Loading...
HomeMy WebLinkAboutBLD2015-00150 - REMODEL • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD15-00150 Received Date: 5/1/2015 SITE ADDRESS: 205 N OTTO ST Issue Date 6/4/2015 PORT TOWNSEND, 98368 Expiration Date 6/4/2016 OWNER: GLEN COVE PROPERTIES LLC PHONE: 360-385-1258 101 KIWI LN SEQUIM WA 98382-8550 9867- PHILLIPS BAY VIEW SUBDIVISION: Block: 19 Lot: 3+ PARCEL NUMBER: 986701902 Section: 16 Township: 30 N Range: 1V\ CONTRACTOR: PHONE: PHONE: PROJECT DESCRIPTION: REMODEL PERMIT OF EXISTING WAREHOUSE- DIVIDE INTO TWO SPACES AND ADDED 2 BATHROOMS sep07-00159 TYPE OF WORK COM SQUARE FOOTAGE: COMMERCIAL: 4,957 TYPE OF IMP ALT MAIN: INDUSTRIAL: VALUATION 10,000.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2012 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: SHORELINE: GARAGE: CONST TYPE: SETBACK: DECK: BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: 69000 Type Amount Paid By: Date: Receipt: BATHROOMS: Permit $157.00 SRE 04/30/15 155969 Exist: 1 Plan Check $102.05 SRE 04/30/15 155969 Prop: 2 State Building Code $4.50 SRE 04/30/15 155969 Total: 3 Potable Water Application $129.00 SRE 04/30/15 155969 NUMBER OF EMPLOYEES: Permit $23.55 SRE 04/30/15 155969 Plan Check $15.30 SRE 04/30/15 155969 Total: $431.40 Directions to Site: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. Request must be received by 3pm the day before the inspection is needed. Office Hours 9:00 am -4:30 pm MONDAY- THURSDAY HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY- SEE ATTATCHED • Jefferson County Building Division Permit Number: BLD15-00150 Applicant: GLEN COVE PROPERTIES LLC BUILDING PERMIT INSPECTION APPROVALS Applicable Code: 2012 International Building Codes To schedule inspections, call (360)379-4455 no later than 3:00PM the day before the inspection is needed. Requests received after 3:00 PM will not be scheduled for the next day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Rough-in Plumbing , (11 Framing VJ I�/1 iY) C� Insulation:Walls r Wallboard Nailing I Smoke&CO /� Miscellaneous 4C1 �I < rlIn, , lighted exist signs and fire extinguishers at exits. Septic System Finaled ( 1J I) Y sep07-1 59 lanning Approval ublic Works Approval A final inspection will not be scheduled until the following are completed and signed off by the applicable Department: • Building Permit Conditions are met • Septic Permit Final/Complete for any building containing plumbing • Land Use Conditions met and signed off • Public Works Permit Final(where applicable) FINAL INSPECTION ( 1 FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • • CONDITIONS for Building Permit# :BLD15-00150 1.) The site plan as submitted with the Building Permit application on April 30, 2015 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated May 1, 2015 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 2.) DWJ \\tidemark\data\forms\F_BLD_Permit_BIdg.rpt 6/4/2015 •Up Front Parcel Review , (a 6 . Parcel 986701902 Printed: May 4, 2015 GLEN COVE PROPERTIES LLC Site Address(es): 101 KIWI LN 205 N OTTO ST PORT TOWNSEND, WA 98368 205-A N OTTO ST PORT TOWNSEND, WA 98368 SEQUIM, WA 98382-8550 203 N OTTO ST PORT TOWNSEND, WA 98368 Parcel Number: 986701902 S-T-R: 16-30N-1W Total Acreage 1 Legal Description PHILLIPS BAY VIEW ADDITION BLK 19 LOTS 3,4,9 & 10 Land Use: 2000 AND TAX 73 LS PTN TAX 75 Flood District: Fire District: 1 Planning Area: 2 Flood Map(FIRM)Panel No: School District 50 Zoning: COMP PLAN DESIGNATION: COMMUNITY PLAN: UGA: UGA Trans [ ] Plot plan states "property line" [ ] Assessor's Map (Property lines on submitted plot plan must match the property lines as identified on the Assessor's 1/4 map) [ ] Legal Access to Property YES NO [ ] Parcel Tags or Scanned Documents YES NO [ ] ESA's: Special Reports Nearby YES NO [ ] Designated Ag YES NO [ ] Shoreline Designation: YES NO [ ] Shoreline Slope Stability: YES NO Stream Type:YES NO FWHCA: YES NO m Wetlands: YES NO • Rare Plants:YES NO Seismic: YES NO �. -�l [ / Landslide: YES NO Flood: YES NO Erosion: YES NO Aquifer Recharge Area:YES NO SIPZ: none At Risk High Risk Coastal CMZ: none High Risk Moderate RiskDisconnected CMZ Stormwater site plan submitted: YesNo [ ] Forest Lands: YES NO Adjoining Forest Lands: Commercial/ Rural/ Inholding [ ] Mineral Lands: YES NO [ ] Agricultural Lands: YES NO [ ] Archaeology: YES NO [ ] No Shooting Zone: YES NO [ ] Stormwater: New Impervious Surface Land Disturbing Activity ESA's Stormwater Req's:Min Req#2 Min Req#1 thru#5 Min Req#1 thru#10 Engineering [ ] Notice Provisions/Disclosure:Airport YES NO MRL YES NO Forest Lands YEs NO [ ] Landscaping Required: Yes No [ ] Parking Spaces Required NO 2 Other 1 1 Building Height: 35' UBC Standard JEFFERSON COUNTY • DEPARTMENT OF COMMUNITY DEVELOPMENT 521 Sheridan Street,Port Townsend,WA 98388 I Web:wwn.co.jefferson wa us co Tyr ty e el p°er! Tel:360.379.4450(Fax:360379 4451 Email:dcdt)co.iefferson.wa.vs SquareONE Resource Center!Building Permits&Inspections I Development Review I Long Range Planning April 16, 2015 GABRIEL GREENSTEM 1014 NW 178TH ST SHORELINE WA 97177 ADDRESS:205-A N OTTO ST CASE ft: BLD15-00078 Dear GABRIEL GREENSTEIN. We have started the plan review process on the subject permit. Unfortunately, we are unable to finish the necessary plan review. We are in need of additional information and/or items as listed below: 1. Building permit application to allow the approval of the existing non-permitted configuration of the subject building originally permitted under BLD08-00269. Nc further review or issuance of the Change of Use permit BLD15-00078 will not be processed prior to approval of#1. 2. Mechanical Permit application for installation of the CO2 Extraction Machines. Fees will be based on commercial valuation of the project. 3. Occupancy- number of employees proposed in each of the three units identified for Building 205. 4. All applications and modifications shall be submitted through the Permit Technician. Please submit the necessary items in order for us to complete the plan review process of this permit. If you should have any questions, please feel free to contact me at (360) 379-4450. Sincerely, r._ _,. A 4 (c-k. Plans Examiner c: File MICHAEL ANDERSON DAN TITTERNESS Susan Porto David Wayne Johnson 14(t (TT-- Nidemarkldata\torms\F BLD AddInfc_PIiCrk.rpt 1113/1999 • . JEFFERSON COUNTY I� DEPARTMENT OF PUBLIC WORKS L _ P.O. Box 2076 -„A 623 Sheridan Street Port Townsend WA n t (360) 5-916 ._-, ,! frank.Gifford,Pu hbebrkr Diiertor Monte Reinder,P .1 Gdunty Engineer APR 3 0 2015 MEMORANDUM MUM1 ,�� • TO: Michelle Fafan COMNiU!vITY DEUELOPMEnT Community Development Department �r■-) .t FROM: James W. Pearson, Project Manag f DATE: September 10, 2008 RE: BLD08-00269 Dan Titterness, Warehouse 205 N Otto Street, Glen Cove Stormwater management The Public Works Department has reviewed the proposal and notes the following: • The Jefferson County Unified Development Code, JCC 18.30.070 Stormwater Management Standards adopts the standards and minimum requirements of the Washington Department of Ecology Stormwater Management Manual for Western Washington. • The proposal includes construction of a 4,959 square feet warehouse and 220 square feet of pervious pavement. • The site is adjacent to an existing 10,000 square foot warehouse with a stormwater infiltration system that was constructed under Jefferson County Building Permit BLD07-00310. There is a shared access constructed with pervious asphalt. Jefferson County Public Works Department staff inspected the infiltration system prior to backfilling. • The Soil Survey for Jefferson County depicts the soils on site as loamy sand. • The proponent has submitted a Jefferson County stormwater management template dated 6/18/2008 that discusses construction stormwater pollution prevention and permanent stormwater management best management practices (BMPs). • Th^ pr^p^r.cnt proposes to infiltrate runoff from the warehouse in a 250 square foot infiltration trench with a design identical to the previous development. The design is in conformance with design criteria from the Kitsap County Stormwater Management Manual adapted to the Port Townsend rainfall regime. The Department recommends approval of the proposal with the following conditions: • The proponent shall implement the BMPs from the stormwater management template dated 6/18/2008. i • • The proponent shall contact the Public Works Department (385-9162) for an inspection prior to backfilling the infiltration trench • The proponent and subsequent occupants shall ensure that materials used and stored on the site do not contaminate stormwater runoff. This may require, as appropriate, additional Best Management Practices such as covered storage, containment structures, and/or a spill response and cleanup plan. • In order to ensure that the approved stormwater management facilities are appropriately maintained for the life of the project, the proponent shall enter into a Stormwater Management Facility Maintenance Agreement with Jefferson County. Prior to final approval of the project,the Department will send a copy of the Agreement that has been signed by the Public Works Director to the proponent. The Department will not give final approval for the project until the Agreement has been signed by the proponent and filed with the Jefferson County Auditor. • The Department's fee for reviewing Stormwater Site Plans and Construction Stormwater Pollution Prevention Plans and inspecting implementation of best management practices is $62 per hour. Fees must be paid prior to final project approval. a , Let,tx u: :,itla