Loading...
HomeMy WebLinkAboutADR2008-00098 ADDRESS REQUEST JEFFERSON COUNTY PERMIT CENTER 621 Sheridan,Port Townsend, WA 98368 (360)379-4450 APPLICANT: Please fill out item 1 through 8. Fee as per Jefferson County Fee Schedule Ip New Address ❑ Correction El Change ❑Review Ih!'F 'LEFT TSIP RIGHT DTFF 2. Applicant Name: -JOµIJ 156t -r 3. Mailing Address: 4 i 1 ff.4[,(6 y,.t.} R.0 Town/State/Zip G jhr-,4-6,bv►, (�✓4- gf3� S 4. Telephone: Work ► Home: 5. Location: Attach a Detailed Drawing or Map. Additional Fees May Be Required if More Than One Site Visit Is Necessary *******PLEASE F LAG YOUR DRIVEWAY.******* Date Flagged: 3//o /6S Flagging Color -„J6 c Nine Digit Tax Parcel Number 7 Ib9r Plat Name Block Lot 6. Road Name: S0 t, if Pe jet-r Is this a PRIVATE or,c_QUNTY road? CIRCLE ONE Nearest Cross Road: /Ho 2ND(�JX 7. Neighbors'Address if Known: Name/Address: Name/Address: 8. Do You N-•To Construct a Driveway? YES or 0 CIRCLE ONE 9. Was This S itted With A Building Permit? FIELD NOTES YES or. NO IRCLE ONE jI ,A AREAS"O FIC Postal'Dis :� r. VIA Real Milep ' 7 Road ti ' � ;01%4 . Right Fire District Building Permit# Plate Sent I^/1�/'` q9 *: . s °' Date Paid . /; / Check �. '' `� ` � Paid Receipt# Date in Computer / l F3 I2Z(pq 18� q7.g51o93 JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT ADDRESS REQUEST INSTRUCTIONS o Complete the address request form in as much detail as possible. The most important information to include is the complete name of the road where your property is located, whether or not the property is in a plat, the nine digit parcel identification number and the block/lot number. The fee is $ o You must also attach a vicinity map or drawing. o Use the survey ribbons provided to flag both sides of your driveway. If your driveway is not in yet, mark the location where the driveway will be. You must apply for a road approach permit if your driveway will connect with a county road. o The address technician from the Permit Center will assign your address within 5 working days. The technician will visit the site and determine the address according to the nearest milepost distance from the start of the road. o The red address plate will be sent to your current mailing address, as indicated by you on the address request form, within one week to ten days. The plate is to be posted at the end of your driveway and is to be clearly visible from both directions. o The Permit Center will notify the appropriate postmaster, fire district and emergency services of your new address. *******.******************************************** ROAD APPROACH INSTRUCTIONS o If you are constructing a driveway that will connect with a county road, you must apply for a road approach permit. The fee is $ 15t,, o To complete the application for the permit, you will need to indicate the nature of work and to include a simple sketch of the proposed work. You will also receive a survey ribbon to mark the site. o Once the permit inspector has visited the site, a permit will be drawn up and will include the general conditions as well as any specific requirements concerning your site. o The permit will be sent to you for you to read and sign. You are then asked to return the permit to the Permit Center for the permit inspector to sign. You will receive a copy of the signed permit. The permit is valid for a period of one year. IF BOTH THE ADDRESS REQUEST AND THE ROAD APPROACH PERMIT IS APPLIED FOR AT THE SAME TIME, THE TOTAL FEE $ If you have additional questions, call the Department of Community Development at(360)379-4450. UwmelpincntrUnfodpwlinstruct doc 1/1/05