Loading...
HomeMy WebLinkAboutBLD2005-00667 IUILDING PERMIT APPLICA N MRAO5 00623 Type: Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00667 Received Date: 10/20/2005 SITE ADDRESS: 55 TERRACE DR PORT TOWNSEND, 98368 OWNER: MILLENNIUM ONE HOMES INC PHONE: 360-385-4837 309 V ST PORT TOWNSEND WA 983683632 KALA TERRACE SUBDIVISION: Block: Lot: 16+ PARCEL NUMBER: 965900016 Section: 26 Township: 30 N Range: 01 W CONTRACTOR: MILLENNIUM ONE HOMES INC PHONE: (360)385-4837 309 V STREET PORT TOWNSEND WA 98368 Contractor's License MILLEOH010MM Expires 7/13/2005 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOI NEW SFR W/ATT GARAGE & 120 GAL PROPANE TANK TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,974 VALUATION 206,000.00 ADD'L: HEAT TYPE: PRO CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N SHORELINE: GARAGE: 600 CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: PUBLIC BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 2 Prop: 2 Total: 2 Total: 2 Routing Date: 10_,VDA Type Amount Paid By: Date: Receipt: APPROVED State Building Code $4.50 SLE 10/20/05 77140 Plan Check $1,031.78 SLE 10/20/05 77140 DEC al 2005 Permit $1,587.35 SLE 10/20/05 77140 Jefferson County Planning Potable Water Application $53.00 SLE 10/20/05 77140 &Building Department Total: $2,676.63 r c. Ncol. CERTIFICATE OF OCCUPANCY Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 (800) 831-2678 PERMIT #: BLD05-00667 SITE ADDRESS: 55 TERRACE DR Issue Date: 12/21/2005 PORT TOWNSEND, 98368 Final Date: 3/27/2007 APPLICANT: MILLENNIUM ONE HOMES INC PHONE: 360-385-4837 309 V ST PORT TOWNSEND WA 983683632 SUBDIVISION: KALA TERRACE Block: Lot: 16+ PARCEL NUMBER: 965900016 Section: 26 Township: 30 N Range: 01 W PROJECT DESCRIPTION: NEW SFR W/ATT GARAGE & 120 GAL PROPANE TANK THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2003 EDITION. OCCUPANCY GROUP( . TYPE OF CONSTRUCTION: 5N SPRINKLER SYSTEM yes THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 3/27/2007 41 ea .I .. '�I9\O`7 Building ttia-1 Signature Date I:1F_BLD_Occupancy.rpt 10/29/19 -� ri? JEFFERSON COUNTY till 1,1 1 3 DEPARTMENT 1` �� 4 621 Sheridan Street • Port Townsend • Washington 98368 ` \�� G` 360/379-4450 • 360/379-4451 Fax 0 5 0 6 http://www.co.jefferson.wa.us/commdevelopment/ Ca STORMWATER SITE PLAN SUBMITTALTEMPLATE9CC TALA# 0 5 (Da-3 PROJECT/APPLICANT NAME: _E 644 JPd/1 6 1 4 4 6)5 Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. Existing Conditions Summary j�ppR �f, 2. Describe the existing topography. Indicate contours on the site map. ` �y ` `_o� -� - - .0 SITE PLAN Nov 30 20 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. 4. Describe the existing soils. Indicate soil type on the site map. ` vJ .„(40,22.4„....,..... 5. Describe the existing site hydrology(i.e., drainage;behavior of water on the site above,below, and on the ground). Indicate • existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. ' S' Id I eo p_J (--- (777&k D ir gAfif rp.f,--t-t 6. Describe any excess levels of noise generated by the proposed use or activity: lEc E 11 W E ----N` . . (. . ,� fi. ran' 3-v cuot --`) Stomlwate •stormwater sae plan template—rev.10/1/2003 ReqUI«• . ,\• \\Il1 _. DEPT. OFJCOMt COUNTY DEvELOrMENT s 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes, etc.)on the site. Indicate location on the site map. E 8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities, roads,and sensitive/critical areas 4 (streams,wetlands,lakes,steep slopes,etc.). . 1_1NC kP. W 51dQXnC -S ICJ 141 �j T E ,-T IN ;' Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP 75.30 in the Manual) or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas . .-wlthin.the.site...,I.�acate.these.facilities on the site plan and differenti e proposed facilities from existing facilities. ):t . . ;c t)a : l.�►,U. Pie.d'iS !Af .- , flakU(a dU -so al 13T 6 . !t ilkWl ' 1AA 16 6_.'''''''...-- - I I t_ i a • •� ia," poi •. r— , w• . c A',1•/ �1 -��9�1 c/� - Ma - . : _t- 1. t� •- L'E AIL • ` . ' . 'tc1,P, . e s- ' t>Pe I,. a drat✓h rr,c,c. cie-R 1-1--,) 10. If the project require the use jof stormwater treatment facilities, describe the types of stormwater treatment facilities proposed 1'""-ter Use on the'site: Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is .^ v brorrr aii?rfor'1ar"O§'projects° projects that involve the potential for dispersion of contaminants.] 11. Describe the performance goals and standards applicable to the project. ,,, ; - I II r, e- ...ate. 12. Describe the flow control system. r^ !. �.- Fr-7 ■ _ l __ ■ _a intlf!4 ! _ ',I E s. � v • • u I fl L-/ aP' - 1 rH , ll 'U 1 1 C��� z� �- �2v u stormwater site plan template-rev.10'V2003 i.•1.:--- 4 130•4'[..Lr i 0 - 6 ,i co -) ( Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems, treatment facilities,flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE I.By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. 2_0-- 0 Ss (LANDOWNER OR AUTHORIZED REPRESENTATIVE sIGNATU ) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: • •� l j A L. k r r I ij (� j CC itl3 li..... --z! OCT 2 0 2005 • 12 stormwater site plan template—rev.10/1/2003 b. Description of special requirements for working in or near environmentally sensitive areas. Vfr 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). /t 5. Construction Phasing. a. Construction sequence (fir- -( nc.C3 4 441=5y 46) b. Construction phasing(if propo „,472/4 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). Provide a proposed construction schedule. II. Wet Season Construction Activities. a. Proposed wet season construction activities. b. Propose• wet season construction activities for environmentally sensitive areas. 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. ■ . Two. IS s / ' Yl AL s • i •1:ni( / / b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. /////A 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. a. Sediment Ponds/Traps. b. Diversions. / ,/ c. Waterways. d. Runoff/Stormwater Detention Calculations storrnwater site plan template—rev.10/112003 12 Required Elements-Construction SWPPP(continued) 8. Stabilize Channels and Outlets../) L / y/ AV 1 L /Ll.f ' AH['Le1.1_,G.2 1.-/t.L7 r 9. Control Pollutants. 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). - 451//:1— � 114.4 �1� z...t f t>/ ct. 1:-4.- ,.......64--6,....64 ,l-i_v__ -.ii - 1 *-C9 _- -d- L`-' .- Z -:! yf ,11 11. Maintain Best Management Practices(BMPs). 12. Manage the Project. 4 i I P f I! t 1;70 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). oe/1.-//1 I`.G ' G ' '-,_ !'- -' 41.04..---r_.,--ere l• . b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). 47//, -Gil -44gziel )3 itILAir _ • 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. /bji 1> stormwater sfe plan template-rev-10/12003 ° 1 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in tte template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible Pr preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwat r Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residerral development. SECTION I-CONSTRUCTION SWPPP NARRATIVE r •r -7 ( s 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or 1 will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable ' to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements-Construction SWPPP 1. Mark Clearing Limits. IL'h-�'�: -Z14.4 cii" .tM el: ,._r ��--r_1 / .- ,ci�e. ,1_ ,- 1..1'L t�L'9VY L,r i �� 2. Establish Construction Access. If F\a 1)le-iiie, L6a.Ni ktcvve4 tMa l-s ka- - 5Fa . 3. Control Flow Rates. /1j/A , 4. Install Sediment Controls. • �J ' r i..�,.•crC _Jam. f -tit;. ,C • gale 5- Riii • .. l 5. Stabilize Soils. t . f i. ira mm ItiniiiiMilliiiiiiiiifilli . 6. Protect Slopes. j' I (' .' ' OCT 2 O 2005 I' ). ■ `J.EULL/ r L.�- 1. i i" Z L 'P'L`l- 7. Protect Drain Inlets. / r stwmwater site plan template-rev.10'1/2003 k 3 1 3. Describe the water quality system. /t1 L. Describe the conveyance system analysis and design. - 15. Describe the source of fill material,physical characteristics of fill material, and deposition of excess material. 4":///91 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. 17. Describe the proposed surfacing material. /l1 It F ! kv"/ Imo ; 1 18. Describe methods for restoration of the site. ! OCT 2 0 2005 r ' 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. • 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. :b 7 stormwaler site plan ter tale-rev.10'1,2003 V 0 �. . _ --r- Z � . Z ' m ■■11■■■1111■■■■■■■1111■■■■■■ !�* S.., ■1111■■i■■■ _ 1■W ■ 1 ■■■1111■■■■■■•Emn u 1 l . : , = ■■■1 --c ■■■■■■■■■■■■■■■1S■■ill■■■1. _' o E1 = 11■■IN__ 1111■■■■■1111■■■■■■1!■A1■■■■111■M MAIM Erlik 1 _z g ■m1J■■■■■■■■1■t1af U i EW1111 1MNI llAIMIL�1V fl age■■■■■■■■■■■■■■■■■■■ t ►mE■■li �! ! 0 G usammm ■■■■■mill■■■■■■ ® ate =7 1111 1111■«i�.�■■■ li■1�.�,+..�. n hmummi�®■■■ommom■ t■mu ■■• •u mmme !1■■®■ d rii►ei■■■■■■■■■ ipmmat■m11■®m®■■■■■■iii■ummi II!IIIflhIImIIIIiiiuIIIIIuIIIIuinhi v ■■■■■■■.IN■■.NNMEN ■ill■ ■■■■■■E .■ "I rn iiimminirimmoromumummEnnumwm• mer ■ ■■■■1■ ■■n■ - -1 ill 111■ ■■■monn ■■\o nak■■■■11■■■■11■■■Is■■■■■mi■■®■■■ ■■■1■ IIi!II1iIIIIUhIIIIIIIII ■■1�■■■■ m HIIUhIItIIII i.A11®®rill■■®1111 m■®®® eie1mil■ m R) 111111111111111111111111111111.1111111 '-'i ■■■■■ilmom v■■vait mmo ■■■ ■ ■■■■■i l F■■■■►I■® ■Is■■vEVU®■■■■■■_ ■■■■■II■.I■ 11111M1111111111111111111 .111114111 k � 1111■■■■'.r:. ommi ■■■■■ 111111■■ olima"iiimak a UU■■ii® ■;■• ■■11■■■■■■I ■11■■■■■■■■■■11■iNIMM ■■■1M ?iis,1■■■■■■■■■■iii■■■■■■■■■■®■1!111111 W■N■■ice■■U■■■■■■■■■■■■ U_■■■■ `ERR ■■■■■■®1■■■■■ill■■■■U■EM ®1V®illmas inI■ --'(--)11 3 ■■■■■m■■U■II■ 1111■■■■ VIA`►, ■■■■■■■■■■I■ m i1IIIIUIIIiiIIIIIIIPNI1IIIIII1II■■■■■ 1■■■■ ■■U■1■■■1 ■ ■■■■■■■■II■ '21 • 7111111111111111111111111 110111111111 - r ' 3 111.11.111111illitigrlill w■1 1m ■■■■ ®r■ ■■■■■■ i ■ 1 m . 79 cuiuuiiiiiuiiiiiiiiuiii' 1 IMENIIII -. IIIIIIIIUINhIUhII !L'iIIIIiIIU --)- ■■■ ■■■a ■R1■■ ■ ffi■gili ■ ■■■ t 0. ■■■■■■■ ■i®■■■■® ■ ■rill■■11■U■■ ■■■ ■■■■■■■■ia..■®■®■®ail ■■ ■ I■■■■■■■ f ■■■■■■■a■■■■■■■■■■■m. `1111■■■■■ ■■■■■■.n IIIIIIII•IIIIIIIIIII.INIIII1 ,1I ..........................................___c„, , , _<. „ , , , ,,,., V. N 4, r.- ; - t -1 oQ 1 JEFFER COUNTY • W DEPARTMENT OF COMMUNITY DEVELOPMENT ' '. 621 Sheridan Street • Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax p$ www.co.jefferson.wa.us/commdevelopment �`S$ING` . Master Permit Application MLA: C`(J (0o1-i Project Description(include separate sheets as necessa ): Ul`e w S e k W(J �� ,>� �,. (f` Tax Parcel ,l I o Property y Number: W S t p 0 6 t 4..Size: l w , � 3 * (acres/square feet) Site Address and/or Directions to Property: , 55 ( T in.44te, pa.t,o t- I t° Property Owner(s)of Record: 14?„t.4..2-4..r+-t.— BLGP Wes' Telephone: 3 T r- t4i$32 Fax: ? 7t-se04'd email: Mailing Address: ?J 4 I. S 1- Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) 0 Building 0 Variance(Minor, Major or Reasonable Economic Use) 0 Demolition Permit r°° 1(-"7�. C('ii'. `' n :' l jiomat ll e[C(a),Cn(d),or C]** CYSingle Family 1 l tL!E L l D�EiisdteGo�ia D"or Unnamed Use Classification ['Garage achR/Detached L� ❑ Speci"Ta Usel i ssential Public Facilfies)** ❑ Manufactured Home [ ❑ Boundary , ' Adjustment D Modular I ttt o n 9 0 U'Shprt Plat-*' D Commercial* D mdingSitePlan** D Change of Use 0 Long Plat** D Address ❑ Road Approach D Planned Rural Residential Development(PRRD)/Amendments** p'Propane ❑ Plat Vacation/Alteration** D Allowed"Yes"Use Consistency Analysis D Shoreline Master Program Exemption/Permit Revisions** D Stormwater Management 0 Shoreline Management Substantial Development*" D Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance D Temporary Use D Comprehensive Plan/UDC/Land Use District Map Amendment n Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment D Forest Practices Act/Release of Six-Year Moratorium *May require a Pre-Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: G I DESIGNATION OF AGENT I hereby designate "7 00 Aes ke la'-• to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE_ �Tg 't t vM. . '. Date: (0 — 1, 0.1° By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business hours. _ — Signature: �" ......y: /v / 7 The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and�ates it below. Signature: c4;�JI/' Date:_ /, –17 3 G:\PexmitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc • OWNER BUILDER STATEMENT • The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLE,R:: PHONE: FAx: _e_z ,,,, , i / ,e S ( -10a 3 �eO —�J>T c(�(i 7 ) MAILING ADDRESS: 1/ S �-- EMAIL: CONTRACTOR'S LICENSE - WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: 11.44:40/1/5,44.-1 5 PHONE (),o) yf2-0if Ax:( ) MAILING ADDRESS: 31 1 s P 4,3 1-7`.m l( [J EMAIL O p ,-J 4 P roject Type: Type: Bathrooms: Shoreline: Type of Sewage Disposal: V- New Wood Existing: Z-- C ewer ❑ Addition ❑ steel Proposed: Bank [,l-C,bmmunity System ❑ Alteration/Remodel W. Concrete Total: 'Z Heigh: ❑ Individual System ❑ Repair ❑ Masonry /f/ /� SEP Permit# ❑ Demolition 0 Other: Bedrooms: ( Water Supply: Existing: Setback: ❑ yrivate well 0 Two Party Type of Heat: Proposed: iublic °u9) Total: Name of System: K If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ❑ Underground Tank Li--A ove ground Tank Size of Propane Tank: /Z`0 ❑ Heat Stove Ld-Cook Stove ❑ Woodstove [-replace Insert n Hot Water Tank B'Pellet Stove ❑ Other Is this appliance being installed in a Manufactured I Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage For Office Use Only Current Proposed Amount Main Floor /Q �� r, f� Consistency Review: I 7 y I vi Base fee: Li 1. 2Nu Floor I �-------– - __ 0i. 5 3'"Floor Addition aR — I , f , I $f .Mezzanine: i Plan OCT 2 O 2005 .! 1 CO 1, "�S" Heated Basement State Surcharge fee: Unheated Basement Pot Water Review fee: S7 Ob Other Unheated 911/Rd Approach fee I ((iiii �i(tdC4-4,1 tt 4SS 1.--Lrt.0 Garage/Carport lY trJ 14 I`I 2 CO TOTAL $ d '7J tr to Decks 1 Receipt Number: 1 1 ( ,i 6 Other Cash/Check Number. ESTIMATED COST(REQUIRED) Date: - 1 .Fair market value of all labor and materials four l Th j to fin ( E`1'11 �c 6� o r , cro 0) Initials: G:\PennitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc , ` • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00667 Received Date 10/20/2005 SITE ADDRESS: 55 TERRACE DR Issue Date 12/21/2005 PORT TOWNSEND, 98368 APPLICANT: MILLENNIUM ONE HOMES INC PHONE: 360-385-4837 309 V ST PORT TOWNSEND WA 983683632 SUBDIVISION: KALA TERRACE Block: Lot: 16+ PARCEL NUMBER: 965900016 Section: 26 Township: 30 N Range: 01 W CONTRACTOR: MILLENNIUM ONE HOMES INC PHONE: (360)385-4837 309 V STREET PORT TOWNSEND WA 98368 (360) 379-4040 Contractor's License: MILLEOH010MM Expires: 7/13/2007 PROJECT DESCRIPTION: NEW SFR W/ATT GARAGE & 120 GAL PROPANE TANK CALL IN FOR THEUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: UFFER: Footing:-/-,20-06 icoNO G-RPWC„'K17y e_44 I (o Found o : 69‹ / / , 6•4014,41r /i rcLr 'lap ASAel4.5SC61) 61/ Stormwater FINAL Approval: Underground Plumbing: Underground lnsulaf.n: Shear Wall 2 JOC. Sheathing: - 2;`1 Ck' , Framing: ` / U -�.•iT o . col . AMITI� . Plumbing:, �4 Propane ank/Lines: Insulation:(,cJAL 3 e_VMA, Sheetrock: / Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: ,it I�a�(ti ;to '-10 3fZ iro HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE SPECIAL CONDITIONS FOR CASE # BLD05-00667 1.) Existing water line and new sewer line installation per SEP05-364 must comply with DOE Sewage Works Design and shall be verified on the as-built for the septic system prior to final. 2.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 3.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 4.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 5.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 6.) MANDATORY MEASURES FOR AN AT RISK SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirements: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. b. Installation of a flow meter. c. On-going well monitoring for chloride concentration. d. Submittal of flow and chloride data to the County per monitoring program. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 7.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 8.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 9.) • A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 10.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 11.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 12.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 13.) The building height is not to exceed 35 feet. 14.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 15.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 16.) Minimum setbacks for Lot 16 are as follows: a. 20 feet from Terrace Drive (western parcel boundary line) b. 7.5 feet from Parcel F (northern property line) c. 5 feet from eastern & southern property boundary 17.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 18.) The Conditions of Approval for Kala Terrace required open space dedication to be incorporated into the dedication language of the final mylar and included in project CC&Rs. The CC&R's reference the building setback of seven and one-half feet to the open space tracts. 19.) Setback requirements from drywell to septic tank is a minimum of 10'. I:1F_B LD_Perm it_Bu i Id ng.rpt 10/29/1999