Loading...
HomeMy WebLinkAboutBLD2015-00078 - COU r%) DEPARTMENT OF COMMUNITY DEVELOPMENT 1 621 Sheridan Street,Port Townsend,WA 98368 "° Tel 360.379.4450 Fax:360.379.4451 Web:www.colefterson.wa.us/communitydevelopment f \O' E-mail:E-mail: dcd a co.jefferson.wa.us //1 G� CERTIFICATE OF OCCUPANCY PERMIT #: BLD15-00078 APPLICANT: GABRIEL GREENSTEM PHONE: 1014 NW 178TH ST SHORELINE WA 97177 206-327-0149 SITE ADDRESS: 205-A N OTTO ST Issue Date: 06/15/2015 PORT TOWNSEND, 98368 Final Date: 6/17/2015 SUBDIVISION: 9867 - PHILLIPS BAY VIEW Block: 19 Lot: 3+ PARCEL NUMBER: 986701902 Section: 16 Township: 30 N Range: 1 W PROJECT DESCRIPTION: CHANGE OF USE PERMIT I-502 PROCESSING & MANUFACTURING Existing floor plan permitted through BLD15-150, no change in floor plan on this permit. CO2 machines permitted through BLD15-175 SEP07-159 THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2012 EDITION. OCCUPANCY GROUP: B TYPE OF CONSTRUCTION: SPRINKLER SYSTEM yes rto THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 6/17/2015 \\tidemark\data\forms\F_BLD_Occupancy.rpt 6/17/2015 S BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD15-00078 Received Date: 3/12/2015 SITE ADDRESS: 205-A N OTTO ST Issue Date 6/15/2015 PORT TOWNSEND, 98368 Expiration Date 6/15/2016 OWNER: GABRIEL GREENSTEM PHONE: 206-327-0149 1014 NW 178TH ST SHORELINE WA 97177 9867 - PHILLIPS BAY VIEW SUBDIVISION: Block: 19 Lot: 3+ PARCEL NUMBER: 986701902 Section: 16 Township: 30 N Range: 1V\ CONTRACTOR: PHONE: PHONE: PROJECT DESCRIPTION: CHANGE OF USE PERMIT 1-502 PROCESSING & MANUFACTURING Existing floor plan permitted through BLD15-150, no change in floor plan on this permit. CO2 machines permitted through BLD15-175 SEP07-159 TYPE OF WORK COM SQUARE FOOTAGE: COMMERCIAL: 2,500 TYPE OF IMP COU MAIN: INDUSTRIAL: VALUATION ADD'L: HEAT TYPE CODE EDITION: 2012 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: 69000 Type Amount Paid By: Date: Receipt: BATHROOMS: Change of Use or Occupar $468.00 SRE 03/11/15 154202 Exist: State Building Code $4.50 SRE 03/11/15 154202 Prop: 1 Potable Water Application $68.00 SRE 03/19/15 154226 Total: 1 Total: $540.50 NUMBER OF EMPLOYEES: Directions to Site: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. Request must be received by 3pm the day before the inspection is needed. Office Hours 9:00 am -4:30 pm MONDAY- THURSDAY HOT LINE AVAILABLE 24 HOURS A DAY • • SPECIAL CONDITIONS APPLY-SEE ATTATCHED Jefferson County Building Division Permit Number: BLD15-00078 Applicant: GREENSTEIN BUILDING PERMIT INSPECTION APPROVALS Applicable Code: 2012 International Building Codes To schedule inspections, call (360)379-4455 no later than 3:00PM the day before the inspection is needed. Requests received after 3:00 PM will not be scheduled for the next day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Miscellaneous / verify BLD-150 and BLD15-175 are naled prior to final for this �l(�1//0 r }permit. fi Septic System Finaled /// sep07-159 lanning Approval 1 SO A final inspection will not be scheduled until the following are completed and signed off by the applicable Department: • Building Permit Conditions are met • Septic Permit Final/Complete for any building containing plumbing • Land Use Conditions met and signed off • Public Works Permit Final(where applicable) FINAL INSPECTION (oil` �5 FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • I CONDITIONS for Building Permit# :BLD15-00078 1.) JCPH approval for the septic system connection is approved based on the applicants statements that processing is limited to the use of the CO2 extractor to manufacture cannibis oil into vaportizer cartridges and small glass containers ONLY. No other process or manufacturing is approved. The applicant has stated NO WASTEWATER is generated from this processing. The septic system is designed for residential waste and approve for sanitary use by employees ONLY. 2.) Per septic permit exceeding the permitted design flow of 478 gal/day max. shall constitute a violation of this permit. Water usage monitoring shall be monitored monthly. These monitoring results will be required to be submitted to the Jefferson County Health Dept. upon request. The current use of the septic system is for 2 employees in #203, this application in 205A is for a proposed 4 employees and 205B is vacant. Current water use provided for 2014 indicates the two employees use an average of 100 gallons per day, which includes landscape irrigation and water leaks noted in March, August and January. 3.) Waste Strength (BOD, TSS, Grease and oils) may be required upon request by Jefferson County Public Health. Resposiblity is that of the owner. 4.) Approval of this permit does not provide any assurance of future approvals for onsite sewage disposal on the property or use of any existing septic systems. Actions taken to date and proposed as part of this project may limit or prevent future development of an onsite sewage system. Future proposals must meet current code at the time of application. 5.) The applicant shall obtain and maintain a State License to process cannabis. 6.) The site plan as submitted with the Building Permit Change of Use application on March 12, 2015 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated April 2, 2015 shall be resubmitted for review and approval by Jefferson County Department of Community Development. \\tidemark\data\forms\F_BLD_Permit_Bldg.rpt 6/15/2015 r BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD15-00078 Received Date: 3/12/2015 SITE ADDRESS: 205-A N OTTO ST Issue Date 6/15/2015 PORT TOWNSEND, 98368 Expiration Date 6/15/2016 • OWNER: GABRIEL GREENSTEM PHONE: 206-327-0149 1014 NW 178TH ST SHORELINE WA 97177 9867- PHILLIPS BAY VIEW SUBDIVISION: Block: 19 Lot: 3+ PARCEL NUMBER: 986701902 Section: 16 Township: 30 N Range: 1V1 CONTRACTOR: PHONE: PHONE: PROJECT DESCRIPTION: CHANGE OF USE PERMIT 1-502 PROCESSING & MANUFACTURING Existing floor plan permitted through BLD15-150, no change in floor plan on this permit. CO2 machines permitted through BLD15-175 SEP07-159 TYPE OF WORK COM SQUARE FOOTAGE: COMMERCIAL: 2,500 TYPE OF IMP COU MAIN: INDUSTRIAL: VALUATION ADD'L: HEAT TYPE: CODE EDITION: 2012 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: 69000 Type Amount Paid By: Date: Receipt: BATHROOMS: Change of Use or Occupar $468.00 SRE 03/11/15 154202 Exist: State Building Code $4.50 SRE 03/11/15 154202 Prop: 1 Potable Water Application $68.00 SRE 03/19/15 154226 Total: 1 Total: $540.50 NUMBER OF EMPLOYEES: Directions to Site: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. Request must be received by 3pm the day before the inspection is needed. Office Hours 9:00 am -4:30 pm MONDAY- THURSDAY HOT LINE AVAILABLE 24 HOURS A DAY • • SPECIAL CONDITIONS APPLY - SEE ATTATCHED Jefferson County Building Division Permit Number: BLD15-00078 Applicant: GREENSTEIN BUILDING PERMIT INSPECTION APPROVALS Applicable Code: 2012 International Building Codes To schedule inspections, call (360)379-4455 no later than 3:00PM the day before the inspection is needed. Requests received after 3:00 PM will not be scheduled for the next day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Miscellaneous (l// ` verify BLD-150 and BLD15-175 are finaled prior to final for this /O permit. Septic System Finaled sep07-159 lanning Approval � `S- \ 50 A final inspection will not be scheduled until the following are completed and signed off by the applicable Department: • Building Permit Conditions are met • Septic Permit Final/Complete for any building containing plumbing • Land Use Conditions met and signed off • Public Works Permit Final(where applicable) FINAL INSPECTION (p// /'s /y1: FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR CONDITIONS for Building Permit# :BLD15-00078 1.) JCPH approval for the septic system connection is approved based on the applicants statements that processing is limited to the use of the CO2 extractor to manufacture cannibis oil into vaportizer cartridges and small glass containers ONLY. No other process or manufacturing is approved. The applicant has stated NO WASTEWATER is generated from this processing. The septic system is designed for residential waste and approve for sanitary use by employees ONLY. 2.) Per septic permit exceeding the permitted design flow of 478 gal/day max. shall constitute a violation of this permit. Water usage monitoring shall be monitored monthly. These monitoring results will be required to be submitted to the Jefferson County Health Dept. upon request. The current use of the septic system is for 2 employees in#203, this application in 205A is 14 for a proposed 4 employees and 205B is vacant. Current water use provided for 2014 indicates the two employees use an average of 100 gallons per day, which includes landscape irrigation and water leaks noted in March, August and January. 3.) Waste Strength (BOD, TSS, Grease and oils) may be required upon request by Jefferson County Public Health. Resposiblity is that of the owner. 4.) Approval of this permit does not provide any assurance of future approvals for onsite sewage disposal on the property or use of any existing septic systems. Actions taken to date and proposed as part of this project may limit or prevent future development of an onsite sewage system. Future proposals must meet current code at the time of application. 5.) The applicant shall obtain and maintain a State License to process cannabis. 6.) The site plan as submitted with the Building Permit Change of Use application on March 12, 2015 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated April 2, 2015 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 11 tidemark\data\forms\F_BLD_Permit_Bldg.rpt 6/15/2015 • • CERTIFICATE OF OCCUPANCY Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 (800) 831-2678 Al ScaIf, Building Official PERMIT#: BLD08-00269 SITE ADDRESS: 205 N OTTO ST Issue Date: 09/11/2008 PORT TOWNSEND, 98368 Final Date: 4/8/2010 APPLICANT: GLEN COVE PROPERTIES LLC PHONE: 101 KIWI LN SEQUIM WA 88382-8550 SUBDIVISION: PHILLIPS BAY VIEW ADDITION Block: 19 Lot: 3+ PARCEL NUMBER: 986701902 Section: 16 Township: 30 N Range: 01 W PROJECT DESCRIPTION: NEW 4959 S.F. UNHTD COMMERCIAL WAREHOUSE THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2006 EDITION. OCCUPANCY GROUP: TYPE OF CONSTRUCTION: SPRINKLER SYSTEM yes C no Tt—PR.QJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 4/8/2010 JEFFERSON CO lNT NO. RECEIVED FROM } DATE " DESCRIPTION •-�--mac_- '�.. E E- q+ Fr-S A4P.S s �°�, CURRENCY <` AMOUN7 CDIN CHECKS { RECEIVED BY MICHAEL J.ANDERSON Civil Engineer a Land Surveyor 330 Cleveland Street Port Townsend,WA 98368 MEMO DATE: May 7, 2015 TO: Jefferson County Community Development Department Attention: Building Department FROM: Michael J. Anderson 1, PE &PLS / SUBJECT: Revision to Existing BLD15-00150: 205 North Otto Street, Port Townsend Reference: BLD08-00269 APN 986 701 902 Attached are two (2)copies of the building floor plan that was originally filed with the referenced BLD08-00269 to supplement the application filed on May 1, 2015. The plan shows the two toilet facilities but three were constructed,the two shown on these plans and the additional facility in Unit B as shown in the filed for BLD15-00078 and the subject BLD15- 00150. Please indicate if you need any additional information to complete your review of this pr i ject. Attachments: 1 „\c, `\ C: Dan Tittemess, DBA Glen Cove Properties LLC, Owne O �P� Gabriel Greenstein,DBA PDT Technologies, Tenant o��w �Nt 1 M \/ DF t! M:51-911 MICHAEL 1.ANDERSON t S on Civil Engineer a Land Surveyor 330 Cleveland Street Port To tinsend.WA 98368 MEMO DATE: April 2, 2014 __�I TO: Jefferson County Community Development Department / ' - Ii Attention: Ms Sally Ellis, Permits ! FROM: Michael J. Anderson CC'''.UNITY DFv'nor"cn T PE &PLS SUBJECT: PDT Technologies (Tenant: Mr. Gabriel Greenstein) 205 A No. Otto Street,PT APN 986 701 902 RESPONSE TO: 1) March 19. 2015 e-mail from Ms Mary Blain, Building Dept. 2) March 24, 2015 letter from Susan Porto, Health Dept. 3) March 25, 2015 letter from David Johnson, Planning Dept. BLAIN MEMO: In response to the question regarding the floor plan, the only change from the original approval of the building was the addition of the wall separating the 205 A and 205 B units. Attached is a revised building and site plan showing the wall. The unit 205 C walls were part of the original construction and final inspection. Units 205 A and 205 B has a man door and a garage door that provide two exits. The building plan shows the details for the interior security fencing required by the State. An explanation of the use was in the transmittal of a revised building plan on March 26, 2015 by this office. The attached plan dated March 31, 2015 now illustrates these improvements. The following is an updated description of the proposed business operations: The business activities occurring at 205-A N Otto St, Port Townsend WA 98388 will be marijuana processing. This will include the extraction of raw cannabis material, and the packaging of the ensuing essential cannabis oils into retail products. Raw, pre-ground material will arrive securely from a legal i-502 farm, and be received into a caged, secured"Quarantine" (see attached PDT Technologies Site Plan) area within the facility. As per WSLCB regulations, the material will sit in the designated Quarantine for a period of no less than 24 hours upon receipt. • • After the required waiting period, the material will be taken from the secure storage :rea and moved into the CO2 extraction vessel, where it is converted into oil. This equip ent is commonly used in the food industry to produce clean, non-volatile, non-hydro car ion solvent based food extracts. The CO2 extraction works, by forcing high pressure gas through the plant material ii the extraction vessel, causing the material to separate into essential oils and plant matter residue. The organic waste residue is then stored in the Quarantine/ Controlled Area where it will eventually be mixed with a 50% blend of organic material, and taken t• a composting facility. The essential plant oils, will then be stored in Quarantine, while a sample of the oil i. sent out and evaluated at a 3`d party QA lab for potency and pathogen testing. Once the oils are determined by the lab to be safe for consumer consumption, the oil will be taken from Quarantine and placed into retail packaging. The final products will be placed in Quarantine where inventory will be available fo sale to licensed 502 retail stores. To summarize, this application is for a change of use only. No improvements to either the e isting building or utility systems are required. PORTO LETTER: Item No. 1. The new attached plans dated Mar. 31, 2015 show the demising wall as noted above. There are two employees at the existing 203 Building and both buildings are served Iby the same water and sewer system. The attached plans show the existing wall constructed without a permit or inspection. Item No. 2. The current use in the 205B Unit is"un-occupied" at the present time Item No. 3. Attached is a copy of the water billing dated Feb. 20,2012 from the City of Port Townsend that illustrates that the average consumption is about 1000 gals per month with tl-e exceptions where the toilet overflowed and the summer months of irrigation of the plantings. Item No. 4. In a review of the operation plan submitted by PDT,there will be 4 employees. Item No. 5. The existing sink is for personnel hygiene only.Not a part of proposed business operations. Item No. 6. The ORCAA responded to today indicating that they are not a party t, this permitting at this time and will respond to any complaints in the future. As indicated, any w:ste material from the operation will be mixed with compost and delivered to the JC plant. We will be re.ponding to today's e-mail from Gary Lee, Engineer from DOE and provide an answer ASAP. Item No. 7. The water line location has been added to the site plan and is located onsistent with the Health Dept. regulations as shown on the approved septic permit plan. • • JOHNSON LETTER: The attached site plan has been revised to list the employee number currently planned for 6 people and the plan illustrates how 11 parking spaces can be provided, including one handicap space. SUMMARY: Please review this summary of our responses and provide us with your comments. As indicated, we will be contacting DOE and will provide update ASAP. Thank you for your prompt responses in processing this application for change in use. c: Dan Titterness, Property Owner Gabe Greenstein, Tenant 41' Cr i III _,rowo CITY OF PORT TOWNSEND Account • 250 Madison Street#1 Statement u. ' 1- ' Port Townsend, WA 98368 ACCOUNT.INFORMATION ACCOUNT: 012383-000 SERVICE ADDRESS: 203 OTTO ST SERVICE PERIOD: 1/1/2015 to 1/31/2015 BILLING DATE: 1/31/2015 DUE DATE: 2/20/2015 METER READING 4075 1 MB 0.432 4276 / 4075 19-20-16 page 1 at 1 DAN TITTERNESS Previous Reading Current Reading 101 KIWI LN Serial No Date Reading Date Reading Cons SEQUIM WA 98382-8550 68098458 12/102014 1240 1,202015 1320 8000 lull'1111'I'Il'lIIIIii11111111111■11111111111L1111'lll111111111 - If not paid by the due date, a$5.00 minimum penalty or a Water 46.75 1-1/2%penalty,whichever is greater,will be applied to the 10%General Services Tax 4.68 account. 10% Public Safety&Streets Ta 4.67 -GO PAPERLESS, GO DOXO. See reverse side of statement for payment options and billin• info • . '•n. CURRENT CHARGES 56.10 Water Capital Surcharge 21.60 TOTAL CURRENT CHARGES 77 70 USAGE HISTORY � � --- _ o S 4 o v PREVIOUS BALANCE 43.58 o' PAYMENTS RECEIVED 43.58 ow If Y a 9 DJUSTMENTS 0.00 a v ? d '� �x •DDITIONAL BILLING V - 7 $ URRENT CHARGES 0.00 soup , ---- 4 77.70 It Z000-1 I II TOTAL AMOUNT DUE ' 77.70 D X.7 - _- ll !..1 it - .... / ,1 JAN F® .A MAR APR MAY JUN A AUG SEP OCT NOV DEC JAN del / /• Q Prior Cons Clifford Cons „j I'9/ /� r 7 /� �, 5 4 /A__ ' ��� L..). y 1 . G f 0 ,, I A a 1 I • • t j} r a,Lg iftg 49 "v..4. 1 4 October 1,2009 Dan Tittemess Glen Cove Properties LLC PO Box 1142 Port Townsend, WA 98368 Jefferson County,WA Re: BLD08-00269 Commercial Warehous+ county Auditor Stormwater Management Facility Mau ferson St. C,%!: ::id;WA 98368 Dear Mr Titter ess: _e!pt: 09-01439 In order to meet the requirements of the Jeffers( Washington Department of Ecology Stormwate Name Extended Product $64.CC stormwater management facilities are appropria AGR Ag;eer ent on County requires project proponents to enter into 547ot4 D ac(:rnent# 3 e Agreement with the County. # pages 564.001 Please sign the attached Agreement before a Not Totat You should keep a copy of the Agreement for yo X64.00 E. _ ..;necK) Also attached is a bill for the Department's fees f EN COVE preparing the Agreement. LLC The Department cannot give final sign off on the '1 has been paid. Thank'('' Sincerely;=". 10128109 10:33 AM bonnie �r James W. Pearson c:1� \ J' Project Manager Attachment :\'k o'.:rtR MICHAEL 1.ANDERSON • S Civil Engineer a Land Surveyor 330 Cleveland Street Port Townsend WA 98368 *IWCA—CIL Up/ I'M ThniECEIVEr9 DATE: March 26,2015 �? h MAR 2 t 2015 TO: Jefferson County Community Development Department Attention: Building Department JEFFERSON OUNTY DEPT OF COMMUNI OEUFtOPMFNT FROM: Michael J. Anderson PE&PLS / SUBJECT: BLD15-00078: CHANGE OF USE PERMIT 205 A North Otto Street, Port Townsend Reference: BLD08-00269 APN 986 701 902 Attached are two (2)copies of the existing building floor plan that shows the revisions t. the interior of the South half of the building which was assigned the address of 205 A as not=d.No structural changes to the building or its utility systems are proposed. The plans have bee prepared in response to the e-mail from Ms Mary Blain of March 19, 2015. The change of use is from an industrial to the I-502 Processing and Manufacturing desi ation which can be described as follows: 1. The raw material will arrive by truck and be delivered directly into the Securi Area which is fenced and locked as per Washington State regulations 2. The material is then transferred to the CO2 extraction vessel equipment whic converts it to an oil. This equipment is commonly used in the food industry to produce clean,non-volatile, non-hydro carbon solvent based food extracts. e high pressure gas is forced through the extraction vessel causing the material to separate into the essential oil and leave a residue. The residue is then stored in the Qu antine/ Controlled Area(see attached PDT Technologies Site Plan)and removed fro the site after being mixed with 50%organic material that is taken to a compostin facility. To summarize,this application is for a change of use only.No improvements to either th existing building or utility systems are required. Please indicate if you need any additional information to complete your review of this pr ject. Attachments: 2 c: Dan Titterness,DBA Glen Cove Properties LLC, Owner Gabriel Greenstein,DBA PDT Technologies, Tenant • b 0 0 1 Washington State Liquor Control Board(WSLCB)License Number: Type(e.g.Tier 1):_r 415704 SECTION A. GENERAL INFORMATION X Attach a copy of the Operation Plan submitted with the WSLCB License Application. 1. Business name PDT Technologies 2. Owner and Operator Gabrial Greenstein 3. Primary contact Gabriel Greenstein 4. Business address 205 A No.Otte Street,Port Townsend,WA 98368 5. Phone 206-327-0149 5. Email gabe@pdttechnologies.com 6. Latitude/longitude in decimal degrees 48.091683 /-122.815278 (NAD83/WGS84) 7. Site size(dimensions in feet) 290 % 184 8. Zoning Light Industrial 9. Soil type(available from NRCS at Dick Loamy sand http://websoi lsurvey.nres.usda.gov/app!) 10. Nearest surface water body(stream,lake,wetland) Port Townsend BAy 11. Distance from surface water body(feet) 3380 feet 12. Depth to groundwater(feet) 15 feet 13. Average ground slope of production site(percent) 5 % 14. Nearest well(feet),well type and owner N/A 15. Legal description of the nearest well N/A'AS 'AS S TWN R (to the nearest''A'A section,township,range) ECY 000-000 (02/15) S # Washington State Liquor Control Board(WSLCB)License Number: Type(e.g. Tier 1): 415704 SECTION B. PRODUCTION WASTEWATER ❑Yes NO Is production(growing)proposed at this location?If no,proceed to Section C. L Describe any differences between the Operation Plan and the actual planned production(growing) 2. What is the water source? If private well,provide legal description of the well /.S 'AS S TWN R (to the nearest 3/4 to section,township, range) If public water supply,provide name 3. Production type(soil,hydroponic,aeroponic) If hydroponic, list reservoir size(gallons) Frequency of water exchange(days or weeks) Approximate volume of water exchange(gallons) 4. Estimated annual production (pounds) 5. Months of production 6. Number of harvests per year 7. Name(s)of cleaning products used 8. Average volume of production wastewater produced daily(gallons) 9. Discharge to publicly owned sanitary wastewater ]Yes ❑No collection and treatment system? If yes,name of system 10. Do you have written approval? ❑ Yes ❑No If yes,attach the approval letter ❑ If no,what is the proposed method of wastewater disposal(e.g. land application, irrigation)? 11. If land application or irrigation is proposed, provide the number of acres used for application Provide a legal description of the application site 'AS 'AS S TWN R (to the nearest ''A 1/.section,township,range) Attach an aerial map of the acreage ❑ 12. Explain what steps or measures will be taken to minimize the amount of wastewater generated,or improve the quality of wastewater produced. ECY 000-000 (02/15) • S Washington State Liquor Control Board(WSLCB)License Number: Type(e.g.Tier 1): SECTION C. PROCESSING WASTEWATER YES Is processing proposed at this location? If no, STOP. 1. Describe any differences between the Operation NONE - Plan and the actual planned processing 2. Average volume of processing wastewater NONE produced daily(gallons) 3. Will THC be extracted? YES If yes,what extraction chemicals will be used? CO 2 4. Will edible products be produced? NO If yes,name products NIA 5. What is the estimated annual production(pounds) ZERO of each edible product? 6. Months of production 12 7. Discharge to publicly owned sanitary wastewater ❑ Yes X NO collection and treatment system? If yes,name of system N/A 8. Do you have written approval? X Yes ❑No If yes,attach the approval letter SEE ATTACHED If no,what is the proposed method of wastewater N/A disposal(e.g. land application, irrigation)? 9. If land application or irrigation is proposed, N/A provide the number of acres used for application Provide a legal description of the application site N/A 1/4S '/4S S TWN R (to the nearest'% section,township,range) Attach an aerial map of the acreage N/AU 10. Explain what steps or measures will be taken to N/A minimize the amount of wastewater generated,or improve the quality of wastewater produced. 11. What is the water source? N/A If private well,provide legal description of the well N/A%S 1/4S S TWN R (to the nearest'/4'/4 section,township,range) If public water supply,provide name CITY OF PORT TOWNSEND..DOMESTIC ONLY 12. Estimated average daily water use(gallons/day) N/A ECY 000-000 (02/15)