Loading...
HomeMy WebLinkAboutBLD1996-00384!! . . a JEFFERSON COUNTY BUILDING APPLICATION Jefferson County Permit Center Castle Hill Mall 621 Sheridan St. Port Townsend, WA 98368 360-379-4450 PERMIT # •BLD96-0384 DATE RECEIVED. :06/24/96 SITE ADDRESS:1294 LEMONDS DR :QUILCENE, WA 98376 APPLICANT. . . :ETHAN ROUSH PHONE:206-723-5324 MAILING ADDR.DIANE TOURVILLE :4903 51ST AVE S :SEATTLE WA 98118 CONTRACTOR. . :OWNER PHONE: MAILING ADDR: • CONTR. LIC #: EXPIRATION DATE: / / ARCHITECT/ . . : PHONE: DESIGNER • MAILING ADDR: PARCEL NO. . . :601032010 ALT: CON j=,naQ LEGAL DESC. . :STR 03-26-01 WWM, TAX # 16 BY : rya DATE: 6.95.16 LOT , BLOCK , WATER: DATE: DESCRIPTION OF IMPROVEMENT: single family residence BUILDING TYPE •RES BEDROOMS--- BATHROOMS-- MAIN FL. . . : 1097 sf TYPE OF IMPROVEMENT:NEW EXIST. : 0 EXIST. : 0 ADD'L FL. . : 897 sf GARAGE/CARPORT PROP. . : 2 PROP. . : 2 HTED BSMT. : 0 sf WOODSTOVE • TOTAL. : 2 TOTAL. : 2 UNHT BSMT. : 0 sf UBC OCCUPANCY GROUP: SEWAGE DISP. . :CON OTHER 0 sf TYPE OF CONST WATER SUPPLY. :PWELL CRPT/GAR. . : 0 sf UNITS. : 0 STORIES:2 HEAT TYPES. :WOD/PRO/ DECKS • 300 sf DIMENSIONS: MOBILE HOME COMMERCIAL: 0 sf FRAME TYPE:WOOD MAKE: YR: INDUSTRIAL: 0 sf EST COST.$: 1060 0 SIZE: BANK HT. . . : 0 ft PROJ GRP. . : 8068 SH SETBACK: 0 ft Owner/agent FEES Signature: UG \� type amount by date recpt 7 PRMT $ 922.25 EMH 06/24/96 1121443 Date: J r •� �`''% 7 PLCK $ 276.68 EMH 06/24/96 1121443 eking B.C. $ 4.50 EMH 06/24/96 1121443 Issued By: D,,r 'ermine �,nan� ii Date: $ 1203 .43 TOTAL CA LI r '' ' JEFFERSON COUNTY PERMIT CENTER, 621 SHERIDAN ST, PORT TOWNSEND'WA' 98368 BUILDING PERMIT APPLICATION _ PROJECT DESCRIPTION: V le_ *Lily res-/ Rc-e/ 1 BUILDING TYPE: PROJECT TYPE: FRAME TYPE: 'tg SINGLE FAMILY '� NEW WOOD ❑ GARAGE ATTACHED/DETACHED ❑ ADDITION ❑ STEEL ❑ MODULAR ❑ ALTERATION/REMODEL ❑ CONCRETE ❑ COMMERCIAL ❑ REPAIR ❑ MASONRY ❑ MULTI FAMILY/# OF UNITS ❑ DEMOLITION ❑ OTHER ❑ INDUSTRIAL ❑ OTHER BEDROOMS: BATHROOMS: TYPE OF SEWAGE DISPOSAL: EXISTING EXISTING ❑ SEWER ❑ COMMUNITY SYSTEM PROPOSED 2- PROPOSED 2 ] INDIVIDUAL SYSTEM ® Conventional TOTAL Z TOTAL Z PERMIT # SEP ❑ Alternative 74,4orwed $p /ysQ i/ed a- Zr— 92 WATER SUPPLY: TYPE OF HEAT: ���9 " Ig, PRIVATE WELL ❑ ELECTRICITY ❑ ❑ PUBLIC Name of water system: WOODSTOVE PROPANE ❑ HEAT PUMP ❑ OTHER: SQUARE FOOTAGE: MAIN FLOOR 9 7 jo 7/1 2ND FLOOR OR OFFIC.:... .:.; ;:::::::.::.:.: 2 00 £s' 7 y� 64. 3RD FLOOR uec occu a:.; cR .;,..; TD BASEMENT H EMEN S :::`.:r . .;;:.:;: .... . U NHTD BASEMENT _ 0 .. .:...>..:::<..:»....::::>;<::::>:::>CARPORT GARAGE ;;;:»':,,,,,:;::::3 Q $TATS SURCHAGE 4 5 ~D E K S / COM R M IAL E C INDUSTRIAL OTHER TOTAL VALUATION ... .:: ;; ;:.;:.;:.;:. et • 0 or ` d 61(4 TIMATED COST !� ao ESTIMATED C OS i r' D r l ein-ii IF WATERFRONT PROPERTY, DISTANCE TO BANK OR HIGH WATER LINE ft BANK HEIGHT ft SIGNATURE <' I��IG%�'` DATE NAME (PLEASE PRINT) f%ah Ra�.5'L H:\Home\Pkantr\Forms\Bldepp.Rm8/95 . g r1► I v0 M �, h R N M 0� in b O� o N . c0 N J ` c c c c 0 co c p .c N 0 0 0 0 o o•co U d G� co CL ) C._ N rn a a) 0 Q N co C `. 0 t E c Q 'O U O LL 0 _O z c I° N N v x o d Q b o i 1 2 cn GL 9J ` _ U -_ t— 'i "1‘.40-) , N ` o `� ti 4 til v; - °' v y �°_ s c so C) L11 r • ` J 1 U `` \ L C e d i h 4 a) Z .. U ! tIJI Ei a - ' c t CU E E ri . w a� 0 = Y tki ♦ `G c U 0 Z o :v.) J c f4 C N m L O d O W • C = a) 0O E Y J y W Y C C E C N d'O CA N N 0 +• C C U U O a) c6 Cl . cn a y a rn cD cn } a) cn °) O u' " O Cf)a z 0 o d Cl) 0 cn 0 L 0 c 0 0 (�m 0 - z c N O .z ca C U w CC C C p w CI 45 - . D ►• to O • a) O fA 0 0 y O ca 0 C a) 3 -0 Q c"0 'C .D 0 -a i. Cl) -0 •D -00`+--0 O N f0 �CC N O N O < c �Q N < U < O 0 Q U < d 2 a Q LL co .0 CL .a o2S .N 4 f0 C 0) •� 0) c0 C7 co 0 ) 0) ...! CO CA �' 0 ' Q > 4) c) V C C C `- C aL- • C t C C +~'.0 C y Q) 7* U G = 0.-0= r C C �: • U •.� (D C•�CD E. D .'r- aai� o f° o.,,_ `9 0 f° °' 0 cif Q JUG Li c a) cn oa J cn a. . 2 Q;_2 ¢ 2 C7 A 1 . / • V CD Z SN3VEflS al > 9 � >- A� C) Z Q v) W t / 0 2 a. o > aU) U W ° 0 0 ce d } A W a J W W a o CC G] V . Cl- r 6 I -1'4. LL ° f1., U. a )-W z Rl Z a N `�1 `" otLZG a s J o a ai n /Pbod N of v `ro z Q J CL a 2 o J Z a O W Q O. v Q O 4 Jefferson County Permit Center - - Date 621 Sheridan Street Fee Port Townsend WA 98368 Rec # CRITICAL AREAS QUESTIONNAIRE Ck # = Case # Applicant Name 2�ch �s Building Application Land Use Application _ Shoreline Application On-site Sewage Application Subdivision Application Other: 1. Is there any standing or running water on the surface of the YES `( NO property or on any nearby property at any time during the year? If YES, please describe: 2. Has any portion of the property or any nearby property ever been YES k. NO identified as a wetland or swamp? If YES, please describe: 3. Are any willows, skunk cabbage, alders, or cottonwoods present X YES NO on your property or adjacent properties? If YES, please describe: 14445 711_,i eve-yracks rs .d rdrt 0.3j hdda�er"d rows, c-- �Gl ' .61/oerc 4 4. Are there any indications on any portion of the property or on any YES x NO nearby property of rockslides, earthflows, mudflows, or landslides? If YES, please describe: 5. Please indicate which line best represents the steepest slope found on your property. (Check appropriate box) 0 0 4 Q a o / I / ; : r r i i i i i / r r i i i i i i �'� i / / � ' iii,i i i' i' .' ''� / � ' iiiiiii .' .rJ r r i i i i i �'�� ��' . . -- (Questionnaire Continues on Back) 6. Does the site have steep slopes with little to no vegetation? YES `1)s, NO If YES, please describe: 7. Does the site contain high percentages of silt and/or very fine YES k NO sand? If YES, please describe: 8. Does the site contain ground water seepage or springs near the YES +' ` NO surface of the ground? If YES, please describe: The applicant hereby certifies that all of the above statements and the information contained in any other transmittals made herewith are true, and the applicant acknowledges that any action taken by Jefferson County based in whole or in part on this application may be reversed if it develops that any such statement or other information contained herein is false. Signature Date 6/°?1//C6 FOR OFFICE USE ONLY ❑ Wetlands ❑ Seismic CRITICAL AREAS ON OR ❑ Aquifer Recharge Area (zone_) ❑ Fish & Wildlife Area 1 • IMMEDIATELYADJACENTTO SITE: ❑ Frequently Flooded Area ❑ Fish & Wildlife Area 2 ❑ Erosion ❑ Landslide Zone: Parcel Size: Status: Comprehensive Plan Land Use Designation: Reviewed by: Community Plan: Date: r .erson County Permit Center July 26, 1996 Sheridan art Townsend WA 98368 f) -- - 60) 379-4463 NDINGS AND CONDITIONS OF APPROVAL AS REQUIRED UNDER T A�� ' 21995 FFERSON COUNTY INTERIM CRITICAL AREAS ORDINANCE JEFFERSON COUNTY plicant ETHAN ROUSH PERMIT CENTER iling Addr: DIANE TOURVILLE 4903 51ST AVE S SEATTLE WA 98118 Critical Area Review Case NO. : CAR96-0113 Project Description: single family residence Parcel 601032010 S-T-R: 03-26-01 W Site Addr: 1294 LEMONDS DR QUILCENE, WA 98376 FINDINGS In accordance with the authority provided under subsection 4.101 and the requirements contained in Subsection 5.402 of the Jefferson County Interim Critical Areas Ordinance, the following are findings of fact relating to the referenced application: 1) The application was reviewed by Jefferson County Permit Center staff on July 16, 1996 for the potential presence of critical areas regulated under the provisions of the Ordinance, and the following critical areas were confirmed as potentially present on the subject property: Landslide Hazard Area, Critical Aquifer Recharge Area andErosional Hazard Area. 2) Acting upon the above information, Jefferson County staff member, Michelle Lewis conducted a site inspection of the subject property on July 18, 1996 and confirmed the existence of the following critical areas and/or their associated buffers on the property: Landslide Hazard Area and Erosional Hazard Area. 3) Following the site inspection, Jefferson County staff reviewed the application for conformance with the protection standards and requirements for Landslide Hazard Areas and determined that. . . The proposed location for the residence is surrounded by dense vegetation on the north, east, and west sides of the cleared site area. South of the proposed site, is a small berm (terrace like) which has been was cut to place the road. It is this area, as well as the recent clearing that is of concern. The parcel is situated on a landslide hazard area. The recent clearing and grading of the road has also altered the existing topography and is very steep, which will add to the occurence of increased erosion in this area. It is for these reasons that the following conditions apply. This waiver from the provisions of the Jefferson County Interim Critical Areas Ordinance is granted subject to the following conditions. Any diviation from these conditions shall result in this waiver being revoked and the application becoming subject to further review. 7111160 Page: 2 CAR96-0113 ETHAN ROUSH CONDITIONS OF APPROVAL 1) Vegetation retained on-site following completion of clearing for roadways, utilities and the like, may be cleared only if such clearing is absolutely necessary to complete the proposal (Note: This condition shall not be construed as allowing removal of native vegetation within a designated critical area or its associated buffer) . 2) The proposed development shall be located on the subject property exactly as identified on the Universal Plot Plan, or other Site Plan, approved by the County as part of the triggering permit application. Applicant shall be responsible for contacting and notifying contractor(s) of the above conditions in order to ensure compliance at various stages of construction/development. 3) The applicant shall develop and submit to the Department of Public Works for approval, a "Small Parcel Erosion Control Plan. " (see enclosures) . The subject permit will not be issued unless the applicant submits to the Permit Center, a copy of the "Small Parcel Erosion Control Plan" showing a stamp of approval from the Department of Public Works. Once the subject permit has been issued, the applicant shall fully implement the provisions of the submitted "Small Parcel Erosion Control Plan", and contact the Jefferson County Public Works Department to arrange a schedule of inspection for plan compliance. A Certificate of Occupancy will not be issued until the Public Works Department verifies plan compliance. 40119 Al Sc- f Dat Director of Co • ity Development I understand that the granting of the above waiver from the provisions of the Jefferson County Interim Critical Areas Ordinance is made subject to my complying with the above listed conditions, and that any violation of said conditions shall result in revocation of the permit or approval and further review of the project under the Critical Areas Ordinance. Please sign and return to the Permit Center. adition4)414,44/6./ g--/ -YC Applicant Date 411111 ' • 1 t. iz 9'• . ' ' '\If . .-- . , ..-- ' t>18•M' 3-1115: /- .).4 -7 1 . ... ..., . .. .....t , , . -""MIMIll■ ' i , , • . no ..',. --:-,-....-'.• •- • -44„ N 1,,n , --4. es ' --,--;.:--. . in • .....r, „ , • 'Z.;/001 ti ..._ ::ir'' — , 1 ,1! Ato IV . . 40 . . - . ' ..4-. A.Lc . ,. Nnao33ANoolad3dIvr I ; 1--.-„,-. ••-- 1 • • 1---. , I. . 1 . 4; i: 7 A . I. 1 \ / , 1 . , ; ; i i . 1 . , . ..1.c • „C A8 1 ,. 4.1 1 pi H Is 1 AI I . f "- _ .„. \ v, -1 • . ,16, ... z to, . - to ,, r41 ......-...------, 1 ., : : i -. oi 1%. V........... _....... 1 1 ,. , \ 111111 13 re% : T _1_ • ' • I ••■• fn * •44 ‘-• eft\ Ma 1 t " US * V‘ NI lin et.. ra-1 >.._ ct x • .„,, .•1 0 „ F77:,.c.a• i• %I.i il :, H == co :.....i c.,-...,- ,i, 'b _t,.■ L.I../ .3 t41),t1 et. ‘ /2 ] M, I ..■ C.4 \. • •-•".... .;••. ta. r.,_,,,,___I _„,„,..................w... i ° ' , 5 c • , • 0.-.) h . ..;3 N...4 ut VI . la ii) ,.. 0 • \ tIN, 4 T •:= - \ Ith ••• • '0 t) .1 0":"."::\ .45* J,. 1.,. .....„,k — .... VNII\1 0 '4•41') ...,(1 ...., ..., ' V CL ki ''''''..........'................."4,,..)%i: I. . 'n• Ilk- ..N.N.... • -- la 4 - ...4,.... 11 A.,„„; . • ....I • 1,.. • - , . ••1 N........%)S'L6).. °^1 -... • ., ,..,•° • 4 . . .., , ... , i tu --------.- V • IC '.... . . ./1. CZ: _ .../ t. 'a - 9.1, v -.....„. .... , ..„.....- .... i. t.l. //"N . 2 (:71--- 1.14) 1140 ..... ...- ..... ....: ... ... ---___ .....----- .---- I ...... ........:"...:.. _---------- ...‘ - -* I 0 1 92 . 4 ,... N.) 7? ___...,.• ..... ---------.l,5'' . 12ST/ , • r � % 'N. i -q) e ` • I( i '+ N I .,Q 0 1 k it )i 1 '-01 4J L '. : ''Cl .3- L '" `, M O o 3 a fi .� ,s! S °),• - -'t c� a c. v v__: __t a 1 j i ,c _E 1i I t C) i 0 X s. VI N a 1.)is i ` �� 3 `J i' ! u� y cM 3 . ti 0 1 .0 x � IC , v .0 3 b tl 4l a o 0 4.0 V) l k a a tr. s k■ r : s. <tb_at � 1 • ..„ Q, V \` T .) N N Z , q. Q kE a L N. -¢ jn *. ,u x II 0 i y • )-- V u d 9I 4. u x ON ,act . r d 'z I1)i w y ten, fa) CA M bti %.0 '.1. .4.) .4% 0% 2) S Drf el 2 31 5 [ ;GLU AUG 1.31996 .� EROSION AND SEDIMENTATION CONTROL WORKSHE T JEFFERSON COUNTY PERMIT CENTER Property Owner �OUsL Telephone 2-'66- 324 Address 6LYre. 5,/�P9 &) 7pArecr, Plan Prepared By sue. Telephone 1. Describe what primary temporary erosion and sedimentation control measure(s)will be implemented to control erosion and p r e vent sediment from leaving the project site or entering or impacting any critical areas during any clearing, grading, excavation, embankment and/or construction activities. This requirement can be met by implementing one or more of the measures listed below. Please check the measure(s) you plan to implement and show their approximate location on the site plan. Measures, other than those listed, may be proposed. Attach additional sheet(s)if more space is required. Start and complete all clearing, grading, and construction activities and stabilize the site between April 1 and October 15. Stabilization means that disturbed areas will have a well established plant cover or be landscaped to minimize erosion prior to October 15. Areas that do not have a well established plant cover will be covered with mulch or plastic to prevent erosion. Limit clearing and grading activities to areas of less than 5000 square feet and maintain a minimum of a 25 foot well established vegetative buffer between V disturbed areas and all-property-boundaries, road side ditches and/or critical areas designated as wetlands, aquatic habitat,landslide hazards or erosion hazards. Cover exposed areas awaiting final grading and stabilization with a minimum of 2 inches of straw or hay or other material approved for this purpose. Install a filter fence on the downhill portion of the lot, along the contour line where possible, to filter run-off before it leaves the project site or enters any buffer areas or areas designated as wetlands or aquatic habitat. The filter fence shall be installed according to the installation instructions contained in the Storm Water Management Manual for the Puget Sound Basin. Propose other erosion and sedimentation control measures. Please describe proposed measures below. Be specific as to design and specifications. 77e ci/sior.6ed er a- 1twM oo/ z7e9 -i4 1-4e ai f" fie d nyAl/►+�r/ _ is a4nom, SC'x 5l ' /74- consisic d)C ce„Ad sp,„k=r-,x/ 71-6/44.- 1 e. e' eyey?✓r.'fidn. lead a sRpfic 7' e /zc a fer„..,/ U/,Y/ Ze (1 d r7b RICA.I /.� 7;4.7hd.0'c 4 AN Col, 71,4 .P/174c 7`a1z , Stu/rAl 79 0 r44 .c. /eh-a,.,e allt 4, '716 lira rsi -/- 431 /Ale.? �r/d« Si{r I s Ceiryrr >z ' - 5-C3' 6714 d le:// liz,mac- ea . bo/A/ d i.,sfisf/-d as 5-4di . dIrt 7aAe. ,o/e7` p/avz> /// J 4 b 1d/ o n c of a reCand 71011& fx../6/1y . -j7 ovs 1sfis "el-cewfa �� .Sand and grave/ eaKd has Shtuuto hG S�a�s d'74.N any 111.4y Za-14 cup -a r-6/ 0(1 .K 5 doe a f- . h:home/pincntr/infodpw/erosion.doc 5/24/96 • D BUG 1 31996 • 2. Briefly describe how disturbed areas will be permanently stabilized (such s se landscaped, etc.) and how run-off from constructed impervious surfaces •11 be JEFFERSON COUNTY ) p PERMIT CENTER controlled(such as dry well, route run-off to existing drainage facilities, etc. . Qhe e COAI37''JG vr► ARS Aeei ea p/S ( any el;la r6e n.s-tea, ca,/J 66' pkt.lea q, "rim N 6 @o✓IG Y- .�c ea ii4f/vr -gees • t/ f 6i17��/ rold 717 �r�.42 s (.4./;// G�/SC`7 erJ '76 ryp1 4 d74 the ,hetikl/it L/ sr`/r E,u het" '74 /end „lives aut>a,>/ -/a inA .7-he . 7cc? u."// e.va.y '.-4 ,e aot acenf p riper/y. Pr/veu ay thzr,r,car cdIr/ec/ a14elLY A9rr`jfI, i fl se Verdi phi c€ c _ 3. Specify your construction sequence below. The construction sequence must describe the timing for implementation of all site improvements (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and erosion/sedimentation control measures. <Ppt /99S s-"ea1:c _Sys . 40744//ec/ rateleird cic71- /99Y 0:k" co .134 i44q°. /996 r,► uray eY-nu.a,pcl� di#ctied/ cod citsc na y Axed. v.ri /led ri°d /998' RUr/d/ , eo�cp/ Map /994' P4v,111tii €m dt// eccyesed r dLSfUr areci,5 Gil A,,p1-, ec� I hereby state that the information provided above will be implemented to control erosion, sedimentation, and run-off, and that I will notify the Department of Public Works for inspections as required. Signature of Owner t Date h:home/pincntr/infodpw/erosion.doc 5/24/96 Page: 3 CAR96-0113 ETHAN ROUSH CONDITIONS OF APPROVAL 1) The proposed development shall be located on the subject property exactly as identified on the Universal Plot Plan, or other Site Plan, approved by the County as part of the triggering permit application. 2) Vegetation retained on-site following completion of clearing for roadways, utilities and the like, may be cleared only if such clearing is absolutely necessary to complete the proposal (Note: This condition shall not be construed as allowing removal of native vegetation within a designated critical area or its associated buffer) . 3) As discussed on site, the applicant agrees to amend the berm adjacent to the road (driveway) . The applicant shall amend this area on the site with a retaining wall, vegetation groundcover, or a bulkhead. Al Scalf Date Director of Community Development I understand that the granting of the above waiver from the provisions of the Jefferson County Interim Critical Areas Ordinance is made subject to my complying with the above listed conditions, and that any violation of said conditions shall result in revocation of the permit or approval and further review of the project under the critical Areas Ordinance. Please sign and return to , Per ' 't Center. Atir„.., Mar 7-7k ?- App a t Date j/. D CAR96-0113 1P JEFFERSON COUNTY BUILDING PERMIT Jefferson County Permit Center Castle Hill Mall 621 Sheridan St. Port Townsend, WA 98368 360-379-4450 PERMIT # •BLD96-0384 DATE ISSUED. : 08/14/96 SITE ADDRESS: 1294 LEMONDS DR :QUILCENE, WA 98376 APPLICANT. . . :ETHAN ROUSH PHONE: 206-723-5324 MAILING ADDR:DIANE TOURVILLE :4903 51ST AVE S :SEATTLE WA 98118 CONTRACTOR. . :OWNER PHONE: MAILING ADDR: CONTR. LIC #: EXPIRATION DATE: / / LOAN LENDER. : MAILING ADDR: PARCEL NO. . . : 601032010 LEGAL DESC. . :STR 03-26-01 WWM, TAX # 16 LOT , BLOCK , DESCRIPTION OF IMPROVEMENT: single family residence ( 1/( ooting/Setbacks (Shoreline Setback) : ( ) Foundation: ( ) Underground Plumbing/Underground Insulation: ( • i°lumbi /Chimney: S 0 A6UnaPIAIPIMOIT.nr7 - c - 1d' 4%-o-4._ CAS ( Insulation: oat 4,-2.0 -74v ( vrSheetrock:cYC V679 6,11 ( Final/Occupancy Approval: i `4rMESWAVAIWA&Ilr•+g Ara . AW eXT 7` /Air GAS THIS PERMIT IS VALID FOR ONE YEAR. L I Ale" Qt P''/'$1.6y�►G d9K. 24 Hour Recorder for Inspections CALL 379-4455 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS Office Hours 9 a.m. to 4 : 30 p.m. Inspector's Phone Hours 8 - 9 a.m.