Loading...
HomeMy WebLinkAbout010515_ca04Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director /County Engineer Agenda Date: January 5, 2015 Subject: Local Agency Supplement with Transportation ( WSDOT), Uppe Replacement, Federal Project CR1896 the Washington State De +pt. of - Hoh Road MP 3.338 Culvert �ILH -A 160(001), County Project No. Statement of Issue: The attached Local Agency Supplement with WSDOT is necessary in order to proceed with construction of the Upper Hoh Road, MP 3.338 Culvert Replacement project. The Board originally signed this on May 27, 2014 and is being resubmitted because of minor changes in project description requested by WSDOT. The funding levels remain the same. Analysis /Strategic Goals /Pro's ft Con's: This project consists of replacing the substandard, failing culvert at Upper Hoh Road MP 3.338 with a new 48 -inch diameter steel culvert. The new pipe is to be installed by pipe ramming through the fill adjacent to the existing culvert in order to keep the road open and lower costs. This Local Agency Supplement is for the construction contract and construction engineering. Fiscal Impact /Cost Benefit Analysis: This Local Agency Supplement will provide $733,565 for construction of the project. This project has 100% funding through the Public Lands Highway Discretionary fund, administered by the Federal Highway Administration. Recommendation: The Board is requested to sign the three originals of the Local Agency Supplement, and return to Public Works. Department Contact: Jon Watson, P.E., Engineering Services Manager, 385 -9160. hilip Morl Couftty-Admtnlistrator Date AlMlk inn Local Agency Agreement Supplement agency Supplement Number Jefferson County 2 = ederal Aid Project Number Agreement Number CFDA No. 20,2055 PLH -A 160 001 LA -7591 Catal of Federal Domestic Assistance The Local Agency requests to supplement the agreement entered into and executed on September 23, 2011 All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows: Project Description Name Access Preservation: Hoh Rainforest, Olympic National Park Length 3.7 Termini Upper Hoh Road MP 3.2 to MP 6.9 Description of Work ❑ No Change Replace failing or substandard culverts at Upper Hoh Rd. MP 3.3, 4.3 and 6.9 in three phases. Reason for Supplement Obligate CN for phase one MP 3.338 Does this change require additional Right of Wav or Easements? ❑ Yes ® No Advertisement Date: 2/18/2015 Estimate of Funding Type of Work (t) (2) (3) (4) 1 (s) Previous Estimated Total Estimated Agency Estimated A reement/Su I. Supplement Project Funds Funds Federal Funds PE a. Agency 680,799.00 680,799.00 680,799.00 100 % b. Other c. Other Federal Aid d. State Participation - — 10,000.00 10,000.001 10,000.00 Ratio for PE e. Total PE Cost Estimate (a +b +c +d) 690 799.00, 690,799.00 690,799.00 Right of Way f. Agency % g. Other Federal Aid h. Other Participation Ratio for RW i. State �/ as f0m M-+ Z — _ J_ Total R/W Cost Estimate (f +g +h +i) CTSOf1 CO, Pr0spcut We i Construction k. Contract David AlvaMZ, CbIct UvIl 650 827.00 I. Other Contract MP 3.338 650,827.00 650,827.00 100 % m. Other Federal Aid n. Other Participation o. Agency 72,738.00 72,738.00 72,738.00 10,000.00 10,000.00 _ Ratio for CN p. State 10,000.00 733 565.00 q. Total CN Cost Estimate k+Irn+n+o 733,565.00: 733,565.00 r. Total Project Cost Estimate e The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washington State Department of Transportation By Title DOT Form 140 -041 EF Revised 03/2014 By Director of Local Programs Date Executed