Loading...
HomeMy WebLinkAbout062215_ca04r Consent Agenda JEFFERSON COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST TO: Board of Commissioners Philip Morley, County Administrator FROM: Frank Gifford, Central Services Director DATE: June 22, 2015 RE: Professional Services Agreement— Streamline Environmental, Inc. STATEMENT OF ISSUE: The permit for the septic system at the Tri Area Community Center requires finalization. Streamline Environmental will provide the necessary engineering services to support finalizing the existing permit with Environmental Health. ANALYSIS: Performing this work will aid in meeting the mandated requirement to finalize the existing septic permit. FISCAL IMPACT: The cost is within the current maintenance budget. Approve and authorize the Board of Commissioners to sign the agreement. REVIEWED BY: Philip Morley o ty A ministrato , Date Proposal No. 150601 APPENDIX B PROFESSIONAL SERVICES AGREEMENT This Agreement, by and between the Jefferson County Central Services (hereinafter called CLIENT), and Streamline Environmental, Inc. (hereinafter called "Streamline "), is effective as of date signed below. ARTICLE I - SCOPE OF WORK Streamline shall perform professional services as described in Proposal No. 150601. ARTICLE II - COMPENSATION 1. These services shall be billed at an hourly rate of $100/hour for productive time only. Streamline will predict the required effort upon each request for assistance. Predictions will not be exceeded without e -mail authorization from CLIENT. 2. Streamline will invoice CLIENT for all services rendered under this Agreement, at a regular basis not to exceed once per month. Invoiced amounts shall be due upon receipt. A deposit for services maybe requested at Streamlines' discretion. If a deposit is required the CLIENT will be notified before commencement of services. 3. The obligation of CLIENT to compensate Streamline for services performed are not contingent or conditioned upon the receipt of insurance or other third party payments. Should the CLIENT terminate the contract before services are completed the CLIENT is obligated to compensate Streamline for time and material expense up to the date of termination of contract. ARTICLE III - CONFIDENTIAL INFORMATION In the course of performance of services by Streamline for CLIENT, it is possible that certain confidential information will be revealed to Streamline by CLIENT or that Streamline will obtain knowledge of such confidential information through other sources. Likewise, it is possible that CLIENT will become acquainted with certain techniques and procedures used by Streamline which Streamline considers confidential. Streamline and CLIENT will maintain the confidentiality of, and will not release or allow access to, information, documents, or materials which are designated as confidential by Streamline or CLIENT. ARTICLE IV - INDEMNITY 1. Streamline agrees to hold harmless and indemnify CLIENT from and against any and all claims, demands, actions, or causes of action, including, but not limited to, any and all costs, expenses, legal fees and liabilities incurred in and about the investigation and defense thereof, for personal injuries, including death, or property damage suffered by any person, firm of corporation whatsoever and arising from the gross negligence of Streamline, its agents, servants, or employees under this Agreement. 2. Streamline shall not be liable to CLIENT for any special, indirect or consequential damages whatsoever, whether caused or alleged to be caused by Streamline's negligence, errors, omissions, strict liability, breach of contract, or performance of services under this Agreement. 3. In any event, Streamline's entire liability under this Agreement is limited to the greater of (i) $25,000 or (ii) the total dollar value of this Agreement. ARTICLE V - STANDARD OF PERFORMANCE 1. Streamline shall deliver its services under this Agreement in a thorough, efficient, and professional manner, promptly and with due diligence and care, and in accordance with the standard practices of the engineering profession. NO WARRANTY REPRESENTATION, EITHER EXPRESSED OR IMPLIED, IS INCLUDED OR INTENDED IN STREAMLINE PROPOSALS, CONTRACTS OR REPORTS. 2. If any part of Streamline's work is found to be defective for reasons attributable to Streamline within a period of 12 months after completion of the work, Streamline's entire liability for such defective work shall be to re- perform at its own expense those aspects of the work found defective, provided CLIENT notifies Streamline in writing as soon as the defect is discovered and within the above mentioned 12 months warranty period. Proposal No. 150601 ARTICLE VI - INSURANCE Streamline carries General Liability, Errors and Omissions, Automobile, and Workman's Compensation insurance in the amount of $3,000,000. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on their behalf by their respective representatives, each such representative having been first duly authorized so to act, as of the date and year first herein above written. Signed By: Printed Name: Title: Date: STREAMLINE ENVIRONMENTAL, INC. By: Everett A. Sorensen, P.E. Title: Principal Engineer Date: June 1, 2015 4 STREAMLINE ENVIRONMENTAL 715 Grant Street • Port Townsend, Washington 98368 Phone (360) 821 -9960 • www.streamlineenv.com June 1, 2015 Mr. Jeff Monroe Chief On -Site Sewage System Operator Jefferson County Central Services PO Box 1220 Port Townsend, WA 98368 Via e- mail: JMonroe(a)co.jefferson.wa.us Re: Proposal 150601 for Septic System Permit Finalization Tri -Area Community Center On -Site Sewage System 10 West Valley Road Chimacum, WA 98325 Jefferson County Tax Parcels 901113014 and 901113015 Jefferson County Septic Permit SEP98 -243; SOM98 -243 Dear Mr. Monroe, Thank you for the opportunity to provide engineering consulting services to Jefferson County Central Services. Streamline Environmental, Incorporated (Streamline) proposes to provide engineering services in support of finalizing existing septic permit SEP98 -243 with Jefferson County Environmental Health, at an hourly rate of $100/hour, plus any incurred costs, marked up 10 %. The proposed work scope required to finalize the referenced septic permit involves: • Preparing As -Built Drawing Set (scale site plan & entire system overview; drainfield detail; tank details, pump & panel detail). • Prepare County As -Built Inspection Report (including equipment data, pumping rates, etc.), • Prepare a system - specific O &M Manual (boilerplate septic operating instructions plus above site - specific documentation), and • Coordinate and perform a pump demonstration and alarm test for Environmental Health Sanitarian (including showing entire system for inspection). Page 2 The above work scope is expected to require 22 to 28 hours. Only actual productive time will be charged. Should the effort expand so that this prediction may be exceeded, Streamline will notify you in advance, to obtain written approval. Please feel free to contact me directly if you have any questions. Sincerely, Streamline Environmental, Inc. 4 rloe� Everett A. Sorensen, P.E. Principal Engineer (360) 821 -9960 everett(& streamlineenv. com Attached: Professional Services Agreement