HomeMy WebLinkAboutBruch & Bruch Construction, Inc. re: Downs Creek Road Realignment Change Order No. 1 - 090815r
14 -o
JEFFERSON COUNTY
Std 1 of 1
DEPARTMENT OF PUBLIC WORKS
Charge
i
Data &112015
CHANGE ORDER
Order No.
Ordered by County Engineer under terms of
r-1 Section 1 - 04. 4 of the Standard Specfications
CR17993
Contract No.
❑X Change proposed by Contractor
To:
Bash & Bruch Construction, Ins.
1706 Highway 101 West
% /
J _/ � / La�
E i�ohr G%N tr �,.c� 7
Port Angeles, WA98363
1 � r/H Fi+m /Jame i
8a
Project Title Dcvans Creek Road
D
— 3i}pla /t_ure ate e
/,1t, -
! ✓LQt %& e /
Tibe
Consent given by Surety: (when required)
RealWaient
B
Atfoney-irtract Date
You are ordered to perform the following described vrok upon receipt of an approved copy of this change order:
This charge order authorizes replacement of apprm unatedy 1,300 cubic yards of Light Looser Rip sap, (Bid Item No. 8)
with a new bid item, Quarry Spell Blend (Bid Item No 22), consisting of the following materials
Approrumately 1,000 cubic yards of 4!'- 2" spalls from Snider Quarry blended with appmimately 300 cubic
yards of 3° - 1 -112` minus coshed rock from Beaver Falls Quarry.
Materials
Section 8 -15.2 is supplemented with the following:
Materials for Quarry Spelt Blend will be be visually approved and accepted by the Engineer.
Measurement
Section 8 -15.4 is supplemented with the following:
- Quarry Spell Blend will be measured by the cubic yard of Quarry Spoil Blend actually placed.
Payment
Section 8 -15.5 is supplemented with the following: '..
"Quarry Span Blend", Per cubic yard. The unit price for the blended material shag be $32.351dy. ,
The estimated total decrease in the contract amount for this change order is as follows:
(1,300 cy)'($37.61) - $32.35) = $6,825.00
Ail work matenb5 and measurement m be in accordance with the provisions of the standard specifications and
special provisions for the type of eonstmctioh invoNed.
ORIGINAL
CURRENT
ESTIMATED
ESTIMATED
CONTRACT
CONTRACT
NETCHANGE
CONTRACT TOTAL
AMOUNT
AMOUNT
THIS ORDER
AFTER CHANGE
3338. 46675
$338,466.75
- 00,825.00
$331,541.75
ORIGINAL CONTRACT
CURREN7CON7RACT
CONTRACT TIME
NEWCONTRACT
TIME (days)
TIME (days)
CHANGE (AddfW
TIME (days)
50
50
0
50
APPROVAL RECOMMENDED APPROVAL ECOMMEND
Project Man ger Dote County E Date
APP A R COMMENDED APP VED
EngineAng Services Manager Date Chair, Jetfe, o&Courdy Corrtrt>issioners Date
Department of Public Works
O Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, P.E., Public Works Director /County EngineeriL�
Agenda Date: September 8, 2015
Subject: Change Order No. 1, Dowans Creek Road Realignment, County
Project No. CR17993, FEMA 1734- DR -WA, Grant No. E08 -796
Statement of Issue: Change Order No. 1 with Bruch and Bruch Construction for the
Dowans Creek Road Realignment, County Project No. CR17993.
Analysis /Strategic Goals /Pro's It Con's: This Contract is for construction of the road
realignment between Dowans Creek Road milepost 0.85 and milepost 1.53. The road
realignment is necessary in order to move the road out of an active landslide area and
preserve access to properties served by Dowans Creek Road beyond the slide area.
Change Order No. 1 was proposed by the Contractor to utilize an alternate material
for road embankment construction, providing a cost savings to the County.
Fiscal Impact /Cost Benefit Analysis: This change order will decrease the original
contract amount by $6,825.00, from $338,466.75 to $331,641.75. This project is
funded at 75% by the Federal Emergency Management Agency (FEMA), 12.5% by
Washington State, and 12.5% by the County Road Fund.
Recommendation: Public Works recommends that the Board execute all three
originals of Change Order No. 1 with Bruch and Bruch Construction and return two (2)
originals to Public Works for further processing.
Department Contact: Mark Thurston, P.E., Project Manager, 385 -9160.
Reviewed By:
P i ip Morley C unty dmini rator Date