Loading...
HomeMy WebLinkAboutBLD2015-00103 - NSFR "I"' r�r DEPARTMENT OF COMMUNITY DEVELOPMENT 1 621 Sheridan Street,Port Townsend,WA 98368 lf Tel b3:w60.379.44D0 I Fax:wa.36us0 379.4451/commw.co.Jefferson. unitydevelopment -4. $yf1 s,LtYp' E-mail:dcdaco.jefferson.wa.us CERTIFICATE OF OCCUPANCY PERMIT#: BLD15-00103 APPLICANT: ANN MATSUNAMI PHONE: 1650 LILIHA ST#201 HONOLULU HI 96817-3169 SITE ADDRESS: 190 BEE MILL RD Issue Date: 06/17/2015 BRINNON, 98320 Final Date: 11/3/2015 SUBDIVISION: 9639 -JACKSON COVE PARK Block: Lot: PARCEL NUMBER: 963900023 Section: 13 Township: 26 N Range: 2W PROJECT DESCRIPTION: NSFR with covered deck and concrete pad for future hot tub SEP13-000116 Revision received 6116/15 : Bldg revision received -- adding 3 windows in stairwell. Structural changes to shearwall, hold downs THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2012 EDITION. OCCUPANCY GROUP: R-3 TYPE OF CONSTRUCTION: 5N r. SPRINKLER SYSTEM yes no THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 11/3/2015 Building Official, 11tidem a rkld atalforms\F_BLD_Occupancy.rpt 11/6/2015 • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD15-00103 Received Date: 3/31/2015 SITE ADDRESS: 190 BEE MILL RD Issue Date 6/17/2015 BRINNON, 98320 Expiration Date 6/17/2016 OWNER: ANN MATSUNAMI PHONE: 1650 LILIHA ST#201 HONOLULU HI 96817-3169 9639 -JACKSON COVE PARK SUBDIVISION: Block: Lot: PARCEL NUMBER: 963900023 Section: 13 Township: 26 N Range: 2V1 CONTRACTOR: OWNER/BUILDER PHONE: PROJECT DESCRIPTION: NSFR with covered deck and concrete pad for future hot tub SEP 13-000116 Revision received 6/16/15 : Bldg revision received -- adding 3 windows in stairwell. Structural changes to shearwall, hold downs TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,048 VALUATION 210,000.00 ADD'L: 624 HEAT TYPE: EEE CODE EDITION: 2012 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: R-3 UNHEATED: # OF STORIES: 2 OCCUPANCY: CONST TYPE: 5N OTHER: SHORELINE: CONST TYPE: DECKLE' SETBACK: 690 BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: 27047 Type Amount Paid By: Date: Receipt: BEDROOMS: BATHROOMS: Permit $1,797.00 SRE 03/31/15 154304 Exist: 0 Exist: 0 Plan Check $1,168.05 SRE 03/31/15 154304 Prop: 2 Prop: 2 State Building Code $4.50 SRE 03/31/15 154304 Total: 2 Total: 2 Potable Water Application $68.00 SRE 03/31/15 154304 Plan Check $78.00 NEW 06/17/15 156199 Total: $3,115.55 Directions to Site: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. Request must be received by 3pm the day before the inspection is needed. Office Hours 9:00 am -4:30 pm MONDAY- THURSDAY HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY- SEE ATTATCHED • • Jefferson County Building Division Permit Number: BLD15-00103 Applicant: MATSUNAMI BUILDING PERMIT INSPECTION APPROVALS Applicable Code: 2012 International Building Codes To schedule inspections, call (360)379-4455 no later than 3:00PM the day before the inspection is needed. Requests received after 3:00 PM will not be scheduled for the next day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks 5/12/2015 C 6/05 5 ( cjc t Aa Q r4' cikj' E• rosion Control 5/12/2015 ) C- 51►Jt5 F• oundation Footing 5/12/2015 5/i J i5 t I F• ooting Drains Foundation Stem Wall 5/12/2015 i L �\ Underground Plumbing J Under Floor Framing 2/2015 C.- 51/115 S• traps(hold downs) 0245 r, �2 y revision on 2nd story,hold downs added-meb Straps(hold downs) • CO/DAC me- Ext.Shear Wall Nailing .) is ME \� Rough-in Plumbing 4j /l155 �(� L Ot Framing bj.2�f/)5 1 G fi Blocking '' C Airseal W24/ 15 J C 1 U'r Insulation:Walls 7/t) f5 Insulation: Floors Pi/ e//5. ' Insulation: Ceiling 7'JJ� iSS Int. Shear Wall Nailing 2nd story revision. See revised plans-meb W• allboard Nailinglµ G• as Line: Interior Lfz,/i Gas Line: Exterior P• ropane Tank I4415 Heat/Chimney Clearance /0/4 A• ddress Posted '_3. lc Septic System Finaled sep13-116 not installed • • A final inspection will not be scheduled until the following are completed and signed off by the applicable Department: • Building Permit Conditions are met • Septic Permit Final/Complete for any building containing plumbing • Land Use Conditions met and signed off • Public Works Permit Final(where applicable) FINAL INSPECTION }�-3- t� � - I�z �IER�PLG b LaiupG.„; �l 1.30/15 FINAL INSPECTION/MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • CONDITIONS for Building Permit# :BLD15-00103 1.) See SPAAD MLA 13-00159 for Zoning and Critical Area approval. 2.) DWJ 3.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 4.) The Applicant shall comply with the Habitat Management Plan prepared by Westech Company dated December 2013 in its entirety. 5.) The site plan as submitted with the Building Permit application on March 31, 2015 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated April 5, 2015 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 6.) A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. \\tidemark\data\forms\F_BLD_Permit_BIdg.rpt 6/17/2015 • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD15-00103 Received Date: 3/31/2015 SITE ADDRESS: 190 BEE MILL RD Issue Date 4/8/2015 BRINNON, 98320 Expiration Date 4/8/2016 OWNER: ANN MATSUNAMI PHONE: 1650 LILIHA ST#201 HONOLULU HI 96817-3169 9639 SUBDIVISION: Block: Lot: PARCEL NUMBER: 963900023 Section: 13 Township: 26 N Range: 2V1 CONTRACTOR: OWNER/BUILDER PHONE: PROJECT DESCRIPTION: NSFR with covered deck and concrete pad for future hot tub SEP13-000116 TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW VALUATION 210,000.00 MAIN: 1,048 CODE EDITION: 2012 ADD'L: 624 HEAT TYPE: EEE OCCUPANCY: R-3 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: UNHEATED: #OF STORIES: 2 CONST TYPE: 5N OTHER: GARAGE: SHORELINE: CONST TYPE: SETBACK: DECK: 690 BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: 27047 Type Amount Paid By: Date: Receipt: BEDROOMS: BATHROOMS: Permit $1,797.00 SRE 03/31/15 154304 Exist: 0 Exist: 0 Plan Check $1,168.05 SRE 03/31/15 154304 Prop: 2 Prop: 2 State Building Code $4.50 SRE 03/31/15 154304 Total: 2 Total: 2 Potable Water Application $68.00 SRE 03/31/15 154304 Total: $3,037.55 Directions to Site: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. Request must be received by 3pm the day before the inspection is needed. Office Hours 9:00 am -4:30 pm MONDAY- THURSDAY HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE ATTATCHED • • Jefferson County Building Division Permit Number: BLD15-00103 Applicant: BUILDING PERMIT INSPECTION APPROVALS ApplicableCode: 2012 International Building Codes To schedule inspections, call (360)379-4455 no later than 3:00PM the day before the inspection is needed. Requests received after 3:00 PM will not be scheduled for the next day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks 5• //i c, Erosion Control F• oundation Footing -51///5— LrL_ F• ooting Drains � F• oundation Stem Wall 5 1/45— rL U• nderground Plumbing / ' Under Floor Framing 7/7//5-- S• traps /7//Straps (hold downs) Si Ext.Shear Wall Nailing (illis R• ough-in Plumbing F• raming B• locking Airseal Insulation:Walls Insulation: Floors Insulation:Ceiling Int. Shear Wall Nailing W• allboard Nailing G• as Line: Interior G• as Line: Exterior P• ropane Tank H• eat/Chimney Clearance A• ddress Posted Septic System Finaled sep13-116 not installed A final inspection will not be scheduled until the following are completed and signed off by the applicable Department: • Building Permit Conditions are met • Septic Permit Final/Complete for any building containing plumbing • Land Use Conditions met and signed off • Public Works Permit Final(where applicable) FINAL INSPECTION I FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • • CONDITIONS for Building Permit# :BLD15-00103 1.) See SPAAD MLA 13-00159 for Zoning and Critical Area approval. 2.) DWJ 3.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 4.) The Applicant shall comply with the Habitat Management Plan prepared by Westech Company dated December 2013 in its entirety. 5.) The site plan as submitted with the Building Permit application on March 31, 2015 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated April 5, 2015 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 6.) A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. \\tidemark\data\forms\F_BLD_Permit_BIdg.rpt 4/8/2015 • • Jefferson County DCD Building Division �ov cow Correction Notice PERMIT NUMBER Vic, DO/p3 OWNER /14,7-04 ,4Mr °sznive� JOB LOCATION 9C) 13cg. MILL Rn Inspection of this structure has found the following violations: / L.)-3/ L.G ITEC ADDe .I4/.) P61 Cz>uurr .514 10 11 CI 556M- f'oPAL, '6 rr NGT/¢i1rE5 LcJ,¢LL CALL FG/ RE- liusFECTl #J f J 0 4 u& ru L e D s -rb 136 p $E,-3 t' You are hereby notified additional work shall not be done upon these premises until the above violations are corrected, unless otherwise noted. When corrections have been made, call for inspection. Date / 13e)//c Inspect Building Division (360) 379-4450 Inspection Hotline (360) 379-4455 THIS NOTICE MUST BE KEPT WITH APPROVED PLANS ON SITE. , S $ TL1it authorized axenc/represenrurvt is the primary contact for all pojec: ratted pa:steins anti urxesputaietuxe. The County will mail/e-mail a yUearx anti information about rhe application to the authorized ,kern/reprcxant1adve and will copy(cc)the owner notal below The authorized agent/reprcacnrat'c is responsible For ctruunurnicanng the reformation to all panted invuly ti with dw 4ripiicadun. Jr is the renpc iisihiliry rnf the anrlinrh ctt ag nt/teprcunraarc aril owner to ensure their mailbox accepts County lona (ie. County entail is not blocked or dent ui "Junk mail". Ap Iicant/ProperOwner Information Property owners Name: ANN MATSUNAMI Address: 1660 LILIHA ST. #201 HONOLULU, HI 96817 Phone N: 808»595-6600 - E-mail Address: ann@padgroup,com Please contact thorized Agent/Representative with project info.(select only one), Property Owner Sirature: V‘fl/ly/ t%(1--r Date: 3 2? l-t."f Notre For projects with mumps oweert loath a separate shot with each,outwit)iaror'notion and itsrwttuea. Applicant Authorized Agent/Representative(ttacawPianowrierl Name: VERN PETERS Address: Phone e: 360-477.105a .._ _. .. E-mail Address: Professional: Is this an Authorized Agent/Representative for this project? NO YES Y Engineer .__ .._. ✓ _ Architect Surveyor Contractor Consultant Name: ZENOVIC &ASSOCIATES, INC. _ Address: 301,EAST 6TH STREET. SUITE#1 PQRTANGELES, '�ANGELES WA 98382 Phone a: 380-417-0501 E-mail Address. Professional: is this an Authorized Agent/Representative for this project? NO YES Engineer Architect Surveyor Contractor Consultant �� Name: Address: Phone if: _._... ._��., , Email Address: _ n Professional; _ _ is this an Authorized Agent/Representative for this project? NO YES Engineer Architect Surveyor Contractor Consultant Name: Address: Phone fk: E-mail Address: Protesslonal: Is this an Authorized i 0._ Agent/Representative for this project. NO YES � I Engineer Architect Surveyor Contractor Consultant Name: __ _ I Address: 1 Phone a: E-mail Address: Attach additional pages If necessary Builders Statement The signer of this statement certifies that they are the Owners of the parcel referenced herein,that they are not licensed contractors an that they will be assuming the responsibility of the General Contractor for the proposed project, Sifsriature , CGCG � CcL I'p i�Namo: <?�� �tj jlrt27f( </"lf Acte: //pS, / 7 1 • i Sally Ellis From: Sally Ellis Sent: Tuesday, April 07, 2015 8:14 AM To: 'Steve Zenovic' Subject: RE: Matsunami Dear Steve-Thank you for the below information, I will add this information to our database and issue the Building permit. Questions- Should I mail the approved building permit to the owner or to you? Or would someone like to come pick it up at our office? Also it looks like the New Single Family Residences permit is ready to be issued as well-but we also require the contractor information for that permit before we can issue the permit. Please advise how you would like me to proceed with this? Thank you Sally Ellis From: Steve Zenovic [mailto:steve@zenovic.net] Sent: Monday, April 06, 2015 2:04 PM To: Sally Ellis Subject: RE: Matsunami Sally- The owner has elected to act as General Contractor at this time to get the demolition permit issued and the mobile home removed. She wants to wait until the bids for the house are in before selecting a contractor for the house if she elects to do so. What do you need form us to move forward? Is her signature on the Builder's Statement sufficient. Thanks for your help. Steve From: Sally Ellis [mailto:SEllis@co.iefferson.wa.us] Sent: Friday, April 03, 2015 4:57 PM To: Steve Zenovic Subject: RE: Matsunami Dear Steve, BLD15-00104 the Demo Permit is ready for Matsunami project- However before I can issue the permit-you must list a contractor- I think we discussed this during our intake appointment. Once you have given us the Contractors information we can the issue the building permit. If you have any questions and or need more information please feel free to contact me. Thank you Sincerely 1 S I Sally L Ellis Jefferson County Community Development Permit Technician 621 Sheridan St., Port Townsend,WA 98368 Mon-Thurs 9am-4:30pm, closed from 12-1 Ph: 360-379-4452 Fax: 360-379-4451 sellis@@co.jefferson.wa.us http://www.co.jefferson.wa.us From:Steve Zenovic [mailto:steve@zenovic.net] Sent: Monday, March 30, 2015 4:30 PM To: Sally Ellis Subject: Matsunami Sally- I have the Demolition Permit application as well as the approved ORCAA permit for the Matsunami project. I'll bring those with the remaining permit documentation to tomorrow's meeting. Attached is the Supplemental Permit Application form. If you have time, can you provide plan review and Building Permit fees? If you don't, I'll just bring a blank check. Also, can I use the same check for the Demolition Permit as well? Steve Zenovic Consulting Principal Engineer Zenovic&Associates, Inc. 301 East 6th Street, Suite 1 Port Angeles, WA 98362 360-417-0501 2 • Up Front Parcel Reviews Parcel 963900023 Printed: March 31, 2015 ANN MATSUNAMI Site Address(es): 1650 LILIHA ST#201 190 BEE MILL RD BRINNON, WA 98320 HONOLULU, HI 96817-3169 Parcel Number: 963900023 S-T-R: 13-26N-2W Total Acreage 0 Legal Description JACKSON COVE PARK LOT 17 Land Use: 1101 Flood District: Fire District: 4 Planning Area: 11 Flood Map(FIRM)Panel No: School District 46 Zoning: COMP PLAN DESIGNATION: COMMUNITY PLAN: UGA: UGA Trans [ ] Plot plan states "property line" [ ] Assessor's Map(Property lines on submitted plot plan must match the property lines as identified on the Assessor's 1/4 map) [ ] Legal Access to Property YES NO [ ] Parcel Tags or Scanned Documents YES NO [ ] ESA's: Special Reports Nearby YES NO _ [ ] Designated Ag YES NO [ ] Shoreline Designation: YES NO [ ] Shoreline Slope Stability: YES NO Stream Type:YES NO (1 FWHCA: YES NO A N _ Wetlands: YES NO Rare Plants:YES NO ( j Seismic: YES NO 'Z D UV r Landslide: YES NO Flood: YES NO Erosion: YES NO Aquifer Recharge Area:YES NO SIPZ: none At Risk High Risk Coastal CMZ: none High Risk Moderate RiskDisconnected CMZ Stormwater site plan submitted: YesNo [ ] Forest Lands: YES NO Adjoining Forest Lands: Commercial/ Rural/ Inholding [ ] Mineral Lands: YES NO [ ] Agricultural Lands: YES NO [ ] Archaeology: YES NO [ ] No Shooting Zone: YES NO ii �l [ ] Stormwater: New Impervious Surface Land Disturbing Activity l l Ceil) ESA's Stormwater Req's:Min Req#2 Min Req#1 thru#5 Min Req#1 thru#1i6 ngineering [ ] Notice Provisions/Disclosure:Airport YES NO MRL YES NO Forest Lands YEs NO [ ] Landscaping Required: Yes No [ ] Parking Spaces Required NO 2 Other I- 1 Building Height: 35' UBC Standard [ ] Impervious Surface cover percentage: 3(0 • ( C(_C -RE( & Resource LandsPublic: I Rural Residential: 25% Rural In al: Per UDC Se 6.7 Rural Commercial: 60% Area of Building Coverage: 60%in Rural Industrial Lands only [ I Total Building (s) Size: RVC: 20,000 SF CC: 5,000 SF NC: 7,500 SF GC: 10,000 SF All others:subject to septic&water constraints/None specified [ ] Setbacks: Front: Left Side: Right Side: Rear: Shoreline Setback: LSHA Setback: [ ] Road Classification: Road Approach: EXISTING NOT REQ'D RAP [ ] SEPA Required: YES EXEMPT [ ] Flood Certificate: [ ] Existing Case(s)&Condition(s): Violations: Yes No [ ] Recorded Date of Subdivision: AFN Over 5yrs=UDC Plat Conditions: <5yrs=Plat Conditions on plat or Old Ordinance [ ] Lots/Require Declaration of Restrictive Covenant YES NO, submitted: YES NO [ ] UGA No Protest Agreement YES NO, submitted: YES NO [ ] Site Visit conducted YES NO [ ] Require Final Zoning Approval YES NO [ ] ADMIN: Setbacks entered in Permit Plan case N/A YES New Parcel Tags entered in Permit Plan N/A YES Special Reports Scanned N/A YES Title Notes Updated Parcel tags found for parcel 963900023 1.) WSRC Coaching - 2013-03-12 Setbacks, NativeVeg, Stormwater, Footprint 05/09/2013 SMP Parcel tags found for parcel 963900023 2.) WSRC Coaching - 2013-03-12 Setbacks, Stormwater, Footprint 05/09/2013 CAO Parcel tags found for parcel 963900023 3.) WSRC Coaching - LID 2013-03-12 Setbacks, NativeVeg, Stormwater, 05/09/2013 Parcel tags found for parcel 963900023 4.) WSRC Coaching - 2013 -04-04 sg 06/13/2013 Other Parcel tags found for parcel 963900023 5.) WSRC Coaching - 2011-11-17, CZ 08/29/2013 Other Parcel tags found for parcel 963900023 6.) WSRC Coaching - 2011-11-17, CZ 08/29/2013 CAO Parcel tags found for parcel 963900023 7.) WSRC Coaching - 2011-01-26, CZ 08/29/2013 Other Parcel tags found for parcel 963900023 8.) WSRC Coaching - 2011-01-26, CZ 08/29/2013 CAO Parcel tags found for parcel 963900023 9.) WSRC Coaching - 2010-06-10, CZ 09/03/2013 SMP Parcel tags found for parcel 963900023 10.) WSRC Coaching - 2010-06-10, CZ 09/03/2013 CAO Parcel tags found for parcel 963900023 11.) Habitat Management HMP &Addendum submitted for MLA13-00159 SPAAD 08/28/2014 Plan \\tidemark\data\forms\R_Parcel_CRMLA.rpt 3/31/2015 Page 2 of 3 Cases Associated with APN 96390 Siew Cases Name iype Status Planner BLD15-00005 MATSUNAMI A Application Received: 1/7/2015 Permit Issued/Case closed: 1/7/2015 Case Finaled: 1/7/2015 RE-ROOFING SAME FOR SAME BLD15-00103 MATSUNAMI P Application Received: 3/31/2015 Permit Issued/Case closed: Case Finaled: M LA13-00159 ZON13-00054 MLA13-00159 MATSUNAMI TRSTE I A Colleen Zmolek Application Received: 12/16/2013 Permit Issued/Case closed: 8/26/2014 Case Finaled: Site Plan Approval Advance Determination (SPAAD) OTH13-00005 KINNAN CLS Application Received: 3/14/2013 Permit Issued/Case closed: Case Finaled: 7/18/2013 SEP73-00116 MATSUNAMI TRSTE I A Joel Peterson Application Received: 10/8/2013 Permit Issued/Case closed: 12/4/2013 Case Finaled: SEP82-164 not valid and tiled here PRJ10-00289 SKELTON F Application Received: 9/8/2010 Permit Issued/Case closed: Case Finaled: lot 17 SEP82-00164 SKELTON C Application Received: 7/23/1982 Permit Issued/Case closed: 7/26/1982 Case Finaled: 7/26/1982 Filed w/SEP13-116 SOM82-00164 SKELTON FIN Application Received: 7/26/1982 Permit Issued/Case closed: Case Finaled: \\tidemark\data\forms\R_Parcel_CRMLA.rpt 3/31/2015 Page 3 of 3 . • JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT UNIFIED DEVELOPMENT CODE TYPE I LAND USE PERMIT APPLICANT: ANN N MATSUNAMI TRSTE A N MATSUNAMI REV LIV TRS 1650 LILIHA ST#201 HONOLULU HI 96817-3169 DATE ISSUED:August 26, 2014 DATE EXPIRES:August 26,2019 MLA NUMBER: MLA13-00159 PROJECT PLANNER: Colleen Zmolek PROJECT DESCRIPTION: Site Plan Approval Advance Determination (SPAAD) PROJECT LOCATION: Parcel Number: 963 900 023, Site Address: 190 Bee Mill Rd Brinnon, S-T-R: 13-26N-2W CONDITIONS: 1.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 2.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk(or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage)yards. In no case, shall any such junk motor vehicles be stored in a critical area. 3.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 4.) Duration of Approval- Several of the included findings shall become conditions upon the submittal of a building and septic permit. The duration of approval of the Site Plan shall be effective for five (5) years from the date of original approval by the Administrator. If a building permit has not been issued within the five (5) year period, the Site Plan Approval Advance Determination (SPAAD) cannot be revived or extended except by new application that must meet all the existing criteria and conditions listed in this Section. Knowledge of the expiration date shall be the responsibility of the applicant. The county will not provide notification prior to expiration. Limitations of Approval-Approval of the site plan shall not guarantee the performance of specific site features or improvements (e.g. wells, septic systems, stormwater drainage facilities, etc.) and shall not be immune from changes in state or federal law which are enacted or have an effective date after the date of the Site Plan Approval Advance Determination (SPAAD)and which may affect the performance and implementation of the site plan and associated use or activity. Any subsequent land division or boundary line adjustment of a parcel or lot which has received site plan approval advance determination under this Section 8.7 shall void such site plan approval and require a new site plan approval advance determination application. Approval of a site plan under this section does not constitute authority to comence any development or building activity until such time as final authorizing permits are issued (e.g., septic, wells, stormwater management, or building permit, etc.). Modification to an approved site plan may be required by the applicant and approved by theAdministrator subject to the provisions for Type I decisions. (Please request a copy of Section 8.7 of the UDC for criteria pertaining to modifications). 5.) The applicant shall apply for and obtain a building permit prior to beginning any work approved under this SPAAD. 6.) The applicant shall apply for a shoreline exemption at the time of building application. 7.) The applicant shall submit a stormwater plan that complies with the Ecology Stormwater Management Manual for Western Washington at the time of building application. If a perscriptive method cannot be used, the applicant shall submit an engineered stormwater plan. 8.) The applicant shall implement the approved HMP addendum prepared by Westech Company submitted July 18., 2014. The Original HMP was prepared by Westech Company and is dated January 13, 2014.. 9.) The owner shall contact DCD once the mitigation has been completed. NO FINAL BUILDING CERTIFICATE OF OCCUPANCY SHALL BE ISSUED UNTIL DCD HAS REVIEWED AND APPROVED THE MITIGATION AREA.. 10.) This approval is for a SPAAD only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 11.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 12.) Minimum building setback from Bee Mill Road right-of-way shall be 20 feet. Minimum side yard building setbacks shall be 5 feet. Shoreline setback for the deck shall be 26 feet 9 to the North and 30 feet 2 inches to the south measured from the OHWM. Shoreline setback for the single family residence shall be 37 feet 3 inches to the North and 40 feet 6 inches to the South measured from OHWM. 13.) VOLUNTARY MEASURES OF COASTAL&AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three(3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 14.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. FINDINGS: 1.) The Administrator finds that this application complies with applicable provisions of the Unified Development Code, all other applicable ordinances and regulations,and is consistent with the Jefferson County Comprehensive Plan and Land Use map. 2.) The application was reviewed by the Jefferson County Department of Community Development staff on 8-13-2014 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review, the following ESAs were confirmed to be present on the subject property: shoreline designation; suburban, fish and wildlife habitat conservation area, SIPZ; coastal, fish bearing stream, wetlands, Seismic hazardous area, FEMA flood hazardous area, susceptible aquifer recharge area, . 3.) The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section 3.402.5, which exempts the"construction by an owner, lessee, or contract purchaser of a single-family residence[in shoreline jurisdiction)for the owner's or owner's family's use..."from the substantial development permit(SDP) requirements under certain provisions. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements. 4.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 5.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 6.) The site plan as submitted with the SPAAD application on December 13, 2013 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated Auguse 18, 2013 shall be resubmitted for review and approval by Jefferson County Department of Community Development. • • 7.) This approval is for a SPAAD only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 8.) The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998. 9.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 10.) Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drillec obtain freshwater suitable forpublic consumption without significant additional on upland areas cannot 9 PP interface is primarilya function of treatment and cost. Maintaining a stable balance in the saltwater/freshwater the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals(primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer. 11.) The parcel is located within a coastal SIPZ(seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Polic} (Resolution 61-02, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet. 12.) NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58. Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code. If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once. The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that"takes" listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. All areas in Jefferson County are included as"critical habitat" for a listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following: -All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters - Remove minimal vegetation for site development, especially large trees -Allow trees that have fallen into surface waters to remain there - Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches The Federal Bald and Golden Eagle Protection Act requires landowners within 660 feet (118th of a mile) of an eagle nest to consult with the US Fish and Wildlife Service. This Eagle Act prohibits anyone from"taking" bald eagles. This federal law defines the term "take" and describes the possible legal consequences when a"take" occurs. Among other actions, "take" includes a disturbance of bald eagles or their habitat. Under federal law a permit may still be required for activities that impact bald eagles or their habitat. Contact the US Fish and Wildlife Service (http://www.fws.gov/pacificleagle/) to learn more about how this law affects your project. Any individual, group, or agency can bring suit for a listed species"taking", even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle, or the U.S. Fish and Wildlife Service. • APPEALS: Pursuant to RCW 36.70C, the applicant or any aggrieved party may appeal this final decision to Jefferson County Superior Court within twenty-one(21)calendar days of the date of issuance of this land use decision. For more information related to judical appeals see JCC 18.40.340. U minis rator MLA13-00159 \\tidemark\data\forms\F_MLT_IssuePermit U.rpt 8/26/2014 Page 4 of 4 • JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT UNIFIED DEVELOPMENT CODE TYPE I LAND USE PERMIT APPLICANT: ANN N MATSUNAMI TRSTE A N MATSUNAMI REV LIV TRS 1650 LILIHA ST#201 HONOLULU HI 96817-3169 DATE ISSUED: August 26, 2014 �L r� DATE EXPIRES:August 26, 2019 MBAR 3 1 2015 I MLA NUMBER: MLA13-00159 Li PROJECT PLANNER:Colleen Zmolek JEFrERSOf,COUNTY OF COMMUNITY DEVEI OPMENT PROJECT DESCRIPTION: Site Plan Approval Advance Determination (SPAAD) PROJECT LOCATION: Parcel Number: 963 900 023, Site Address: 190 Bee Mill Rd Brinnon, S-T-R: 13-26N-2W CONDITIONS: shall beprovided for the single familyresidence. ' 'mum of two (2) on-site parkingspaces 9 1.) A minimum p 2.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk(or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage)yards. In no case, shall any such junk motor vehicles be stored in a critical area. 3.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 4.) Duration of Approval-Several of the included findings shall become conditions upon the submittal of a building and septic permit. The duration of approval of the Site Plan shall be effective for five (5)years from the date of original approval by the Administrator. If a building permit has not been issued within the five (5)year period, the Site Plan Approval Advance Determination (SPAAD) cannot be revived or extended except by new application that must meet all the existing criteria and conditions listed in this Section. Knowledge of the expiration date shall be the responsibility of the applicant. The county will not provide notification prior to expiration. Limitations of Approval-Approval of the site plan shall not guarantee the performance of specific site features or improvements (e.g. wells, septic systems, stormwater drainage facilities, etc.) and shall not be immune from changes in state or federal law which are enacted or have an effective date after the date of the Site Plan Approval Advance Determination (SPAAD)and which may affect the performance and implementation of the site plan and associated use or activity. Any subsequent land division or boundary line adjustment of a parcel or lot which has received site plan approval advance determination under this Section 8.7 shall void such site plan approval and require a new site plan approval advance determination application. Approval of a site plan under this section does not constitute authority to comence any development Or building activity until such time as final authorizing permits are issued (e.g., septic, wells, stormwater management, or building permit, etc.). Modification to an approved site plan may be required by the applicant and approved by theAdministrator subject to the provisions for Type I decisions. (Please request a copy of Section 8.7 of the UDC for criteria pertaining to modifications). 5.) The applicant shall apply for and obtain a building permit prior to beginning any work approved under this SPAAD. 6.) The applicant shall apply for a shoreline exemption at the time of building application. 7.) The applicant shall submit a stormwater plan that complies with the Ecology Stormwater Management Manual for Western Washington at the time of building application. If a perscriptive method cannot be used, the • • applicant shall submit an engineered stormwater plan. 8.) The applicant shall implement the approved HMP addendum prepared by Westech Company submitted July 18., 2014. The Original HMP was prepared by Westech Company and is dated January 13, 2014.. 9.) The owner shall contact DCD once the mitigation has been completed. NO FINAL BUILDING CERTIFICATE OF OCCUPANCY SHALL BE ISSUED UNTIL DCD HAS REVIEWED AND APPROVED THE MITIGATION AREA.. 10.) This approval is for a SPAAD only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 11.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 12.) Minimum building setback from Bee Mill Road right-of-way shall be 20 feet. Minimum side yard building setbacks shall be 5 feet. Shoreline setback for the deck shall be 26 feet 9 to the North and 30 feet 2 inches to the south measured from the OHWM. Shoreline setback for the single family residence shall be 37 feet 3 inches to the North and 40 feet 6 inches to the South measured from OHWM. 13.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three(3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 14.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. FINDINGS: 1.) The Administrator finds that this application complies with applicable provisions of the Unified Development Code, all other applicable ordinances and regulations, and is consistent with the Jefferson County Comprehensive Plan and Land Use map. 2.) The application was reviewed by the Jefferson County Department of Community Development staff on 8-13-2014 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review, the following ESAs were confirmed to be present on the subject property: shoreline designation; suburban, fish and wildlife habitat conservation area, SIPZ; coastal, fish bearing stream, wetlands, Seismic hazardous area, FEMA flood hazardous area, susceptible aquifer recharge area, . 3.) The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section 3.402.5, which exempts the "construction by an owner, lessee, or contract purchaser of a single-family residence[in shoreline jurisdiction]for the owner's or owner's family's use..."from the substantial development permit(SDP) requirements under certain provisions. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements. • 4.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 5.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 6.) The site plan as submitted with the SPAAD application on December 13, 2013 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated Auguse 18, 2013 shall be resubmitted for review and approval by Jefferson County Department of Community Development. • • 7.) This approval is for a SPAAD only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 8.) The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998. 9.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 10.) Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drillec on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals(primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximityto marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer. 11.) The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Polic} (Resolution 61-02, effective September 23, 2002)that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet. 12.) NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58. Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code. If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once. The Federal Endangered Species Act rules.to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that"takes" listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. All areas in Jefferson County are included as"critical habitat"for a listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following: -All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters - Remove minimal vegetation for site development, especially large trees -Allow trees that have fallen into surface waters to remain there - Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches The Federal Bald and Golden Eagle Protection Act requires landowners within 660 feet (1/8th of a mile) of an eagle nest to consult with the US Fish and Wildlife Service. This Eagle Act prohibits anyone from "taking" bald eagles. This federal law defines the term "take" and describes the possible legal consequences when a "take" occurs. Among other actions, "take" includes a disturbance of bald eagles or their habitat. Under federal law a permit may still be required for activities that impact bald eagles or their habitat. Contact the US Fish and Wildlife Service (http://www.fws.gov/pacific/eagle/) to learn more about how this law affects your project. Any individual, group, or agency can bring suit for a listed species"taking", even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle, or the U.S. Fish and Wildlife Service. • • APPEALS: Pursuant to RCW 36.70C, the applicant or any aggrieved party may appeal this final decision to Jefferson County Superior Court within twenty-one(21)calendar days of the date of issuance of this land use decision. For more information related to judical appeals see JCC 18.40.340. U mini rator MLA13-00159 \ltidemarktdata\forms\F_MLT_IssuePermit_U.rpt 8/26/2014 Page 4 of 4