HomeMy WebLinkAbout030915_ca02Consent Agenda
JEFFERSON COUNTY
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
TO: Board of Commissioners
Philip Morley, County Administrator
FROM: Frank Gifford, Central Services Director
DATE: March 9, 2015
RE: Professional Services Agreement — Streamline Environmental, Inc.
STATEMENT OF ISSUE:
The septic system at the Jefferson County Jail needs to remain in good working order. The
agreement with Streamline Environmental, Inc. will help to assess current conditions of the
drainfield and establish guidelines for monitoring usage.
ANALYSIS:
Performing this work will help to maintain the life of the drainfield system
FISCAL IMPACT:
The cost is within the current maintenance budget.
Approve and authorize the Board of Commissioners to sign the agreement.
REVIEWED BY:
Phi ip Morley, o y Administrator Date
Proposal No. 150302
APPENDIX B
PROFESSIONAL SERVICES AGREEMENT
This Agreement, by and between the Jefferson County Jail (hereinafter called CLIENT), and Streamline
Environmental, Inc. (hereinafter called "Streamline "), is effective as of date signed below.
ARTICLE I - SCOPE OF WORK
Streamline shall perform professional services as described in Proposal No. 150302.
ARTICLE II - COMPENSATION
1. These services shall be billed at an hourly rate of $100/hour for productive time only. Streamline will predict
the required effort upon each request for assistance. Predictions will not be exceeded without e-mail
authorization from CLIENT.
2. Streamline will invoice CLIENT for all services rendered under this Agreement, at a regular basis not to exceed
once per month. Invoiced amounts shall be due upon receipt. A deposit for services maybe requested at
Streamlines' discretion. If a deposit is required the CLIENT will be notified before commencement of services.
3. The obligation of CLIENT to compensate Streamline for services performed are not contingent or conditioned
upon the receipt of insurance or other third party payments. Should the CLIENT terminate the contract before
services are completed the CLIENT is obligated to compensate Streamline for time and material expense up to
the date of termination of contract.
ARTICLE III - CONFIDENTIAL INFORMATION
In the course of performance of services by Streamline for CLIENT, it is possible that certain confidential
informatiori.wA be ieLealed'td StrcamliriAY CLIENT or that Streamline will obtain knowledge of such confidential
information through other sources. Likewise, it is possible that CLIENT will become acquainted with certain techniques
and procedures used by Streamline which Streamline considers confidential. Streamline and CLIENT will maintain the
confidentiality'of an y 11 hot release or allow access to, information, documents, or materials which are designated as
confidential by Streamline or CLIENT. ,
ARTICLE IV - INDEMNITY
1. Streamline agrees to hold harmless and indemnify CLIENT from and against any and all claims, demands,
actions, or causes of action, including, but not limited to, any and all costs, expenses, legal fees and
liabilities incurred in and about the investigation and defense thereof, for personal injuries, including death,
or property damage suffered by any person, firm of corporation whatsoever and arising from the gross
negligence of Streamline, its agents, servants, or employees under this Agreement.
2. Streamline shall not be liable to CLIENT for any special, indirect or consequential damages whatsoever,
whether caused or alleged to be caused by Streamline's negligence, errors, omissions, strict liability, breach
of contract, or performance of services under this Agreement.
3. In any event, Streamline's entire liability under this Agreement is limited to the greater of (i) $25,000 or (ii)
the total dollar value of this Agreement.
ARTICLE V - STANDARD OF PERFORMANCE
1. Streamline shall deliver its services under this Agreement in a thorough, efficient, and professional manner,
promptly and with due diligence and care, and in accordance with the standard practices of the engineering
profession. NO WARRANTY REPRESENTATION, EITHER EXPRESSED OR IMPLIED, IS
INCLUDED OR INTENDED IN STREAMLINE PROPOSALS, CONTRACTS OR REPORTS.
2. If any part of Streamline's work is found to be defective for reasons attributable to Streamline within a
period of 12 months after completion of the work, Streamline's entire liability for such defective work shall
be to re- perform at its own expense those aspects of the work found defective, provided CLIENT notifies
Streamline in writing as soon as the defect is discovered and within the above mentioned 12 months
warranty period.
Proposal No. 150302
ARTICLE VI - INSURANCE
Streamline carries General Liability, Errors and Omissions, Automobile, and Workman's Compensation
insurance in the amount of $3,000,000.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on their behalf by
their respective representatives, each such representative having been first duly authorized so to act, as of the date and
year first herein above written.
Signed By:
Printed Name:
Title:
Date:
STREAMLINE ENVIRONMENTAL, INC.
By:
Everett A. Sorensen, P.E.
Title: Principal Engineer
Date: March 2, 2015
4
A t0 101M
7,,Y/r
9'e ergs Ctl. Prosec#oes IeI
David Alvarez, Chief Civil DPA
IN—
715 Grant Street • Port Townsend, Washington 98368
Phone (360) 821 -9960 • www.streamlineenv.com
March 2, 2015
Mr. Jeff Monroe
Chief On -Site Sewage System Operator
Jefferson County Sheriff's Office
79 Elkins Road
Port Hadlock, WA 98339
Via e- mail: JMonroekco.jefferson.wa.us
Re: Proposal 150302 for Consulting on System Diagnostics and Maintenance
Jefferson County Jail On -Site Sewage System
Jefferson County Jail
81 Elkins Road
Port Hadlock, WA 98339
Jefferson County Tax Parcel 901111009
Large On -Site Sewage System (LOSS) JEF016
Dear Mr. Monroe,
Thank you for the opportunity to provide engineering consulting services to the Jefferson County
Sheriff's Office. Streamline Environmental, Incorporated (Streamline) proposes to provide
engineering services in support of ongoing system diagnostics and maintenance, at an hourly rate
of $100/hour, plus any incurred costs, marked up 10 %.
The current work scope with respect to the referenced LOSS involves:
• Assessing recent volumetric flows based on pumping data (monthly and daily peaks and
averages),
• Revising a System Performance Spreadsheet that will allow easy calculations of volumetric
flows based on inputted pumping data,
• Assessing the condition of the three existing drainfields, and
• Assisting with completion of an Annual Monitoring & Maintenance Report, to be
submitted to the Washington State Department of Health LOSS Program.
The above work scope is likely to not exceed 8.0 hours. Only actual productive time will be
charged. Should the effort expand so that this prediction may be exceeded, Streamline will notify
you in advance, to obtain written approval.
Page 2
Future consulting tasks may arise, and will be addressed, as requested via e-mail. Streamline has
already tallied 3.0 hours on a site visit & planning meeting, and for ongoing telephone and e-mail
consultations. We would like to include these hours on our first invoice to be completed after
additional work is completed. This would increase the predicted charge for the above scope plus
past efforts to 11.0 hours.
Please feel free to contact me directly if you have any questions.
Sincerely,
Streamline Environmental, Inc.
4;�
Everett A. Sorensen, P.E.
Principal Engineer
(360) 821 -9960
everett(& streamlineenv. com
Attached: Professional Services Agreement
Copy to: Mr. John Zinza
Environmental Engineer
Wastewater Management Section
Office of Shellfish and Water Protection
Washington State Department of Health
Olympia, WA 98504 -7824
Via e -mail: john.zinza(a,doh.wa. og_v