Loading...
HomeMy WebLinkAbout110215_ca08Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Engineerp� Agenda Date: November 2, 2015 Subject: Change Order No.2 - Dowans Creek Road Realignment Project No. CR 1799-3, FEMA 1734 -DR -WA, Grant No. E08-796 Statement of Issue: Change Order No. 2 with Bruch and Bruch Construction for the Dowans Creek Road Realignment. Analysis/Strategic Goals/Pro's Et Con's: This contract is for construction of the road realignment between Dowans Creek Road milepost 0.85 and 1.53. The road realignment is necessary in order to move the road out of an active landslide area and preserve access to properties served by Dowans Creek Road beyond the slide area. On-site soil conditions proved even worse than anticipated and were exacerbated by wet, late season weather. The on-site soils, marginal even in dry weather, became problematic due to late season, wet weather construction required by permitting agencies to avoid bird impacts. Geotextile for separation and a job average of 7 additional inches of select borrow were needed to support construction haul traffic. Fiscal Impact/Cost Benefit Analysis: The change order will increase the previously approved contract amount by $71,948 from $331,641.75 to $403,589.75. This project is funded at 75% by the Federal Emergency Management Agency (FEMA), 12.5% by Washington State, and 12.5% by the County Road Fund. Recommendation: Please sign the three (3) originals of Change Order #2 where indicated and return two (2) to Public Works for processing with the Contractor. Department Contact: Matt Klontz, P.E., Project Manager, 301-9026 Reviewed By: CL" Philip County Admin trator Date JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change 2 Date: 10/19/2015 CHANGE ORDER Order No. Ordered by County Engineer under terms of [X Section 1 - 04. 4 of the Standard Specifications CR17993 Contract No. Change proposed by Contractor To: Bruch & Bruch Construction, Inc. Port Highway 101 West Port Angeles, WA 98363 End by: ontractor Firm Na Sigpature D�� Title Project Title Dowans Creek Road Consent given by Surety: (when required) Realignment By: Attorney-in-fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: On-site soil conditions proved even worse than anticipated and were exacerbated by wet, late season weather. The on-site soils, marginal even in dry weather, became problematic due to late season, wet weather construction required by permitting agencies to avoid bird impacts. Geotextile for separation and a job average of 7 additional inches of select borrow were needed to support heavy construction haul traffic. This change order authorizes the following: Increase Mobilization (Bid Item No. 1) lump sum amount $2,448. Increase Roadway Excavation Incl. Haul (Bid Item No. 4) quantity 400 cubic yards (CY) for a total quantity of 6,253 CY. Increase Select Borrow (Bid Item No. 6) quantity 3,200 CY for a total quantity of 7,476 CY. Increase Unsuitable Foundation Excavation Incl. Haul (Bid Item No. 7) quantity 500 CY for a total quantity of 600 CY. Add 2000 square yards (SY) of Geotextile (New Item No. 23) at $3.75/SY. Add $4,500 for Force Account work (New Item No. 25). Add six (6) Working Days to the contract time All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL ` AMOUNT AMOUNT THIS ORDER AFTER CHANGE $338,466.75 $331,641.75 $71,948.00 $403,589.75 ORIGINAL CONTRACT CURRENT CONTRACT CONTRACT TIME NEW CONTRACT TIME (days) TIME (days) CHANGE (Add/Del) TIME (days) A 50 50 6 56 APPROVAL RECOMMENDED APPR9VAtR= ENDED Project Manager Date County ngineer Date APPROL 0 ENDED APPROVED 1Zr Q Engineering Services Manager Date Chair, Jefferson County Commissioners Date C> \ ? \ f \ 2 ) k \ / I rl rl � §kn 04 __ __7 \ 2 u 7 ' 2 $ m / / \ k / / N ) & j u @ \ & / f & C:) f ¢ 2= » / r _ o / ® # 2 w _ _ m - « m M _ y @ 7 w ) � � f§ 2 & 2 � & \ u k § d \ \ / w $ / E u \ < � 4 z / / 5 @ / ON cq 2 / m ) \ m