Loading...
HomeMy WebLinkAbout040615_ca05Department of Public Works O Consent Agenda Page 1 of 2 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director, County Engineer� Agenda Date: April 6, 2015 `t" Subject: Local Agency Agreement Supplement #6 with Washington State Department of Transportation For : Queets Bridge Painting, Bridge No. 8W, Clearwater Road MP 0.60 to M.P. 0.76, Project No. CR1881 Statement of Issue: A Local Agency Agreement Supplement #6 with the Washington State Dept. of Transportation is necessary in order to re- distribute existing federal funding within the Construction Engineering phase for the Queets Bridge Painting project. Analysis /Strategic Goals /Pro's £t Con's: This project consists of repainting the steel bridge girders and bracing members of the Queets Bridge. The work includes minor girder web bracing, abrasive blasting, treatment of pack rust, containment of wastes, and repainting with a primer and top coat paint system. This action re- distributes the existing funding from the Construction Contract category to the Construction Engineering category. Fiscal Impact /Cost Benefit Analysis: None. Recommendation: The Board is requested to sign the three original Local Agency Agreement Supplement #6 documents. One fully executed original will be returned to the Board after execution by the Washington State Dept. of Transportation. Department Contact: John Wayand, Project Manager, 385 -9377. Review By: !7 i. y, ty Adminis or Date AIM Washington State wo Department of Transportation Local Agency Agreement Supplement Agency Supplement Number Jefferson County Public Works 6 Federal Aid Project Number Agreement Number CFDA No. 20.205 BHOS -16WA 001 LA 7393 (Catalog of Federal Domestic Assistance The Local Agency requests to supplement the agreement entered into and executed on June 12, 2014 All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows: Project Description Name Queets Bridge Painting Length 0.16 Termini Clearwater Road milepost 0.60 to milepost 0.76 Description of Work ® No Change The proposed work consists of repainting the steel girders and cross bracing. This will include the following general items of work: (I )providing a containment system, (2) abrasive blasting to remove existing paint, (3) treatment of pack rust, (4) disposal of waste, (5) repainting with a primer and topcoat painting system, (6) traffic control, and (7) minor girder web bracing in Span 1 and Span 4. Reason for Supplement Increase of CE Agency amount due to an extended project close -out period. The extended close -out period is due to a legal suit filed by the contractor. Supplement #6 shifts a portion of the unused CN Contract amount to the CE Agency amount to provide for defense against the suit. Does this change require additional Right of Way or Easements? ❑ Yes ® No Estimate of Funding_ Type of Work (1) (2) (3) 1 (4) (5) Previous Supplement Estimated Total Estimated Agency; Estimated Agreement/Suppl. Project Funds Funds ! Federal Funds PE a. Agency 100 % b. Other c. Other Federal Aid d. State Participation Ratio for PE e. Total PE Cost Estimate (a +b +c +d) 295,355.00 0.00 295,355.00 0.001 295,355.00 10,000.00 0.00 -- — 305 355.00 10,000.00 10,000.00 0.00 - 305,355.00 305,355.00 Right of Way f. Agency_ g._ Other _ Federal Aid h. Other Participation Ratio for RW i. State j. Total R/W Cost Estimate (f +g +h +i) h�� V-4-/ Jeffcrson-Cd:-Pro David A-luatez, Chief Civil 1DPA Construction k. Contract I. Other 100 % M. Other 1,964,705.00 - 266,929.99 1,697,775.01 0.00 1,697,775.01 - Federal Aid n. Other Participation o. Agency Ratio for CN p. State q. Total CN Cost Estimate k+l+m+n+o - 0.00 956,521.99 10,000.00 2,664,297.00 699,592.001 2.66 929.99 956,521.99 10,000.00 2 664 297.00 10,000.00 2,664,297-00 r. Total Project Cost Estimate e The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washington State Department of Transportation By Title DOT Form 140 -041 EF Revised 03/2011 By Director of Highways and Local Programs Date Executed