Loading...
HomeMy WebLinkAbout052615_ca02Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director /County Engineer�� Agenda Date: May 26, 2015 J(�'-� Subject: Rural Arterial Program (RAP) Project Agreement for Construction Proposal with the County Road Administration Board (CRAB) South Discovery Road Pavement Preservation MP 3.20 - 4.56 Statement of Issue: Jefferson County submitted one application to the County Road Administration Board (CRAB) for Rural Arterial Program (RAP) funding consideration for the 2015 -2017 biennium. This proposal qualified for funding. CRAB has provided a project agreement which must be executed within 45 days of April 16, 2015 in order to secure the Rural Arterial Trust Account (RATA) funds for this project. Analysis /Strategic Goals /Pro's rt Con's: This road segment has poor structure and surface condition. The project includes dig - out repair and pavement resurfacing. This project is #21 on the 2015 -2020 Six -Year Transportation Improvement Program. Construction is scheduled for the summer of 2018. Fiscal Impact /Cost Benefit Analysis: Local funds available for road construction are limited. The Rural Arterial Program is a primary funding source available to counties for road improvements. The RAP Grant provides 90% of the needed project funds. County road fund will be used to match the RAP grant at 10% of the project cost. The project cost is estimated at $500,000. Recommendation: Authorize the chair to sign three original Rural Arterial Program Project Agreements. Return to Public Works for further processing. Department Contact: Zoe Ann Lamp, Transportation Planner 360- 385 -9162 Reviewed By: P flip Morl y, ounty Adm' r S��l��� Date STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM PROJECT AGREEMENT FOR CONSTRUCTION PROPOSAL Submitting County: Jefferson Project Number: 1615 -01 Date Approved: 04/16/2015 AUTHORIZED RATA FUNDS: $450,000 Road Road Name(s) BMP(s) EMP(s) Segment # 60150 South Discovery Road Pavement Preservation 3.200 4.560 1 The State of Washington County Road Administration Board (CRABoard) and Jefferson County mutually agree as follows: (1) The funds hereby authorized are for completion of the proposed project as defined by chapter 36.79 RCW Roads and bridges — rural arterial program. (2) The County is in compliance with the provisions of chapter 136 -150 WAC regarding eligibility for Rural Arterial Trust Account (RATA) funds. If the County is found not to be in compliance with these provisions, such non compliance may be cause for the CRABoard to withdraw or deny the Certificate of Good Practice of the County and require pay back of any RATA funds that have been paid to the County for this project. (3) If the project is reconstruction, the County shall gain approval from WSDOT (chapter 43.32 RCW) for all deviations from the design standards listed in the Local Agency Guidelines prior to construction. (4) If the project is 3R (resurfacing restoration and rehabilitation), the County shall document its design considerations for the proposed improvements in keeping with 3R standards as listed in the Local Agency Guidelines. (5) The project shall be constructed in accordance with the information furnished to the CRABoard, and the plans and specifications prepared by the county engineer. (6) Phased construction methodology is permitted upon notification by the County Engineer of the phasing plan as authorized under WAC 136 - 170 -030. Failure by the county to notify the CRABoard of phasing plan at least 15 days prior to commencement of construction may result in withdrawal of funding by the CRABoard and county forfeiture of all RATA funds expended. (7) The County shall notify the CRABoard when a contract has been awarded and/or when construction has started, and when the project has been completed. (8) The County shall reimburse the RATA in the event a project post audit reveals improper expenditure of RATA funds. (9) Costs of the project which exceed the amount of RATA funds authorized by the CRABoard, set forth above, and the required matching funds and other funds represented by the county to be committed to the project, shall be paid by the County as necessary to complete the project as submitted to the CRABoard. RAP Project Number: 1615 -01 Page 1 of 2 (10) Matching funds and other funds represented to be committed to the project shall be available as necessary to implement the projected development of the project as set forth in the construction proposal prospectus. (11) The CRABoard hereby agrees to reimburse the county from RATA funds allocated, and not otherwise, for its reimbursable costs not to exceed the amount above specified. (12) The CRABoard will reimburse counties on the basis of monthly progress payment vouchers received and approved on individual projects in the order in which they are received in the CRABoard office, and subject to the availability of RATA funds apportioned to the region. Such obligation to reimburse RATA funds extends only to project costs incurred after the date of project approval by the CRABoard. (13) Either the CRABoard or the County may request changes to the provisions contained in this agreement. Such changes shall be mutually agreed upon and incorporated by written amendment to this agreement. No variation or alteration of the terms of this agreement shall be valid unless made in writing and signed by authorized representatives of the CRABoard or the County hereto. (14) During the term of this agreement and for a period not less than six (6) years from the date of final payment by the CRABoard, the records and accounts pertaining to this agreement are to be kept available for inspection and audit and copies of all records, accounts, documents, or other data pertaining to the agreement will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until said litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the six year retention period. IN CONSIDERATION of the allocation by the CRABoard RATA funds to the project in the amount set out above, the County hereby agrees that as condition precedent to payment of any RATA funds allocated at any time to the above referenced project, it accepts and will comply with the terms of this agreement, including the terms and conditions set forth in Chapter 49, Laws of 1983, 1 st Ex. Sess. (chapter 36.79 RCW); the applicable rules of Title 136 WAC and all representations made to the CRABoard upon which the fund allocation was based; all of which are familiar to and within the knowledge of the county and are incorporated herein and made a part of this agreement, although not attached. "Ibis agreement supersedes all prior agreements issued using the project number listed above and shall be valid and binding only if it is signed and returned to the CRABoard office within 45 days of its mailing by the CRABoard. COUNTY ROAD ADMINISTRATION BOARD: Jefferson C1 C' it By: L % 6K P� By: Date: " 1�<i1�J1� S1 t L j 1-'-9'[{ Date: RAP Project Number: 1615 -01 Page 2 of 2 as David Alvarez, s ) Ox�