded terrain. The infiltration swale was assumed to have an infiltration rate of 20 inches per hour,based on the soil survey and experience with similar sandy soils. Approximate dimensions of the predevelopment infiltration area are 140'wide by 300' long with a natural slope of 8%. The post development condition was modeled as a single basin with outflow to a constructed infiltration basin. The infiltration basin was modeled as a 3 foot deep trapezoidal pond with 2:1 side slopes and a total surface area of 1400 square feet. The proposed basin will be sculpted to appear more natural, but retain the modeled surface area. The existing impoundment on the Eades'property south of Balsa Way was also modeled using the Western Washington Hydrology Model. The predevelopment condition was analyzed for all area of the basin upstream of the impoundment in its existing state. The postdevelopment condition was analyzed for development of 7.3 acres of the Eades'property with 30% impervious and 70%lawn area. The impounded area was modeled as a trapezoidal pond with a total depth of 5 feet and 6:1 side slopes. The required surface area of the pond was approximately 35,000 square feet with a total volume of about 2 acre feet. Based on lidar contours of the natural drainage,the existing impoundment has approximately the same surface area. Exact layout and configuration of the future development could be significantly different from that assumed,and a stormwater plan addressing the specifics of the development will be required at the time. The impoundment also detains a significant amount of offsite runoff which is neither required or recommended. 4 r r A map of the predevelopment and postdevelopment basin areas with lidar topography and aerial photography from Jefferson County GIS is included in Appendix A. A spreadsheet of the predevelopment and postdevelopment basin sizes, surface conditions is included in appendix B. Results of the WWHM computer modeling are included in Appendix C. Stormwater Conveyance Analysis: Flow capacity of the proposed pipe and drainage swale was modeled in an Excel spreadsheet using the step backwater method based on maximum flow for the 25 year storm based on the WWHM model results. A 12 inch smooth wall corrugated polyethylene pipe is sufficient for conveyance of the stormwater. The spreadsheet is included in Appendix D. In addition, some minor changes to the home at the southeast end of Balsa Way are recommended. The grading around the back of the house aggravated the infrequent flooding and previously resulted in stormwater pouring through the foundation vents and accumulating in the lowest portion of the crawl space. We recommend that vent wells be added along the back of the house and that a drain pipe be installed from the lowest portion of the crawl space. Summary: The proposed stormwater improvements for the east end of Balsa Way are designed to restore the natural drainage disturbed by the recent grading and home construction. Analysis and sizing of the facility has been performed using the latest version of the Stormwater Management Manual for Western Washington and the Western Washington Hydrology Model. The proposed conveyance system is designed to protect the existing homes from infrequent flooding. The existing earthen dam and impoundment may be suitable for stormwater control of future development of the property south of Balsa Way. However, it does not appear to have been constructed according to current standards. We recommend that at a minimum,the orifice cap on the outlet pipe be removed at this time and the dam inspected by a geotechnical engineering expert. Maintaining the free flow of the natural drainage channel and providing separate stormwater controls for future development would be more appropriate. Extreme storms,uncontrolled development,or alteration of natural drainage patterns could exceed the capacity of the proposed stormwater conveyance system. In this event, stormwater would most likely back up and cause temporary flooding of the homes and yards of the homes in this area,as has happened previously. Care should therefore be taken to ensure that adequate stormwater detention facilities are constructed when approving development within the drainage basin. Diversion of additional areas to this drainage basin is not recommended. 5 Y Appendix A Basin Maps Y ' I J r .. j� i 1�• 9 11 M �w� � R y 4r f as •'' c . +w/ b CI j •"11.:-.4...•;` r 5 • MMYnM i'f ,i }'b°"':.., f.,y ..' f• 1 tt l • �w w,u , { a • I I y r; '2 J`7 .r s t ..*Pi' r ,r ' 1 f6 4kw, ...� �w . . ,. , tiles �.p ir..... � k F ....„.,..... :, ,. ,.„.„,,. Itc,,, 1: ''•'. ' . . • .. --"•••.- • ...'.-:-3:-..........; . ' a w j,. .• �,� 'l "1 •�,� lk.r_' r i r. t,Off::n � � r pig Ab� ' I- ri'' i. "r. . • , , • r. -.44.6.i,- '. .... „ ,,, , .... ...., a::.....,'' . " ... ;a �r. .i fir." .16%;,...:t..... .....4• d:11,9t ti7'T 'y7,'"' _ s. • L�. 'R•A..��. �•�h :t.•.. apy[•2� 5 7� �'iy4�,� �� ..1 1. e " .....:;.::75t O X54. ..'.t.":!t:1 4N i ', { EADS PROPERTY DATE: OC . : .f. 2010 DRAINAGE STUDY - SCALE:f=500' POS7DEVELOPMENT BASIN ON DRAWN BY JEP MAP�^ EN /NEER/NC. INC(380)452-3023 CHECKED: • � � yr r � �° - �'� Sa 4 t 'mod a ,a �"' 1�k + r '� a w t�. � 'j '�. d � k r,� ro w,-re,4 9 kw Appendix B Spreadsheet Summary of Basin Coverage Appendix C WWHM Results Western Washington Hydrology Model PROJECT REPORT Project Name: Eads#1 Site Address: Louisa City Port Townsend Report Date : 10/12/2010 Gage Port Angeles Data Start 1948/10/01 Data End 1993/09/30 Precip Scale: 0.51 WWHM3 Pro Version: PREDEVELOPED LAND USE Name Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Forest, Flat 56.6 C, Pasture, Flat 14.08 C, Lawn, Flat 1.19 C IMP DISP FLAT 7.84 Impervious Land Use Acres ROADS FLAT 0.51 Element Flows To: Surface Interflow Groundwater Channel 1, Channel 1, Name Channel 1 Bottom Length: 300ft. Bottom Width : 140ft. Manning's n : 0.05 Channel bottom slope 1: 0.08 To 1 Channel Left side slope 0: 1 To 1 Channel right side slope 2: 1 To 1 Infiltration On Infiltration rate : 20 Infiltration saftey factor : 0.5 Discharge Structure Riser Height: 0 ft. Riser Diameter: 0 in. Element Flows To: 4 Outlet 1 Outlet 2 Channel Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 0.000 0.964 0.000 0.000 0.000 0.006 0.964 0.005 0.206 9.722 0.011 0.964 0.011 0.653 9.722 0.017 0.964 0.016 1.283 9.722 0.022 0.965 0.021 2.073 9.722 0.028 0.965 0.027 3.006 9.722 0.033 0.965 0.032 4.074 9.722 0.039 0.965 0.038 5.267 9.722 0.044 0.965 0.043 6.580 9.722 0.050 0.965 0.048 8.007 9.722 0.056 0.965 0.054 9.544 9.722 0.061 0.965 0.059 11.19 9.722 0.067 0.965 0.064 12.93 9.722 0.072 0.965 0.070 14.78 9.722 0.078 0.965 0.075 16.72 9.722 0.083 0.965 0.080 18.76 9.722 0.089 0.965 0.086 20.89 9.722 0.094 0.966 0.091 23.11 9.722 0.100 0.966 0.096 25.42 9.722 0.106 0.966 0.102 27.82 9.722 0.111 0.966 0.107 30.30 9.722 0.117 0.966 0.113 32.86 9.722 0.122 0.966 0.118 35.51 9.722 0.128 0.966 0.123 38.24 9.722 0.133 0.966 0.129 41.05 9.722 0.139 0.966 0.134 43.94 9.722 0.144 0.966 0.139 46.91 9.722 0.150 0.966 0.145 49.96 9.722 0.156 0.966 0.150 53.08 9.722 0.161 0.966 0.156 56.28 9.722 0.167 0.967 0.161 59.55 9.722 0.172 0.967 0.166 62.89 9.722 0.178 0.967 0.172 66.31 9.722 0.183 0.967 0.177 69.80 9.722 0.189 0.967 0.182 73.36 9.722 0.194 0.967 0.188 76.99 9.722 0.200 0.967 0.193 80.69 9.722 0.206 0.967 0.198 84.46 9.722 0.211 0.967 0.204 88.29 9.722 0.217 0.967 0.209 92.20 9.722 0.222 0.967 0.215 96.17 9.722 0.228 0.967 0.220 100.2 9.722 0.233 0.968 0.225 104.3 9.722 0.239 0.968 0.231 108.5 9.722 0.244 0.968 0.236 112.7 9.722 0.250 0.968 0.241 117.0 9.722 0.256 0.968 0.247 121.4 9.722 0.261 0.968 0.252 125.8 9.722 0.267 0.968 0.258 130.3 9.722 0.272 0.968 0.263 134.9 9.722 J 0.278 0.968 0.268 139.5 9.722 0.283 0.968 0.274 144.2 9.722 0.289 0.968 0.279 148.9 9.722 0.294 0.968 0.285 153.7 9.722 0.300 0.968 0.290 158.6 9.722 0.306 0.969 0.295 163.5 9.722 0.311 0.969 0.301 168.5 9.722 0.317 0.969 0.306 173.5 9.722 0.322 0.969 0.311 178.6 9.722 0.328 0.969 0.317 183.8 9.722 0.333 0.969 0.322 189.0 9.722 0.339 0.969 0.328 194.3 9.722 0.344 0.969 0.333 199.6 9.722 0.350 0.969 0.338 205.0 9.722 0.356 0.969 0.344 210.5 9.722 0.361 0.969 0.349 216.0 9.722 0.367 0.969 0.354 221.5 9.722 0.372 0.970 0.360 227.1 9.722 0.378 0.970 0.365 232.8 9.722 0.383 0.970 0.371 238.6 9.722 0.389 0.970 0.376 244.3 9.722 0.394 0.970 0.381 250.2 9.722 0.400 0.970 0.387 256.1 9.722 0.406 0.970 0.392 262.0 9.722 0.411 0.970 0.398 268.0 9.722 0.417 0.970 0.403 274.1 9.722 0.422 0.970 0.408 280.2 9.722 0.428 0.970 0.414 286.4 9.722 0.433 0.970 0.419 292.6 9.722 0.439 0.970 0.425 298.9 9.722 0.444 0.971 0.430 305.2 9.722 0.450 0.971 0.435 311.6 9.722 0.456 0.971 0.441 318.0 9.722 0.461 0.971 0.446 324.5 9.722 0.467 0.971 0.452 331.1 9.722 0.472 0.971 0.457 337.7 9.722 0.478 0.971 0.462 344.3 9.722 0.483 0.971 0.468 351.0 9.722 0.489 0.971 0.473 357.8 9.722 0.494 0.971 0.478 364.6 9.722 0.500 0.971 0.484 371.4 9.722 0.506 0.971 0.489 378.3 9.722 Name Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Forest, Flat 56.6 C, Pasture, Flat 14.08 C, Lawn, Flat 1.19 C IMP DISP FLAT 7.84 Impervious Land Use Acres ROADS FLAT 0.51 l Element Flows To: Surface Interflow Groundwater Trapezoidal Pond 1, Trapezoidal Pond 1, Name Trapezoidal Pond 1 Bottom Length: 20ft. Bottom Width: 30ft. Depth : 3ft. Volume at riser head : 0.0262ft. Infiltration On Infiltration rate : 20 Infiltration saftey factor : 1 Wetted surface area On Side slope 1: 2 To 1 Side slope 2: 2 To 1 Side slope 3: 2 To 1 Side slope 4: 2 To 1 Discharge Structure Riser Height: 1.5 ft. Riser Diameter: 120 in. Element Flows To: Outlet 1 Outlet 2 Pond Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 0.000 0.014 0.000 0.000 0.000 0.033 0.014 0.000 0.000 0.281 0.067 0.014 0.001 0.000 0.285 0.100 0.014 0.001 0.000 0.288 0.133 0.014 0.002 0.000 0.292 0.167 0.015 0.002 0.000 0.295 0.200 0.015 0.003 0.000 0.299 0.233 0.015 0.003 0.000 0.302 0.267 0.015 0.004 0.000 0.306 0.300 0.015 0.004 0.000 0.310 0.333 0.015 0.005 0.000 0.313 0.367 0.016 0.005 0.000 0.317 0.400 0.016 0.006 0.000 0.321 0.433 0.016 0.006 0.000 0.324 0.467 0.016 0.007 0.000 0.328 0.500 0.016 0.007 0.000 0.332 0.533 0.016 0.008 0.000 0.335 0.567 0.016 0.009 0.000 0.339 0.600 0.017 0.009 0.000 0.343 0.633 0.017 0.010 0.000 0.347 0.667 0.017 0.010 0.000 0.350 0.700 0.017 0.011 0.000 0.354 4 0.733 0.017 0.011 0.000 0.358 0.767 0.018 0.012 0.000 0.362 0.800 0.018 0.013 0.000 0.366 0.833 0.018 0.013 0.000 0.370 0.867 0.018 0.014 0.000 0.374 0.900 0.018 0.014 0.000 0.378 0.933 0.018 0.015 0.000 0.382 0.967 0.019 0.016 0.000 0.386 1.000 0.019 0.016 0.000 0.390 1.033 0.019 0.017 0.000 0.394 1.067 0.019 0.017 0.000 0.398 1.100 0.019 0.018 0.000 0.402 1.133 0.019 0.019 0.000 0.406 1.167 0.020 0.019 0.000 0.410 1.200 0.020 0.020 0.000 0.414 1.233 0.020 0.021 0.000 0.418 1.267 0.020 0.021 0.000 0.422 1.300 0.020 0.022 0.000 0.426 1.333 0.021 0.023 0.000 0.431 1.367 0.021 0.023 0.000 0.435 1.400 0.021 0.024 0.000 0.439 1.433 0.021 0.025 0.000 0.443 1.467 0.021 0.026 0.000 0.447 1.500 0.021 0.026 0.000 0.452 1.533 0.022 0.027 0.593 0.456 1.567 0.022 0.028 1.676 0.460 1.600 0.022 0.028 3.080 0.465 1.633 0.022 0.029 4.742 0.469 1.667 0.022 0.030 6.627 0.473 1.700 0.023 0.031 8.711 0.478 1.733 0.023 0.031 10.98 0.482 1.767 0.023 0.032 13.41 0.487 1.800 0.023 0.033 16.00 0.491 1.833 0.023 0.034 18.74 0.495 1.867 0.024 0.035 21.62 0.500 1.900 0.024 0.035 24.64 0.504 1.933 0.024 0.036 27.78 0.509 1.967 0.024 0.037 31.05 0.513 2.000 0.024 0.038 34.43 0.518 2.033 0.025 0.039 37.93 0.523 2.067 0.025 0.039 41.54 0.527 2.100 0.025 0.040 45.26 0.532 2.133 0.025 0.041 49.09 0.536 2.167 0.025 0.042 53.01 0.541 2.200 0.026 0.043 57.04 0.546 2.233 0.026 0.044 61.16 0.550 2.267 0.026 0.044 65.38 0.555 2.300 0.026 0.045 69.69 0.560 2.333 0.026 0.046 74.09 0.564 2.367 0.027 0.047 78.58 0.569 2.400 0.027 0.048 83.15 0.574 2.433 0.027 0.049 87.82 0.579 2.467 0.027 0.050 92.56 0.584 2.500 0.028 0.051 97.39 0.588 2.533 0.028 0.052 102.3 0.593 2.567 0.028 0.053 107.3 0.598 2.600 0.028 0.053 112.4 0.603 2.633 0.028 0.054 117.5 0.608 2.667 0.029 0.055 122.7 0.613 2.700 0.029 0.056 128.0 0.618 2.733 0.029 0.057 133.4 0.623 2.767 0.029 0.058 138.8 0.628 2.800 0.030 0.059 144.4 0.633 2.833 0.030 0.060 149.9 0.638 2.867 0.030 0.061 155.6 0.643 2.900 0.030 0.062 161.3 0.648 2.933 0.030 0.063 167.1 0.653 2.967 0.031 0.064 173.0 0.658 3.000 0.031 0.065 178.9 0.663 3.033 0.031 0.066 184.9 0.668 MITIGATED LAND USE ANALYSIS RESULTS Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(ofs) 2 year 0.093558 5 year 0.162619 10 year 0.221111 25 year 0.311199 50 year 0.391136 100 year 0.482999 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.093558 5 year 0.162619 10 year 0.221111 25 year 0.311199 50 year 0.391136 100 year 0.482999 Yearly Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1950 0.092 0.092 1951 0.122 0.122 1952 0.093 0.093 1953 0.040 0.040 1954 0.073 0.073 1955 0.272 0.272 1956 0.176 0.176 1957 0.056 0.056 1958 0.088 0.088 1959 0.048 0.048 1960 0.148 0.148 1961 0.146 0.146 1962 0.144 0.144 1963 0.057 0.057 1964 0.060 0.060 4 1965 0.092 0.092 1966 0.055 0.055 1967 0.053 0.053 1968 0.164 0.164 1969 0.069 0.069 1970 0.052 0.052 1971 0.063 0.063 1972 0.250 0.250 1973 0.459 0.459 1974 0.084 0.084 1975 0.027 0.027 1976 0.079 0.079 1977 0.090 0.090 1978 0.042 0.042 1979 0.058 0.058 1980 0.105 0.105 1981 0.093 0.093 1982 0.108 0.108 1983 0.228 0.228 1984 0.127 0.127 1985 0.060 0.060 1986 0.218 0.218 1987 0.315 0.315 1988 0.136 0.136 1989 0.063 0.063 1990 0.067 0.067 1991 0.072 0.072 1992 0.316 0.316 1993 0.165 0.165 1994 0.046 0.046 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.4589 0.4589 2 0.3157 0.3157 3 0.3146 0.3146 4 0.2718 0.2718 5 0.2497 0.2497 6 0.2278 0.2278 7 0.2183 0.2183 8 0.1759 0.1759 9 0.1647 0.1647 10 0.1636 0.1636 11 0.1483 0.1483 12 0.1462 0.1462 13 0.1442 0.1442 14 0.1363 0.1363 15 0.1275 0.1275 16 0.1221 0.1221 17 0.1077 0.1077 18 0.1049 0.1049 19 0.0929 0.0929 20 0.0929 0.0929 21 0.0924 0.0924 22 0.0919 0.0919 23 0.0903 0.0903 • • • 24 0.0881 0.0881 25 0.0835 0.0835 26 0.0789 0.0789 27 0.0729 0.0729 28 0.0720 0.0720 29 0.0687 0.0687 30 0.0671 0.0671 31 0.0632 0.0632 32 0.0627 0.0627 33 0.0603 0.0603 34 0.0595 0.0595 35 0.0580 0.0580 36 0.0573 0.0573 37 0.0562 0.0562 38 0.0546 0.0546 39 0.0532 0.0532 40 0.0520 0.0520 41 0.0479 0.0479 42 0.0458 0.0458 43 0.0422 0.0422 44 0.0400 0.0400 45 0.0274 0.0274 POC #1 The Facility PASSED The Facility PASSED. Flow(CFS) Predev Dev Percentage Pass/Fail 0.0468 2179 2179 100 Pass 0.0503 1926 1926 100 Pass 0.0537 1755 1755 100 Pass 0.0572 1538 1538 100 Pass 0.0607 1426 1426 100 Pass 0.0642 1272 1272 100 Pass 0.0676 1183 1183 100 Pass 0.0711 1062 1062 100 Pass 0.0746 987 987 100 Pass 0.0781 903 903 100 Pass 0.0816 846 846 100 Pass 0.0850 781 781 100 Pass 0.0885 736 736 100 Pass 0.0920 685 685 100 Pass 0.0955 626 626 100 Pass 0.0990 597 597 100 Pass 0.1024 543 543 100 Pass 0.1059 509 509 100 Pass 0.1094 474 474 100 Pass 0.1129 440 440 100 Pass 0.1163 407 407 100 Pass 0.1198 387 387 100 Pass 0.1233 356 356 100 Pass 0.1268 336 336 100 Pass 0.1303 310 310 100 Pass 0.1337 292 292 100 Pass 0.1372 275 275 100 Pass 0.1407 262 262 100 Pass 0.1442 239 239 100 Pass 0.1477 226 226 100 Pass 0.1511 213 213 100 Pass 0.1546 200 200 100 Pass 0.1581 188 188 100 Pass 0.1616 180 180 100 Pass 0.1650 165 165 100 Pass 0.1685 156 156 100 Pass 0.1720 149 149 100 Pass 0.1755 145 145 100 Pass 0.1790 134 134 100 Pass 0.1824 127 127 100 Pass 0.1859 122 122 100 Pass 0.1894 112 112 100 Pass 0.1929 105 105 100 Pass 0.1963 100 100 100 Pass 0.1998 95 95 100 Pass 0.2033 88 88 100 Pass 0.2068 84 84 100 Pass 0.2103 80 80 100 Pass 0.2137 76 76 100 Pass 0.2172 72 72 100 Pass 0.2207 70 70 100 Pass 0.2242 66 66 100 Pass 0.2277 65 65 100 Pass 0.2311 58 58 100 Pass 0.2346 57 57 100 Pass 0.2381 54 54 100 Pass 0.2416 54 54 100 Pass 0.2450 50 50 100 Pass 0.2485 48 48 100 Pass 0.2520 44 44 100 Pass 0.2555 43 43 100 Pass 0.2590 41 41 100 Pass 0.2624 38 38 100 Pass 0.2659 36 36 100 Pass 0.2694 33 33 100 Pass 0.2729 31 31 100 Pass 0.2764 29 29 100 Pass 0.2798 29 29 100 Pass 0.2833 28 28 100 Pass 0.2868 26 26 100 Pass 0.2903 26 26 100 Pass 0.2937 25 25 100 Pass 0.2972 23 23 100 Pass 0.3007 22 22 100 Pass 0.3042 18 18 100 Pass 0.3077 15 15 100 Pass 0.3111 12 12 100 Pass 0.3146 12 12 100 Pass 0.3181 9 9 100 Pass 0.3216 9 9 100 Pass 0.3250 9 9 100 Pass 0.3285 8 8 100 Pass 0.3320 8 8 100 Pass 0.3355 8 8 100 Pass , 0.3390 7 7 100 Pass 0.3424 7 7 100 Pass 0.3459 7 , 7 100 Pass 0.3494 6 6 100 Pass 0.3529 6 6 100 Pass 0.3564 6 6 100 Pass 0.3598 5 5 100 Pass 0.3633 5 5 100 Pass 0.3668 5 5 100 Pass 0.3703 5 5 100 Pass 0.3737 4 4 100 Pass 0.3772 4 4 100 Pass 0.3807 4 4 100 Pass 0.3842 4 4 100 Pass 0.3877 4 4 100 Pass 0.3911 3 3 100 Pass Water Quality BMP Flow and Volume for POC 1. On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Flow Frequency Return Periods for Predeveloped. POC #2 Return Period Flow(cfs) 2 year 0.001933 5 year 0.00336 10 year 0.004569 25 year 0.006431 50 year 0.008083 100 year 0.009982 Flow Frequency Return Periods for Mitigated. POC #2 Return Period Flow(cfs) 2 year 0.147631 5 year 0.553317 10 year 1.153138 25 year 2.609799 50 year 4.507139 100 year 7.462057 Yearly Peaks for Predeveloped and Mitigated. POC #2 Year Predeveloped Mitigated 1950 0.002 0.000 1951 0.003 0.000 1952 0.002 0.000 1953 0.001 0.000 1954 0.002 0.000 1955 0.006 0.000 1956 0.004 0.000 1957 0.001 0.000 1958 0.002 0.000 1959 0.001 0.000 1960 0.003 0.000 1961 0.003 0.000 1962 0.003 0.000 1963 0.001 0.000 1964 0.001 0.000 1965 0.002 0.000 1966 0.001 0.000 1967 0.001 0.000 I 1968 0.003 0.000 1969 0.001 0.000 1970 0.001 0.000 1971 0.001 0.000 1972 0.005 0.000 1973 0.010 0.000 1974 0.002 0.000 1975 0.001 0.000 1976 0.002 0.000 1977 0.002 0.000 1978 0.001 0.000 1979 0.001 0.000 1980 0.002 0.000 1981 0.002 0.000 1982 0.002 0.000 1983 0.005 0.000 1984 0.003 0.000 1985 0.001 0.000 1986 0.005 0.000 1987 0.006 0.000 1988 0.003 0.000 1989 0.001 0.000 1990 0.001 0.000 1991 0.001 0.000 1992 0.007 0.000 1993 0.003 0.000 1994 0.001 0.000 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #2 Rank Predeveloped Mitigated 1 0.0095 0.0000 2 0.0065 0.0000 3 0.0065 0.0000 4 0.0057 0.0000 5 0.0051 0.0000 6 0.0047 0.0000 7 0.0045 0.0000 8 0.0036 0.0000 9 0.0034 0.0000 10 0.0034 0.0000 11 0.0031 0.0000 12 0.0030 0.0000 13 0.0030 0.0000 14 0.0028 0.0000 15 0.0026 0.0000 16 0.0025 0.0000 17 0.0022 0.0000 18 0.0022 0.0000 19 0.0019 0.0000 20 0.0019 0.0000 21 0.0019 0.0000 22 0.0019 0.0000 23 0.0019 0.0000 24 0.0018 0.0000 25 0.0017 0.0000 26 0.0016 0.0000 27 0.0015 0.0000 28 0.0015 0.0000 29 0.0014 0.0000 30 0.0014 0.0000 31 0.0013 0.0000 32 0.0013 0.0000 33 0.0012 0.0000 34 0.0012 0.0000 35 0.0012 0.0000 36 0.0012 0.0000 37 0.0012 0.0000 38 0.0011 0.0000 39 0.0011 0.0000 40 0.0011 0.0000 . 1 4 41 0.0010 0.0000 42 0.0009 0.0000 43 0.0009 0.0000 44 0.0008 0.0000 45 0.0006 0.0000 POC #2 The Facility PASSED The Facility PASSED. Flow(CFS) Predev Dev Percentage Pass/Fail 0.0010 2135 0 0 Pass 0.0010 1918 0 0 Pass 0.0011 1722 0 0 Pass 0.0012 1543 0 0 Pass 0.0013 1404 0 0 Pass 0.0013 1272 0 0 Pass 0.0014 1170 0 0 Pass 0.0015 1063 0 0 Pass 0.0015 980 0 0 Pass 0.0016 899 0 0 Pass 0.0017 840 0 0 Pass 0.0018 788 0 0 Pass 0.0018 727 0 0 Pass 0.0019 674 0 0 Pass 0.0020 629 0 0 Pass 0.0020 587 0 0 Pass 0.0021 544 0 0 Pass 0.0022 505 0 0 Pass 0.0023 473 0 0 Pass 0.0023 437 0 0 Pass 0.0024 408 0 0 Pass 0.0025 382 0 0 Pass 0.0025 353 0 0 Pass 0.0026 335 0 0 Pass 0.0027 311 0 0 Pass 0.0028 293 0 0 Pass 0.0028 274 0 0 Pass 0.0029 260 0 0 Pass 0.0030 239 0 0 Pass 0.0031 224 0 0 Pass 0.0031 212 0 0 Pass 0.0032 200 0 0 Pass 0.0033 191 0 0 Pass 0.0033 179 0 0 Pass 0.0034 165 0 0 Pass 0.0035 157 0 0 Pass 0.0036 149 0 0 Pass 0.0036 143 0 0 Pass 0.0037 132 0 0 Pass 0.0038 127 0 0 Pass 0.0038 120 0 0 Pass 0.0039 112 0 0 Pass 0.0040 104 0 0 Pass 0.0041 101 0 0 Pass 0.0041 93 0 0 Pass 4 0.0042 89 0 0 Pass 0.0043 83 0 0 Pass 0.0043 80 0 0 Pass 0.0044 76 0 0 Pass 0.0045 71 0 0 Pass 0.0046 70 0 0 Pass 0.0046 68 0 0 Pass 0.0047 63 0 0 Pass 0.0048 59 0 0 Pass 0.0048 57 0 0 Pass 0.0049 55 0 0 Pass 0.0050 53 0 0 Pass 0.0051 50 0 0 Pass 0.0051 47 0 0 Pass 0.0052 46 0 0 Pass 0.0053 43 0 0 Pass 0.0054 40 0 0 Pass 0.0054 38 0 0 Pass 0.0055 35 0 0 Pass 0.0056 33 0 0 Pass 0.0056 32 0 0 Pass 0.0057 29 0 0 Pass 0.0058 29 0 0 Pass 0.0059 29 0 0 Pass 0.0059 26 0 0 Pass 0.0060 25 0 0 Pass 0.0061 25 0 0 Pass 0.0061 24 0 0 Pass 0.0062 22 0 0 Pass 0.0063 19 0 0 Pass 0.0064 14 0 0 Pass 0.0064 13 0 0 Pass 0.0065 11 0 0 Pass 0.0066 10 0 0 Pass 0.0066 9 0 0 Pass 0.0067 9 0 0 Pass 0.0068 8 0 0 Pass I 0.0069 8 0 0 Pass 0.0069 8 0 0 Pass 0.0070 7 0 0 Pass 0.0071 7 0 0 Pass 0.0071 7 0 0 Pass 0.0072 6 0 0 Pass 0.0073 6 0 0 Pass 0.0074 6 0 0 Pass 0.0074 6 0 0 Pass 0.0075 5 0 0 Pass 0.0076 5 0 0 Pass 0.0077 5 0 0 Pass 0.0077 4 0 0 Pass 0.0078 4 0 0 Pass 0.0079 4 0 0 Pass 0.0079 4 0 0 Pass 0.0080 4 0 0 Pass 0.0081 3 0 0 Pass • f 4 Water Quality BMP Flow and Volume for POC 2. On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. This program and accompanying documentation is provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such damages. J J Western Washington Hydrology Model PROJECT REPORT Project Name: Eads#2 Site Address: City Report Date : 10/12/2010 Gage Port Angeles Data Start 1948/10/01 Data End 1993/09/30 Precip Scale: 0.51 WWHM3 Pro Version: PREDEVELOPED LAND USE Name : Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Forest, Flat 55 C, Pasture, Flat 13.8 C IMP DISP FLAT 7.56 Impervious Land Use Acres Element Flows To: Surface Interflow Groundwater Name Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Pasture, Flat 13.8 C, Forest, Flat 47.66 C IMP DISP FLAT 7.56 Impervious Land Use Acres Element Flows To: Surface Interflow Groundwater Trapezoidal Pond 1, Trapezoidal Pond 1, Name Basin 2 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 5.14 Impervious Land Use Acres ROADS FLAT 2.2 Element Flows To: Surface Interflow Groundwater Trapezoidal Pond 1, Trapezoidal Pond 1, Name Trapezoidal Pond 1 Bottom Length: 260.380669797252ft. Bottom Width: 52.0761339594505ft. Depth : 5ft. Volume at riser head : 2.0438ft. Side slope 1: 6 To 1 Side slope 2: 6 To 1 Side slope 3: 6 To 1 Side slope 4: 6 To 1 Discharge Structure Riser Height: 4 ft. Riser Diameter: 8 in. Orifice 1 Diameter: 0.59 in. Elevation: 0 ft. Orifice 1 Diameter: 2.09 in. Elevation: 2.668 ft. Orifice 1 Diameter: 1.26 in. Elevation: 3 ft. Element Flows To: Outlet 1 Outlet 2 Pond Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 0.000 0.311 0.000 0.000 0.000 0.056 0.316 0.017 0.002 0.000 0.111 0.321 0.035 0.003 0.000 0.167 0.326 0.053 0.004 0.000 0.222 0.331 0.071 0.004 0.000 0.278 0.335 0.090 0.005 0.000 0.333 0.340 0.109 0.005 0.000 0.389 0.345 0.128 0.006 0.000 0.444 0.350 0.147 0.006 0.000 0.500 0.355 0.167 0.006 0.000 1 4 0.556 0.360 0.186 0.007 0.000 0.611 0.365 0.207 0.007 0.000 0.667 0.370 0.227 0.007 0.000 0.722 0.375 0.248 0.008 0.000 0.778 0.380 0.269 0.008 0.000 0.833 0.385 p.290 0.008 0.000 0.889 0.390 '41411 .311 0.009 0.000 0.944 0.396 0.333 0.009 0.000 1.000 0.401 0.355 0.009 0.000 1.056 0.406 0.378 0.009 0.000 1.111 0.411 0.401 0.010 0.000 1.167 0.416 0.423 0.010 0.000 1.222 0.421 0.447 0.010 0.000 1.278 0.427 0.470 0.010 0.000 1.333 0.432 0.494 0.011 0.000 1.389 0.437 0.518 0.011 0.000 1.444 0.443 0.543 0.011 0.000 1.500 0.448 0.567 0.011 0.000 1.556 0.453 0.593 0.011 0.000 1.611 0.459 0.618 0.012 0.000 1.667 0.464 0.643 0.012 0.000 1.722 0.469 0.669 0.012 0.000 1.778 0.475 0.696 0.012 0.000 1.833 0.480 0.722 0.012 0.000 1.889 0.486 0.749 0.013 0.000 1.944 0.491 0.776 0.013 0.000 2.000 0.497 0.804 0.013 0.000 2.056 0.502 0.831 0.013 0.000 2.111 0.508 0.859 0.013 0.000 2.167 0.513 0.888 0.013 0.000 2.222 0.519 0.916 0.014 0.000 2.278 0.524 0.945 0.014 0.000 2.333 0.530 0.975 0.014 0.000 2.389 0.536 1.004 0.014 0.000 2.444 0.541 1.034 0.014 0.000 2.500 0.547 1.064 0.014 0.000 2.556 0.553 1.095 0.015 0.000 2.611 0.559 1.126 0.015 0.000 2.667 0.564 1.157 0.015 0.000 2.722 0.570 1.189 0.042 0.000 2.778 0.576 1.220 0.053 0.000 2.833 0.582 1.253 0.062 0.000 2.889 0.588 1.285 0.069 0.000 2.944 0.593 1.318 0.076 0.000 3.000 0.599 1.351 0.082 0.000 3.056 0.605 1.384 0.097 0.000 3.111 0.611 1.418 0.106 0.000 3.167 0.617 1.452 0.114 0.000 3.222 0.623 1.487 0.121 0.000 3.278 0.629 1.522 0.128 0.000 3.333 0.635 1.557 0.134 0.000 3.389 0.641 1.592 0.140 0.000 3.444 0.647 1.628 0.146 0.000 3.500 0.653 1.664 0.151 0.000 3.556 0.659 1.700 0.156 0.000 3.611 0.665 1.737 0.161 0.000 3.667 0.671 1.774 0.166 0.000 t it 3.722 0.677 1.812 0.171 0.000 3.778 0.684 1.850 0.175 0.000 3.833 0.690 1.888 0.180 0.000 3.889 0.696 1.926 0.184 0.000 3.944 0.702 1.965 0.188 0.000 4.000 0.708 2.004 0.192 0.000 4.056 0.715 2.044 0.281 0.000 4.111 0.721 2.084 0.441 0.000 4.167 0.727 2.124 0.646 0.000 4.222 0.734 2.165 0.888 0.000 4.278 0.740 2.205 1.162 0.000 4.333 0.746 2.247 1.465 0.000 4.389 0.753 2.288 1.793 0.000 4.444 0.759 2.330 2.146 0.000 4.500 0.766 2.373 2.521 0.000 4.556 0.772 2.415 2.918 0.000 4.611 0.778 2.459 3.334 0.000 4.667 0.785 2.502 3.770 0.000 4.722 0.791 2.546 4.224 0.000 4.778 0.798 2.590 4.696 0.000 4.833 0.805 2.634 5.185 0.000 4.889 0.811 2.679 5.690 0.000 4.944 0.818 2.725 6.211 0.000 5.000 0.824 2.770 6.747 0.000 5.056 0.831 2.816 7.299 0.000 MITIGATED LAND USE ANALYSIS RESULTS Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.0293 5 year 0.087975 10 year 0.156299 25 year 0.288487 50 year 0.428616 100 year 0.611969 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.011742 5 year 0.024899 10 year 0.039071 25 year 0.066103 50 year 0.095242 100 year 0.134608 Yearly Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1950 0.021 0.010 1951 0.082 0.014 1952 0.041 0.013 S 1953 0.008 0.006 1954 0.011 0.009 1955 0.232 0.133 1956 0.095 0.011 1957 0.023 0.010 1958 0.043 0.009 1959 0.006 0.007 1960 0.081 0.011 1961 0.088 0.012 1962 0.093 0.013 1963 0.009 0.006 1964 0.012 0.008 1965 0.025 0.013 1966 0.013 0.010 1967 0.015 0.009 1968 0.107 0.014 1969 0.017 0.007 1970 0.004 0.008 1971 0.006 0.006 1972 0.124 0.010 1973 0.363 0.109 1974 0.020 0.010 1975 0.007 0.009 1976 0.017 0.010 1977 0.019 0.010 1978 0.004 0.008 1979 0.003 0.006 1980 0.004 0.007 1981 0.063 0.037 1982 0.039 0.013 1983 0.144 0.106 1984 0.065 0.013 1985 0.013 0.008 1986 0.099 0.013 1987 0.250 0.084 1988 0.078 0.012 1989 0.014 0.010 1990 0.023 0.009 1991 0.044 0.012 1992 0.268 0.121 1993 0.108 0.014 1994 0.005 0.006 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.3633 0.1328 2 0.2681 0.1212 3 0.2497 0.1092 4 0.2323 0.1064 5 0.1443 0.0837 6 0.1238 0.0371 7 0.1077 0.0141 8 0.1074 0.0140 9 0.0995 0.0140 10 0.0945 0.0133 11 0.0927 0.0131 s 12 0.0881 0.0130 13 0.0824 0.0129 14 0.0814 0.0126 15 0.0777 0.0125 16 0.0651 0.0120 17 0.0627 0.0118 18 0.0440 0.0115 19 0.0433 0.0115 20 0.0408 0.0114 21 0.0392 0.0104 22 0.0246 0.0102 23 0.0232 0.0101 24 0.0226 0.0101 25 0.0207 0.0099 26 0.0201 0.0098 27 0.0192 0.0098 28 0.0167 0.0096 29 0.0166 0.0093 30 0.0153 0.0093 31 0.0141 0.0091 32 0.0132 0.0087 33 0.0129 0.0085 34 0.0119 0.0081 35 0.0113 0.0079 36 0.0087 0.0078 37 0.0077 0.0077 38 0.0067 0.0074 39 0.0061 0.0074 40 0.0055 0.0073 41 0.0053 0.0063 42 0.0041 0.0060 43 0.0038 0.0059 44 0.0036 0.0058 45 0.0029 0.0057 POC #1 The Facility PASSED The Facility PASSED. Flow(CFS) Predev Dev Percentage Pass/Fail 0.0147 5057 4887 96 Pass 0.0188 4024 1909 47 Pass 0.0230 3221 1818 56 Pass 0.0272 2777 1728 62 Pass 0.0314 2413 1651 68 Pass 0.0356 2113 1578 74 Pass 0.0397 1828 1517 82 Pass 0.0439 1591 1467 92 Pass 0.0481 1340 1353 100 Pass 0.0523 1183 1257 106 Pass 0.0565 1048 1140 108 Pass 0.0606 936 998 106 Pass 0.0648 835 896 107 Pass 0.0690 745 780 104 Pass 0.0732 675 656 97 Pass 0. 0.0774 620 556 89 Pass 0.0816 560 428 76 Pass 0.0857 510 351 68 Pass 0.0899 461 319 69 Pass 0.0941 415 292 70 Pass 0.0983 384 264 68 Pass 0.1025 351 219 62 Pass 0.1066 319 172 53 Pass 0.1108 295 113 38 Pass 0.1150 268 95 35 Pass 0.1192 248 78 31 Pass 0.1234 230 52 22 Pass 0.1275 216 39 18 Pass 0.1317 203 13 6 Pass 0.1359 192 0 0 Pass 0.1401 177 0 0 Pass 0.1443 165 0 0 Pass 0.1485 151 0 0 Pass 0.1526 139 0 0 Pass 0.1568 129 0 0 Pass 0.1610 115 0 0 Pass 0.1652 105 0 0 Pass 0.1694 94 0 0 Pass 0.1735 87 0 0 Pass 0.1777 83 0 0 Pass 0.1819 79 0 0 Pass 0.1861 72 0 0 Pass 0.1903 70 0 0 Pass 0.1945 66 0 0 Pass 0.1986 62 0 0 Pass 0.2028 60 0 0 Pass 0.2070 57 0 0 Pass 0.2112 54 0 0 Pass 0.2154 50 0 0 Pass 0.2195 48 0 0 Pass 0.2237 45 0 0 Pass 0.2279 41 0 0 Pass 0.2321 37 0 0 Pass 0.2363 34 0 0 Pass 0.2404 30 0 0 Pass 0.2446 26 0 0 Pass 0.2488 22 0 0 Pass 0.2530 21 0 0 Pass 0.2572 19 0 0 Pass 0.2614 18 0 0 Pass 0.2655 15 0 0 Pass 0.2697 13 0 0 Pass 0.2739 12 0 0 Pass 0.2781 11 0 0 Pass 0.2823 11 0 0 Pass 0.2864 10 0 0 Pass 0.2906 10 0 0 Pass 0.2948 10 0 0 Pass 0.2990 9 0 0 Pass 0.3032 8 0 0 Pass 0.3074 8 0 0 Pass 0.3115 8 0 0 Pass 0.3157 7 0 0 Pass 0.3199 7 0 0 Pass 0.3241 6 0 0 Pass 0.3283 6 0 0 Pass 0.3324 5 0 0 Pass 0.3366 4 0 0 Pass 0.3408 4 0 0 Pass 0.3450 3 0 0 Pass 0.3492 3 0 0 Pass 0.3533 2 0 0 Pass 0.3575 2 0 0 Pass 0.3617 2 0 0 Pass 0.3659 0 0 0 Pass 0.3701 0 0 0 Pass 0.3743 0 0 0 Pass 0.3784 0 0 0 Pass 0.3826 0 0 0 Pass 0.3868 0 0 0 Pass 0.3910 0 0 0 Pass 0.3952 0 0 0 Pass 0.3993 0 0 0 Pass 0.4035 0 0 0 Pass 0.4077 0 0 0 Pass 0.4119 0 0 0 Pass 0.4161 0 0 0 Pass 0.4203 0 0 0 Pass 0.4244 0 0 0 Pass 0.4286 0 0 0 Pass Water Quality SMP Flow and Volume for POC 1. On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. This program and accompanying documentation is provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. in no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such damages. 1 1 1 � Appendix D Hydraulic Analysis of Pipe and Swale 0 . t g 0000d lign;g; pp Gp pp qq O O O g O iy • 0 Op M b 1s�00000 �oo $ate o°ao — —— y�ynnnnS 0000 da�yy v(N(V�i N fe�yy N N N N. ' 5 dow c �y O 1 1 v N N N N N V leas O O O O i `o T CD 2udoa e- S 1 pp�nnnnn U 0o000 - � & $ v v a . . - - o 11,A.9.202; c ta Cl. 2 ,ANN N J 1 d T l53s000 �s a 1p� U a gPN _ l« aN m v m N 1 �nnnnn C �000do > i --- — '--- — ill nea cnMn Qj p �' 0$0000ci , N as S ipaiat 1 i_N \ -,KOO I , i . ra000d 1 0111 All� a cn v. sv tgel8vg g,ED im!!!! fill 0 0 0 0 v N N N N 2."40vw, 1014,6 tig"ABM I . . . Appendix E Soil Logs SOIL LOGS Site: Eades Property/S end of Louisa ID#TP#1 Location: Drainage Channel,20'S of PL Elevation: 240+- Date: 10/5/2010 Client: James and Marsha Eades Method: Mini Excavator Observations by: JEP/JSP Cat 303C Soil Description Depth Notes: 0 Reddish Brown Sandy Loam w/organics 10" Compact reddish brown sandy gravel 24" Reddish brown sandy gravel w/mottling 36" Roots to 36" Saturated gravelly sand-gray 50" Fine sand,grey,compact 52" Compact glacial till h2o at 58" 60" Bottom of hole Site: Eades Property/S end of Louisa ID#TP#2 Location: Drainage Channel,80'S of PL Elevation: 240+- Date: 10/5/2010 Client: James and Marsha Eades Method: Mini Excavator Observations by: JEP/JSP Cat 303C Soil Description Depth Notes: 0 Fine sandy loam with organics 12" Reddish brown sandy gravel 28" Gravelly sand w/cobbles,mottled 46" h2o flowing in from side at 46" Compact glacial till 62" standing h2o in pit at 54" Site: E end of Charles ID#TP#3 Location: N side Elevation: 220+- Date: 10/5/2010 Client: James and Marsha Eades Method: Mini Excavator Observations by: JEP/JSP Cat 303C Soil Description Depth Notes: 0 Medium Fine Sand Roots to 3 ft. 7 ft. Site: E end of Charles ID#TP#4 Location: S side Elevation: 220+- Date: 10/5/2010 Client: James and Marsha Eades Method: Mini Excavator Observations by: JEP/JSP Cat 303C Soil Description Depth Notes: 0 Medium Fine Sand Roots to 2 ft. 7ft. 4SEASONS ENGINEERING, INC (360) I Y4.. 619 S. Chase Street'• Port Angels, WA 98362 October 22.201 0 .lames Pearson Jefh istn County Department of Public Works A.O. f3ox 2070 Port Townsend, WA 9836 Re: Stormwater Improvement Plan tier James 8e Marsha Eades Mr. Pearson. Thank yoga for contacting me With your questions about the Stotmnwater Improvement Plan for James and Marsha FA4des. In our phone conversation,you expressed concern about the infiltration tate used in our design of ttte infiltration basin at the end of the stormwater conveyance system. The proposed stormwater conveyance system preserves the natural drainage pattern and dischar acs into a forested area underlain by sandy soils,which slopes toward the state highway. The infiltration basin was designed to restore infiltration capacity lost when the natural drainage pattern was altered. I have reviewed the infiltration rate used,and the computer modeling of the stormwater routine and infiltration design. The soils observed daring our site investigation of the infiltration area were very uniform, homogenous sand,which will likely have a much higher infiltration rate than that assumed by the textural analysis guidelines of the Storrmvater Management Manual for Western Washington. Unfortunately,a Pilot Infiltration Test, as described in Volume III - Appendix I7 of the manual, is cost prohibitive for a project of this size. The Soil Survey of Jefferson, County Area. Washington cites an infiltration rate of 6.0 to 20.0 inches per hour for soils in. this area. In my professional judgment,an infiltration rat'of 8 inches per hour as recommended in Table 3.7 in the manual,with the minimum recommended reduction factor of 0.5 is a very conservative estimate for the soils and the application of this project. ject. Results of the computer modeling with the revised infiltration rue indicate that an infiltration basin with a surface area of 2500 square feet is sufficient. I have revised our report_the computer model,and plan sheets. Please review the amended report and plans and contact me if von have any further questions or concerns. Sincerely, Jo Pup,* APPROVED STORMWATER PLAN \\\ OCT 2 6 2010 John E. Patch, P.E. cc: Lades,the '°6, ts►i. �c, 10NAO. - JEF • 1044 • DEPT.OF r 4TY DE • _ SIGNAT RA i1;♦�i��_//� StormW•t-r�' ' • Requlyd��l - `:TO Nv - r 1, ,, -:... , . Lle.ite",i 1,; .! ' " .,: , !':1 To";rt . . ` ' Stormwater System improvement Plan Hydrologic and Hydraulic Analysis For James and Marsha Fades Balsa Way, Port Townsend, Washington Client: James and Marsha Eades 2911 Sherman Street Port T'owr:send, WA 98368 APPROVED STORMWATER PL N Amended: October 21, 2010 OCT 2 6 2010 Location: Balsa Way li U NT' 7� JEF E' El0'1 �I Tt34VTlSeI26, f�l DEPTOf C�� I� �/ � i%� stirov R i��. - Prepared By: 4 Seasons Engineering. Inc. 619 South Chase Street Port Angeles, WA 98362 ) StOrrnV4 f' .360 452-3023 � o Requi r:d ,1, , trk„, ..2:2,.........4i.4., „ . r � *. le r 'rd 1 �F I ,t I I t 7 Summary: Stormwater improvements to the street and residential lots at the east end of Balsa Way are proposed to ease intermittent flooding of newly constructed homes. During periods of late winter heavy rains, considerable stormwater passes through the yards of the newly constructed homes. Balsa Way and the associated residences were constructed beginning in 2006 in a previously platted,but undeveloped area. To improve the conveyance of stormwater around the homes, a new rock lined drainage swale, 12" culvert, and catch basins are proposed. The outflow of the new conveyance system will direct the stormwater to a shallow infiltration depression on the lot to the north. Our assessment of the existing conditions included review of topography, drainage patterns, soils, ground cover, and existing development using aerial photography, lidar topographic mapping, and on site observations, including soil test pits. The analysis and design of the stormwater improvements was done in accordance with the latest version of the Stormwater Management Manual for Western Washington. Drainage Basin Description: The proposed project is in the Glen Cove area south of Port Townsend, in Sections 16 and 21, Township 30 North, Range 1 West. The residential area at the end of Balsa Way is a moderately sloping area west of Highway 20, accessed from Louisa Street. The residential area was platted many years ago,but only recently developed by the Eades. The Eades family also owns the undeveloped property to the south, as well as a number of remaining undeveloped lots in the area. Average annual rainfall at this site is approximately 25 inches per year. The ground elevation at this location is approximately 250 feet above sea level. A natural drainage channel from the south previously dispersed overland onto the gently sloping area at the end of Balsa Way. The drainage is a small, forested valley on the edge of a gently sloping plateau. An earthen dam was constructed across the natural drainage channel in 2006. The earthen dam is about 7 feet high and topped with crushed roofing tiles. An 8 inch outlet pipe with a 2 inch diameter orifice drains the impounded area to the natural drainage below. The plateau to the south is undulating,very gently sloping and extends approximately'A a mile before reaching the natural drainage divide. The plateau contains a mixture of forested and lightly developed rural properties just west of Highway 20. Undeveloped areas of the basin are forested with second growth fir, cedar, and alder,with grass, salal, and native ground cover. Many small depressions exist with signs of seasonal ponding and vegetation tolerant of hydric soil conditions. A small area of light industrial properties also drains into the natural drainage with a 24 inch concrete culvert across Highway 20. Soils of the plateau area, and the natural drainage channel are mapped mostly as Clallam gravelly sandy loam, according to the Soil Survey of Jefferson County. The Clallam soils typically consist of 20 to 40 inches of well drained soils over a slowly permeable cemented layer. Permeability would typically be moderate to the glacial till layer,but very slow 2 through it, causing a shallow seasonal water table during the rainy season. A portion of the area, including the natural drainage is mapped as Hoypus gravelly loamy sand,but soil test pits confirmed the presence of compact till layers similar to Clallam soils. Soil test pits were dug in the area of the natural drainage channel just south of the Balsa Way neighborhood. The soils contained layers of sandy gravel over compact glacial till at a depth of about 5 feet. Below Balsa Way, the drainage naturally dispersed out onto a lower plateau of gently sloping sandy soils, where it appears to have naturally infiltrated. Overflow from the area would naturally have flowed toward a shallow ditch along the west side of Highway 20. The existing ditch does not have a well defined bed, indicating that the majority of runoff from the area naturally infiltrates into the sandy soils. The Soil Survey indicates that the area contains Dick loamy sand,which is typically very deep and somewhat excessively drained sand formed in glacial outwash. Permeability of these types of soils is typically rapid and the hazard of water erosion is slight to moderate. Soil test pits confirmed the presence of deep, sandy soils in the area. Two test pits were dug, confirming the presence medium fine sand down to depths of over 7 feet. Proposed Improvements: Intermittent flooding of the properties at the east end of Balsa Way in the past few winters, illustrated the need for a storm drainage system. The natural drainage channel has been altered by the grading and home construction. The roadway ditch along Balsa Way ends at the last driveway with out a culvert to help maintain the natural drainage. A new drainage system with a mixture of rock lined drainage swales and 12 inch culverts is proposed to direct the natural drainage around the existing homes and yards. The storm drain system will daylight to a shallow infiltration basin a block to the north, on a residential lot also owned by the Eades. Any overflow from the infiltration basin will be directed overland toward the natural drainage,which leads toward the highway. In addition,to the proposed storm drainage improvements, the existing impoundment of the natural drainage channel was analyzed. The property which contains the dammed impoundment is currently an undeveloped, forested area of approximately 17.5 acres, also owned by the Eades. The impoundment was analyzed for its' impacts on stormwater flow and the future development of the property. Approximately 7.3 acres of the property appears to drain to the impounded area. Future plans for the property include the development of residential lots and possibly some park area. The impounded area is of adequate size to be suitable for stormwater control from a future development. However, the earthen dam and outlet pipes would need to be reconstructed to meet state and local codes. Maintaining the free flow of the natural drainage channel and providing separate stormwater controls for the developed area would be more appropriate. Stormwater controls could include preserving portions of the site, such as the natural drainage channel as native vegetation, and incorporating smaller stormwater retention areas throughout the development. 3 Earthen dams over 6 feet high require a geotechnical design, are required to be keyed into the native ground, and compacted to proper specifications. The existing dam appears to be constructed of lightly compacted native earth and discarded roofing tiles without an adequate spillway. In the event of an overtopping storm,the earthen dam could fail and send a large surge of water down towards the residences below. We recommend that at a minimum,the orifice cap on the outlet pipe be removed and the vertical riser cut down to 4 feet above the pond bottom to restore the free flow of the natural drainage. Removal of the earthen dam or lowering the top to a maximum of 4 feet should also be considered. If kept in place, the earthen dam should be inspected by a geotechnical engineering expert to verify whether the construction is adequate for existing or future use as a stormwater impoundment. Hydrologic Modeling: The Western Washington Hydrology Model was used to model stormwater runoff and size the stormwater control measures. The predevelopment condition was analyzed based on soil and surface types from soil survey maps, aerial photography, and field verification. The computer model used a single basin with the attributes of the existing conditions with outflow to an infiltration swale area of wooded terrain. The infiltration swale was assumed to have an infiltration rate of 8 inches per hour,based on the soil investigation and the infiltration rates from the Stormwater Management Manual for Western Washington. Approximate dimensions of the predevelopment infiltration area are 140'wide by 300' long with a natural slope of 8%. The post development condition was modeled as a single basin with outflow to a swale and a constructed infiltration basin. Infiltration rate used in the model was 8 inches per hour. Based on the homogeneity of the sandy soils observed in the test pits, a reduction factor of 0.5 is suitable. The infiltration basin was modeled as a 3 foot deep trapezoidal pond with 2:1 side slopes and a total surface area of 2500 square feet. Retained depth was 2 feet with an overflow weir. The proposed basin will be sculpted to appear more natural,but retain the modeled surface area. The existing impoundment on the Eades'property south of Balsa Way was also modeled using the Western Washington Hydrology Model. The predevelopment condition was analyzed for all area of the basin upstream of the impoundment in its existing state. The postdevelopment condition was analyzed for development of 7.3 acres of the Eades'property with 30% impervious and 70% lawn area. The impounded area was modeled as a trapezoidal pond with a total depth of 5 feet and 6:1 side slopes. The required surface area of the pond was approximately 35,000 square feet with a total volume of about 2 acre feet. Based on lidar contours of the natural drainage,the existing impoundment has approximately the same surface area. Exact layout and configuration of the future development could be significantly different from that assumed, and a stormwater plan addressing the specifics of the development will be required at the time. The impoundment also detains a significant amount of offsite runoff which is neither required or recommended. 4 A map of the predevelopment and postdevelopment basin areas with lidar topography and aerial photography from Jefferson County GIS is included in Appendix A. A spreadsheet of the predevelopment and postdevelopment basin sizes, surface conditions is included in appendix B. Results of the WWHM computer modeling are included in Appendix C. Stormwater Conveyance Analysis: Flow capacity of the proposed pipe and drainage swale was modeled in an Excel spreadsheet using the step backwater method based on maximum flow for the 25 year storm based on the WWHM model results. A 12 inch smooth wall corrugated polyethylene pipe is sufficient for conveyance of the stormwater. The spreadsheet is included in Appendix D. In addition, some minor changes to the home at the southeast end of Balsa Way are recommended. The grading around the back of the house aggravated the infrequent flooding and previously resulted in stormwater pouring through the foundation vents and accumulating in the lowest portion of the crawl space. We recommend that vent wells be added along the back of the house and that a drain pipe be installed from the lowest portion of the crawl space. Summary: The proposed stormwater improvements for the east end of Balsa Way are designed to restore the natural drainage disturbed by the recent grading and home construction. Analysis and sizing of the facility has been performed using the latest version of the Stormwater Management Manual for Western Washington and the Western Washington Hydrology Model. The proposed conveyance system is designed to protect the existing homes from infrequent flooding. The existing earthen dam and impoundment may be suitable for stormwater control of future development of the property south of Balsa Way. However, it does not appear to have been constructed according to current standards. We recommend that at a minimum,the orifice cap on the outlet pipe be removed at this time and the dam inspected by a geotechnical engineering expert. Maintaining the free flow of the natural drainage channel and providing separate stormwater controls for future development would be more appropriate. Extreme storms,uncontrolled development, or alteration of natural drainage patterns could exceed the capacity of the proposed stormwater conveyance system. In this event, stormwater would most likely back up and cause temporary flooding of the homes and yards of the homes in this area, as has happened previously. Care should therefore be taken to ensure that adequate stormwater detention facilities are constructed when approving development within the drainage basin. Diversion of additional areas to this drainage basin is not recommended. 5 Appendix A Basin Maps — \ t- a fit._= ` v: `' r pp 22° 1.70 7 1,.r �� ,.i ,, \ ,..u_ �� may.., e ,f. � , ,n 1 7 IIPII i y r j`��i�,a 1 -,r i ce ' L. 5 � ,, `°� 1� \ 0,-1 ' EX 24 Co I CULVERT �4� � - E ISTING DAM �` ',7k -_ 73l ;'� 1 _�"'`` MBANKMENT 4„-\41 ,1/4k, _-- t. >, � °-.° �, 9°;AC rp is a.,.> 1-"f O. ti q� k. �^ i i ri �3 ' 170 3� ''�..� :''is `°.,,,,,,,, ,. ,, .v= ', s „, i r ,.,,,: : % 1 s r. L I,,„,,,_, —\ D—HWY 2 '.4 '' c> ‘:,-.',' jp. s ,''1:4:Clik44 ij, ,,..,,,,_ '4.74 A C. :1) ,..:--,,,,...., '' ..f.* '4\ 464 , ,., ,,,,,. ,..„ . , ,,,,. „_, ..., a .,, `wE�'° 'ao F ,. 5 .S AC. ORES TED k� „...-\. ..,,,,,:::,,-._ ,),' ,44,, '''''' , __,,,,,,, —,,,,,, , ,,,,,, ,w NANk il,:ii c. I -,;1...7; j)'':: ..,,, t� BASEMAP FROA ,lEFERSON • COUNTY ONLINE' �I ;:' y., MAPPING. 10 FT. (CONTOURS A FROM PUGET S0-NP LIDAR ' `� ' � =� t� �� f CONSORTIUM DA A s ` --/ , \` -v— ') Th- t.1., > m ,......, it ,, t,,, 05,,,--:-.;a://,- ,,t,,.:- t,.:1--,,,„,„4-11 ....3/4,„ 1 1 ri' ? f`t V ;\` , '•-y _ l' , ' �J i� •"t, "..3 X1,) 1 1 . ��� �..' `a fit- ,.,_,�,. y e J.”'"�, e r 4\L! „,� �sd G1,_.. ,.,i- �F �.,�, t $ fit s'6.,' �: �ytr. { J �+ P s. �a f;; ' "• ? EADS PROPERTY DATE: OCTOBER 2010 DRAINAGE STUDY — SCALE:1'=500` PREDEVELOPMENT BASIN MAP SEASONS DRAWN BY: JEP 1"=500' ENGINEERING, INC.(350) 452-3023 CHECKED: 51S S Chase St. Port Angeles, WA SC352 SHEET: �� 14 t t . <f r " -\ --_, d city . \ } A3 i yt s y S . ,/rti , 7 �s G �� rvr 1 S f. ``, Q `t ' j ,; r."'" `. EX, 24 iC0 7 CUL Ri ,a ' �..---"i EXISTING DAM L:y.�-`F f c--- k ,,,, ..„4,,,,,,. <N.", L'7, -:, ,,, " fa„si a , lt. Nit ,,--,,,, 1 i ' 1.4.18 AC. 1 �� e 'or1 3,.Y 4 t v ,• ■ ,-{ ' 1,:::64,%., I.,, s:\',',,,..:7;?. ' '1'`. ' -..,, ,,, . ' •r .No 4 1 I I 114 kl 6 I I IL ' 1 4 I 111' •'1,''t! • 411 -in, , L:S r 4 .,:f5-----" -'-- ,,,.--- ,2--,,, ,:,,,, _ , A h'BASEMAP FR011 JFERSON ®+ ,, COUNTY ONL ,- tl - �� -L � MAPPING. 10�';FT. CONTOURS <'� FROM PUGET Sd N 41DAR NI, ;/ Pf'..,.,., :_f""' 1. �`CONSORTI�IIyI DA A T ' ': ^-. ,,. „ Asti Q.• w^ A. , , 1_, 0„ Cox 'L.1 "''' 'N} 47 :',e'47- et.1, C:� °,,,>,..7 , " ' rI ` _ >,%!f `�.. `^.'°, 1. EADS PROPERTY DATE: OCTOBER 2010 DRAINAGE STUDY — SCALE:1 =500' POSTDEVELOPMENT BASIN SEA SONS DRAWN BY: JEP ,4 MAP 1 ENGINEERING, INC.(350) 452-3023 CHECKED: 1"=500' 519 S Chase St. Port Angeles, WA G0352 SHEET Appendix B Spreadsheet Summary of Basin Coverage CO N CD CO O M M CO O cD O) n V7 a0 n cD n O 7 0 7 d 7 0 = _O to M M n cl7 ` 0..0 CO CO D)o uJ ` O_ O M M O)o o C O O Z NOOpo M M 0 W 0 ZN O am0�M0 ' a) ZNOC C)Mp c0 O Z0 O l/i a)-N. N O n N 0.a- N aN O n co 0.�N , No• n 0a OII ❑ E ❑ E ❑ E ❑ E co U) 0 0 0 Q 7 7 7 7 (� a) 0 N _ _ O_ O 200000 7)c, In Z 2000000 0 Z 4000000 0 2N NN- O Q O O aQ 6 aQ O aQ N fV E E E E N 0 co co N a) O N a) CD CO . a) p 12 2 O o 0 0 0 0 c p c p F. 2 0 0 0 0 0 N 0 2 2 0 0 0 0 0 T F 2 2 0 0 O O n n LL Q c0 CO LL Q O lL¢ V V u_ - p C a) D) 0) M+ C as O C c0 0 C co aD m. 3 E o 0 0 0 0 7 o c 3 2 0 0 0 0 0 0 0 3 2 o 0 0 0 0 0 0 % m 3 — Cl 1 0 JQ 0 5<.i )n o E ;, C c c •o. 2 NMnnncO W 0 2 O M n n pcO 0 0 2 oMnn0c0 O C 0 j W O o N d O)N N M 0 0 •o Q. v �0) N NO p W E N dO)NNOMp 0° E `) p O O a a O G O N 0 — a Q O 0 0 N 0 c a 0 0 0 O N •O 2 C a Q O c CC o o an d c• a a) a) a) a) a) Q• a) a) a) a) a) d Q o ur 7 c y N .0 7 N N 7 N 7 a) R O a 7 7 7 7 7 d oa y _O a 7 7 7 7 7 y E O a 7 7 7 7 7 0 CO E O a 3 m >.0 0 0 0 0 co O O Z >.V) .) .) a) .) 0 �O Z >`'/) (1) (4 ° U) 0 O Z T c0 O m y F CO CO CO CO CO,J LL X y I- 03 CO CO CO CO LL d O E- CO CO CO CO CO LL d y I-J a 0_0_ 0_ 0_ 0_ W a a aaaa � a aaaaa > y 'a 0 Ch c D.f 7 C 7 C 7 C 7 C To O 8 0 0 0 0 0 0 0 c Cl) 0 0 0 0 0 0 0 0 4/ 2 0 0 0 0 0 0 0_ as 0 V O c Z rns- s- v) v) n Cl rnUn )n� t. Z rn � .— n ) dZ n Q as E CO maa <I 81! Qaa co 0_ 6 Cl Cl o Cl To. N Q N�. ..- a)�. a) •�. 7 .0 Cl 07 '° 07v 07-0 m Zwma") a") mmom G d Zymmma) a) af o4300a> aa)) aa)) a) � � o 0 a) o}}}}}Z C >, > O a)} } } }} c vk g m } }}} � c N OZ CU O.N ' 0 a N #' d N * a y 3 E'p 0• C3 Ep c Ep c Ep C. 0 N •fA L M cis E o a a to Y.• co N y N 6 N c M 7 '� 7 7 7 O C O C d O CN o O C E80000000 00000000 W co 'z °§c0000 - E 2 0000000 E 'z 80 gt a) a) -0)0)c0c0M y N- O) co c0 c0 Q a) N�d7 a)co co Q. o N M a Ea Ea C Ea 6 Ea Cl — > o a G' Cl g 0 ram .. d d Q �t2 nN nvo)� D g .Q � nnwop Q m4nnurn� N 0‘- O Q 0_v = s_ V F NZ N N V n 0 O 0 Q N N V O ' Q N N O Q F 7 7 N< 7 C N 5 R0_0 0 O N N ,f f Q N N v ` 0 Ce 0' y 2 0 m 0 N i 0 a' 0 aa) a a) a) 0 >, a) N y CO N 0 >,a) 0 CO a) 0 T N N a) 13 d E E a) E a t a E E co E 2 a E E a) E 2 a 2 E E E E y o O) o 0- 0 o)LL O 0 L 0 LLO. ■'- 0 0- 0)L a) ❑WUU=Ua LLUU =U LLUU=U a N C .5. C C l N -V) w m a) a) mcCU❑ W)LO mamoo Wu_ m <CO❑ WLL m .0 a .0 7 7 7 7 m m CI) 0 Appendix C WWHM Results Western Washington Hydrology Model PROJECT REPORT Project Name: Eads#3 Site Address: Louisa City Port Townsend Report Date : 10/21/2010 Gage Port Angeles Data Start 1948/10/01 Data End 1993/09/30 Precip Scale: 0.51 WWHM3 Pro Version: PREDEVELOPED LAND USE Name Basin 1 Bypass: No Groundwater: No Pervious Land Use Acres C, Forest, Flat 56.6 C, Pasture, Flat 14.08 C, Lawn, Flat 1.19 C IMP DISP FLAT 7.84 Impervious Land Use Acres ROADS FLAT 0.51 Element Flows To: Surface Interflow Groundwater Channel 1, Channel 1, Name Channel 1 Bottom Length: 300ft. Bottom Width : 140ft. Manning's n : 0.05 Channel bottom slope 1: 0.08 To 1 Channel Left side slope 0: 1 To 1 Channel right side slope 2: 1 To 1 Infiltration On Infiltration rate : 8 Infiltration saftey factor : 0.5 Discharge Structure Riser Height: 0 ft. Riser Diameter: 0 in. Element Flows To: Outlet 1 Outlet 2 Channel Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 0.000 0.964 0.000 0.000 0.000 0.017 0.964 0.016 1.283 3.889 0.033 0.965 0.032 4.074 3.889 0.050 0.965 0.048 8.007 3.889 0.067 0.965 0.064 12.93 3.889 0.083 0.965 0.080 18.76 3.889 0.100 0.966 0.096 25.42 3.889 0.117 0.966 0.113 32.86 3.889 0.133 0.966 0.129 41.05 3.889 0.150 0.966 0.145 49.96 3.889 0.167 0.967 0.161 59.55 3.889 0.183 0.967 0.177 69.80 3.889 0.200 0.967 0.193 80.69 3.889 0.217 0.967 0.209 92.20 3.889 0.233 0.968 0.225 104.3 3.889 0.250 0.968 0.241 117.0 3.889 0.267 0.968 0.258 130.3 3.889 0.283 0.968 0.274 144.2 3.889 0.300 0.968 0.290 158.6 3.889 0.317 0.969 0.306 173.5 3.889 0.333 0.969 0.322 189.0 3.889 0.350 0.969 0.338 205.0 3.889 0.367 0.969 0.354 221.5 3.889 0.383 0.970 0.371 238.6 3.889 0.400 0.970 0.387 256.1 3.889 0.417 0.970 0.403 274.1 3.889 0.433 0.970 0.419 292.6 3.889 0.450 0.971 0.435 311.6 3.889 0.467 0.971 0.452 331.1 3.889 0.483 0.971 0.468 351.0 3.889 0.500 0.971 0.484 371.4 3.889 0.517 0.972 0.500 392.3 3.889 0.533 0.972 0.516 413.6 3.889 0.550 0.972 0.532 435.3 3.889 0.567 0.972 0.549 457.5 3.889 0.583 0.973 0.565 480.1 3.889 0.600 0.973 0.581 503.2 3.889 0.617 0.973 0.597 526.7 3.889 0.633 0.973 0.614 550.6 3.889 0.650 0.973 0.630 575.0 3.889 0.667 0.974 0.646 599.7 3.889 0.683 0.974 0.662 624.9 3.889 0.700 0.974 0.678 650.5 3.889 0.717 0.974 0.695 676.5 3.889 0.733 0.975 0.711 702.9 3.889 0.750 0.975 0.727 729.7 3.889 0.767 0.975 0.743 757.0 3.889 0.783 0.975 0.760 784.6 3.889 0.800 0.976 0.776 812.6 3.889 0.817 0.976 0.792 840.9 3.889 0.833 0.976 0.808 869.7 3.889 0.850 0.976 0.825 898.9 3.889 0.867 0.977 0.841 928.4 3.889 0.883 0.977 0.857 958.4 3.889 0.900 0.977 0.874 988.7 3.889 0.917 0.977 0.890 1019. 3.889 0.933 0.978 0.906 1050. 3.889 0.950 0.978 0.922 1081. 3.889 0.967 0.978 0.939 1113. 3.889 0.983 0.978 0.955 1145. 3.889 1.000 0.978 0.971 1178. 3.889 1.017 0.979 0.988 1211. 3.889 1.033 0.979 1.004 1244. 3.889 1.050 0.979 1.020 1278. 3.889 1.067 0.979 1.037 1311. 3.889 1.083 0.980 1.053 1346. 3.889 1.100 0.980 1.069 1380. 3.889 1.117 0.980 1.086 1415. 3.889 1.133 0.980 1.102 1451. 3.889 1.150 0.981 1.118 1487. 3.889 1.167 0.981 1.135 1523. 3.889 1.183 0.981 1.151 1559. 3.889 1.200 0.981 1.167 1596. 3.889 1.217 0.982 1.184 1633. 3.889 1.233 0.982 1.200 1670. 3.889 1.250 0.982 1.216 1708. 3.889 1.267 0.982 1.233 1746. 3.889 1.283 0.983 1.249 1785. 3.889 1.300 0.983 1.266 1823. 3.889 1.317 0.983 1.282 1862. 3.889 1.333 0.983 1.298 1902. 3.889 1.350 0.983 1.315 1942. 3.889 1.367 0.984 1.331 1982. 3.889 1.383 0.984 1.347 2022. 3.889 1.400 0.984 1.364 2063. 3.889 1.417 0.984 1.380 2104. 3.889 1.433 0.985 1.397 2145. 3.889 1.450 0.985 1.413 2187. 3.889 1.467 0.985 1.430 2229. 3.889 1.483 0.985 1.446 2271. 3.889 1.500 0.986 1.462 2314. 3.889 1.517 0.986 1.479 2357. 3.889 Name Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Forest, Flat 56.6 C, Pasture, Flat 14.08 C, Lawn, Flat 1.19 C IMP DISP FLAT 7.84 Impervious Land Use Acres ROADS FLAT 0.51 Element Flows To: Surface Interflow Groundwater Channel 1, Channel 1, Name Trapezoidal Pond 1 Bottom Length: 40ft. Bottom Width: 40ft. Depth : 3ft. Volume at riser head : 0.0891ft. Infiltration On Infiltration rate : 8 Infiltration saftey factor : 0.5 Wetted surface area On Side slope 1: 2 To 1 Side slope 2: 2 To 1 Side slope 3: 2 To 1 Side slope 4: 2 To 1 Discharge Structure Riser Height: 2 ft. Riser Diameter: 120 in. . Element Flows To: Outlet 1 Outlet 2 Pond Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 0.000 0.037 0.000 0.000 0.000 0.033 0.037 0.001 0.000 0.149 0.067 0.037 0.002 0.000 0.150 0.100 0.037 0.004 0.000 0.151 0.133 0.038 0.005 0.000 0.153 0.167 0.038 0.006 0.000 0.154 0.200 0.038 0.007 0.000 0.155 0.233 0.038 0.009 0.000 0.156 0.267 0.039 0.010 0.000 0.157 0.300 0.039 0.011 0.000 0.158 0.333 0.039 0.013 0.000 0.159 0.367 0.039 0.014 0.000 0.161 0.400 0.040 0.015 0.000 0.162 0.433 0.040 0.017 0.000 0.163 0.467 0.040 0.018 0.000 0.164 0.500 0.040 0.019 0.000 0.165 0.533 0.041 0.021 0.000 0.166 0.567 0.041 0.022 0.000 0.167 0.600 0.041 0.023 0.000 0.169 0.633 0.042 0.025 0.000 0.170 0.667 0.042 0.026 0.000 0.171 0.700 0.042 0.028 0.000 0.172 0.733 0.042 0.029 0.000 0.173 0.767 0.043 0.030 0.000 0.175 0.800 0.043 0.032 0.000 0.176 0.833 0.043 0.033 0.000 0.177 0.867 0.043 0.035 0.000 0.178 0.900 0.044 0.036 0.000 0.179 0.933 0.044 0.038 0.000 0.181 0.967 0.044 0.039 0.000 0.182 1.000 0.044 0.041 0.000 0.183 1.033 0.045 0.042 0.000 0.184 1.067 0.045 0.044 0.000 0.185 1.100 0.045 0.045 0.000 0.187 1.133 0.046 0.047 0.000 0.188 1.167 0.046 0.048 0.000 0.189 1.200 0.046 0.050 0.000 0.190 1.233 0.046 0.051 0.000 0.192 1.267 0.047 0.053 0.000 0.193 1.300 0.047 0.054 0.000 0.194 1.333 0.047 0.056 0.000 0.195 1.367 0.047 0.057 0.000 0.197 1.400 0.048 0.059 0.000 0.198 1.433 0.048 0.061 0.000 0.199 1.467 0.048 0.062 0.000 0.200 1.500 0.049 0.064 0.000 0.202 1.533 0.049 0.065 0.000 0.203 1.567 0.049 0.067 0.000 0.204 1.600 0.049 0.069 0.000 0.205 1.633 0.050 0.070 0.000 0.207 1.667 0.050 0.072 0.000 0.208 1.700 0.050 0.074 0.000 0.209 1.733 0.051 0.075 0.000 0.211 1.767 0.051 0.077 0.000 0.212 1.800 0.051 0.079 0.000 0.213 1.833 0.051 0.080 0.000 0.214 1.867 0.052 0.082 0.000 0.216 1.900 0.052 0.084 0.000 0.217 1.933 0.052 0.086 0.000 0.218 1.967 0.053 0.087 0.000 0.220 2.000 0.053 0.089 0.000 0.221 2.033 0.053 0.091 0.593 0.222 2.067 0.053 0.093 1.676 0.224 2.100 0.054 0.094 3.080 0.225 2.133 0.054 0.096 4.742 0.226 2.167 0.054 0.098 6.627 0.228 2.200 0.055 0.100 8.711 0.229 2.233 0.055 0.102 10.98 0.230 2.267 0.055 0.104 13.41 0.232 2.300 0.056 0.105 16.00 0.233 2.333 0.056 0.107 18.74 0.234 2.367 0.056 0.109 21.62 0.236 2.400 0.056 0.111 24.64 0.237 2.433 0.057 0.113 27.78 0.239 2.467 0.057 0.115 31.05 0.240 2.500 0.057 0.117 34.43 0.241 2.533 0.058 0.119 37.93 0.243 2.567 0.058 0.121 41.54 0.244 2.600 0.058 0.122 45.26 0.245 2.633 0.059 0.124 49.09 0.247 2.667 0.059 0.126 53.01 0.248 2.700 0.059 0.128 57.04 0.250 2.733 0.060 0.130 61.16 0.251 2.767 0.060 0.132 65.38 0.252 2.800 0.060 0.134 69.69 0.254 2.833 0.060 0.136 74.09 0.255 2.867 0.061 0.138 78.58 0.257 2.900 0.061 0.140 83.15 0.258 2.933 0.061 0.142 87.82 0.260 2.967 0.062 0.144 92.56 0.261 3.000 0.062 0.147 97.39 0.262 3.033 0.062 0.149 102.3 0.264 Name Channel 1 Bottom Length: 70ft. Bottom Width : 2ft. Manning's n : 0.035 Channel bottom slope 1: 0.05 To 1 Channel Left side slope 0: 2 To 1 Channel right side slope 2: 2 To 1 Infiltration On Infiltration rate : 8 Infiltration saftey factor : 0.5 Wetted surface area On Discharge Structure Riser Height: 0 ft. Riser Diameter: 0 in. Element Flows To: Outlet 1 Outlet 2 Trapezoidal Pond 1, Channel Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 0.000 0.003 0.000 0.000 0.000 0.017 0.003 0.000 0.021 0.013 0.033 0.003 0.000 0.066 0.013 0.050 0.004 0.000 0.131 0.014 0.067 0.004 0.000 0.212 0.014 0.083 0.004 0.000 0.309 0.014 0.100 0.004 0.000 0.420 0.014 0.117 0.004 0.000 0.546 0.015 0.133 0.004 0.000 0.686 0.015 0.150 0.004 0.001 0.839 0.015 0.167 0.004 0.001 1.006 0.015 0.183 0.004 0.001 1.186 0.016 0.200 0.005 0.001 1.379 0.016 0.217 0.005 0.001 1.586 0.016 0.233 0.005 0.001 1.805 0.016 0.250 0.005 0.001 2.038 0.016 0.267 0.005 0.001 2.284 0.017 0.283 0.005 0.001 2.543 0.017 0.300 0.005 0.001 2.815 0.017 0.317 0.005 0.001 3.100 0.017 0.333 0.005 0.001 3.399 0.018 0.350 0.005 0.002 3.712 0.018 0.367 0.006 0.002 4.038 0.018 0.383 0.006 0.002 4.378 0.018 0.400 0.006 0.002 4.731 0.019 0.417 0.006 0.002 5.098 0.019 0.433 0.006 0.002 5.480 0.019 0.450 0.006 0.002 5.875 0.019 0.467 0.006 0.002 6.285 0.019 0.483 0.006 0.002 6.709 0.020 0.500 0.006 0.002 7.147 0.020 0.517 0.007 0.003 7.600 0.020 0.533 0.007 0.003 8.067 0.020 0.550 0.007 0.003 8.550 0.021 0.567 0.007 0.003 9.047 0.021 0.583 0.007 0.003 9.559 0.021 0.600 0.007 0.003 10.09 0.021 0.617 0.007 0.003 10.63 0.022 0.633 0.007 0.003 11.19 0.022 0.650 0.007 0.003 11.76 0.022 0.667 0.008 0.004 12.35 0.022 0.683 0.008 0.004 12.96 0.023 0.700 0.008 0.004 13.58 0.023 0.717 0.008 0.004 14.21 0.023 0.733 0.008 0.004 14.87 0.023 0.750 0.008 0.004 15.54 0.024 0.767 0.008 0.004 16.22 0.024 0.783 0.008 0.004 16.93 0.024 0.800 0.008 0.005 17.64 0.024 0.817 0.008 0.005 18.38 0.025 0.833 0.009 0.005 19.13 0.025 0.850 0.009 0.005 19.90 0.025 0.867 0.009 0.005 20.69 0.025 0.883 0.009 0.005 21.50 0.025 0.900 0.009 0.005 22.32 0.026 0.917 0.009 0.006 23.16 0.026 0.933 0.009 0.006 24.02 0.026 0.950 0.009 0.006 24.89 0.026 0.967 0.009 0.006 25.79 0.027 0.983 0.010 0.006 26.70 0.027 1.000 0.010 0.006 27.63 0.027 1.017 0.010 0.007 28.58 0.027 1.033 0.010 0.007 29.54 0.028 1.050 0.010 0.007 30.53 0.028 1.067 0.010 0.007 31.53 0.028 1.083 0.010 0.007 32.55 0.028 1.100 0.010 0.007 33.60 0.029 1.117 0.010 0.008 34.66 0.029 1.133 0.011 0.008 35.74 0.029 1.150 0.011 0.008 36.84 0.029 1.167 0.011 0.008 37.96 0.030 1.183 0.011 0.008 39.10 0.030 1.200 0.011 0.008 40.25 0.030 1.217 0.011 0.009 41.43 0.030 1.233 0.011 0.009 42.63 0.031 1.250 0.011 0.009 43.85 0.031 1.267 0.011 0.009 45.09 0.031 1.283 0.011 0.009 46.35 0.031 1.300 0.012 0.010 47.63 0.032 1.317 0.012 0.010 48.93 0.032 1.333 0.012 0.010 50.25 0.032 1.350 0.012 0.010 51.59 0.032 1.367 0.012 0.010 52.95 0.033 1.383 0.012 0.011 54.34 0.033 1.400 0.012 0.011 55.74 0.033 1.417 0.012 0.011 57.17 0.033 1.433 0.012 0.011 58.62 0.034 1.450 0.013 0.011 60.09 0.034 1.467 0.013 0.012 61.58 0.034 1.483 0.013 0.012 63.09 0.034 1.500 0.013 0.012 64.63 0.035 1.517 0.013 0.012 66.19 0.035 MITIGATED LAND USE ANALYSIS RESULTS Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.093558 5 year 0.162619 10 year 0.221111 25 year 0.311199 50 year 0.391136 100 year 0.482999 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.093558 5 year 0.162619 10 year 0.221111 25 year 0.311199 50 year 0.391136 100 year 0.482999 Yearly Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1950 0.092 0.092 1951 0.122 0.122 1952 0.093 0.093 1953 0.040 0.040 1954 0.073 0.073 1955 0.272 0.272 1956 0.176 0.176 1957 0.056 0.056 1958 0.088 0.088 1959 0.048 0.048 1960 0.148 0.148 1961 0.146 0.146 1962 0.144 0.144 1963 0.057 0.057 1964 0.060 0.060 1965 0.092 0.092 1966 0.055 0.055 1967 0.053 0.053 1968 0.164 0.164 1969 0.069 0.069 1970 0.052 0.052 1971 0.063 0.063 1972 0.250 0.250 1973 0.459 0.459 1974 0.084 0.084 1975 0.027 0.027 1976 0.079 0.079 1977 0.090 0.090 1978 0.042 0.042 1979 0.058 0.058 1980 0.105 0.105 1981 0.093 0.093 1982 0.108 0.108 1983 0.228 0.228 1984 0.127 0.127 1985 0.060 0.060 1986 0.218 0.218 1987 0.315 0.315 1988 0.136 0.136 1989 0.063 0.063 1990 0.067 0.067 1991 0.072 0.072 1992 0.316 0.316 1993 0.165 0.165 1994 0.046 0.046 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.4589 0.4589 2 0.3157 0.3157 3 0.3146 0.3146 4 0.2718 0.2718 5 0.2497 0.2497 6 0.2278 0.2278 7 0.2183 0.2183 8 0.1759 0.1759 I 9 0.1647 0.1647 10 0.1636 0.1636 11 0.1483 0.1483 12 0.1462 0.1462 13 0.1442 0.1442 14 0.1363 0.1363 15 0.1275 0.1275 16 0.1221 0.1221 17 0.1077 0.1077 18 0.1049 0.1049 19 0.0929 0.0929 20 0.0929 0.0929 21 0.0924 0.0924 22 0.0919 0.0919 23 0.0903 0.0903 24 0.0881 0.0881 25 0.0835 0.0835 1 26 0.0789 0.0789 27 0.0729 0.0729 28 0.0720 0.0720 29 0.0687 0.0687 30 0.0671 0.0671 31 0.0632 0.0632 32 0.0627 0.0627 33 0.0603 0.0603 34 0.0595 0.0595 35 0.0580 0.0580 36 0.0573 0.0573 37 0.0562 0.0562 38 0.0546 0.0546 39 0.0532 0.0532 40 0.0520 0.0520 41 0.0479 0.0479 42 0.0458 0.0458 43 0.0422 0.0422 44 0.0400 0.0400 45 0.0274 0.0274 POC #1 The Facility PASSED The Facility PASSED. Flow(CFS) Predev Dev Percentage Pass/Fail 0.0468 2179 2179 100 Pass 0.0512 1858 1858 100 Pass 0.0556 1645 1645 100 Pass 0.0600 1459 1459 100 Pass 0.0644 1272 1272 100 Pass 0.0688 1153 1153 100 Pass 0.0732 1012 1012 100 Pass 0.0776 920 920 100 Pass 0.0820 833 833 100 Pass 0.0864 767 767 100 Pass 0.0908 705 705 100 Pass 0.0952 626 626 100 Pass 0.0997 576 576 100 Pass 0.1041 516 516 100 Pass 0.1085 483 483 100 Pass 0.1129 440 440 100 Pass 0.1173 402 402 100 Pass 0.1217 368 368 100 Pass 0.1261 336 336 100 Pass 0.1305 310 310 100 Pass 0.1349 291 291 100 Pass 0.1393 267 267 100 Pass 0.1437 247 247 100 Pass 0.1481 222 222 100 Pass 0.1525 209 209 100 Pass 0.1569 196 196 100 Pass 0.1613 180 180 100 Pass 0.1657 165 165 100 Pass 0.1702 153 153 100 Pass 0.1746 147 147 100 Pass 0.1790 134 134 100 Pass 0.1834 124 124 100 Pass 0.1878 116 116 100 Pass 0.1922 105 105 100 Pass 0.1966 100 100 100 Pass 0.2010 91 91 100 Pass 0.2054 86 86 100 Pass 0.2098 80 80 100 Pass 0.2142 76 76 100 Pass 0.2186 71 71 100 Pass 0.2230 67 67 100 Pass 0.2274 65 65 100 Pass 0.2318 58 58 100 Pass 0.2362 56 56 100 Pass 0.2407 54 54 100 Pass 0.2451 50 50 100 Pass 0.2495 48 48 100 Pass 0.2539 44 44 100 Pass 0.2583 41 41 100 Pass 0.2627 38 38 100 Pass 0.2671 34 34 100 Pass 0.2715 32 32 100 Pass 0.2759 29 29 100 Pass 0.2803 29 29 100 Pass 0.2847 26 26 100 Pass 0.2891 26 26 100 Pass 0.2935 25 25 100 Pass 0.2979 23 23 100 Pass 0.3023 21 21 100 Pass 0.3067 16 16 100 Pass 0.3112 12 12 100 Pass 0.3156 11 11 100 Pass 0.3200 9 9 100 Pass 0.3244 9 9 100 Pass 0.3288 8 8 100 Pass 0.3332 8 8 100 Pass 0.3376 7 7 100 Pass 0.3420 7 7 100 Pass 0.3464 7 7 100 Pass 0.3508 6 6 100 Pass 0.3552 6 6 100 Pass 0.3596 5 5 100 Pass 0.3640 5 5 100 Pass 0.3684 5 5 100 Pass 0.3728 4 4 100 Pass 0.3772 4 4 100 Pass 0.3817 4 4 100 Pass 0.3861 4 4 100 Pass 0.3905 3 3 100 Pass 0.3949 3 3 100 Pass 0.3993 3 3 100 Pass 0.4037 3 3 100 Pass 0.4081 3 3 100 Pass 0.4125 3 3 100 Pass 0.4169 2 2 100 Pass 0.4213 2 2 100 Pass 0.4257 2 2 100 Pass 0.4301 2 2 100 Pass 0.4345 2 2 100 Pass 0.4389 2 2 100 Pass 0.4433 2 2 100 Pass 0.4477 2 2 100 Pass 0.4522 2 2 100 Pass 0.4566 2 2 100 Pass 0.4610 0 0 100 Pass 0.4654 0 0 0 Pass 0.4698 0 0 0 Pass 0.4742 0 0 0 Pass 0.4786 0 0 0 Pass 0.4830 0 0 0 Pass The Development Has an increase in flow durations for more than 50% of the flows for the range of the duration analysis. Water Quality BMP Flow and Volume for POC 1. On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Flow Frequency Return Periods for Predeveloped. POC #2 Return Period Flow(cfs) 2 year 0.022663 5 year 0.039798 10 year 0.054758 25 year 0.078447 50 year 0.100021 100 year 0.12536 Flow Frequency Return Periods for Mitigated. POC #2 Return Period Flow(cfs) 2 year 0.079821 5 year 0.148092 10 year 0.208792 25 year 0.305949 50 year 0.39505 100 year 0.500125 Yearly Peaks for Predeveloped and Mitigated. POC #2 Year Predeveloped Mitigated 1950 0.023 0.000 1951 0.030 0.000 1952 0.021 0.000 1953 0.009 0.000 1954 0.019 0.000 1955 0.068 0.000 1956 0.043 0.000 1957 0.014 0.000 1958 0.022 0.000 1959 0.012 0.000 1960 0.036 0.000 1961 0.036 0.000 1962 0.036 0.000 1963 0.014 0.000 1964 0.014 0.000 1965 0.022 0.000 1966 0.013 0.000 1967 0.013 0.000 1968 0.041 0.000 1969 0.017 0.000 1970 0.012 0.000 1971 0.015 0.000 1972 0.058 0.000 1973 0.116 0.123 1974 0.021 0.000 1975 0.007 0.000 1976 0.019 0.000 1977 0.022 0.000 1978 0.011 0.000 1979 0.014 0.000 1980 0.026 0.000 1981 0.023 0.000 1982 0.026 0.000 1983 0.055 0.000 1984 0.032 0.000 1985 0.015 0.000 1986 0.054 0.000 1987 0.078 0.049 1988 0.033 0.000 1989 0.016 0.000 1990 0.016 0.000 1991 0.018 0.000 1992 0.079 0.000 1993 0.041 0.000 1994 0.011 0.000 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #2 Rank Predeveloped Mitigated 1 0.1160 0.1226 2 0.0788 0.0491 3 0.0784 0.0000 4 0.0685 0.0000 5 0.0576 0.0000 6 0.0553 0.0000 7 0.0538 0.0000 8 0.0432 0.0000 9 0.0412 0.0000 10 0.0407 0.0000 11 0.0362 0.0000 12 0.0360 0.0000 13 0.0356 0.0000 14 0.0330 0.0000 15 0.0316 0.0000 16 0.0304 0.0000 17 0.0264 0.0000 18 0.0263 0.0000 19 0.0232 0.0000 20 0.0230 0.0000 21 0.0218 0.0000 22 0.0215 0.0000 23 0.0215 0.0000 24 0.0214 0.0000 25 0.0209 0.0000 26 0.0190 0.0000 27 0.0190 0.0000 28 0.0177 0.0000 29 0.0166 0.0000 30 0.0161 0.0000 31 0.0160 0.0000 32 0.0153 0.0000 33 0.0147 0.0000 34 0.0140 0.0000 35 0.0139 0.0000 36 0.0139 0.0000 37 0.0138 0.0000 38 0.0135 0.0000 39 0.0129 0.0000 40 0.0120 0.0000 41 0.0119 0.0000 42 0.0111 0.0000 43 0.0106 0.0000 44 0.0092 0.0000 45 0.0071 0.0000 POC #2 The Facility PASSED The Facility PASSED. Flow(CFS) Predev Dev Percentage Pass/Fail 0.0113 2195 21 0 Pass 0.0122 1964 21 1 Pass 0.0131 1758 20 1 Pass 0.0140 1569 20 1 Pass 0.0149 1412 20 1 Pass 0.0158 1279 19 1 Pass 0.0167 1168 18 1 Pass 0.0176 1058 17 1 Pass 0.0185 974 17 1 Pass 0.0194 896 17 1 Pass 0.0203 834 17 2 Pass 0.0212 782 17 2 Pass 0.0221 711 17 2 Pass 0.0230 661 17 2 Pass 0.0239 615 17 2 Pass 0.0248 572 16 2 Pass 0.0257 525 15 2 Pass 0.0266 495 15 3 Pass 0.0275 454 15 3 Pass 0.0284 425 15 3 Pass 0.0292 390 15 3 Pass 0.0301 369 15 4 Pass 0.0310 344 14 4 Pass 0.0319 319 14 4 Pass 0.0328 293 14 4 Pass 0.0337 279 14 5 Pass 0.0346 263 13 4 Pass 0.0355 244 13 5 Pass 0.0364 229 12 5 Pass 0.0373 213 12 5 Pass 0.0382 199 12 6 Pass 0.0391 189 12 6 Pass 0.0400 180 11 6 Pass 0.0409 166 11 6 Pass 0.0418 156 11 7 Pass 0.0427 149 11 7 Pass 0.0436 140 11 7 Pass 0.0445 133 11 8 Pass 0.0454 125 11 8 Pass I 0.0463 118 11 9 Pass 0.0472 112 10 8 Pass 0.0481 103 10 9 Pass 0.0490 97 9 9 Pass 0.0499 91 8 8 Pass 0.0507 85 8 9 Pass 0.0516 82 8 9 Pass 0.0525 77 8 10 Pass 0.0534 75 8 10 Pass 0.0543 70 8 11 Pass 0.0552 67 8 11 Pass 0.0561 63 7 11 Pass 0.0570 60 7 11 Pass 0.0579 56 7 12 Pass 0.0588 55 7 12 Pass 0.0597 53 7 13 Pass 0.0606 49 7 14 Pass 0.0615 48 7 14 Pass 0.0624 46 7 15 Pass 0.0633 42 7 16 Pass 0.0642 39 6 15 Pass 0.0651 38 6 15 Pass 0.0660 34 6 17 Pass 0.0669 33 6 18 Pass 0.0678 32 6 18 Pass 0.0687 29 6 20 Pass 0.0696 29 6 20 Pass 0.0705 27 6 22 Pass 0.0714 26 6 23 Pass 0.0722 25 6 24 Pass 0.0731 25 6 24 Pass 0.0740 23 5 21 Pass 0.0749 20 5 25 Pass 0.0758 17 5 29 Pass 0.0767 13 5 38 Pass 0.0776 12 5 41 Pass 0.0785 11 5 45 Pass 0.0794 9 5 55 Pass 0.0803 9 5 55 Pass 0.0812 8 5 62 Pass 0.0821 8 4 50 Pass 0.0830 8 4 50 Pass 0.0839 8 4 50 Pass 0.0848 7 4 57 Pass 0.0857 6 4 66 Pass 0.0866 6 4 66 Pass 0.0875 6 4 66 Pass 0.0884 6 4 66 Pass 0.0893 6 4 66 Pass 0.0902 5 4 80 Pass 0.0911 5 4 80 Pass 0.0920 4 4 100 Pass 0.0929 4 3 75 Pass 0.0938 4 3 75 Pass 0.0946 4 3 75 Pass 0.0955 4 3 75 Pass 0.0964 4 3 75 Pass 0.0973 4 3 75 Pass 0.0982 3 3 100 Pass 0.0991 3 3 100 Pass 0.1000 3 3 100 Pass Water Quality BMP Flow and Volume for POC 2. On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. This program and accompanying documentation is provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such damages. Western Washington Hydrology Model PROJECT REPORT Project Name: Eads#2 Site Address: City Report Date : 10/12/2010 Gage Port Angeles Data Start 1948/10/01 Data End 1993/09/30 Precip Scale: 0.51 WWHM3 Pro Version: PREDEVELOPED LAND USE Name Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Forest, Flat 55 C, Pasture, Flat 13.8 C IMP DISP FLAT 7.56 Impervious Land Use Acres Element Flows To: Surface Interflow Groundwater Name Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Pasture, Flat 13.8 C, Forest, Flat 47.66 C IMP DISP FLAT 7.56 Impervious Land Use Acres Element Flows To: Surface Interflow Groundwater Trapezoidal Pond 1, Trapezoidal Pond 1, Name Basin 2 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 5.14 Impervious Land Use Acres ROADS FLAT 2.2 Element Flows To: Surface Interflow Groundwater Trapezoidal Pond 1, Trapezoidal Pond 1, Name Trapezoidal Pond 1 Bottom Length: 260.380669797252ft. Bottom Width: 52.0761339594505ft. Depth : 5ft. Volume at riser head : 2.0438ft. Side slope 1: 6 To 1 Side slope 2: 6 To 1 Side slope 3: 6 To 1 Side slope 4: 6 To 1 Discharge Structure Riser Height: 4 ft. Riser Diameter: 8 in. Orifice 1 Diameter: 0.59 in. Elevation: 0 ft. Orifice 1 Diameter: 2.09 in. Elevation: 2.668 ft. Orifice 1 Diameter: 1.26 in. Elevation: 3 ft. Element Flows To: Outlet 1 Outlet 2 Pond Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) infilt(cfs) 0.000 0.311 0.000 0.000 0.000 0.056 0.316 0.017 0.002 0.000 0.111 0.321 0.035 0.003 0.000 0.167 0.326 0.053 0.004 0.000 0.222 0.331 0.071 0.004 0.000 0.278 0.335 0.090 0.005 0.000 0.333 0.340 0.109 0.005 0.000 0.389 0.345 0.128 0.006 0.000 0.444 0.350 0.147 0.006 0.000 0.500 0.355 0.167 0.006 0.000 0.556 0.360 0.186 0.007 0.000 0.611 0.365 0.207 0.007 0.000 0.667 0.370 0.227 0.007 0.000 0.722 0.375 0.248 0.008 0.000 0.778 0.380 0.269 0.008 0.000 0.833 0.385 0.290 0.008 0.000 0.889 0.390 0.311 0.009 0.000 0.944 0.396 0.333 0.009 0.000 1.000 0.401 0.355 0.009 0.000 1.056 0.406 0.378 0.009 0.000 1.111 0.411 0.401 0.010 0.000 1.167 0.416 0.423 0.010 0.000 1.222 0.421 0.447 0.010 0.000 1.278 0.427 0.470 0.010 0.000 1.333 0.432 0.494 0.011 0.000 1.389 0.437 0.518 0.011 0.000 1.444 0.443 0.543 0.011 0.000 1.500 0.448 0.567 0.011 0.000 1.556 0.453 0.593 0.011 0.000 1.611 0.459 0.618 0.012 0.000 1.667 0.464 0.643 0.012 0.000 1.722 0.469 0.669 0.012 0.000 1.778 0.475 0.696 0.012 0.000 1.833 0.480 0.722 0.012 0.000 1.889 0.486 0.749 0.013 0.000 1.944 0.491 0.776 0.013 0.000 2.000 0.497 0.804 0.013 0.000 2.056 0.502 0.831 0.013 0.000 2.111 0.508 0.859 0.013 0.000 2.167 0.513 0.888 0.013 0.000 2.222 0.519 0.916 0.014 0.000 2.278 0.524 0.945 0.014 0.000 2.333 0.530 0.975 0.014 0.000 2.389 0.536 1.004 0.014 0.000 2.444 0.541 1.034 0.014 0.000 2.500 0.547 1.064 0.014 0.000 2.556 0.553 1.095 0.015 0.000 2.611 0.559 1.126 0.015 0.000 2.667 0.564 1.157 0.015 0.000 2.722 0.570 1.189 0.042 0.000 2.778 0.576 1.220 0.053 0.000 2.833 0.582 1.253 0.062 0.000 2.889 0.588 1.285 0.069 0.000 2.944 0.593 1.318 0.076 0.000 3.000 0.599 1.351 0.082 0.000 3.056 0.605 1.384 0.097 0.000 3.111 0.611 1.418 0.106 0.000 3.167 0.617 1.452 0.114 0.000 3.222 0.623 1.487 0.121 0.000 3.278 0.629 1.522 0.128 0.000 3.333 0.635 1.557 0.134 0.000 3.389 0.641 1.592 0.140 0.000 3.444 0.647 1.628 0.146 0.000 3.500 0.653 1.664 0.151 0.000 3.556 0.659 1.700 0.156 0.000 3.611 0.665 1.737 0.161 0.000 3.667 0.671 1.774 0.166 0.000 3.722 0.677 1.812 0.171 0.000 3.778 0.684 1.850 0.175 0.000 3.833 0.690 1.888 0.180 0.000 3.889 0.696 1.926 0.184 0.000 3.944 0.702 1.965 0.188 0.000 4.000 0.708 2.004 0.192 0.000 4.056 0.715 2.044 0.281 0.000 4.111 0.721 2.084 0.441 0.000 4.167 0.727 2.124 0.646 0.000 4.222 0.734 2.165 0.888 0.000 4.278 0.740 2.205 1.162 0.000 4.333 0.746 2.247 1.465 0.000 4.389 0.753 2.288 1.793 0.000 4.444 0.759 2.330 2.146 0.000 4.500 0.766 2.373 2.521 0.000 4.556 0.772 2.415 2.918 0.000 4.611 0.778 2.459 3.334 0.000 4.667 0.785 2.502 3.770 0.000 4.722 0.791 2.546 4.224 0.000 4.778 0.798 2.590 4.696 0.000 4.833 0.805 2.634 5.185 0.000 4.889 0.811 2.679 5.690 0.000 4.944 0.818 2.725 6.211 0.000 5.000 0.824 2.770 6.747 0.000 5.056 0.831 2.816 7.299 0.000 MITIGATED LAND USE ANALYSIS RESULTS Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.0293 5 year 0.087975 10 year 0.156299 25 year 0.288487 50 year 0.428616 100 year 0.611969 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.011742 5 year 0.024899 10 year 0.039071 25 year 0.066103 50 year 0.095242 100 year 0.134608 Yearly Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1950 0.021 0.010 1951 0.082 0.014 1952 0.041 0.013 1953 0.008 0.006 1954 0.011 0.009 1955 0.232 0.133 1956 0.095 0.011 1957 0.023 0.010 1958 0.043 0.009 1959 0.006 0.007 1960 0.081 0.011 1961 0.088 0.012 1962 0.093 0.013 1963 0.009 0.006 1964 0.012 0.008 1965 0.025 0.013 1966 0.013 0.010 1967 0.015 0.009 1968 0.107 0.014 1969 0.017 0.007 1970 0.004 0.008 1971 0.006 0.006 1972 0.124 0.010 1973 0.363 0.109 1974 0.020 0.010 1975 0.007 0.009 1976 0.017 0.010 1977 0.019 0.010 1978 0.004 0.008 1979 0.003 0.006 1980 0.004 0.007 1981 0.063 0.037 1982 0.039 0.013 1983 0.144 0.106 1984 0.065 0.013 1985 0.013 0.008 1986 0.099 0.013 1987 0.250 0.084 1988 0.078 0.012 1989 0.014 0.010 1990 0.023 0.009 1991 0.044 0.012 1992 0.268 0.121 1993 0.108 0.014 1994 0.005 0.006 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.3633 0.1328 2 0.2681 0.1212 3 0.2497 0.1092 4 0.2323 0.1064 5 0.1443 0.0837 6 0.1238 0.0371 7 0.1077 0.0141 8 0.1074 0.0140 9 0.0995 0.0140 10 0.0945 0.0133 11 0.0927 0.0131 12 0.0881 0.0130 13 0.0824 0.0129 14 0.0814 0.0126 15 0.0777 0.0125 16 0.0651 0.0120 17 0.0627 0.0118 18 0.0440 0.0115 19 0.0433 0.0115 20 0.0408 0.0114 21 0.0392 0.0104 22 0.0246 0.0102 23 0.0232 0.0101 24 0.0226 0.0101 25 0.0207 0.0099 26 0.0201 0.0098 27 0.0192 0.0098 28 0.0167 0.0096 29 0.0166 0.0093 30 0.0153 0.0093 31 0.0141 0.0091 32 0.0132 0.0087 33 0.0129 0.0085 34 0.0119 0.0081 35 0.0113 0.0079 36 0.0087 0.0078 37 0.0077 0.0077 38 0.0067 0.0074 39 0.0061 0.0074 40 0.0055 0.0073 41 0.0053 0.0063 42 0.0041 0.0060 43 0.0038 0.0059 44 0.0036 0.0058 45 0.0029 0.0057 POC #1 The Facility PASSED The Facility PASSED. Flow(CFS) Predev Dev Percentage Pass/Fail 0.0147 5057 4887 96 Pass 0.0188 4024 1909 47 Pass 0.0230 3221 1818 56 Pass 0.0272 2777 1728 62 Pass 0.0314 2413 1651 68 Pass 0.0356 2113 1578 74 Pass 0.0397 1828 1517 82 Pass 0.0439 1591 1467 92 Pass 0.0481 1340 1353 100 Pass 0.0523 1183 1257 106 Pass 0.0565 1048 1140 108 Pass 0.0606 936 998 106 Pass 0.0648 835 896 107 Pass 0.0690 745 780 104 Pass 0.0732 675 656 97 Pass 0.0774 620 556 89 Pass 0.0816 560 428 76 Pass 0.0857 510 351 68 Pass 0.0899 461 319 69 Pass 0.0941 415 292 70 Pass 0.0983 384 264 68 Pass 0.1025 351 219 62 Pass 0.1066 319 172 53 Pass 0.1108 295 113 38 Pass 0.1150 268 95 35 Pass 0.1192 248 78 31 Pass 0.1234 230 52 22 Pass 0.1275 216 39 18 Pass 0.1317 203 13 6 Pass 0.1359 192 0 0 Pass 0.1401 177 0 0 Pass 0.1443 165 0 0 Pass 0.1485 151 0 0 Pass 0.1526 139 0 0 Pass 0.1568 129 0 0 Pass 0.1610 115 0 0 Pass 0.1652 105 0 0 Pass 0.1694 94 0 0 Pass 0.1735 87 0 0 Pass 0.1777 83 0 0 Pass 0.1819 79 0 0 Pass 0.1861 72 0 0 Pass 0.1903 70 0 0 Pass 0.1945 66 0 0 Pass 0.1986 62 0 0 Pass 0.2028 60 0 0 Pass 0.2070 57 0 0 Pass 0.2112 54 0 0 Pass 0.2154 50 0 0 Pass 0.2195 48 0 0 Pass 0.2237 45 0 0 Pass 0.2279 41 0 0 Pass 0.2321 37 0 0 Pass 0.2363 34 0 0 Pass 0.2404 30 0 0 Pass 0.2446 26 0 0 Pass 0.2488 22 0 0 Pass 0.2530 21 0 0 Pass 0.2572 19 0 0 Pass 0.2614 18 0 0 Pass 0.2655 15 0 0 Pass 0.2697 13 0 0 Pass 0.2739 12 0 0 Pass 0.2781 11 0 0 Pass 0.2823 11 0 0 Pass 0.2864 10 0 0 Pass 0.2906 10 0 0 Pass 0.2948 10 0 0 Pass 0.2990 9 0 0 Pass 0.3032 8 0 0 Pass 0.3074 8 0 0 Pass 0.3115 8 0 0 Pass I 0.3157 7 0 0 Pass 0.3199 7 0 0 Pass 0.3241 6 0 0 Pass 0.3283 6 0 0 Pass 0.3324 5 0 0 Pass 0.3366 4 0 0 Pass 0.3408 4 0 0 Pass 0.3450 3 0 0 Pass 0.3492 3 0 0 Pass 0.3533 2 0 0 Pass 0.3575 2 0 0 Pass 0.3617 2 0 0 Pass 0.3659 0 0 0 Pass 0.3701 0 0 0 Pass 0.3743 0 0 0 Pass 0.3784 0 0 0 Pass 0.3826 0 0 0 Pass 0.3868 0 0 0 Pass 0.3910 0 0 0 Pass 0.3952 0 0 0 Pass 0.3993 0 0 0 Pass 0.4035 0 0 0 Pass 0.4077 0 0 0 Pass 0.4119 0 0 0 Pass 0.4161 0 0 0 Pass 0.4203 0 0 0 Pass 0.4244 0 0 0 Pass 0.4286 0 0 0 Pass Water Quality BMP Flow and Volume for POC 1. On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. This program and accompanying documentation is provided ,as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such damages. Appendix D Hydraulic Analysis of Pipe and Swale Z C �Elev. (ft.) N N a� ' N mo� a .P O O 0 O F Passmo =x ,a s°'g° -`t%F a -,-, .,3 .1. 11 gym_ g . WO 8f t 6<3w \ 10'il P7v24.1,10,1i , o v a 1 a 141!, inn xm- N .— T .,mg N `v€O.E,0 0 00 l 0) m 0 0 Jr I E00 mm m a v+°w AN�TT O P° ° –W N < w N'< W W W 3 2 al W m m O w 13 0'p U1 0 0— ,CT l rt a T �m CD • I— -1 w Np o• 3 A ,d.iv x Fl S m fA O T /� Su fI n I a _ -, _ 4m O m C _N K I sd m C O Il J < Cry�. moo» m —",- I * ' v n m ✓ m g n oa� = I::��s iiili=E O 000 os SSo$$ a� �5 NN = O V+T 11 O O++O 5 NN r P+AR W O; 111 Appendix E Soil Logs SOIL LOGS Site: Eades Property/S end of Louisa ID#TP#1 Location: Drainage Channel,20'S of PL Elevation: 240+- Date: 10/5/2010 Client: James and Marsha Eades Method: Mini Excavator Observations by: JEP/JSP Cat 303C Soil Description Depth Notes: 0 Reddish Brown Sandy Loam w/organics 10" Compact reddish brown sandy gravel 24" Reddish brown sandy gravel w/mottling 36" Roots to 36" Saturated gravelly sand-gray 50" Fine sand,grey,compact 52" Compact glacial till h2o at 58" 60" Bottom of hole Site: Eades Property/S end of Louisa ID#TP#2 Location: Drainage Channel,80'S of PL Elevation: 240+- Date: 10/5/2010 Client: James and Marsha Eades Method: Mini Excavator Observations by: JEP/JSP Cat 303C Soil Description Depth Notes: 0 Fine sandy loam with organics 12" Reddish brown sandy gravel 28" Gravelly sand w/cobbles, mottled 46" h2o flowing in from side at 46" Compact glacial till 62" standing h2o in pit at 54" Site: E end of Charles ID#TP#3 Location: N side Elevation: 220+- Date: 10/5/2010 Client: James and Marsha Eades Method: Mini Excavator Observations by: JEP/JSP Cat 303C Soil Description Depth Notes: 0 Medium Fine Sand Roots to 3 ft. 7 ft. Site: E end of Charles ID#TP#4 Location: S side Elevation: 220+- Date: 10/5/2010 Client: James and Marsha Eades Method: Mini Excavator Observations by: JEP/JSP Cat 303C Soil Description Depth Notes: 0 Medium Fine Sand Roots to 2 ft. 7 ft. O P N .. //\ o z m L > m 4 v �o w 0 ZlS,, IInC) .i, A§A2 CZniz \% >/ ., \+ �x~gym II� . < z ,<*.,..; Zozr-" n p 1.5 MIN \' mzmOoo V/s"(.44;,...::: g!"1 '//' 111=WI'-. --I ,,,,,,/ ADZ E o � k A A >tj N IV\\\" ttik � /'z? a n v \/Il A x<n rn $ -C- � Nmnn aA DO1g.\n� u',aQQ zr�-c?\\ zy1Y Zy Z x-i ROT' r> --i C �m�P 4 v 10 m--I Y z8 10 4 a rn N•a _ /64 .,. p I � • N 6 � E Sl 1 i X pAppp >g g 4 $1, _, O1 (N� ///y///�! n bNNS�, z (-I ...*. El ": C 1 Z -- i_1 '`'i`�i�i�ti N mi z 1IIu 1�I 3'i111N.�,„ aZ r a. �"J cn sTORAt� "/ ' 2 5 i ._, ,...i k O—1 ':�.i T�'��i��� yC m 70 Mod / ilik:L153 CD R1 n a In 'i�p��i':4$ 8 Cu,o r .- • N > r'w WV 4l 2*0 elr :--<, , 01 '-'i C ifgee: "I z F. ` ..",AJ m:A}ate ti ib~iI +NVIII 0 X C .�C��.a g a 5`e, I 0 r— �� 8 '<ca%o z z -c�2� REVD: OCTOBER 21,2010 STORM DRAINAGE IMPROVEMENT PLAN DATE OCTOBER 2010 JAMES AND MARSHA EADES SCALE NOTED N J,NWY4 NW Y4 SECTION 21, TOWNSHIP 30N,RANGE 1W,LESS 4SEASONS DRAWN BY JEP PORTION OF ZAMPERIN SHORT PLAT,LESS R/W ENGINEERING, INC.(360)452-3023 CHECKED: JSP PARCEL NO. 001212008,JEFFERSON COUNTY, WA 619 S Chose St.Port Myelee,WA 98362 SHEET: 3 Jefferson County t Department of Public Works 3 f 623 Sheridan St. ... tei 1 ' Port Townsend, WA 98368 c str (360) 385-9160 Frank Gifford, Public Works Director Monte Reinders, P.E., County Engineer MEMORANDUM ' ;� r '!� ,1 TO: Michelle Farfan Community Development Department FROM: James W. Pearson,Project Manage DATE: a DATE: October 22, 2010 L 9� RE: MLA10-00385 Emergency Stormwater Repair; Balsa Way James and Marsha Eades, applicants The Public Works Department has reviewed the Stormwater System Improvement Plan(4 Season Engineering, October 14, 2010) for the proposal and notes the following: • The proposal is intended to retrofit an existing drainage system by collecting runoff from the adjoining property to the south(Assessors Parcel Number 001212008)that periodically inundates properties on Balsa Way and conveying it by means of a Swale and 12"diameter storm drainage pipe to an infiltration facility located on an adjoining lot to the north(Assessors Parcel Number 948603201). • This drainage problem was the subject of an Action Request to Public Works initiated by Nancy Rody, 159 Louisa Street(Balsa Way)on June 10,2010. Public Works determined that the problem was not attributable to runoff from public roads or from the Eades' development on Louisa Street and Balsa Way. • The Jefferson County Unified Development Code, Section 18.30.070 Stormwater Management Standards adopts the standards and minimum requirements of the Washington Department of Ecology Stormwater Management Manual for Western Washington. • The applicants have submitted a Stormwater Improvement Plan for the proposal prepared by 4 Seasons Engineering(October 14,2010). The Plan states that the improvements have been designed in accordance with the Stormwater Management Manual.Public Works reviewed the Plan and discussed it with 4 Seasons which clarified and revised aspects of the Plan in an email and attachment to Public Works dated October 22,2010. . • A natural drainage channel on the adjoining property to the south has been impounded by a 7' high earthen dam that was constructed by the applicants in 2006.The structure has an 8"outlet pipe with a 2"orifice cap.This structure was not permitted by Jefferson County or a State agency. The Stormwater Plan states that it does not comply with State requirements for height or construction materials or methods. The Plan recommends either that the structure be removed or its height be reduced to 4' and the orifice cap on the outlet pipe be removed. It also Eades Stormwater Repair Balsa Way } recommends that if the structure is kept in place, it should be inspected by a geotechnical engineer. The Stormwater Plan calculations and recommended design of the conveyance and infiltration facilities assume that the height of the structure will be reduced and the orifice cap will be removed. The disposition of this structure is not the responsibility of Public Works. This memo does not review or authorize its construction or modification. • The applicants shall implement the Stormwater Management Improvement Plan as revised by 4 Seasons Engineering on October 22, 2010. The work shall be conducted under the direction of a licensed engineer. • After the work has been completed,the applicants shall submit a letter to Public Works from the project engineer certifying that the stormwater management facilities have been constructed as per the Stormwater Plan. • In order to meet the requirements of the Jefferson County Unified Development Code and the Washington Department of Ecology Stormwater Management Manual for Western Washington Minimum Requirement#10 Operation and Maintenance and to ensure that the approved • stormwater management facilities are appropriately maintained for the life of the project, Jefferson County requires the applicant to enter into a Stormwater Management Facility Maintenance Agreement with the County. Public Works will send a copy of the Agreement that has been signed by the Public Works Director to the applicant.Prior to final project approval, the applicant shall sign the Agreement before a notary and file it with the Jefferson County Auditor. • The proponent shall pay all costs related to Public Works review of the Stormwater Improvement Plan, any site inspections,communications,and preparation of the Stormwater Management Facility Maintenance Agreement. In accordance with the Jefferson County Public Works Department Fee Schedule,the Department's fee is currently$65 per hour. c: Paul Walters, Jefferson County Public Works Department Terry Barnet, Maintenance Superintendent, WSDOT, 1707 South C Street,Port Angeles, WA 98363 Jim Eades, 2911 Sherman Street, Port Townsend, WA 98368 Nancy Rody, 159 Louisa Street, Port Townsend, WA 98368 Ryan Barnard, 155 Louisa Street, Port Townsend, WA 98368 Jay Gordon, 153 Louisa Street, Port Townsend, WA 98368 Eades Stormwater Repair Balsa Way Page 1 of 1 Michelle Farfan From: Jim Pearson Sent: Monday, October 25, 2010 3:24 PM To: Michelle Farfan Cc: partch_fourse @olypen.com Subject: MLA10-00385 Stormwater Repair; James and Marsha Eades, Balsa Way Michelle, The following should be added to my comments dated October 22, 2010: The applicant's engineer shall provide an operations and maintenance manual that is consistent with Stormwater Management Manual, Minimum Requirement#10 Operations and Maintenance to the applicant and Public Works. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax c: Jim Eades, 2911 Sherman Street, Port Townsend, WA 98368 10/25/2010 Page l of l Michelle Farfan From: Jim Pearson Sent: Monday, October 25, 2010 1:42 PM To: Michelle Farfan Subject: MLA10-00385 Stormwater Repair; James and Marsha Eades, Balsa Way Michelle, The following should be added to my comments dated October 22, 2010. The proposal would require the applicant to obtain easements to construct the drainage conveyance system across the following parcels in Eisenbeis Bay View Addition: • Block 40, Parcel H, Assessor's Parcel Number 948604004, John and Kim Gordon; • Block 39, Parcel G, Assessor's Parcel Number 948603901, Ryan Barnard; and • Block 32, Parcel F, Assessor's Parcel Number 948603207, Michael and Nancy Rody. The proposal would also require the applicant to obtain an easement to construct the drainage conveyance and infiltration system across following parcel in Eisenbeis Bay View Addition: Block 32, Parcel A, Assessor's Parcel Number 948603201, Joab and Eden Eades. The applicant will need to document the easements to Public Works prior to preparation of the Stormwater Management Facility Maintenance Agreement. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax c: Jim Eades, 2911 Sherman Street, Port Townsend, WA 98368 Michael and Nancy Rody, 159 Louisa Street, Port Townsend, WA 98368 Ryan Barnard, 155 Louisa Street, Port Townsend, WA 98368 Jay and Kim Gordon, 153 Louisa Street, Port Townsend, WA 98368 Joab and Eden Eades, 21 Balsa Way, Port Townsend, WA 98368 10/25/2010 Page 1 of 2 Michelle Farfan From: Jim Pearson Sent: Monday, October 25, 2010 2:30 PM To: Michelle Farfan; 'Barnett, Terry' Subject: FW: Eades Drainage Report and Plans Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax From: John Partch [mailto:partch_fourse @olypen.com] Sent: Monday, October 25, 2010 2:27 PM To: Jim Pearson Subject: RE: Eades Drainage Report and Plans Jim, I think your reply covers it, unless he wants more confirmation. John E. Partch, P.E. Civil Engineer 4 Seasons Engineering, Inc. 360-452-3023 From: Jim Pearson [mailto:jpearson @co.jefferson.wa.us] Sent: Monday, October 25, 2010 8:59 AM To: Barnett,Terry; Michelle Farfan Cc: partch_fourse @olypen.com; Paul Walters Subject: RE: Eades Drainage Report and Plans John, do you want to respond Terry Barnet? Terry, according to the stormwater analysis preformed by 4 Seasons Engineering, the facility has been designed to infiltrate the projected runoff. Detention and infiltration facilities typically have an emergency overflow in case there is an overwhelming event(for example the December 2007 rain on snow event) that the system cannot handle. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax From: Barnett,Terry [mailto:Barnett@wsdot.wa.gov] Sent: Friday, October 22, 2010 4:38 PM To: Jim Pearson; Michelle Farfan Cc: partch_fourse @olypen.com; Paul Walters Subject: RE: Eades Drainage Report and Plans 10/25/2010 • Page 2 of 2 In reviewing the attached plans it appears that the"Infiltration facility" has an outlet to the WSDOT SR20 right of way. I realize the facility is designed to trap storm water, is there any possibility it will be over run and dump onto our property? Terry Barnett WSDOT Maint. Superintendent 360-565-0680 From: Jim Pearson [mailto:jpearson @co.jefferson.wa.us] Sent: Friday, October 22, 2010 3:30 PM To: Michelle Farfan Cc: partch_fourse @olypen.com; Barnett, Terry; Paul Walters Subject: FW: Eades Drainage Report and Plans Michelle, I have reviewed the Eades proposal and discussed it with their engineer, John Partch, 4 Seasons Engineering. Attached are revised stormwater plan sheets and a revised stormwater report. The report includes a cover letter from John Partch. Also attached is a memo from Public Works regarding the proposal. Jim Pearson Jefferson County Public Works Department 623 Sheridan Street Port Townsend, WA 98368 (360) 385-9162 (360) 385-9234 Fax From: John Partch [mailto:partch_fourse @olypen.com] Sent: Friday, October 22, 2010 11:22 AM To: Jim Pearson Subject: Eades Drainage Report and Plans Jim, Please review the attached response to your questions, and the revised report and plans. Give me a call if you'd like to discuss further. John E. Partch, P.E. Civil Engineer 4 Seasons Engineering, Inc. 360-452-3023 *** eSafe2 scanned this email for malicious content *** *** IMPORTANT: Do not open attachments from unrecognized senders *** 10/25/2010 Map Output Page 1 of 1 ArcIMS HTML Viewer Map 91860'.402 0444 602 944466.640 10416016(Y 3 x`tt a94860'10! 4486°0660 948604,500 Sa idslon Ln .. ., (444,0 0, 9486°'1°2 ,94666460' 971394321406 „m `02,„i+ 448602/02 943602/02 948tx,„2602 ._...446602602- 1. .T.i3.)4 < S+f aC}vW3? c.,WU4602/63 fA4i4t#.42s`t'sh 94416024503 944S& 2e4LLL? 446625'«'4 ,+,' f //y� Legend 946303002 A 1 ' x 4 s, a2 94.96..» f. Selected Features 9414 3+ . xx, =, JC_Roads Parcels.H 948603440 90.18603'0' 94660320/ 's aaa way ?is4f4F/.N320' 4A1&£.w'*7 r3" 948601'.02 gdiaeo4om 4540486040A 9414160390' to 4a Co 42'2X8 4.rx xfcr> xl✓i_c1091∎p;rr C!34r:-t'C,3'3:n aervr id r., o 1,11f1 FOR INFORMATIONAL PURPOSES ONLY- Jefferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection.Wed Oct 20 09:17:03 2010 http://gisserver/servlet/com.esri.esrimap.Esrimap?ServiceName=ovmap&ClientVersion=... 10/20/2010 N a° JEFFERSON COUNTY a ` DEPARTMENT OF COMMUNITY DEVELOPMENT ... 621 Sheridan Street• Port Townsend •Washington 98368 .e� 360/379-4450 • 360/379-4451 Fax " ING http://www.co.jefferson.wa.us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA V [0--3gs- PROJECT/APPLICANT NAME: C2(i Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. ,,,T ,44 C.e'k-T-64- Ru►3 0 FP COOTI2W L CURD JG 14£l4U t/ bcrE,OD- g-0 RA Ira "FhL AFT Q A `Peo1..0 tJ 6E ) (y}I J o Pf�R( �/ Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. 4 5M1tLL FoRes'rf ® U MA, et -(,«P� -P LAT- l�u / 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. V Ray/06 FcRe5M0 io Cr H c of b C7eixortf F,R c R Q hiii) Ac. k w rill Q.PkSS / 54.ri4i M)) NATIOC &kip cs LID Co O,~Q 4. Describe the existing soils. Indicate soil type on the site map. C(pc C_.L.A1.i RIIl1 Llt:.L>/ sAfory L D R ti O% p t. G10 11 ea Lo I . SA4.0 -k (Sr-v.E A-(Z • O . ' - . D . • 0' _ .- : I 5. Describe the existing site hydrology(i.e., drainage; behavior of water on the site—above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. i>=JPtTrO 0 PO P R.I))c a.sac(_,..'SC) eA)rr tit U61) G .. SLOPE..t� 0 kt.t..7 6. Describe any excess levels of noise generated by the proposed use or activity: 5M ALL CAL C A<0 ce..T> L, Fob Pc- P&At 0D 0 F ( -- a w ec'3 — OCT 2 0 l stormwater site plan template—rev.10/21/2008 5 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the site. Indicate location on the site map. SM a LL Polak!i(9 lA-R& S �-� aF PtkJ� O tQi�►ro f�o�y ,tt ivy PEA oO_ 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads, and sensitive/critical_areas (streams,wetlands,lakes,steep slopes,etc.). 1( .3 ' Coni M C c t et-L 7p i3c 4.tJD f2cl art AL 5106GL rA-trc.y ckc Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30 in the Manual)or, if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. rorit5112tcrIr Main (dock t &b )ACES I 0271-1 ID F LC)TS F 1-t ROD Dpe pt'c Ls-es G `I4 10. If the project requires the use of stormwater treatment facilities,describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for"large"projects or projects that involve the potential for dispersion of contaminants.] 11. Describe the performance goals and standards applicable to the project. Co ft 0 L 5T/ 6W Lei A-T'h Fuoc)o ( 01= C S Co 1 r- 12. Describe the flow control system. A IkrriCreekrth3 5c-igtEt3 L (L A1.E 5 TO co lM1J 4 iot, P 6 Rec rIo, stormwater site plan template—rev.10/21/2008 6 I 13. Describe the water quality system. 54Al2)‘,4412.40„,e_Ar 3 c&C `(49 14. Describe the conveyance system analysis and design. poi- q 5e-P6613 1�.)C�'lJ e 11N Q3 15. Describe the sou ce of fill material,physical characteristics of fill material,and deposition of excess material. 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code., r j Pr 17. Describe the proposed surfacing material. /"/A- 18. Describe methods for restoration of the site. pt,Rt,rt-(0 6 c7'- f -rW f C,Qocx tAb (()O 41 it36 si+RuL �r i;RJ S . t i L t-�41 l NN l.cl< 012a 1 � -I- ( Act46 (36,12(2 j t) I U• 6—S 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. r 20. List here(af d in e A n spe I r ports or studies conducted to prepare the Stormwater Site Plan. o 7 E� 6 I►•1 2 i OG 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. 10in- , _ 7 stormwater site plan template—rev.10/21/2008 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at Volume II Section 3.2.3 of the Manual(beginning on page 3-7). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. y ffLLot:) p e. OAf FLj 1-ftIPs- 2. Establish Construction Access. c).13E- -$o eta'H AT e u D dP LlSc.usk 5t'pct oiled E#' V AT' AS oV C t-t 2t�s 45r ifili 2 Hwy Z.x> 3. Control Flow Rates. 'VTR P4A4) 4. Install Sediment Controls. emt_.s 5. Stabilize Soils. ` ce t) mu Lctj 6. Protect Slopes. 5110 WGC f 7. Protect Drain Inlets. 1 stormwater site plan template—rev.10/21/2008 8 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Chnne�ls and Outlets. 9. Control Pollutants. ST1Z r IA I LS 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). , /14 11. Maintain Best Management Practices(BMPs). 12. Manage the Project.To pat )t roe x.00072(tcliacQ A431) 5-1 t t ATck (Zu,i.) OFF 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). FR WA P Rlc c� o o 12.i cif p �11"C.e. Q i tJ 6 f i(.e-1 `j'b P� g&S l D g-s)T t Nu AR c 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. Pi stormwater site plan template—rev.10/21/2008 9 b. Description of special requirements for working in or near environmentally sensitive areas. NfPt 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). Aiifs- 5. Construction Phasing. a. Construction sequence DcA,tkitW oP_ /14Kret VAL fZ0c6C A1� k) tP(0 6 AJArc. 't We pcit pL 2oLt< A1.30 0i cA04,It. b. Construction phasing(if proposed) (P LP l-T 6/204(, 60 k, 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). I. Provide a proposed construction schedule. 3j 10 J ( coevt PcE31-_ ey 1,kto is a II. Wet Season Construction Activities. a. Proposed wet season construction activities. b. Proposed wet season construction activities for environmentally sensitive areas. 7. Financial/Ownership Responsibilities. a. AIdet�the property owner responsible for the initiation of bonds and/or other financial securities. l" b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following, if applicable. a. Sediment Ponds/Traps. b. Diversions. /I (,04-cSa 0 c. Waterways. c, e,EA 6/ N EZA f 1l RE-POR9" d. Runoff/Stormwater Detention Calculations 38 _rk/14) m4% ''33t tli' 4-u :arse ctepoo It stormwater site plan template—rev.10/21/2008 10 SECTION II—EROSION AND SEDIMENT CONTROL PLAN Sediment and erosion control measures may be depicted on the master land use application plot plan,a stormwater site plan,and/or a separate Construction SWPPP site plan. This is a checklist to ensure that the following are depicted on a site plan: 1. General. a. Vicinity Map b. Jefferson County Approval Block c. Erosion and Sediment Control Notes 2. Site Plan. a. Legal description of subject property. b. North arrow. c. Indicate boundaries of existing vegetation(e.g.,tree lines,pasture areas, etc.). d. Identify and label areas of potential erosion problems. e. Identify FEMA base flood boundaries and Shoreline Management boundaries(if applicable). f. Show existing and proposed contours. g. Indicate drainage basins and direction of flow for individual drainage areas. h. Label final grade contours and identify developed condition drainage basins. i. Delineate areas that are to be cleared and graded. j. Show all cut and fill slopes indicating top and bottom of slope catch lines. 3. Conveyance Systems. a. Designate locations for swales, interceptor trenches,or ditches. b. Show all temporary and permanent drainage pipes,ditches,or cut-off trenches required for erosion&sediment control. c. Provide minimum slope and cover for all temporary pipes or call out pipe inverts. d. Shows grades,dimensions, and direction of flow in all ditches,swales,culverts and pipes. e. Provide details for bypassing off-site runoff around disturbed areas. f. Indicate locations and outlets of any dewatering systems. 4. Location of Detention Best Management Practices(BMPs). Identify location of detention BMPs. 5. Erosion and Sediment Control Facilities. a. Show the locations of sediment trap(s), pond(s), pipes and structures. b. Dimension pond berm widths and inside and outside pond slopes. c. Indicate the trap/pond storage required and the depth,length,and width dimensions. d. Provide typical section views through pond and outlet structure. e. Provide typical details of gravel cone and standpipe,and/or other filtering devices. f. Detail stabilization techniques for outlet/inlet. g. Detail control/restrictor device location and details. h. Specify mulch and/or recommended cover of berms and slopes. i. Provide rock specifications and detail for rock check dam(s), if applicable. j. Specify spacing for rock check dams as required. k. Provide front and side sections of typical rock check dams. I. Indicate the locations and provide details and specifications for silt fabric. m. Locate the construction entrance and provide a detail. 6. Detailed Drawings. Any structural practices used that are not referenced in the Ecology Manual should be explained and illustrated with detailed drawings. 7. Other Pollutant BMPs. Indicate on the site plan the locations of BMPs to be used for the control of pollutants other than sediment(e.g.,concrete wash water). 8. Monitoring Locations. Indicate on the site plan the water quality sampling locations to be used for monitoring water quality on the construction site. Sampling stations should be located upstream and downstream of the project site. stormwater site plan template—rev.10/21/2008 11 Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs), the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. ZO OWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DAT THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: stormwater site plan template—rev.10/21/2008 12 October 25, 2010 JOAB EADES EDEN EADES 21 BALSA WAY PORT TOWNSEND WA 98368-8730 RE: SITE ADDRESS: LOUISA ST MLA#: MLA10-00385 Dear JOAB EADES: Jefferson County Department of Community Development staff have reviewed the application materials for the above project proposal and have determined that the application is substantially complete. Additional information needed for project review may be requested in writing by the Director or Project Planner. Please call the Department of Community Development if you have any questions. Sincerely, Department of Community Development Staff c: File UMW October 25, 2010 Dear Reviewer, RE: MLA10-00385 Jefferson County has forwarded the attached application to you for review and comment because your agency is responsible for determining compliance with state and federal requirements or may otherwise be affected by the following proposal: STAND ALONE EMERGENCY STORMWATER REPAIR Comments must be received within fourteen (14)calendar days or by November 8,2010. If no written response has been received within fourteen (14)days, your agency will be presumed to have no comments. If necessary,the UDC administrator may grant an extension of time for comment. Please contact at (360)379-4450 if you desire an extension of lime or have additional questions regarding this proposal. Thank you in advance for your attention to this matter. Sincerely, c: , fN co . JEFFERSON COUNTY r DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street • Port Townsend •Washington 98368 0 360/379-4450 • 360/379-4451 Fax SG http://www.co.jefferson.wa.us/commdevelopment/ Stormwater Calculation Worksheet MLA# 10 " PROJECT/APPLICANT NAME: Ead 1°/S DETERMINING STORMWATER MANAGEMENT REQUIREMENTS: This stormwater calculation worksheet should be completed first to classify the proposal as"small,""medium,"or"large." The size determines whether a Stormwater Site Plan is required in conjunction with a stand-alone stormwater management permit application, building permit application, or other land use approval application that involves stormwater review. The basic information will also be helpful for completing a Stormwater Site Plan,if required. PARCEL SIZE(I.E.,SITE) Size of parcel acres An acre contains 43,560 square feet. Multiply the acreage by this figure. Size of parcel in square feet sq/ft ,_ v Land-disturbing activity is any activity that results in movement of earth, or a change in the existing soil cover(both vegetative and non-vegetative) and/or the existing soil topography. Land disturbing activities include, but are not limited to clearing, grading, filling, excavation, and compaction associated with stabilization of structures and road construction. Native vegetation is vegetation comprised on plant species, other than noxious weeds,that are indigenous to the coastal region of the Pacific Northwest and which reasonably could have been expected to naturally occur on the site. Examples include species such as Douglas fir,western hemlock,western red cedar, alder, big-leaf maple, and vine maple;shrubs such as willow,elderberry,salmonberry, and salal; herbaceous plants such as sword fern,foam flower,and fireweed. LAND DISTURBING ACTIVITY,CONVERSION OF NATIVE VEGETATION,AND VOLUME OF CUT/FILL Calculate the total area to be cleared, graded,filled, Answer the following two questions related to excavated,and/or compacted for proposed development conversion of native vegetation: project. Include in this calculation the area to be cleared for: D foso\n y, 0 Does the project convert g/.acres or more of So Constructio sq/ft native vegetation to lawn or landscaped areas? Drainfield,septic tank,etc. sq/ft Circle: Yes Well,utilities,etc. sq/ft Does the project convert 2 1/2 acres or more of native vegetation to pasture? Driveway,parking,roads, etc. sq/ft Circle: Yes o Lawn, landscaping,etc. sq/ft Other compacted surface, etc. sq/ft Indicate Total Volumes of Proposed: Total Land Disturbance L/80 0 sq/ft Cut Fill, (cu/yd) [over] stormwater cal°worksheet Rev 9-9-2010—REV.9/9/2010 1 Impervious surface is a hard surface that either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A hard surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces which similarly impede the natural infiltration of stormwater. STORMWATER CALULATIONS-IMPERVIOUS SURFACE NEW EXISTING Structures(all roof area) sq/ft Structures(all roof area) sq/ft Sidewalks sq/ft Sidewalks sq/ft Patios sq/ft Patios sq/ft Solid Decks sq/ft Solid Decks sq/ft (without infiltration below) (without infiltration below) Driveway, parking, roads,etc sq/ft Driveway, parking, roads,etc sq/ft Other sq/ft Other sq/ft Total New sq/ft Total Existing sq/ft TOTAL NEW+TOTAL EXISTING* sq/ft *This amount will be used BY STAFF to check total lot coverage. The following questions will help determine whether the proposed project is considered development or redevelopment. DEVELOPMENT v. REDEVELOPMENT Divide the total existing impervious surface above by the size of the parcel and convert to a percentage: -6,70 Does the site have 35%or more of existing impervious surface? Circle: Yes No FURTHER INSTRUCTIONS: If the answer is yes, the proposal is considered redevelopment and the attached Figure 2 should be used to determine the applicable Minimum Requirements. If the answer is no, the proposal is considered new development and the attached Figure 1 should be used. At this juncture, the applicant should refer to the applicable Flow Chart to determine the Minimum Requirements for stormwater management. DCD staff will help verify the classification of the project and the application requirements. For proponents of "small" projects who must comply only with Minimum Requirement #2—Construction Stormwater Pollution Prevention—an additional submittal is not required. The proponent is responsible for employing the 12 Elements to control erosion and prevent sediment and other pollutants from leaving the site during the construction phase of the project. Pick up the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet. Proponents of"medium" projects—those that must meet only Minimum Requirements #1 through #5—and for "large" projects—those that must meet all 10 Minimum Requirements—are required to submit a Stormwater Site Plan. DCD has prepared a submittal template of a Stormwater Site Plan, principally for rural residential projects. Complete the template in the Stormwater Site Plan Instructions and Submittal Template or prepare a Stormwater Site Plan using the step-by-step guidance in the Stormwater Management Manual. APPLICANT SIGNATURE By signing the Stormwater Calculation Worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. a OWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE)007- /c7 �E'a-ti m v,r£���� a ``,,,:,... t �•a" i '",�.'''",� `"&4 £ i s ., �^.mss;,u �.�`,a 'ror., au�,.r.�.�,�.F �, �r'. � t � � �•° stormwater calc worksheet Rev 9-9-2010-.REV.9/9/2010 2 r • ` d�g JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street • Port Townsend•Washington 98368 360/379-4450 .800/831-2678. 360 '� �[]���e 360/379-4451 Fax Stormwater Management Permit Supplemental Application MLA# 10` ,3g5" PROJECT/APPLICANT NAME: 1/4_ ' 'IV?p'-5 E"gt ript_S Applications for grading projects or land-disturbing activities which require a stormwater management permit shall include the following information. This information may also be provided on other diagrams, plans, studies, or attachments submitted with the project application. If so, please indicate such on this permit application. The Administrator may waive specific submittal requirements determined to be unnecessary for review of the application. 1. Source of fill material and deposition of excess material. Ai/A- 2. Physical characteristics of fill material: /Q/Pt., 3. Proposed methods of placement and compaction p• sistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. N/Pt 4. Proposed surfacing material. 11/4 /A• 5. Proposed method(s)of drainage and erosion control. s• ,NO fil U(cat /' 5k----6-0/x) .6 GI� 1! G i ress �j) CJ'Or)FQ ri 6. Methods for restoration of the site. P j o j n or ,Opt-n U. C.4 Z o u 18 cwcQ 036 50(413--- wy t E. SALAL c E,0 4 5 0114:60Z At-hi*, WI I-100400 tc>1< at.Tr. . , 7. Demonstrate that instream flow of water will remain unobstructed. -7 8. Demonstrate that erosion and sedimentation from outflow channels will be minimized by vegetation or othermeans,and demonstrate that pond runoff will be controlled to protect adjacent property damage. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. // `��t�U�o �D OWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) STORMWATER MGMT PERMIT.DOC REV.1/13/2006 Paae 3 JEFFERSON COUNTY r‘6,),,�so ooDEPARTMENT OF COMMUNITY DEVELOPMENT ti vo 04 621 Sheridan Street Port Townsend, WA 98368 cvo October 20, 2010 Al Scalf, Director Dear Rey.ievgr qc44v'% ` t") RE: MLA10-00385 Jefferson County has forwarded the attached application to you for review and comment because your agency is responsible for determining compliance with state and federal requirements or may otherwise be affected by the following proposal: STAND ALONE EMERGENCY STORMWATER REPAIR Comments must be received within fourteen (14)calendar days or b� If no written response has been received within fourteen(14)days, your agency will be presumed to have no comments. If necessary,the UDC administrator may grant an extension of time for comment Please contact at(360)379-4450 if you desire an extension of time or have additional questions regarding this proposal. Thank you in advance for your attention to this matter. Sincerely, / AL.Ai — -.012/t..— �[. c: t" '4164 ,, 4 ou- C 4 , ; a is us , -. an Ku? T;61r;pa. (f4. 4Qr ( M pr . yow fr■dow oof a., &OW LS so 4, vaihk, Building Permits/ Inspections Development Review Division Long Range Planning (360) 379-4450 FAX: (360) 379-4451 October 20, 2010 JOAB EADES EDEN EADES 21 BALSA WAY PORT TOWNSEND WA 98368-8730 RE: SITE ADDRESS: LOUISA ST MLA#: MLA10-00385 Dear JOAB EADES: Jefferson County Department of Community Development staff have reviewed the application materials for the above project proposal and have determined that the application is substantially complete. Additional information needed for project review may be requested in writing by the Director or Project Planner. Please call the Department of Community Development if you have any questions. Sincerely, Department of Community Development Staff c: File 10/.2-0J2,,0l0 10:23 FAX 1360379845E • HOPE 12001/001 /7 10/20/2010 09:14 FAX 3603798456 HOPEINCG QJol/001 - Y m Lt..) -( \ u m'" �-- • JEFFERSON COUNTY '' �� ter1471 DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street - Port Townsend •Washington 98366 1 J6 360/379-4450. 360/379-4451 Fax _ www.co,jefferson.wa.us/commdevelopment y\ Master Permit Application MLA: 10 '3- ) Project Description( dude separate sh ets as n- ry):-- -(--...1 ( I y ft 1#1k. — r* ■h.. , v roJQ2 wA P tk.j etc .. Tax Parcel Numb Property Size: _r (acresls oars feet) ■ Site Address and/or Directions to Property: �- Property Owner(e)of Record: `1 O a. L: �,v, 'aft dl��5 Telephone: Fax:. _ email: Mailing Address:. 1 L3a1 Set_ \A]tk. P T, A 9 $`-hg Applicant/Agent(if different from owner): -/ is; vh to 9,d,eS _ . Telephone: Fax: email: Mailing Address , _ -Wh&t,kind of Permit?(Checkeacttcbo:that applies - 0 Lot or Road Segregation . ❑Building ❑Critical Areas Stewardship Plan ❑ Demolition Permit ❑Variance(Minor,Major or Reasonable Economic Use) O Single Family Cl Garage Attached/Detached 0 Conditional Use[C(a), C(d).or C]•• ' O Manufactured-1ome., . ❑ Modular . - • - 0 Discretionary'ID"or Unnamed Use Classification ❑ Commercial• ❑Special Use(Essential Public Facilities)"- ❑ Change of Use ❑Boundary Line Adjustment ❑ Address ❑Road Approach ❑Short Plat" c C T 2 0 J ❑Home Business O Cottage Industry ❑Binding Site Plan•• 0 Propane 0 Long Plat"" ❑Sign -- " • ❑Planned Rural Residential Development(PRRD)/Amendments" • O mellowed'Yes"Use Consistency Analysis ❑Plat Vg atioNAiteration`- tormwater Management ❑Shoreli: Master Program ExemptioNPermit Revisions" p.Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Substantial Development*' O Temporary Use El Shoreline Management Variance • ❑wireless Telecommunication* ❑Comprehensive Plan/UDC/Land Use District Map Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium ❑Jefferson County Shoreline Master Program Amendment •May piquing a Pre—Application Conference 0 Tree Vegetation Request ••R:-titres a Pr@- - lceUU- Conference Please identify any other local,state or federal permits required for this proposal, if known: r DESIGNATION OF AGENT I hereby designate 1 A A ' G , .,,e s to act as my agent in Matters relating to this appllcati-n for permit(s). OWNER SiGruaurE I —. , /! �..# ,9SDste: D ZC 2- /0 By signing this appllcatio Klir,the owner/agent attests that the Infornatipn provtgeci herein,and In any attachments,is true and correct to the best of his,her or its knowledge. . material falsehood or any omission of a material fact made by the owner/agent with respect to•this application packet may result In this permit being null and void. i further agree to save,Indemnify and hold harmless;Jefferson County against all liabilities,Judgments,court costs,reasonable attorney's fees and expensea which may in any way accrue against Jefferson County as a result of or In consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and as employees,representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be alti :lad unless the applicant Informs the County in writing at the time of the application the or she We otioe. ` The action or action Scant will undertake as a result of the Issuance of this permit may negatively fnpaCt upon one or more.threateaed or endangered species and could bad to*potential"take"of an endangered spoons as those terms are defined in the federal law known as the 'Endangered Species Act or"ESA.'Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been Issued Will not violate the ESA. A•y Individual,group or agency can file a lawsuit on behalf of an endangeredapecies regarding your action(s)even If you are 1 compiian It ;r =•arson County development code.The Applicant acknowledges that he,she Cris holds individual and non-transferable res nsibill f ad•_�, to and complying with the ESA. The Applicant has lead this discla r and si s and dates it it below. ' Ipnature: •' 4 to /a 2� z 610 ...4..1.■:.wr 1 44.1s,• t lc44.4l4%r19r1 L"/115 11'!if\.(•--- TDT II..—...\%1"..-..-13.—...;•A.....:r•:....t'1O AO A...- BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that' they will be assuming the responsibility of the General Contractor for the proposed project. )..-- c2C) aala Signature:< �� - -_, � �/ - Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: ) 38 5 .78 C 37? 8(WA, MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame.Type: Bathrooms: Shoreline: Type of Sewage Disposal: ❑ New 0 Wood Existing: ❑ Sewer 0 Addition 0 Steel Proposed: Bank ❑ Community System Total: Height: ❑ Individual System ❑ Alteration/Remodel ❑ Concrete SEP Permit O Repair 0 Masonry ❑ Demolition ❑ Other: . Bedrooms: Water Supply: Existing: Setback: ❑ Private well 0 Two Party Proposed: 0 Public Type of Heat: Total: Name of System: t If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employee-,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have F.00d.'Service? Yes / No _ If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: l Underground Tank 1 Above ground Tank Size of Propane Tank: 1 Heat Stove 1 Cook Stove l Woodstove l Fireplace Insert i Hot Water Tank l Pellet Stove l Other is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, includin' the reserve area. . gar 3 s x,, tr .. rt .' 'm z '`�' a €.a+i ..--' rfy 4'w Square Footage Current Proposed l e,P s U r , ,,,i , 1-A' 4",: a e i i s . 0 I 4 �e Y;�s, ` 4 �u Ott . r EH Bid App Review: Main Floor Heated , 1 . 2`"Floor Heated ` ,‘ Consistency Review:•Other Heated K-. w h Y Base fee: Mezzanine i,, ,i"-,' Additional l Section: tit a Heated Basement 6x „ R Plan Check fee: Unheated Basement : State Surcharge fee: - Pot Water Review fee: Other Unheated : ., Garage/Carport � • SUBTOTAL tifekei Decks ,z_i x 911/Rd Approach fee: 1 Other TOTAL: �� ��.� `...,+ter Receipt Number: , r1 n Cash/Check Number: ESTIMATED COST(REQUIRED) Date: •Fair market value of all labor and materials foundation to finish Initials` y'. ,„_.._,.._....A+4++-NunRusilittanit )FC)RMS\Current DRD Forms\Master Permit Application 5-29-08.doc acv C M-Va`(m t� d ,�? od, JEFFERSON COUNTY ''� ��� ` a q DEPARTMENT OF COMMUNITY DEVELOPMENT ZU Z o: 621 Sheridan Street• Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax C(\ '3 I,S- www.co.jefferson.wa.us/commdevelopment /0 _2_0 — (0 Master Permit Application MLA: /O — 3 8`S Project DescripjQn(' elude separate sh is as nee. 9ry): i t" >A0 C ilk cue 1p r \--/Q( ilk. t— — C1� hc� �-- ov C p►��P rc� 1 CQ,�1 Tax Parcel Number: 9.)1 % (0 0 �j -7-O \ Property Size: (acres/square feet) Site Address and/or Directions to Property: Property Owner(s)of Record: •et. IllEIMIMINSP Telephone: Fax: email: Mailing Address: 1 Uoi\Sc \-t.)ca. P T . ,j cl cc;3(dir Applicant/Agent(if different from owner): S y L. P S Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies ❑Lot or Road Segregation ❑Building ❑Critical Areas Stewardship Plan ❑ Demolition Permit ❑Variance(Minor,Major or Reasonable Economic Use) 0 Single Family 0 Garage Attached/Detached 0 Conditional Use[C(a),C(d),or C]- ❑ Manufactured Home : .0 Modular . 0 Discretionary"D"or Unnamed Use Classification 0 Commercial* 0 Special Use(Essential Public Facilities)** ❑ Change of Use ❑Boundary Line Adjustment ❑ Address 0 Road Approach 0 Short Plat'"'* ❑ Home Business ❑Cottage Industry 0 Binding Site Plan** ❑ Propane ❑Long Plat** ❑Sign ❑Planned Rural Residential Development(PRRD)/Amendments** 0 Allowed"Yes"Use Consistency Analysis ❑Plat Vacation/Alteration** )4torrnwater Management ❑Shoreline Master Program Exemption/Permit Revisions** ❑Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Substantial Development** 0 Temporary Use ❑Shoreline Management Variance 0 Wireless Telecommunication* ❑Comprehensive Plan/UDC/Land Use District Map Amendment ❑Forest Practices Act/Release of Six-Year Moratorium ❑Jefferson County Shoreline Master Program Amendment *May require a Pre—Application Conference 0 Tree Vegetation Request - n { **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate IL., ., , .,1.:__. to act as my agent in matters relating to this application for permit(s). i OWNER SIGNATURE / /fill° /�. . �r Date: By signing this applicatio i4rrn,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the application that he or she wants prior notice. Signature: , ate: The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: } ate: G:\PenmtCenter\###FORMS###\DRD FORMS\Current DRD Forms\Master Permit Application 5-29-08.doc BUILDER STATEMENT :r The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAx: ( ) ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAx:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: ❑ New ❑ Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: Bank ❑ Community System ❑ Alteration/Remodel ❑ Concrete Total: Height: ❑ Individual System ❑ Repair ❑ Masonry SEP Permit# ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: Setback: ❑ Private well ❑ Two Party Proposed: U Public Type of Heat: Total: Name of System:; ' If this is a Commercial Project you must answer the following: • Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: I Underground Tank 1 Above ground Tank Size of Propane Tank: I Heat Stove i Cook Stove I Woodstove 1 Fireplace Insert I Hot Water Tank I Pellet Stove i Other Is this appliance being installed in a Manufactured I Mobile Home? Yes / No _ When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, includin' the reserve area. x x c s S quare Footage Current Proposed :. `x Main Floor Heated EH BId App Review: Floor Heated Consistency Review: Base Heated : ., ase fee Mezzanine Additional Section: Heated Basement Plan Check fee: Unheated Basement State Surcharge fee: Other Unheated Pot Water Review fee: � 4 Garage/Carport z SUBTOTAL Decks a 911/Rd Approach fee: • Other TOTAL: $ Receipt Number: Cash/Check Number: ESTIMATED COST(REQUIRED) y Date: .Fair market value of all labor and materials foundation to finish Initials: G:\PennitCenter\###FORMS###\DRD FORMS\Current DRD Forms\Master Permit Application 5-29-08.doc Parcel Print Page 1 of 1 Parcel Number: 948603201 05/14/2007 Owner Mailing Address: JOAB EADES EDEN EADES 21 BALSA WAY PORT TOWNSEND WA 983688730 Site Address: Section: 16 School District: Port Townsend (50) Qtr Section: SW1/4 Fire Dist: Chimacum (1) Township: 30N Tax Status: Taxable Range: 1W Tax Code: 111 Planning area: Quimper(2) Sub Division: EISENBEIS BAY VIEW Land Use Code: 9100 - VACANT LAND Property Description: EISENBEIS BAY VIEW I BLK 32 PARCEL A I BND TGTH THRU BLA#107144 I SURVEY V31 PG4 I ADJ QTA © No Photo Available http://www.co.jefferson.wa.us/assessors/parcel/parcelprint.asp?PARCEL NO=94860320... 10/20/2010 a -I X X -b 01 CO -I -b X -I -I co co -- -- co -o Cl) 0) x o- c) r+ X 01 C) -3 -0 m 0 - -0 -5 -3 C) 0 C 0- CD 01 C) CD M- m cc -- CD cc CD CD a CD r+ o CD - O 7C 0 -3 E -s -- m rn o o I* cc - - - CD CD 0 - - o_ 0 0 N O 0 -- CPI N 0 0) M CO a - v CO m CO 0 CA) O N N o C CO Cr! -+ O rF - m m N rn L C) ` . rt a Cl) CO CO m G7 o -' O O O O c D C Z I' I-I CD 70 m a 01 U) rn 73 O 7C CO 0 -I 03 Z CO v CO Cl) C m a I- CD --I - rn -I CO Z C7 77 -I I- m m m X -< G7 N CO o. m cT o CO a Is -I L -I rn a = X a 0 o m o x 1-♦ co r o Z rn rn -I a co a co o cn X CO CO n a O -• -I 70 o -0 0-) rn a o x x CD 03 -- Z -< o a v 70 rn a - o 0 70 03 07 C 1 -< 0) rn m r -P co m cn rn 03 a ,c o 70 0_ CO I' I-1 N -1 X a m - - -- H -. - 3 D Z o D L CO o C7 I- 11 CO o co O 0) -+ -1 E W C 7 41. m 0) 0. -II, 73 CO C7 I 0 0 CO 0- U) �1 CD eD W o CO 0 0 -1 -I C) �, D I- 0 C O Z a n CD C) C a a CO CO I-I Q r+- Z O 0 M -I C o n (fi cn r+ o_ 70 3 a - cn - o- Z L o CA) - CD -b 0 a cn -- - N o C- Cii O I-I o �,- -n Z Cr N 71 .0 0 C o H y 73 --.7,-;---, / c- 3E5 3 ' .ilaNE-W_a-I i rI-MZ....z.a .1.......r / f '-7.4111-1flbrf _1_2211 'Oa Date. C - - time received ' a / pm .„,,- ' Mon. Tues. .Wed; tifi BID: /0 -' ?a / / - r1/4 Date:_______----- , 7 \)s / • Contact Name___— : °------A- - -- C- C. OWNER: ec‘. eS . 0 . , ,0 Contact Number 360_IS.__L-7" "ff A.... ADDRESS: 4 206_____-_ 4 Notes: . . Foundation Plumblnq - Framing Propane Tank Mechanical Setbacks Under-ground Framing Under ground Furnace Footing _ Rough in Air seal Above ground Gas — Stemwall Hydronic Exterior shear Exterior lines Oil #4. — Straps _____ Appliance — Interior shear Interior lines . Ducts Y— Post Hole Ventilation Underfloor _ Gas/wood stove Man-Homes . Final Inspection___ Setbacks _ Insulation. '. Foundation Address Posted oor wall ceiling Bieck&Tie fl ______---... .1■MIIIIIMIMMINIMIIIIIIIIII