HomeMy WebLinkAboutBruch & Bruch Construction, Inc. re: Downs Creek Road Realignment Change Order No. 1 - 090815r 14 -o JEFFERSON COUNTY Std 1 of 1 DEPARTMENT OF PUBLIC WORKS Charge i Data &112015 CHANGE ORDER Order No. Ordered by County Engineer under terms of r-1 Section 1 - 04. 4 of the Standard Specfications CR17993 Contract No. ❑X Change proposed by Contractor To: Bash & Bruch Construction, Ins. 1706 Highway 101 West % / J _/ � / La� E i�ohr G%N tr �,.c� 7 Port Angeles, WA98363 1 � r/H Fi+m /Jame i 8a Project Title Dcvans Creek Road D — 3i}pla /t_ure ate e /,1t, - ! ✓LQt %& e / Tibe Consent given by Surety: (when required) RealWaient B Atfoney-irtract Date You are ordered to perform the following described vrok upon receipt of an approved copy of this change order: This charge order authorizes replacement of apprm unatedy 1,300 cubic yards of Light Looser Rip sap, (Bid Item No. 8) with a new bid item, Quarry Spell Blend (Bid Item No 22), consisting of the following materials Approrumately 1,000 cubic yards of 4!'- 2" spalls from Snider Quarry blended with appmimately 300 cubic yards of 3° - 1 -112` minus coshed rock from Beaver Falls Quarry. Materials Section 8 -15.2 is supplemented with the following: Materials for Quarry Spelt Blend will be be visually approved and accepted by the Engineer. Measurement Section 8 -15.4 is supplemented with the following: - Quarry Spell Blend will be measured by the cubic yard of Quarry Spoil Blend actually placed. Payment Section 8 -15.5 is supplemented with the following: '.. "Quarry Span Blend", Per cubic yard. The unit price for the blended material shag be $32.351dy. , The estimated total decrease in the contract amount for this change order is as follows: (1,300 cy)'($37.61) - $32.35) = $6,825.00 Ail work matenb5 and measurement m be in accordance with the provisions of the standard specifications and special provisions for the type of eonstmctioh invoNed. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NETCHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE 3338. 46675 $338,466.75 - 00,825.00 $331,541.75 ORIGINAL CONTRACT CURREN7CON7RACT CONTRACT TIME NEWCONTRACT TIME (days) TIME (days) CHANGE (AddfW TIME (days) 50 50 0 50 APPROVAL RECOMMENDED APPROVAL ECOMMEND Project Man ger Dote County E Date APP A R COMMENDED APP VED EngineAng Services Manager Date Chair, Jetfe, o&Courdy Corrtrt>issioners Date Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director /County EngineeriL� Agenda Date: September 8, 2015 Subject: Change Order No. 1, Dowans Creek Road Realignment, County Project No. CR17993, FEMA 1734- DR -WA, Grant No. E08 -796 Statement of Issue: Change Order No. 1 with Bruch and Bruch Construction for the Dowans Creek Road Realignment, County Project No. CR17993. Analysis /Strategic Goals /Pro's It Con's: This Contract is for construction of the road realignment between Dowans Creek Road milepost 0.85 and milepost 1.53. The road realignment is necessary in order to move the road out of an active landslide area and preserve access to properties served by Dowans Creek Road beyond the slide area. Change Order No. 1 was proposed by the Contractor to utilize an alternate material for road embankment construction, providing a cost savings to the County. Fiscal Impact /Cost Benefit Analysis: This change order will decrease the original contract amount by $6,825.00, from $338,466.75 to $331,641.75. This project is funded at 75% by the Federal Emergency Management Agency (FEMA), 12.5% by Washington State, and 12.5% by the County Road Fund. Recommendation: Public Works recommends that the Board execute all three originals of Change Order No. 1 with Bruch and Bruch Construction and return two (2) originals to Public Works for further processing. Department Contact: Mark Thurston, P.E., Project Manager, 385 -9160. Reviewed By: P i ip Morley C unty dmini rator Date