Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, Public Works Director /County Engineer
Agenda Date: January 5, 2015
Subject: Local Agency Supplement with
Transportation ( WSDOT), Uppe
Replacement, Federal Project
CR1896
the Washington State De +pt. of
- Hoh Road MP 3.338 Culvert
�ILH -A 160(001), County Project No.
Statement of Issue: The attached Local Agency Supplement with WSDOT is necessary
in order to proceed with construction of the Upper Hoh Road, MP 3.338 Culvert
Replacement project. The Board originally signed this on May 27, 2014 and is being
resubmitted because of minor changes in project description requested by WSDOT.
The funding levels remain the same.
Analysis /Strategic Goals /Pro's ft Con's: This project consists of replacing the
substandard, failing culvert at Upper Hoh Road MP 3.338 with a new 48 -inch diameter
steel culvert. The new pipe is to be installed by pipe ramming through the fill
adjacent to the existing culvert in order to keep the road open and lower costs. This
Local Agency Supplement is for the construction contract and construction
engineering.
Fiscal Impact /Cost Benefit Analysis: This Local Agency Supplement will provide
$733,565 for construction of the project. This project has 100% funding through the
Public Lands Highway Discretionary fund, administered by the Federal Highway
Administration.
Recommendation: The Board is requested to sign the three originals of the Local
Agency Supplement, and return to Public Works.
Department Contact: Jon Watson, P.E., Engineering Services Manager, 385 -9160.
hilip Morl Couftty-Admtnlistrator
Date
AlMlk
inn Local Agency Agreement Supplement
agency Supplement Number
Jefferson County 2
= ederal Aid Project Number Agreement Number CFDA No. 20,2055
PLH -A 160 001 LA -7591 Catal of Federal Domestic Assistance
The Local Agency requests to supplement the agreement entered into and executed on September 23, 2011
All provisions in the basic agreement remain in effect except as modified by this supplement.
The changes to the agreement are as follows:
Project Description
Name Access Preservation: Hoh Rainforest, Olympic National Park Length 3.7
Termini Upper Hoh Road MP 3.2 to MP 6.9
Description of Work ❑ No Change
Replace failing or substandard culverts at Upper Hoh Rd. MP 3.3, 4.3 and 6.9 in three phases.
Reason for Supplement
Obligate CN for phase one MP 3.338
Does this change require additional Right of Wav or Easements? ❑ Yes ® No Advertisement Date: 2/18/2015
Estimate of Funding
Type of Work (t) (2) (3) (4) 1 (s)
Previous Estimated Total Estimated Agency Estimated
A reement/Su I. Supplement Project Funds Funds Federal Funds
PE a. Agency
680,799.00
680,799.00
680,799.00
100 % b. Other
c. Other
Federal Aid d. State
Participation -
— 10,000.00
10,000.001
10,000.00
Ratio for PE e. Total PE Cost Estimate (a +b +c +d)
690 799.00,
690,799.00
690,799.00
Right of Way f. Agency
% g. Other
Federal Aid
h. Other
Participation
Ratio for RW i. State
�/
as f0m M-+
Z —
_
J_ Total R/W Cost Estimate (f +g +h +i)
CTSOf1 CO, Pr0spcut We
i
Construction k. Contract
David
AlvaMZ, CbIct UvIl
650 827.00
I. Other Contract MP 3.338
650,827.00 650,827.00
100 % m. Other
Federal Aid n. Other
Participation o. Agency
72,738.00 72,738.00
72,738.00
10,000.00 10,000.00 _
Ratio for CN p. State
10,000.00
733 565.00
q. Total CN Cost Estimate k+Irn+n+o
733,565.00: 733,565.00
r. Total Project Cost Estimate e
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington State Department of Transportation
By
Title
DOT Form 140 -041 EF
Revised 03/2014
By
Director of Local Programs
Date Executed