Loading...
HomeMy WebLinkAbout110215_ca07Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer� Agenda Date: November 2, 2015 Subject: Change Order No. 2, Upper Hoh Road MP 3.338 Culvert Replacement, Project No. CR18960, Federal Aid Project No. PLH-A 160(001) Statement of Issue: Change Order No. 2 with Rognlin's, Inc. for the Upper Hoh Road MP 3.338 Culvert Replacement, County Project No. CR18960. Analysis/Strategic Goals/Pro's Et Con's: This project consists of replacing the substandard, failing culvert at Upper Hoh Road MP 3.338 with a new steel culvert, to be installed by the pipe ramming method. Change Order No. 2 was proposed by the contractor to reduce the steel pipe wall thickness from 0.75 -inch to 0.625 -inch and credit Jefferson County $7,032. Fiscal Impact/Cost Benefit Analysis: This change order will decrease the contract amount by $7,032.00, from $594,038.64 to $587,006.64. This project is funded at 100% by the Federal Highway Administration. Recommendation: Public Works recommends that the Board execute all three originals of Change Order No. 2 with Rognlin's Inc. and return two (2) originals to Public Works for further processing. Department Contact: Mark Thurston, P. E., Project Manager, 385-9160. Reviewed By: 4hilip4rle' County Admin' trator Date JEFFERSON COUNTY Sheet 1 of 1 DEPARTMENT OF PUBLIC WORKS Change 2 Date: 7/15/2015 CHANGE ORDER Order No. Ordered by County Engineer under terms of Section 1 - 04. 4 of the Standard Specifications CR18960 Contract No. Change proposed by Contractor To: Rognlins, Inc. .— n rise by Contrac Finn Nafne P.O. Box 307 321 West State Street or Aberdeen, WA 98520 ' t D Sign tore Date Title Project Title Upper Hoh Road MP 3.338 Consent given by Surety: (when required) Culvert Replacement By: Attomey-in-fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: The Contract documents are modified as follows: The Contractor proposes to substitute 0.625" casing wall thickness in lieu of the County's specified 0.75" casing wall thickness. The Contractor takes full responsibility for the engineering calculations that the Contractor prepared to demonstrate that the 42'X 0.625" pipe can withstand pipe rammingforces and obstruchons without deforming. The Contractor takes full responsibility for corrective action in the event that the casing deforms during ramming. The Contractor shall credit Jefferson County in the amount of $7,032.00. s All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED Rwr CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE ` r $515,000.00 $594,038.64 -$7,032.00 $587,006.64 �# g. ORIGINAL CONTRACT CURRENT CONTRACT CONTRACT TIME NEW CONTRACT TIME (days) TIME (days) CHANGE (Add/Del) TIME (days) 46 0 46�� IMWMO 45 APPROVAL RECOMMENDED APPROVAL RECOMMENDED % - Project Manager Date County ngineer Date APPR VA COMMENDED APPROVED 91 a Engineering Services Manager Date Chair, Jefferson County Commissioners Date