HomeMy WebLinkAbout110215_cabs01JEFFERSON COUNTY
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
FEE DISCUSSION
TO: Board of County Commissioners
Philip Morley, County Administrator
FROM: David Goldsmith, Interim Director
Jodi Adams, Office Coordinator
DATE: November 2, 2015
SUBJECT: Proposed Community Development Fee Ordinance
ATTACHED: Appendix A - Proposed Fee Schedule
STATEMENT OF ISSUE:
The current fee schedule generally outlines fees for both building fees and land use development fees. The
building base fee and plan check fee are based upon the valuation of the structure proposed to be
constructed. The valuation is based on Appendix L Permit Fees in the current International Residential
Code as well as the International Code Council Building Valuation Data establishing a value for this type
of construction within this area of the United States which is updated in February and August of each year.
The land use fees as outlined in the existing ordinance are derived by multiplying the minimum time it
takes to process a permit from acceptance of the application to a decision point multiplied by the hourly
rate charged by the department. The overall goal of charging building and land use fees is to recover the
cost associated with the review and decision making for the application in order that development pays for
development and land use is not subsidized by public funds.
The primary focus of this update to the fee schedule deals with the hourly rate being charged by the
department. The hourly rate utilized in the year 2009 per Ordinance 02-0223-09 was derived by taking the
cost to run Community Development, including administration and overhead, and dividing it by the
billable hours available. The 2009 fee was calculated at $71.00 per hour and this hourly rate has been
updated each January 1st to reflect the consumer price index per Ordinance 12-1209-96. The annual
change has fallen short of actual costs over previous years in areas of wages, benefits, and overhead costs
for rent, computers and vehicles.
The department has examined the fee schedule and proposes adjustments to the hourly rate. Permits other
than building permits are charged an hourly fee based upon the minimum time it takes DCD staff to
process the application. Additional review time is billed after review is complete and prior to permit
issuance. By the building code and consistent with the approved fee ordinance, the Building Official is
authorized to review the value of a structure or associated development and must attest to the true cost
estimate of the project is being utilized for the purposes of calculating the accurate fee to be charged.
The proposed new hourly fee includes department cost recovery for code review, permit preparation,
decision making, customer service and administrative duties associated with intake, issuance and records
anaement.
- 12--�S
ip Mor oun y Adminis for Date
WHAT 1S THE BASIS FOR DIRECT COST RECOVERY?
The legal basis for fee recovery can be found in state statue at RCW 82.02.020 (3). Nothing in this section
prohibits cities, towns, counties, or other municipal corporations from collecting reasonable fees from an
applicant for a permit or other governmental approval to cover the cost to the city, town, county, or other
municipal corporation of processing applications, inspecting and reviewing plans, or preparing detailed
statements required by chapter 43.21CRCW
State law requires that the fee be reasonable and the cost recovery be correlated to the processing, decision
making and inspections of the building and land use permits accepted, reviewed for code compliance,
issuance, inspections and final certification for occupancy or use. This cannot include expenses not
directly related to processing permits such as County Planning (Long Range), Code Enforcement, Fire
Marshal services, Fire Inspections, Environmental health activities, or Public Works activities.
The methodology that DCD uses fee calculations are consistent with other local Community Development
jurisdictions and works well for a department that has funding based on permit fees, grants, and general
fund.
HOW WAS THE HOURLY FEE CALCULATED?
DCD's proposed hourly rate is derived by dividing the costs (including administration and overhead) of
the Building and Development Review Divisions by the billable hours available to recover these costs.
This is the same methodology used in 2009 to establish the current hourly rate. In the year 2014, these
costs are $1,042,863 with billable hours from DCD staff available for permit review totaling 11,717. With
rounding, $1,042,863 / 11,717 Ins = $89.00/hr. In the year 2015, 12 month average based on 10 months
data, these costs are $955,451 with billable hours from DCD staff available for permit review totaling
10,630. With rounding, $955,451 / 10,630 firs = $90.00/hr. In order to prevent large fluctuations in the
hourly rate, once the rate has reached $90.00/hr we will resume increasing the hourly rate by the CPI. It is
important to note that departmental costs that are offset by other revenues (such as the general fund
contribution, pass through consultant reimbursements for specific projects, and grants) are not utilized in
calculating the hourly rate. The billable hours are the annual gross hours of departmental staff minus the
non -billable hours available as a result of trainings, meetings, employee vacations, mandatory breaks and
sick leave.
ENTERPRISE FUND, GENERAL FUND or OTHER FUND?
DCD is not considered a general fund department. The annual budget refers to the department as an "other
fund" which means it has revenues generated through fees, general fund transfer and revenue from grants.
The department attempts recover costs associated with review of development proposals without subsidy
from the general fund while providing for services of interest to the applicant and the public at large.
WHAT PRINCIPLES GUIDE COST RECOVERY?
• Applicants should pay for services rendered by the department including associated costs and indirect
costs.
• Fees should include direct and indirect costs associated with the service delivery. Indirect costs are
defined as the following: administrative costs; personnel support costs; training and public education
costs; technology costs; and, facilities costs.
• Applicants should pay for the additional time involved in processing permits if the base hours are
exceeded.
• Fees should be reasonably similar to other county departments.
■ Fees should be based upon the minimum time for review and completion to a decision point.
• Fees should be balanced and support the department's operations through economic cycles and
fluctuations in workload.
STRATEGIC GOALS:
The recovery of direct costs associated with the review and approval of development is supported by the
strategic goals of Jefferson County.
FISCAL IMPACT:
The increase will allow DCD to maintain the current level of service in the area of permit review without
an increased general fund subsidy.
PERIODIC FEE REVIEW:
Per Ordinance 12-1209-96 DCD will review at minimum, once every three (3) years, but no more
frequently than once per year, fees established under this ordinance for consistency and applicable laws,
regulations and fee policies adopted by the Board of Commissioners. Periodic fee review will consider at
least the following factors: service cost recovery; public versus private service benefit; Departmental
goals; other available funding sources; and comparison fees in adjacent counties, statewide averages and
other comparable areas.
EFFECTIVE DATE:
The proposed DCD fee increase if approved by the BoCC would become effective on January 1, 2016.
RECOMMENDATION:
DCD recommends the BoCC approve the ordinance as drafted with the new line item fees and the
proposed $85.00 per hour fee. This fee will increase by $5.00 per year until the current two year average
is met.
2016 $85.00
2017 $90.00
2018 Resume annual increase by Consumer Price Index per Ordinance 12-1209-96.
Note: To encourage more extensive use of the CAM process, it is proposed that the CAM base fee be
applied to a subsequent permit fee, if the permit subject to the CAM is applied for within one year of the
date of the CAM.
Appendix A
STATE of WASHINGTON
COUNTY of JEFFERSON
DEPARTMENT OF COMMUNITY DEVELOPMENT
BUILDING DIVISION, DEVELOPMENT REVIEW AND LONG RANGE PLANNING
a) Applies to new construction only, otherwise, number 7 applies
b) The fee is determined by a schedule established in the Intemational Residential Code, and is based on
the value of the structure.
c) Auditor's Office fee.
d) The fee for residential square footage valuation is based on Building Valuation Data established by
International Code Council, Building Safety Journal. Building Valuation Data is published in February
and August of each year.
e) Building Official will verify valuation per IBC Section 109.3 Building Permit Valuations.
f) Base fee is the minimum amount charged per application. Additional time may be charged on an hourly
basis
}
eR
1) Main Floor
b
b
b
Base Fee
65%
65%
65%
Plan Check Fee
a, d, a
a, d, a
a, d, a
Valuation
e
e
e
2) Additional Floors, Finished Basement
b
b
b
Base Fee
65%
65%
65%
Plan Check Fee
a, d, a
a, d, a
a, d, a
Valuation
3) Unfinished basement
b
b
b
Base Fee
0.65
0.65
0.65
Plan Check Fee
a, d, a
a, d, a
a, d, a
Valuation
4) Carports, Garages, Pole Buildings, Decks
b
b
b
Base Fee
65%
65%
65%
Plan Check Fee
a, d, a
a, d, a
a, d, a
Valuation
4a) Semi -Heated Space
b
b
b
Base Fee
65%
65%
65%
Plan Check Fee
a, d, a
a, d, a
a, d, a
Valuation
5) Modular Home foundations & foundations for relocated
In
b
to
Base Fee
structures
65%
65%
65%
Plan Check Fee
$34.87/sq.
$34.13/sq.
$34.13/sq.
Valuation
ft.
ft.
ft,
d, a
d, a
d, e
6) COMMERCIAL structures, construction or improvements
b
b
b
Cost or Fair Market Value, IRC Fee
table
65%
65%
65%
Plan Check Fee
e
e
e
7) Manufactured Homes / mobile homes (one or two sections)
546.00
595.00
630.00
8) Additional sections for manufactured home / mobile home
41.00
41.00
41.00
Increase by CPI
9) New- propane tanks, lines, and associated appliances
234.00
255.00
270.00
(In existing structures)
9a) New or existing wood stove, inserts, pellet stoves, hot
156.00
170.00
180.00
water heater, heat pump, propane tank swap out
(In existing structures)
10) Inspection; re-inspection
78.00
85.00
90.00
11) Change of Use or Occupancy
456.00
510.00
540.00
12) Title Notice Removal
c
c +'$85 hr
c +'$90 hr
'Per hour based on work provided
13) Renewal
234.00
255.00
270.00
14) Demo Permit
78.00
85.00
90.00
Base
15) Fire Code Official Services
78.00'
85.00'
90.00`
'Per hour or based on contract
provider fee
16) Notification of Water Availability
41.00
41.00
41.00
In addition to Health Department
Review Fee
17) Water System Review
234.00
255.00
270.00
3 hour minimum charge
A[(�
7
18) Road Approach
Now handled by Public Works
19) Application for 911 Number/Address
234.00
255.00
270.00
20) Application for 911 Replacement Number
20.00
20.00
20.00
21) Road Approach & Address Combined
Road Approach now handled by PW
22) Road Vacation Request
234,00
255.00
270.00
23) Road Naming
312.00
340.00
360.00
Previously a Public Works Fee
24) Road Name Change
546.00
595.00
630.00
Previously a Public Works Fee
t
icy
is —
390.00
425.00
450.00
Not applied to permit
25) Pre-application Conference
25a) Pre-application site visit.
156.00
170.00
180.00
26) Customer Assistance Meeting (15 min free)
78.00
`100.00
'100.00
`Base, applied to permit if submitted
Win one year
27) Administrative Appeal of Land Use Decisions
858.00
935.00
990.00
Base
Hearing Examiner plus actual costs as incurred
149.00
149.00
149.00
Public Hearing Notice
for expenses, facilities, etc.
10.00
10.00
10.00
Notice Board
28) Revisions to Land Use Applications Requiring a second
234.00
255.00
270.00
Base
Public Hearing Notice
149.00
149.00
149.00
Public Hearing Notice
29) Site Visit
156.00
170.00
180.00
Base
30) Code Interpretation
546.00
595.00
630.00
Base
31) Notice Board
10.00
10.00
10.00
Each
32) Hourly Rate
78.00
85.00
90.00
Per hour
33) EIS Preparation or Review, Including Third Party Review.
234.00
255.00
270.00
Base & Actual Costs Incurred (Inc.
Consultant Work)
34) 3rd Party Review of Special Reports
234.00
255.00
270.00
Base & Actual Costs Incurred Inc.
Consultant Work)
34a) Special Report Review (Wetland Delineation,
234.00
255.00
270.00
Base
Geo Tech, etc.)
35) Resubmittal of Consistency Review
156.00
170.00
180.00
W-UMNAMi
36) Pre-application for more than 10,000 sq/ft of impervious
390.00
425.00
450.00
surface or more than 5,000 sq/ft of non -single family
development or for a CASP
37) Allowed "Yes" Use Consistency
234.00
255.00
270.00
Base
37a) Road / Lot Segregation
312.00
340.00
360.00
Base
37b) Road Setback Administrative Variance
312.00
340.00
360.00
Base
38) Tree / Vegetation Removal
234.00
255.00
270.00
Base
39) Stonnwater Management Permit Stand Alone Only or in
390.00
425.00
450.00
Base
conjunction with Class IV General Forest Practices
40) Boundary Line Adjustment
702.00
765.00
810.00
Base
41) Minor Plan Modification
312.00
340.00
360.00
Base
(Preliminary approval only)
42) Site Plan Approval Advance Determination
546.00
595.00
630.00
Base
43) Shoreline Master Program Permit Exemption
546.00
595.00
630.00
Base
(Stand alone or with Single Family Residence)
44) Shoreline Master Program Permit Revision
156.00
170.00
180.00
Base
45) Last Will & Testamentary Division
546.00
595.00
630.00
Base
46) Home Business
234.00
255.00
270.00
Base
47) Temporary Use
234.00
255.00
270.00
Base
48) Sign Permit
234.00
255.00
270.00
Base
49) Minor PRRD Amendment
234.00
255.00
270.00
Base
(Planned Rural Residential Development)
50) CASP (Critical Areas Stewardship Plan)
546.00
595.00
630.00
Base
390.00
425.00
450.00
Pre-app
51) Additional fee for State Environmental Policy Act (SEPA)
780.00
850.00
900.00
Base
Review (including SEPA base fee, Notice of Application, and
Notice Board)
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
52) Discrefionary"D" or Unnamed Use Classification
390.00
425.00
450.00
Base
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre-app
2,106.00
2,295.00
2,430.00
Base
53) Short Plat
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
702.00
765.00
810.00
Base
53a) Plat Alteration
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
858.00
935.00
990.00
Base
54) Conditional (Administrative) "C(a)" Use
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
858.00
935.00
990.00
Base
55) Conditional (Discretionary) "C(d)" Use
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
858.00
935.00
990.00
Base
56) Cottage Industry
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
234.00
255.00
270.00
Base
57) Temporary Use
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
858.00
935.00
990.00
Base
58) Variance, Minor
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
59) Shoreline Substantial Development
1,248.00
1,360.00
1,440.00
Base
(Primary Use)
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
60) Release of Six Year Moratorium under
546.00
595.00
630.00
Base
Forest Practices Act (Partial)
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
61) Conversion Option Harvest Plans
546.00
595.00
630.00
Base
149.00
149.00
149.00
Notice of App
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
62) Additional fee for State Environmental Policy Act (SEPA)
780.00
850.00
900.00
Base
Review
RM
63) Binding Site Plans
6,708.00
7,310.00
7,740.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
64) Conditional "C" Use
1,794.00
1,955.00
2,070.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
65) Long Plat, Preliminary (including Planned Rural
6,708.00
7,310.00
7,740.00
Base
Residential Development)
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
66) Plat Alteration
1,638.00
1,785.00
1,890.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
67) Variance, Major
1,638.00
1,785.00
1,890.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
68) Reasonable Economic Use Variance
1,638.00
1,785.00
1,890.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
69) Shoreline Substantial Development (Secondary Use)
1,950.00
2,125.00
2,250.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
70) Shoreline Conditional Use
1,950.00
2,125.00
2,250.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre -app
71) Shoreline Variance
1,638.00
1,785.00
1,890.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board !i
390.00
425.00
450.00
Pre-app
71 a) Release of Moratorium
1,638.00
1,785.00
1,890.00
Base
149.00
149.00
149.00
Notice of App
149.00
149.00
149.00
Notice of Public Hrg
10.00
10.00
10.00
Notice Board
390.00
425.00
450.00
Pre-app
72) Additional Fee for State Environmental Policy Act (SEPA)
780.00
850.00
900.00
Base
Review
WW
41
73) FINAL PLAT APPROVAL Short Plat, Long Plat, Binding
234.00
255.00
270.00
Base
Site Plans; Final (including Planned Rural Residential
Development application)
390.00
425.00
450.00
Pre-app
Vt,.
1.716.00
1,870.00
Base
74) Special Use (Essential Public Facilities)
149.00
149.00
Notice of App
149.00
14900
7450.00
Notice of Public Hrg
10.00
10.00
Notice Board
390.00
425.00
Pre-app
75) Request for Jefferson County Comprehensive Plan/UDC
546.00
595.00
630.00
Base (If docketed, then houdy1charge)
Amendment (Suggested).
390.00
425.00
450.00
Pre-app
76)J.C. Comprehensive Plan/UDC Amendment(Site
3,744.00
4,080.00
4,320.00
Base
Specific) -Includes Noticing & SEPA
j
390.00
425.00
450.00
Pre-app
1,794.00
1,955.00
2,070.00
Base
77) Open Space/Open Space
149.00
149.00
149.00
Notice of App & Public Hrg Nokice
10.00
10.00
10.00
Notice Board
78) Open Space Timber Applications
Assessor Fee
Processed by Assessor's Off
79) Transfer Forest Land (RCW 84.33) to Timber Land (RCW
Assessor Fee
Processed by Assessor's Off
84.34) Application
0.15
Per page.
80) Copy of Duplicating Fee - 8 1/2" x 11" or 8 1/2" x 14"
0.15
0.15
11"x17"
0.30
0.30
0.30
Per Page
Color or Oversized Documents
At Cost
At Cost
At Cost
Compact Disc
1.10
1.10
1.10
Land Use Maps
20.00
20.00
20.00
Each
Publications
At Cost
At Cost
At Cost
Scanning
19.00
21.00
22.00
Base, or actual at hourly rate over'/.
hour. Increase by CPL
Refunds
Amount paid minus staff time
expended at hourly rate. '..